CN214832370U - Interim bank protection device is used in construction of environmental hydraulic engineering - Google Patents
Interim bank protection device is used in construction of environmental hydraulic engineering Download PDFInfo
- Publication number
- CN214832370U CN214832370U CN202120669831.3U CN202120669831U CN214832370U CN 214832370 U CN214832370 U CN 214832370U CN 202120669831 U CN202120669831 U CN 202120669831U CN 214832370 U CN214832370 U CN 214832370U
- Authority
- CN
- China
- Prior art keywords
- base plate
- combination
- top base
- backplate
- hydraulic engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
The utility model discloses an environmental hydraulic engineering construction is with interim bank protection device, including the top base plate, the front end of top base plate is provided with the combination backplate, be provided with the main axle that links between top base plate and the combination backplate, the one end surface of combination backplate is provided with the draw-in groove. An environmental hydraulic engineering construction is with interim slope protection device, be equipped with top base plate, combination backplate, supplementary limit protects etc. can be fixed in domatic top position with top base plate when using, then the appropriate amount of combination backplate is assembled with the bolt to rethread draw-in groove, because the owner even axle all is horizontal extending structure with the bolt, so make the structure after the combination can laminate domaticly better, reinforce through supplementary limit protection simultaneously again, just so make whole slope protection structure's stability higher, bring better use prospect.
Description
Technical Field
The utility model relates to a hydraulic engineering field especially relates to an environmental hydraulic engineering construction is with interim bank protection device.
Background
The water conservancy project is a project built for controlling and allocating surface water and underground water in the nature to achieve the purposes of removing harm and benefiting, is also called as water project, water is a valuable resource essential for human production and life, but the naturally existing state of the water does not completely meet the needs of human beings; the temporary slope protection device for the construction of the existing environmental hydraulic engineering has certain disadvantages when in use, because the temporary slope protection device is influenced by environment and conditions in the construction process, large-area slope protection cannot be poured by cement on slope surfaces, but under the condition of taking measures on slope surfaces, soil loss is serious easily caused, large landslide hidden danger exists, certain adverse effect is brought to the use process of people, and therefore the temporary slope protection device for the construction of the environmental hydraulic engineering is provided.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides an environmental hydraulic engineering construction is with interim bank protection device can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an environmental hydraulic engineering construction is with interim bank protection device, includes the top base plate, the front end of top base plate is provided with the combination backplate, be provided with the main axle that links between top base plate and the combination backplate, the one end surface of combination backplate is provided with the draw-in groove, the middle part of draw-in groove is provided with the gim peg, the both sides surface of combination backplate all is provided with supplementary limit and protects.
Preferably, the fixed orifices have been seted up to the surface of top base plate, and the fixed orifices is located same straight line, the combination backplate is through main even axle and top base plate swing joint, the surface of combination backplate is provided with the net that the equidistance distributes.
Preferably, the number of the combined guard plates is a plurality of groups, the combined guard plates are connected with the clamping bolts through clamping grooves, and the clamping grooves are welded on the outer surfaces of the combined guard plates.
Preferably, a mandrel is arranged between the auxiliary edge protector and the combined guard plate, and the auxiliary edge protector is movably connected with the combined guard plate through the mandrel.
Compared with the prior art, the above technical scheme of the utility model following profitable technological effect has:
this an interim slope protection device is used in construction of environmental hydraulic engineering, top base plate through setting up, the combination backplate, supplementary limit is protected etc, can be fixed in domatic top position with top base plate when using, then the appropriate amount of combination backplate is assembled with the bolt to rethread draw-in groove, because the owner links the axle and all is horizontal extending structure with the bolt, so make the structure after the combination can laminate domaticly better, it consolidates to protect through supplementary limit again simultaneously, just so make whole slope protection structure's stability higher, interim slope protection device is simple structure is used in the construction of whole environmental hydraulic engineering, high durability and convenient operation, the effect of using is better for traditional mode.
Drawings
Fig. 1 is the utility model provides an environmental hydraulic engineering construction is with interim bank protection device's schematic structure.
Fig. 2 is the utility model provides an environmental hydraulic engineering construction is with interim bank protection device combination backplate 2's schematic structure.
Reference numerals: 1. a top substrate; 2. combining the guard plates; 3. a main connecting shaft; 4. auxiliary edge protection; 5. a card slot; 6. and (6) clamping and bolting.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in detail with reference to the accompanying drawings. It should be understood that the description is intended to be illustrative only and is not intended to limit the scope of the present invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
As shown in fig. 1-2, an environmental hydraulic engineering construction is with interim slope protection device, includes top base plate 1, and the front end of top base plate 1 is provided with combination backplate 2, is provided with main even axle 3 between top base plate 1 and the combination backplate 2, and the one end surface of combination backplate 2 is provided with draw-in groove 5, and the middle part of draw-in groove 5 is provided with the bolt 6, and the both sides surface of combination backplate 2 all is provided with supplementary limit and protects 4.
Furthermore, the outer surface of the top base plate 1 is provided with fixing holes, the fixing holes are positioned on the same straight line, the combined guard plate 2 is movably connected with the top base plate 1 through a main connecting shaft 3, and the outer surface of the combined guard plate 2 is provided with grids distributed at equal intervals.
Further, the quantity of combination backplate 2 is a plurality of groups, and is connected with the bolt 6 through draw-in groove 5 between two sets of combination backplate 2, and draw-in groove 5 welds in the surface of combination backplate 2.
Further, a mandrel is arranged between the auxiliary edge protector 4 and the combined protection plate 2, and the auxiliary edge protector 4 is movably connected with the combined protection plate 2 through the mandrel.
What need to explain, the utility model relates to an interim slope protection device is used in environmental hydraulic engineering construction, be fixed in domatic top position through the fixed orifices on surface with top base plate 1 when using, then assemble right amount combination backplate 2 through draw-in groove 5 and bolt 6 again, only need with bolt 6 from one side twist of draw-in groove 5 can, because the owner links axle 3 and bolt 6 all is horizontal extending structure, so make the structure after the combination can laminate domaticly better, protect 4 nail income piles body through supplementary limit simultaneously again and consolidate, just so make whole slope protection structure's stability higher, and to the reinforcement of demolising in later stage, it is also more convenient, whole easy operation is swift, and is comparatively practical.
It is to be understood that the above-described embodiments of the present invention are merely illustrative of or explaining the principles of the invention and are not to be construed as limiting the invention. Therefore, any modification, equivalent replacement, improvement and the like made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. Further, it is intended that the appended claims cover all such variations and modifications as fall within the scope and boundaries of the appended claims or the equivalents of such scope and boundaries.
Claims (4)
1. The utility model provides an environmental hydraulic engineering construction is with interim bank protection device, includes top base plate (1), its characterized in that: the front end of top base plate (1) is provided with combination backplate (2), be provided with main even axle (3) between top base plate (1) and combination backplate (2), the one end surface of combination backplate (2) is provided with draw-in groove (5), the middle part of draw-in groove (5) is provided with the gim peg (6), the both sides surface of combination backplate (2) all is provided with supplementary limit and protects (4).
2. The temporary slope protection device for the environmental hydraulic engineering construction according to claim 1, wherein: the fixed orifices have been seted up to the surface of top base plate (1), and the fixed orifices is located same straight line, combination backplate (2) are through main even axle (3) and top base plate (1) swing joint, the surface of combination backplate (2) is provided with the net that the equidistance distributes.
3. The temporary slope protection device for the environmental hydraulic engineering construction according to claim 1, wherein: the number of combination backplate (2) is a plurality of groups, and two sets of be connected through draw-in groove (5) and gim peg (6) between combination backplate (2), draw-in groove (5) weld in the surface of combination backplate (2).
4. The temporary slope protection device for the environmental hydraulic engineering construction according to claim 1, wherein: a mandrel is arranged between the auxiliary edge protector (4) and the combined protection plate (2), and the auxiliary edge protector (4) is movably connected with the combined protection plate (2) through the mandrel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120669831.3U CN214832370U (en) | 2021-04-01 | 2021-04-01 | Interim bank protection device is used in construction of environmental hydraulic engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120669831.3U CN214832370U (en) | 2021-04-01 | 2021-04-01 | Interim bank protection device is used in construction of environmental hydraulic engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214832370U true CN214832370U (en) | 2021-11-23 |
Family
ID=78761494
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120669831.3U Active CN214832370U (en) | 2021-04-01 | 2021-04-01 | Interim bank protection device is used in construction of environmental hydraulic engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214832370U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116397596A (en) * | 2023-03-14 | 2023-07-07 | 安徽农业大学 | Slope fixing and protecting device for hydraulic engineering |
-
2021
- 2021-04-01 CN CN202120669831.3U patent/CN214832370U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116397596A (en) * | 2023-03-14 | 2023-07-07 | 安徽农业大学 | Slope fixing and protecting device for hydraulic engineering |
CN116397596B (en) * | 2023-03-14 | 2024-07-23 | 安徽农业大学 | Slope fixing and protecting device for hydraulic engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101775840B (en) | Beam column node suitable for quadrate steel pipe column | |
CN204530720U (en) | A kind of foundation pit supporting construction | |
CN202989867U (en) | Junked tire protective surface combined steel-structure check dam | |
CN214832370U (en) | Interim bank protection device is used in construction of environmental hydraulic engineering | |
CN205205833U (en) | Soil nail and stock combined type double row pile underground structure | |
CN205999844U (en) | A kind of novel wave block | |
CN210975722U (en) | Ecological slope protection structure | |
CN202416324U (en) | Beam and slab structure superposed through top-down beam and down-top slab construction of foundation pit project | |
CN214460126U (en) | Slope protection device for hydraulic and hydroelectric engineering | |
CN211171830U (en) | Ecological bank protection of hydraulic engineering | |
CN210396760U (en) | Assembled supporting system for diversion tunnel construction | |
CN204780939U (en) | Masts type double row pile struts system | |
CN210262920U (en) | Multi-functional water conservancy slope protection net | |
CN207073110U (en) | A kind of bucket foundation Larsen steel sheet pile combined type can generation breakwater | |
CN212427168U (en) | Foundation pile assembly | |
CN219261033U (en) | Foundation pit supporting beam | |
CN213508297U (en) | River course bank protection device for hydraulic engineering | |
CN216194455U (en) | Green's slope protection structure | |
CN216275490U (en) | Ecological slope protection for water and soil conservation | |
CN209875163U (en) | Tunnel type underground reservoir surveys entrance bearing structure | |
CN103061347A (en) | Deep foundation pit support structure acting with soil | |
CN211816014U (en) | Hydraulic engineering bank protection reinforced structure | |
CN214573882U (en) | A prefabricated reinforced concrete sheet pile for strengthening manger plate effect | |
CN211312346U (en) | Municipal construction fast-assembling protector | |
CN207891830U (en) | A kind of reservoir dam structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |