CN213867610U - Large-scale concrete member is refuted pier semi-submerged and is refuted seat base - Google Patents

Large-scale concrete member is refuted pier semi-submerged and is refuted seat base Download PDF

Info

Publication number
CN213867610U
CN213867610U CN202022569921.3U CN202022569921U CN213867610U CN 213867610 U CN213867610 U CN 213867610U CN 202022569921 U CN202022569921 U CN 202022569921U CN 213867610 U CN213867610 U CN 213867610U
Authority
CN
China
Prior art keywords
foundation
semi
barge
concrete member
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022569921.3U
Other languages
Chinese (zh)
Inventor
童新春
甘世行
陈猛
梁邦炎
王晓东
李林
姜政遥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Fourth Harbor Engineering Co Ltd
No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd
Original Assignee
CCCC Fourth Harbor Engineering Co Ltd
No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Fourth Harbor Engineering Co Ltd, No 2 Engineering Co of CCCC Fourth Harbor Engineering Co Ltd filed Critical CCCC Fourth Harbor Engineering Co Ltd
Priority to CN202022569921.3U priority Critical patent/CN213867610U/en
Application granted granted Critical
Publication of CN213867610U publication Critical patent/CN213867610U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

The utility model provides a large-scale concrete member is gone into pier semi-submerged and is refuted basic of sitting at the end, pier semi-submerged refutes the compound foundation that the basic of sitting at the end includes bottom DCM pile foundation treatment and is located many of compound foundation top and the preceding vertically strip basis of following the line of pier, the strip basis comprises rubble bed course, concrete beam and rubber surface course, and rubble bed course cross section is trapezoidal, and the concrete beam is installed on rubble bed course upper portion, and the rubble has been backfilled around the concrete beam, and the rubber surface course has been laid at the concrete beam top. The utility model discloses can effectively reduce the settlement of the pier bedbed when semi-submersible refutes the seat end, reduce the fluctuation that brings the bedbed when refuting on the large-scale concrete member, effectively guarantee the normal function of construction operation.

Description

Large-scale concrete member is refuted pier semi-submerged and is refuted seat base
Technical Field
The utility model relates to a pier frontier basis technical field especially relates to the basis technical field in pier frontier semi-submerged berth waters of plugging into.
Background
The water area at the front of the wharf is a semi-submerged barge berthing area. When a semi-submersible barge is used for transporting large concrete members, the concrete members are heavy in weight and large in size, and the foundation bed is easy to settle in the barge-in process, so that the concrete members deform and crack due to fluctuation or fall, the quality and the service life of the members are influenced, and the foundation is damaged. This puts high demands on the basic design of the quayside semi-submersible parking area.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to remedy prior art's not enough, provide a foundation of sitting suitable for pier frontier semi-submerged is refuted parking area.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the large-scale concrete member is refuted pier semi-submerged and is refuted a base basis, pier semi-submerged refuted a base basis includes the compound foundation that the DCM pile foundation of bottom was handled and is located many and the preceding perpendicular strip foundations of line of pier of compound foundation top, the strip basis comprises rubble bed course, concrete beam and rubber surface course, and rubble bed course cross section is trapezoidal, and the concrete beam is installed on rubble bed course upper portion, and the backfill cover has the rubble around the concrete beam, and the rubber surface course has been laid at the concrete beam top.
Furthermore, the rubber surface layer is provided with a plurality of vertical embedded sleeves, and bolts penetrate through the embedded sleeves and are inserted into the concrete beam.
Specifically, the strip base is arranged with 11 strips in total.
Specifically, the diameter of the single bottom DCM pile foundation pile is 1.3m, the lap joint is 0.3m, and DCM cement mixing piles are uniformly arranged under each strip foundation.
The utility model discloses refute the semi-submerged basis of refuting the seat area of honour with rubber + reinforcing bar concrete precast beam + rubble bed course as large-scale concrete member, the foundation below adopts the compound foundation of DCM pile foundation department, can effectively reduce the settlement of pier foundation bed when semi-submerged refutes the seat, and the fluctuation of bringing the foundation bed when refuting on reducing large-scale concrete member has effectively guaranteed the normal function of construction operation.
Drawings
FIG. 1 is a cross-sectional view of the foundation of the dock leading edge and the dock basin.
Fig. 2 is a sectional view of the base of the strip.
FIG. 3 is a layout diagram of cement mixing piles and strip foundations of a foundation of a harbor basin.
In the figure, a wharf 100, a harbor basin foundation 102, a strip foundation 103, a gravel cushion 103.1, a concrete beam 103.2, a rubber surface layer 103.3, an embedded sleeve and a bolt 103.4, a DCM pile foundation 104, a strongly weathered rock 105, a semi-submersible barge foundation boundary 106 and a semi-submersible barge 200.
Detailed Description
As shown in FIGS. 1-3, it can be seen that the large concrete member barge to wharf semi-submerged barge to sit on the foundation of the utility model. The wharf semi-submersible barge base foundation comprises a composite foundation processed by a bottom DCM pile foundation and a plurality of strip foundations 103 which are positioned above the composite foundation and are perpendicular to the front line of a wharf, wherein each strip foundation consists of a broken stone cushion layer 103.1, a concrete beam 103.2 and a rubber surface layer, the cross section of each broken stone cushion layer is trapezoidal, the concrete beam is arranged on the upper part of each broken stone cushion layer, and broken stones are backfilled and covered around the broken stone cushion layer. And a rubber surface layer is laid on the top of the concrete beam. The rubber surface layer is provided with a plurality of vertical embedded sleeves, and the bolts penetrate through the embedded sleeves and are inserted into the concrete beam.
The utility model discloses a strip basis has arranged 11 altogether, and its direction is perpendicular with pier frontier line.
The diameter of a single pile of the DCM pile foundation at the bottom is 1.3m, the lap joint is 0.3m, the diameter of one cluster of four piles is 2.3m, the four piles are arranged in a rectangular mode, and the replacement rate is 30% -39%. The cement mixing pile penetrates through the sand-mixed sludge layer and the clay layer to the weathered rock layer. As shown in figure 3, DCM cement mixing piles are required to be arranged under each strip foundation in the planar arrangement.
The above embodiments are only used for illustrating the present invention, and not for limiting the present invention, and those skilled in the relevant technical field can make various changes and modifications without departing from the spirit and scope of the present invention, so that all equivalent technical solutions also belong to the scope of the present invention, and the protection scope of the present invention should be defined by the claims.

Claims (4)

1. Large-scale concrete member is refuted pier semi-submerged and is refuted seat base, its characterized in that: the dock semi-submerged barge base foundation comprises a composite foundation processed by a bottom DCM pile foundation and a plurality of strip foundations which are positioned above the composite foundation and are perpendicular to the front line of a dock, wherein each strip foundation is composed of a broken stone cushion layer, a concrete beam and a rubber surface layer, the cross section of each broken stone cushion layer is trapezoidal, the concrete beam is installed on the upper portion of the broken stone cushion layer, broken stones are backfilled around the concrete beam, and the rubber surface layer is laid on the top of the concrete beam.
2. The large concrete member barge-on-wharf semi-submersible barge foundation of claim 1, wherein the large concrete member barge-on-wharf semi-submersible barge foundation is characterized in that: the rubber surface layer is provided with a plurality of vertical embedded sleeves, and bolts penetrate through the embedded sleeves and are inserted into the concrete beam.
3. The large concrete member barge-on-wharf semi-submersible barge foundation of claim 1, wherein the large concrete member barge-on-wharf semi-submersible barge foundation is characterized in that: the tape base was arranged with 11 strips in total.
4. The large concrete member barge-on-wharf semi-submersible barge foundation of claim 1, wherein the large concrete member barge-on-wharf semi-submersible barge foundation is characterized in that: the diameter of the single pile of the DCM pile foundation at the bottom is 1.3m, the lap joint is 0.3m, and DCM cement mixing piles are uniformly arranged under each strip foundation.
CN202022569921.3U 2020-11-09 2020-11-09 Large-scale concrete member is refuted pier semi-submerged and is refuted seat base Active CN213867610U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022569921.3U CN213867610U (en) 2020-11-09 2020-11-09 Large-scale concrete member is refuted pier semi-submerged and is refuted seat base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022569921.3U CN213867610U (en) 2020-11-09 2020-11-09 Large-scale concrete member is refuted pier semi-submerged and is refuted seat base

Publications (1)

Publication Number Publication Date
CN213867610U true CN213867610U (en) 2021-08-03

Family

ID=77053893

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022569921.3U Active CN213867610U (en) 2020-11-09 2020-11-09 Large-scale concrete member is refuted pier semi-submerged and is refuted seat base

Country Status (1)

Country Link
CN (1) CN213867610U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023061018A1 (en) * 2021-10-12 2023-04-20 中交第四航务工程局有限公司 Immersed tube floating-state barge-up method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023061018A1 (en) * 2021-10-12 2023-04-20 中交第四航务工程局有限公司 Immersed tube floating-state barge-up method

Similar Documents

Publication Publication Date Title
KR101095496B1 (en) Renewal construction method of decrepit open type wharf and gravity type structure of sheet pile a wharf
CN213867610U (en) Large-scale concrete member is refuted pier semi-submerged and is refuted seat base
CN109797759A (en) A kind of bionical precast-boxed cofferdam of sea scar and its construction method
CN104294749A (en) Method for installing cylinder foundation trestle structure
KR101256274B1 (en) Reverse Drill Method With precast type Caisson and Jacket
CN210066390U (en) Punishment structure suitable for deep weak soil roadbed
JP6241167B2 (en) Seismic reinforcement method for jetty
CN211006518U (en) Novel sheet pile wharf structure
CN104195980B (en) A kind of outfitting quay structure
CN210151762U (en) Steel sheet pile cofferdam layered bottom sealing structure under silt geological condition
CN111321701B (en) Dock main body backfilling process
CN206418455U (en) A kind of deep water sheep pile wharf structure system based on monoblock type off-load cushion cap
CN211523089U (en) Hybrid wharf structure
CN209925759U (en) Double-barrelled structure of laying in river course
CN208857762U (en) Semi-circular caisson and pile foundation combined type breakwater
US10214870B2 (en) Buoyancy compensated erosion control module
CN107989061B (en) Construction method of floating LNG liquefaction plant foundation structure
CN113186889A (en) Combined pile plate structure for reinforcing and protecting artificial island reef and construction method thereof
CN214459744U (en) Riverbed reinforced structure
CN218521709U (en) Riprap slope type wharf island wall structure
CN216040945U (en) High-pile wharf with large-bent-frame track beam and piles
CN211646259U (en) Temporary wharf ox structure
CN216183367U (en) Waterproof structure of foamed concrete
CN108867546A (en) Semi-circular caisson and pile foundation combined type breakwater
CN210887125U (en) Pier body anti-collision structure on side slope of adjacent river

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant