CN213806518U - Linkage convenient to external wall insulation construction - Google Patents

Linkage convenient to external wall insulation construction Download PDF

Info

Publication number
CN213806518U
CN213806518U CN202021765563.7U CN202021765563U CN213806518U CN 213806518 U CN213806518 U CN 213806518U CN 202021765563 U CN202021765563 U CN 202021765563U CN 213806518 U CN213806518 U CN 213806518U
Authority
CN
China
Prior art keywords
guardrail
midair
coating
sling
bin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021765563.7U
Other languages
Chinese (zh)
Inventor
张亚光
曹玉良
胡恩玮
穆佳
张培标
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN202021765563.7U priority Critical patent/CN213806518U/en
Application granted granted Critical
Publication of CN213806518U publication Critical patent/CN213806518U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a suspension device convenient for external wall heat insulation construction, which comprises a suspension frame, a pedal is laid at the bottom in the suspension frame, guardrails are arranged at the peripheral edge positions of the suspension frame, a sling is connected on the suspension frame, a winding device is arranged at one end of the sling far away from the suspension frame, a heat insulation board storage bin is arranged on one side of the suspension frame, a coating barrel frame and an automatic scraping material device are arranged on the guardrail of the suspension frame parallel to the guardrail where the heat insulation board storage bin is arranged, the winding device adjusts the height of the suspension frame through the sling so as to facilitate the construction operation of workers, the heat insulation board storage bin comprises an inner bin and an outer bin, both the inner bin and the outer bin are provided with elastic telescopic arms, the pressure of a support frame on the heat insulation boards is controlled through the elastic telescopic arms, thereby ensuring that the heat insulation boards in the inner bin and the outer bin are supported, meanwhile, the arrangement can be convenient, the space can be reasonably utilized, and the outer bin can extend outwards, thereby expanding the storage space of the insulation board.

Description

Linkage convenient to external wall insulation construction
Technical Field
The utility model belongs to the technical field of the construction and specifically relates to a linkage convenient to external wall insulation construction is related to.
Background
With the development of the building industry, energy conservation, environmental protection, cost reduction and construction efficiency improvement are generally pursued effects in the building field, and especially in recent years, the energy-saving building concept is provided, and the energy-saving building technology which is attached to a wall body or prefabricated in the wall body through materials such as sound insulation, heat insulation, fire prevention and heat absorption can be widely used because the energy-saving building technology can still keep indoor temperature comfortable under the condition of less use or even no use of an external heat circulation system. The heat preservation of the outer wall is an application in energy-saving buildings. The external wall insulation board is compounded by polymer mortar, glass fiber mesh cloth, flame-retardant molded polystyrene foam board (EPS) or extruded sheet (XPS) and other materials, and the bonding construction is completed on site.
At present, the coating is applied paint with a brush to the external wall insulation board in the work progress, mainly bears constructor through linkage and then laminates the external wall insulation board, and the coating solidifies the back and fixes the external wall insulation board on the outer wall, and the technique has certain shortcoming, for example the work progress is loaded down with trivial details, linkage poor stability, needs to install the solid nail of card in addition and fixes it. In addition, the space utilization rate of the traditional suspension device is low, the space on the pedal cannot be fully utilized, the storage quantity of the heat-insulation plates is limited, the heat-insulation plates are stacked mutually, and the heat-insulation plates are easily damaged.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is: the utility model provides a linkage convenient to external wall insulation construction, it is few to solve among the current mounted frame insulation board and deposit quantity, piles up the problem that causes the insulation board to damage easily moreover each other.
In order to solve the technical problem, the utility model discloses the technical scheme who adopts is:
the utility model provides a linkage convenient to external wall insulation construction, includes and suspends the frame in midair, suspends the frame in midair and has laid the footboard in the bottom, suspends the frame in midair and all around the edge position and be provided with the guardrail, suspends the overhead hoist device that is connected with in midair, and the hoist cable is kept away from one of them of suspending the frame and is served and be provided with heated board warehouse on the guardrail of one side of suspending the frame in midair, heated board warehouse including set up at the inside interior storehouse of guardrail and set up at the outside outer storehouse of guardrail, suspend in midair and be provided with coating bucket frame and automatic knife coating device on the parallel guardrail of heated board warehouse place, the hoist device suspends the height of frame in midair through the hoist cable adjustment so that the workman is under construction and operates.
Heated board storage storehouse including setting up at the inside interior storehouse of guardrail and setting up the outer storehouse in the guardrail outside, interior storehouse is including setting up the first adjustable shelf on suspending in the midair, surface sliding fit on first adjustable shelf lower extreme and the footboard, the guardrail was kept away from to first adjustable shelf serves and is provided with vertical ascending first support frame, is provided with first flexible arm between first support frame upper end and the guardrail, outer storehouse is including setting up the second adjustable shelf on suspending in the midair, the one end that the guardrail was kept away from to the second adjustable shelf is provided with vertical ascending second support frame, is provided with second flexible arm between second support frame upper end and the guardrail.
The sling comprises a first sling and a second sling which move synchronously, the first sling and the second sling comprise main ropes connected with the hoisting device, one end of each main rope far away from the hoisting device is provided with two branch ropes, the included angle between each branch rope and each main rope is larger than 150 degrees, and one end of each branch rope far away from each main rope is connected to the edge of the upper end of the guardrail.
The winding device comprises a gear box, an input shaft is arranged on the gear box, a winding motor for driving the gear box to work is connected onto the input shaft, two output shafts are arranged on the gear box, the two output shafts are respectively connected with a first sling and a second sling to adjust the lengths of the corresponding slings, the output shafts are further connected with a supporting seat, the supporting seat is installed on a platform, a bearing is arranged in the supporting seat, an output shaft barrel bearing is rotatably installed in the supporting seat, and a winding pipe is further installed on one end, far away from the supporting seat, of each output shaft.
The winding pipe comprises a main pipe matched with the main cable, sleeves matched with the branch cables are coaxially arranged at two ends of the main pipe, the outer diameter value of each sleeve is larger than the diameter of the main pipe, and a blocking disc is coaxially arranged at one end, far away from the main pipe, of each sleeve.
First support frame upper end both sides and guardrail between all be provided with first elastic stretching arm, all be provided with second elastic stretching arm between second support frame upper end both sides and the guardrail, first elastic stretching arm and second elastic stretching arm all include the telescopic link, first elastic stretching arm and second elastic stretching arm pass through the adapter sleeve coaxial line and install on the guardrail, all be provided with the elasticity resetting means on first elastic stretching arm and the second elastic stretching arm, the second adjustable shelf includes many horizontal guide bars that are parallel to each other, the one end that the guardrail was kept away from to horizontal guide bar is connected with the second support frame, the guardrail is close to horizontal guide bar position and is provided with the uide bushing, the one end that horizontal guide bar is close to the guardrail slides and wears to establish in the uide bushing.
The coating barrel frame comprises a connecting seat arranged on the guardrail and a detachable barrel frame body arranged on the connecting seat.
The inboard automatic coating device that still is provided with of hanging in midair, automatic coating device is including setting up the guide rail on hanging in midair, the slip is provided with the slider on the guide rail, be provided with the thrust device who promotes the slider on the guide rail, fixed mounting has the storehouse of scribbling on the slider, scribbles and is provided with the discharge gate on the storehouse, the coating storehouse lower extreme be provided with wall complex fender material roller, the coating storehouse upper end is provided with the roller of strickleing off that is used for strickleing off coating, strickle off the roller and be connected with the thickness adjusting device who is used for adjusting coating thickness.
The thickness adjusting device comprises transverse strip holes arranged on two side walls of the coating bin, and two end parts of the scraping roller penetrate through the corresponding strip holes to be connected with compression rings.
The utility model has the advantages that: the utility model discloses linkage convenient to external wall insulation construction sets up heated board warehouse, and heated board warehouse includes interior storehouse and outer storehouse, and interior storehouse and outer storehouse all set up the flexible arm, through the pressure of flexible arm control support frame to the heated board, and then guarantee that the heated board in interior storehouse and the outer storehouse is supported, can conveniently arrange the heated board simultaneously, reasonable utilization space, outer storehouse can extend outward, and then expand the storage space of heated board; set up first suspension cable, second suspension cable, first suspension cable and second suspension cable all include the main rope and divide the cable, divide the contained angle between cable and the main rope to be greater than 150, divide the cable lower extreme to be connected to guardrail upper end edge, can guarantee linkage stability, avoid the slope that the unbalance loading leads to, improve job stabilization nature, supporting seat and gear box cooperation can carry out stable support to the spool, and then guarantee job stabilization nature.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic diagram of a structure diagram of the hoisting device of the present invention;
FIG. 3 is a schematic view of the connection between the middle suspension hanger and the guardrail of the present invention;
FIG. 4 is a schematic cross-sectional view of the coil bobbin of the present invention;
FIG. 5 is a schematic view of the connection between the inner bin, the outer bin and the suspension bracket;
FIG. 6 is a schematic view of the connection relationship between the telescopic rod and the guardrail of the present invention;
FIG. 7 is a schematic cross-sectional view of the joint between the telescopic rod and the guardrail of the present invention;
fig. 8 is a schematic view of the connection relationship between the first movable frame, the second movable frame and the suspension frame according to the present invention;
fig. 9 is a schematic view of the connection relationship between the telescopic rod and the elastic restoring device of the present invention;
FIG. 10 is a schematic view of the connection between the paint bucket rack and the guardrail according to the present invention;
fig. 11 is a schematic top view of the middle suspension hanger of the present invention;
FIG. 12 is a schematic view showing the connection relationship between the middle suspension hanger and the automatic material scraping device according to the present invention;
FIG. 13 is a schematic diagram of the structure of the automatic scraping device of the present invention;
FIG. 14 is a schematic cross-sectional view of the connection between the squeegee roller and the paint hopper according to the present invention;
FIG. 15 is a schematic view of the connection between the guide rail and the slide block according to the present invention;
graphic notation: 1-a suspension bracket, 101-a joist, 2-a guardrail, 201-a connecting beam, 202-a stop lever, 203-a rubber sleeve, 3-an inner bin, 301-a first elastic telescopic arm, 302-a first supporting frame, 303-a first movable frame, 304-a spacing ring, 305-a sliding rod, 4-an outer bin, 401-a second elastic telescopic arm, 402-a second supporting frame, 403-a guide rod, 404-a connecting sleeve, 405-a pressing cap, 406-a reset spring, 407-a connecting ring, 408-a guiding sleeve, 5-a paint barrel frame, 501-a connecting seat, 502-a connecting hole, 503-a connecting plate, 504-a connecting pin, 505-a barrel frame body, 6-a hoisting device, 601-a gear box, 602-a supporting plate, 603-a positioning hole, 604-supporting seat, 605-output shaft, 606-bearing, 607-winding pipe, 608-main cable, 609-branch cable, 610-main pipe, 611-sleeve, 612-blocking disc, 7-automatic material scraping device, 701-guide rail, 702-coating bin, 703-blocking roller, 704-leveling roller, 705-sliding block, 706-connecting rod, 707-thrust spring, 708-positioning block, 709-strip hole, 710-roller shaft, 711-roller cylinder, 712-blocking ring, 713-pressing ring, 714-positioning threaded hole, 715-guiding through hole, 716-blocking ring and 8-pedal.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
A suspension device convenient for external wall heat preservation construction comprises a suspension frame 1, wherein the suspension frame 1 is rectangular and is formed by welding rectangular pipes, the suspension frame is light in weight and high in structural strength, a pedal 8 made of steel plates is laid in the suspension frame 1 to facilitate walking of operators, a guardrail 2 is welded at the edge of the periphery of the suspension frame, the guardrail 2 comprises a plurality of upward vertical rods welded along the edge of the suspension frame 1, and a connecting beam 201 welded on the upper end of the vertical rod, the connecting beam 201 is made of a rectangular tube and is convenient to be connected with other structures, meanwhile, the structural strength is high, the suspension frame is connected with a sling, the sling is far away from one end of the suspension frame and is provided with a hoisting device, a heat-insulation plate storage bin is arranged on a guardrail on one side of the suspension frame, a coating barrel rack and an automatic material scraping device are arranged on a guardrail parallel to the guardrail where the heat-insulation plate storage bin is located, and the hoisting device adjusts the height of the suspension frame through the sling so as to facilitate the construction operation of workers.
The suspension cable comprises a first suspension cable and a second suspension cable which are symmetrically distributed on two sides of the suspension frame 1, the first suspension cable and the second suspension cable respectively comprise a main cable 608, the lower end of the main cable 608 is connected with two branch cables 609, in order to improve stability, the main cable 608 is made of steel stranded wires, the branch cables 609 are separated through the steel stranded wires, the main cable 608 and the branch cables 609 are convenient to manufacture, meanwhile, the branch cables 609 are separated through the steel stranded wires, the two branch cables 609 are symmetrical to each other, an included angle between the branch cables 609 and the main cable 608 is larger than 150 degrees, the lower end of the branch cables 609 is connected to the corner of the upper end of the guardrail 2, in the embodiment, the included angle between the branch cables 609 and the main cable 608 is 160 degrees, inclination caused by uneven weight distribution can be reduced, and use stability is guaranteed.
The hoisting device 6 comprises a gear box 601, an input shaft of the gear box 601 is connected with a hoisting motor, a transverse support plate 602 is arranged at the lower end of the gear box 601, a long-strip-shaped positioning hole 603 is processed on the support plate 602, in the installation process, a bolt is firstly arranged on a platform and penetrates through the positioning hole 603 on the support plate 602 of the gear box 601, the position of the gear box 601 can be adjusted and then fixed by adjusting the position of the bolt in the positioning hole 603, the gear box 601 is provided with two output shafts 605, the two output shafts 605 are parallel to each other, under the action of the gear box 601, the rotating speeds and the rotating directions of the two output shafts 605 are the same and opposite, so as to ensure the stable lifting and falling of the suspension bracket 1, a winding pipe 607 matched with a corresponding sling is coaxially fixed at the end part of the output shaft 605, the winding pipe 607 comprises a main pipe 610 matched with a main rope 608, and sleeves 611 matched with branch ropes 609 are coaxially keyed at the two ends of the main pipe 610, the outer diameter value of the sleeve 611 is larger than that of the main pipe 610, the two sleeves 611 and the main pipe 610 form a groove through the outer diameter difference, the main rope 608 is wound in the groove in the winding process, when the groove is filled with the main rope 608, the branch rope 609 rises to the winding pipe 607, the branch rope 609 is wound along the sleeve 611, and the blocking disc 612 is coaxially installed at the outer end of the sleeve 611 to prevent the branch rope 609 from disengaging.
Still install the supporting seat 604 who is connected with the platform on the output shaft 605, in the process of using, the platform generally is roof or intermediate floor, is made by the concrete, and supporting seat 604 is placed on the platform, fixes a position through the earth bolt, and the bearing frame is installed to supporting seat 604 upper end, installs bearing 606 in the bearing frame, and bearing 606 is bearing, can play fine supporting role, and output shaft 605 passes one of bearing 606 and serves and be connected with spool 607, and then guarantees hoisting device 6 job stabilization.
Install heated board storage bin on hanging up 1, heated board storage bin is including distributing at 2 inside interior storehouses 3 of guardrail and distributing in 2 outside outer storehouses 4 of guardrail, interior storehouse 3 is including installing the first adjustable shelf 303 on hanging up 1 in midair, surface sliding fit on first adjustable shelf 303 lower extreme and the footboard 8, vertical ascending first support frame 302 is installed to first adjustable shelf 303 inner, install first flexible arm 301 between first support frame 302 upper end and the guardrail 2, and is concrete, first adjustable shelf 303 inner install with footboard 8 matched with gyro wheel, hanging up 1 edge fastening have with first adjustable shelf 303 matched with slide bar 305, first adjustable shelf 303 passes through the gyro wheel, slide bar 305 and hanging up between 1 sliding fit, job stabilization nature is high.
Outer storehouse 4 includes that the direction cooperation is installed and hangs the second adjustable shelf on putting up 1 in midair, the second adjustable shelf outer end is fixed with vertical ascending second support frame 402, install second elastic expansion arm 401 between second support frame 402 upper end and the guardrail 2, specifically do, the second adjustable shelf includes many horizontal guide bars 403 that are parallel to each other, guide bar 403 outer end is connected with second support frame 402, hang and install on the frame 1 in midair with guide bar 403 matched with uide bushing 408, through uide bushing 408, can lead and support guide bar 403.
In order to facilitate installation, in this embodiment, the first movable frame 303, the second movable frame, the first support frame 302, and the second support frame 402 are assembled and molded by a wire tube, and are connected by a wire tube connector, both the wire tube and the wire tube connector are existing products, and are generally used for a shelf, the material taking is convenient, the manufacturing cost is low, the guide sleeve 408 is a linear bearing matched with the wire tube, both the first elastic telescopic arm 301 and the second elastic telescopic arm 401 include telescopic rods, in order to ensure stable movement of the first movable frame 303 and the second movable frame, both the first elastic telescopic arm 301 and the second elastic telescopic arm 401 are installed on both sides of the corresponding support frame, the first elastic telescopic arm 301 and the second elastic telescopic arm 401 are coaxially connected by a connecting sleeve 404, an elastic resetting device is connected between the last stages of the two telescopic rods, the first stage of the telescopic rod corresponding to the inner bin 3 passes through the connecting beam 201, and is positioned by the rubber sleeve 203, then the flexible reset device is fixed with the connecting beam 201 through a limiting ring 304, the flexible reset device is a reset spring 406 or a reset elastic rope, the telescopic rod is made of pipe fittings, the last stage of the telescopic rod is provided with a pressing cap 405, the inner end of the pressing cap 405 is provided with a connecting ring 407, the two ends of the flexible reset device are connected through the connecting ring 407, the movable frame is pulled inwards in the using process, then the insulation board is placed, the insulation board can be well supported through the movable frame, the supporting frame and the telescopic rod, the deformation or damage of the insulation board is avoided, after the inner bin 3 is filled, the second movable frame is pushed outwards to fill the outer bin 4, the space can be fully utilized, as the second movable frame extends out of the suspension frame 1, the inner bin 3 needs to be filled firstly, the outer bin 4 is refilled, when the flexible tube is used, the outer bin 4 is used firstly, then the inner bin 3 is used, in order to avoid the problem, the wire tube of the first movable frame 303 can be changed into the telescopic rod, but the cost increases and the difficulty of installation increases. Still install on the tie-beam with interior storehouse 3 and 4 complex pin 202 in outer storehouse, support the heated board, avoid the heated board to damage.
The hanging rack 1 is also provided with a coating barrel rack 5, the coating barrel rack 5 is used for placing a coating barrel, the coating is generally cement mortar and is used for adhering a heat-insulating plate to an outer wall, the coating barrel rack 5 comprises a connecting seat 501 fixed on a connecting beam 201, the cross section of the connecting seat 501 is L-shaped and cut and formed by angle steel, the end part of the connecting seat 501 is welded and fixed by a reinforcing rib, the first wing of the connecting seat 501 is welded and fixed with the connecting beam 201, the connecting stability is high, the second wing of the connecting seat 501 is processed with two connecting holes 502, a barrel rack body 505 is welded and formed by reinforcing steel bars and is in a shape of an inverted circular truncated cone, the coating barrel is convenient to place, the upper end of the barrel rack body 505 is welded and fixed with a connecting plate 503, two connecting pins 504 matched with the connecting holes 502 are fixed on the connecting plate 503, when the coating barrel is not needed, the barrel rack body 505 can be removed, the air drop is saved, the connecting pins 504 can be installed on the connecting seat 501 for convenient stacking, the connection hole 502 is processed on the connection plate 503.
The inner side of the suspension bracket 1 is also provided with an automatic material scraping device 7, the automatic material scraping device 7 comprises a guide rail 701 fixed on the suspension bracket 1, in order to ensure the stability of the guide rail 701, a joist 101 matched with the guide rail 701 is further processed on the suspension bracket 1, a slide block 705 is arranged on the guide rail 701, in the embodiment, the guide rail 701 is a dovetail groove guide rail 701, the slide block 705 is in a strip shape, a dovetail block matched with the guide rail 701 is arranged, through the matching of the guide rail 701 and the slide block 705, the slide block 705 can be ensured to move along the guide rail 701, a coating bin 702 is arranged on the slide block 705, discharge ports are respectively arranged on the inner side and the upper side of the coating bin 702, the discharge ports are arranged on the inner side and matched with a wall body for coating, the discharge ports on the upper side are used for adding coating, the lower end of the coating bin 702 is provided with a material blocking roller 703 matched with the wall surface, a rubber layer is arranged on the working surface of the material blocking roller 703, and in the use process, the material blocking roller 703 is tightly pressed with the wall body through the rubber layer, the paint can be prevented from spilling in the paint bin 702, the surface of a wall can be pre-cleaned, the leveling roller 704 for leveling the paint is installed at the upper end of the paint bin 702, for adjusting the thickness of the paint, the leveling roller 704 is connected with a thickness adjusting device for adjusting the thickness of the paint, the thickness adjusting device comprises transverse strip holes 709 which are processed in two side walls of the paint bin 702, two ends of a roller shaft of the leveling roller 704 penetrate through the corresponding strip holes 709 to be connected with a pressing ring 713, in order to prevent the roller 711 of the leveling roller 704 from interfering with the side wall of the paint bin 702, a baffle ring 712 matched with the side wall of the paint bin 702 is installed at the end of the roller shaft 710 of the leveling roller 704, after the position of the leveling roller 704 is adjusted, the side wall of the paint bin 702 is pressed through the baffle ring 712 and the pressing ring 713, and the leveling roller 704 is fixed.
Because the suspension bracket 1 can swing in the using process and the sling can move back and forth along the winding pipe 607 in the winding and unwinding processes of the winding pipe 607, the suspension bracket 1 can correspondingly move, in order to ensure the matching of the coating bin 702, the material blocking roller 703 and the scraping roller 704 with the wall body, a thrust device for pushing the sliding block 705 inwards is arranged on the guide rail 701, the thrust device comprises a positioning block 708 arranged at the outer end of the guide rail 701, a dovetail block matched with the dovetail groove is arranged at the lower end of the positioning block 708, a connecting rod 706 pointing to the positioning block 708 is arranged on the sliding block 705, a guide through hole 715 matched with the connecting rod 706 is arranged on the positioning block 708, the cross section of the guide through hole 715 is a vertical long hole 709, a downward positioning threaded hole 714 is arranged on the positioning block 708, a jackscrew can be arranged on the positioning threaded hole 714 and is matched with the guide rail 701 to position the positioning block 708, and a thrust spring 707 is sleeved on the connecting rod 706 between the positioning block 708 and the sliding block 705, before the use, the position of the positioning block 708 is adjusted, and then the thrust spring 707 pushes the paint bin 702 and the material blocking roller 703, and the position between the leveling roller and the wall body, so as to ensure the stable operation of the automatic paint scraping device 7, paint is injected into the paint bin 702, the injection height does not exceed the strip hole 709, due to the action of the material blocking roller 703 and the paint bin 702, the paint does not leak or leaks less, the suspension bracket 1 is in the process of moving downwards, the paint is adhered to the wall body, and is scraped by the scraping roller 704, and the thickness is controlled, so as to facilitate the pasting of the insulation board, in order to avoid the slider 705 being separated from the track, the connecting rod 706 passes through the guide through hole 715 and is sleeved with the blocking ring 716, because in the construction process, the insulation board is pasted and the wall body is not required to be coated with the paint, in the position of a row, a corresponding number of automatic paint scraping devices 7 can be installed as required, so as to form a corresponding number of vertical paint strips, and the construction cost is saved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides a linkage convenient to external wall insulation construction which characterized in that: including hanging in the midair, hanging in the midair the bottom and having laid the footboard, hanging in the midair and putting all around edge positions and be provided with the guardrail, hanging in the midair and being connected with the hoist cable, the hoist cable is kept away from and is served and be provided with hoisting accessory in the one of them of hanging in the midair, is provided with heated board warehouse on the guardrail of one side of hanging in the midair, heated board warehouse including setting up at the inside interior storehouse of guardrail and setting up in the outside outer storehouse of guardrail, be provided with coating bucket frame and automatic knife coating device on the parallel guardrail in frame and heated board warehouse place, hoisting accessory hangs in the midair through the hoist cable adjustment and highly so that workman's construction operation.
2. The suspension device convenient for exterior wall thermal insulation construction according to claim 1, characterized in that: interior storehouse including setting up the first adjustable shelf on suspending in the midair, first adjustable shelf lower extreme and footboard upper surface sliding fit, the guardrail was kept away from to first adjustable shelf serves and is provided with vertical ascending first support frame, is provided with first flexible arm between first support frame upper end and the guardrail, outer storehouse is provided with vertical ascending second support frame including setting up the second adjustable shelf on suspending in the midair, the one end that the guardrail was kept away from to the second adjustable shelf, is provided with second flexible arm between second support frame upper end and the guardrail.
3. The suspension device convenient for exterior wall thermal insulation construction according to claim 1, characterized in that: the sling comprises a first sling and a second sling which move synchronously, the first sling and the second sling comprise main ropes connected with the hoisting device, one end of each main rope far away from the hoisting device is provided with two branch ropes, the included angle between each branch rope and each main rope is larger than 150 degrees, and one end of each branch rope far away from each main rope is connected to the edge of the upper end of the guardrail.
4. The suspension device convenient for exterior wall thermal insulation construction according to claim 1, characterized in that: the winding device comprises a gear box, an input shaft is arranged on the gear box, a winding motor for driving the gear box to work is connected onto the input shaft, two output shafts are arranged on the gear box, the two output shafts are respectively connected with a first sling and a second sling to adjust the lengths of the corresponding slings, the output shafts are further connected with a supporting seat, the supporting seat is installed on a platform, a bearing is arranged in the supporting seat, an output shaft barrel bearing is rotatably installed in the supporting seat, and a winding pipe is further installed on one end, far away from the supporting seat, of each output shaft.
5. The suspension device convenient for exterior wall thermal insulation construction according to claim 4, wherein: the winding pipe comprises a main pipe matched with the main cable, sleeves matched with the branch cables are coaxially arranged at two ends of the main pipe, the outer diameter value of each sleeve is larger than the diameter of the main pipe, and a blocking disc is coaxially arranged at one end, far away from the main pipe, of each sleeve.
6. The suspension device convenient for exterior wall thermal insulation construction according to claim 2, characterized in that: first support frame upper end both sides and guardrail between all be provided with first elastic stretching arm, all be provided with second elastic stretching arm between second support frame upper end both sides and the guardrail, first elastic stretching arm and second elastic stretching arm all include the telescopic link, first elastic stretching arm and second elastic stretching arm pass through the adapter sleeve coaxial line and install on the guardrail, all be provided with the elasticity resetting means on first elastic stretching arm and the second elastic stretching arm, the second adjustable shelf includes many horizontal guide bars that are parallel to each other, the one end that the guardrail was kept away from to horizontal guide bar is connected with the second support frame, the guardrail is close to horizontal guide bar position and is provided with the uide bushing, the one end that horizontal guide bar is close to the guardrail slides and wears to establish in the uide bushing.
7. The suspension device convenient for exterior wall thermal insulation construction according to claim 1, characterized in that: the coating barrel frame comprises a connecting seat arranged on the guardrail and a detachable barrel frame body arranged on the connecting seat.
8. The suspension device convenient for exterior wall thermal insulation construction according to claim 1, characterized in that: the inboard automatic coating device that still is provided with of hanging in midair, automatic coating device is including setting up the guide rail on hanging in midair, the slip is provided with the slider on the guide rail, be provided with the thrust device who promotes the slider on the guide rail, fixed mounting has the storehouse of scribbling on the slider, scribbles and is provided with the discharge gate on the storehouse, the coating storehouse lower extreme be provided with wall complex fender material roller, the coating storehouse upper end is provided with the roller of strickleing off that is used for strickleing off coating, strickle off the roller and be connected with the thickness adjusting device who is used for adjusting coating thickness.
9. The suspension device convenient for exterior wall thermal insulation construction according to claim 8, wherein: the thickness adjusting device comprises transverse strip holes arranged on two side walls of the coating bin, and two end parts of the scraping roller penetrate through the corresponding strip holes to be connected with compression rings.
CN202021765563.7U 2020-08-21 2020-08-21 Linkage convenient to external wall insulation construction Active CN213806518U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021765563.7U CN213806518U (en) 2020-08-21 2020-08-21 Linkage convenient to external wall insulation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021765563.7U CN213806518U (en) 2020-08-21 2020-08-21 Linkage convenient to external wall insulation construction

Publications (1)

Publication Number Publication Date
CN213806518U true CN213806518U (en) 2021-07-27

Family

ID=76951281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021765563.7U Active CN213806518U (en) 2020-08-21 2020-08-21 Linkage convenient to external wall insulation construction

Country Status (1)

Country Link
CN (1) CN213806518U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197850A (en) * 2022-01-25 2022-03-18 中建八局天津建设工程有限公司 Rail type sliding hanging basket equipment
CN114809565A (en) * 2022-04-18 2022-07-29 中建八局第一建设有限公司 Ultrahigh-rise core tube variable-section inclined wall hanging frame and construction method
CN118087727A (en) * 2024-04-23 2024-05-28 中国二十二冶集团有限公司 Heat-insulating integrated floor structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197850A (en) * 2022-01-25 2022-03-18 中建八局天津建设工程有限公司 Rail type sliding hanging basket equipment
CN114809565A (en) * 2022-04-18 2022-07-29 中建八局第一建设有限公司 Ultrahigh-rise core tube variable-section inclined wall hanging frame and construction method
CN114809565B (en) * 2022-04-18 2023-07-07 中建八局第一建设有限公司 Super high-rise core tube variable-section inclined wall hanger and construction method
CN118087727A (en) * 2024-04-23 2024-05-28 中国二十二冶集团有限公司 Heat-insulating integrated floor structure

Similar Documents

Publication Publication Date Title
CN213806518U (en) Linkage convenient to external wall insulation construction
CN106013452B (en) A kind of flexible suspension formula building module structure
CN103899337A (en) Wide tunnel waterproof board installation platform and installation method
CN103233559B (en) A kind of roof panel high-altitude transmission system and method
CN110528863B (en) Hanging basket device for outer inclined plane construction and construction method
CN103615047B (en) The method that lighting roof steel truss and curtain wall are installed high up in the air
CN104563503A (en) Cast-in-place reinforced concrete high-altitude automatic building method of high-rise and ultra high-rise residential buildings
CN215248962U (en) Transfer device for building partition plate
CN114436134A (en) Glass vertical hoisting in-place tool capable of being flexibly adjusted and displaced in multiple directions and use method
CN205314519U (en) High altitude operation platform based on truss
CN210857774U (en) Roof light framework plate installation device
CN204001751U (en) Super high steel structure construction overhanging unloading platform
CN108316630B (en) High-altitude hanging scaffold
RU2679171C2 (en) Station for automatic alignment of construction mixtures and laying of floor tiles, station for automatic alignment of construction mixtures and station for automatic laying of floor tiles
CN104164974B (en) Building casting method and use thereof pour mold system
CN106120871A (en) A kind of poured band of outer wall of basement outboard template and construction method thereof
CN114809662A (en) Automatic wallboard mounting device and mounting method
CN204879067U (en) Pipeline travelling cradle
CN110107064B (en) Flue plastering device and flue plastering method
CN211037771U (en) Hanging basket device for outer slope construction
CN211597658U (en) Movable overhanging scaffold
CN205875410U (en) A hang module system all for tube structure room panel construction
CN202324658U (en) Device for installing large-span roof truss
CN215926616U (en) Rotary cantilever auxiliary tile sticking machine
CN204661109U (en) Two-layer single-column lifting working platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant