CN213867851U - Take off-wall type utility tunnel foundation ditch of vibrator to backfill auxiliary device - Google Patents

Take off-wall type utility tunnel foundation ditch of vibrator to backfill auxiliary device Download PDF

Info

Publication number
CN213867851U
CN213867851U CN202022867209.1U CN202022867209U CN213867851U CN 213867851 U CN213867851 U CN 213867851U CN 202022867209 U CN202022867209 U CN 202022867209U CN 213867851 U CN213867851 U CN 213867851U
Authority
CN
China
Prior art keywords
vibrator
auxiliary device
wall type
baffle
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022867209.1U
Other languages
Chinese (zh)
Inventor
王宏畅
燕立柱
黄赛民
陈启民
杨大港
张锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Forestry University
Original Assignee
Nanjing Forestry University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Forestry University filed Critical Nanjing Forestry University
Priority to CN202022867209.1U priority Critical patent/CN213867851U/en
Application granted granted Critical
Publication of CN213867851U publication Critical patent/CN213867851U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model belongs to municipal construction field relates to utility tunnel construction, and concretely relates to take vibrator from wall type utility tunnel foundation ditch backfill auxiliary device mainly provides the additional action for from wall type utility tunnel's narrow foundation ditch backfill. The auxiliary device comprises a front baffle (1) for restraining the soil body from sliding down to the foundation pit, a high-frequency vibrator (2) attached to the front baffle provides power for the soil body to rapidly slide down to the foundation pit, the upper portion of a rear supporting plate (3) is connected with the front baffle (1) in a welding mode, the lower portion of the rear supporting plate is connected with the front baffle (1) through a connecting plate (4), and the front baffle is fixed on the porch body external corner to be backfilled through an internal corner clamping groove (5). The utility model discloses a preceding baffle (1) plays the water conservancy diversion effect to the soil body landing, avoids the soil body to destroy waterproof layer and extruded sheet on the external wall of shelter, makes the soil body landing speed through vibrator (2) simultaneously and accelerates, has improved the foundation ditch efficiency of backfilling greatly, has wide application prospect.

Description

Take off-wall type utility tunnel foundation ditch of vibrator to backfill auxiliary device
Technical Field
The utility model belongs to municipal construction field relates to utility tunnel construction, concretely relates to take vibrator from wall type utility tunnel foundation ditch backfill auxiliary device.
Background
Along with the trend of people to good life in recent years, the demand for expansion of underground pipelines is urgent. Traditional direct-burried mode of laying is difficult to satisfy the demand, and the pipeline that exceeds does not plan, and the pipeline is complicated in the crossing department's pipeline complicacy simultaneously to lead to during the construction to cut off water and cut off the power supply etc. and bring very big puzzlement for life production. The urban infrastructure is an important carrier for guaranteeing urban space expansion and improving urban functions, and the construction of the urban underground comprehensive pipe gallery is an important component in the infrastructure.
Because city utility tunnel all buries underground in having built urban road below, in order to avoid causing urban traffic jam and large tracts of land to destroy urban road, when the construction of city utility tunnel underground, the excavation supporting generally adopts the stake support of SMW worker method or the support of Larsen steel sheet pile. The gallery body in the support mode of the piles in the SMW method is constructed in a wall-mounted mode, the support section steel can be directly pulled out after the construction of the pipe gallery main body is completed, and then soil on the upper portion of the gallery body is backfilled; and the gallery body is constructed from the wall when the Larsen steel sheet pile supporting form is adopted, after the construction of the main body of the pipe gallery is completed, a coiled material waterproof layer is pasted outside the main body, then an extruded sheet is pasted to protect the waterproof layer, when deep and narrow foundation pits on two sides are backfilled, the traditional operation generally adopts a back-shoveling type excavator to directly grab soil for backfilling, because the soil body has downward impact force and friction force with the extruded sheet, the extruded sheet is extremely easy to damage, the waterproof layer is further damaged, the water leakage of the pipe gallery is caused, the repair of the waterproof layer outside the gallery body is extremely difficult, and the irreversible quality problem is caused. Because the gallery body both sides foundation ditch is narrower, the soil body descends slowly and blocks near gallery body roof easily when backfilling, and not only the efficiency of construction is low, and the degree of compaction of backfill soil in the deep narrow foundation ditch is hardly satisfied the design requirement moreover.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a take vibrator to backfill auxiliary device from wall type utility tunnel foundation ditch to solve the inconvenient problem of backfilling of utility tunnel soil body among the above-mentioned background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model relates to a take vibrator from wall type utility tunnel foundation ditch backfill auxiliary device, including preceding baffle, preceding baffle is positive glossy steel sheet, and the back is equipped with a high frequency vibrator, the below of preceding baffle is equipped with a reentrant corner draw-in groove, preceding baffle upper portion and back backup pad welded connection, back backup pad with preceding baffle middle part is equipped with a connecting plate, the connecting plate both ends with preceding baffle with back backup pad welded connection constitutes triangle-shaped stable structure.
Further, the high-frequency vibrator type is the attached flat plate vibrator, the high-frequency vibrator pass through the bolt with the front baffle is connected, the high-frequency vibrator passes through the on-the-spot tertiary electronic box power supply of building site.
Furthermore, the rear supporting plate is made of a steel plate, the upper portion and the middle portion of the rear supporting plate are stably connected with the front baffle, and the bottom surface of the rear supporting plate and the upper portion of the internal corner clamping groove are located on the same horizontal plane.
Furthermore, the connecting plate is a selected steel plate and can form a triangular stable structure together with the front baffle and the rear supporting plate.
Further, reentrant corner draw-in groove can coincide completely with corridor body external corner, and can provide stable holding power for preceding baffle and whole device.
Compared with the prior art, the beneficial effects of the utility model are that:
take wall type utility tunnel foundation ditch backfill auxiliary device of vibrator, its modern design, simple structure, the preparation is convenient, excellent in use effect. Can avoid the backfill soil to directly strike the destruction that brings to the outside waterproof layer of corridor and extruded sheet effectively to the quality problem of piping lane percolating water has been avoided. Meanwhile, the high-frequency vibrator can enable the soil body to fall more dispersedly and more quickly, so that the self gravity of the soil body is utilized to reach a compact state, the efficiency of the off-wall type underground comprehensive pipe gallery is greatly improved when the foundation pit is backfilled, the engineering quality is guaranteed, the construction cost is saved, and the off-wall type underground comprehensive pipe gallery has a wide application prospect.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention.
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a left side view of the present invention;
fig. 3 is that the utility model discloses use from wall type utility tunnel backfill part schematic diagram.
In the figure: baffle, 2 high frequency vibration wares, 3 back backup pads, 4 connecting plates, 5 reentrant corner draw-in grooves, 6 corridor body external corner before 1.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a take vibrator to backfill auxiliary device from wall type utility tunnel foundation ditch, includes preceding baffle 1, preceding baffle 1 is the smooth steel sheet in front, and the back is equipped with a high frequency vibrator 2, the below of preceding baffle is equipped with a reentrant corner draw-in groove 3, preceding baffle 1 upper portion and back backup pad 3 welded connection, back backup pad 3 and preceding baffle 1 middle part are equipped with a connecting plate 4, a triangle-shaped stable structure is constituteed with preceding baffle 1 and back backup pad 3 welded connection in 4 both ends of connecting plate.
In this embodiment, the high-frequency vibrator 2 is an attached flat plate vibrator, the high-frequency vibrator 2 is connected with the front baffle 1 through a bolt, and the high-frequency vibrator 2 is powered by a three-level electric box on a construction site.
In this embodiment, back backup pad material is the steel sheet, and its upper portion and middle part are stably connected with preceding baffle 1, and the bottom surface of back backup pad 3 and the upper portion of reentrant corner draw-in groove 5 are on same horizontal plane.
In this embodiment, the connection plate 4 is a selected steel plate, and can form a triangular stable structure with the front baffle 1 and the rear support plate 3.
In this embodiment, the internal corner clamping groove 5 can be completely matched with the external corner 6 of the gallery body, and can provide stable supporting force for the front baffle and the whole device.
During the application, will a take vibrator from wall type utility tunnel foundation ditch backfill auxiliary device place on the piping lane roof that needs backfill, reentrant corner draw-in groove on the preceding baffle is fixed with the complete card of the corridor body external corner, opens high frequency vibrator, then snatch the soil body with the backhoe excavator and place in the front between baffle 1 and the foundation ditch fender post, backfill soil along preceding baffle 1 quick landing to foundation ditch bottom, and avoided the impact that causes the external wall of corridor. Not only ensures the engineering quality, but also saves the construction cost, and has wide application prospect.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (5)

1. The utility model provides a take auxiliary device is backfilled to off-wall type utility tunnel foundation ditch of vibrator, includes preceding baffle (1), its characterized in that, the front of preceding baffle (1) is smooth, and the back is equipped with a high frequency vibrator (2), the below of preceding baffle (1) is equipped with a reentrant corner draw-in groove (5), preceding baffle (1) upper portion and back backup pad (3) welded connection, back backup pad (3) with preceding baffle (1) middle part is equipped with a connecting plate (4), connecting plate (4) both ends with preceding baffle (1) with back backup pad (3) welded connection constitutes triangle-shaped stable structure.
2. The backfill auxiliary device for the foundation pit of the off-wall type underground comprehensive pipe gallery with the vibrator according to claim 1, characterized in that the high-frequency vibrator (2) is an attached flat vibrator, the lower part of the high-frequency vibrator (2) is connected with the front baffle (1) through a bolt, and the high-frequency vibrator (2) is powered by a three-level electric box on a construction site.
3. The off-wall type underground comprehensive pipe gallery foundation pit backfilling auxiliary device with the vibrator according to claim 1, wherein the upper part and the middle part of the rear supporting plate (3) are stably connected with the front baffle (1), and the bottom surface of the rear supporting plate (3) and the upper part of the internal corner clamping groove (5) are on the same horizontal plane.
4. The backfill auxiliary device for the off-wall type underground comprehensive pipe gallery foundation pit with the vibrator according to claim 1, characterized in that the connecting plate (4) is a chosen steel plate, and the front baffle plate (1) and the rear support plate (3) form a triangular stable structure.
5. The auxiliary device is backfilled to take off-the-wall utility tunnel foundation ditch of vibrator of claim 1, characterized in that, reentrant corner draw-in groove (5) can coincide completely with the corridor body external corner, can provide stable holding power for preceding baffle (1).
CN202022867209.1U 2020-12-03 2020-12-03 Take off-wall type utility tunnel foundation ditch of vibrator to backfill auxiliary device Expired - Fee Related CN213867851U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022867209.1U CN213867851U (en) 2020-12-03 2020-12-03 Take off-wall type utility tunnel foundation ditch of vibrator to backfill auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022867209.1U CN213867851U (en) 2020-12-03 2020-12-03 Take off-wall type utility tunnel foundation ditch of vibrator to backfill auxiliary device

Publications (1)

Publication Number Publication Date
CN213867851U true CN213867851U (en) 2021-08-03

Family

ID=77041160

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022867209.1U Expired - Fee Related CN213867851U (en) 2020-12-03 2020-12-03 Take off-wall type utility tunnel foundation ditch of vibrator to backfill auxiliary device

Country Status (1)

Country Link
CN (1) CN213867851U (en)

Similar Documents

Publication Publication Date Title
CN2916024Y (en) Anti-deformation high-voltage line tower in subsidence area
CN201250408Y (en) Recovery type steel structure foundation pit exterior-protected device
CN201459756U (en) Hanging-type construction ceiling coil vertical shaft
CN213867851U (en) Take off-wall type utility tunnel foundation ditch of vibrator to backfill auxiliary device
CN101824825A (en) Deep foundation pit open cutting construction method
CN212428824U (en) Steel structure supporting device of full-recovery assembly type rectangular pipe-jacking working well
CN202644543U (en) Combined recyclable foundation pit supporting inner supporting upright column
CN219992345U (en) Gabion molding construction device for water conservancy bank slope protection engineering
CN202610677U (en) Auxiliary tool for soft soil earthwork construction
CN104047273B (en) Power station dissipation and scouring wall and construction method thereof
CN215715515U (en) Municipal pipe network construction supporting integrated structure under unfavorable geological conditions
CN206768831U (en) Support, anchor cable post-tensioning HU type building enclosures before a kind of steel pipe
CN214832370U (en) Interim bank protection device is used in construction of environmental hydraulic engineering
CN212077954U (en) Portable assembled deep basal pit steel sheet case supporting construction that can have enough to meet need
CN212612506U (en) Quick strutting arrangement of foundation ditch
CN211312487U (en) Steel pipe and steel plate combined sheet pile enclosure structure
CN210766887U (en) Face combination underground groove type structure forever
CN209179783U (en) Loess tunnel inverted arch constructing structure based on mobile trestle
CN202509521U (en) Roadbed side slope retaining protection structure
CN203603162U (en) Construction elevator load basic system based on foundation pit edge
CN208455615U (en) A kind of prefabricated guide groove structure of concrete cut
CN207143845U (en) One kind dismounts easily check dam unit and check dam
CN219137711U (en) Back-attached corrugated steel plate groove supporting structure
CN201407050Y (en) Antifriction baffle plate support exchange device applied in shallow underground construction
CN212248597U (en) Concrete water retaining device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210803