CN213797417U - Wall perforating device is used to construction fitment - Google Patents

Wall perforating device is used to construction fitment Download PDF

Info

Publication number
CN213797417U
CN213797417U CN202022299206.2U CN202022299206U CN213797417U CN 213797417 U CN213797417 U CN 213797417U CN 202022299206 U CN202022299206 U CN 202022299206U CN 213797417 U CN213797417 U CN 213797417U
Authority
CN
China
Prior art keywords
dust
bottom plate
fixedly connected
wall
perforating device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022299206.2U
Other languages
Chinese (zh)
Inventor
吴春燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022299206.2U priority Critical patent/CN213797417U/en
Application granted granted Critical
Publication of CN213797417U publication Critical patent/CN213797417U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a wall perforating device for building construction decoration, which comprises a bottom plate, wherein the bottom of the bottom plate is provided with a self-locking universal wheel, the upper end of the right side of the bottom plate is fixedly provided with a dust storage box, the upper end of the dust storage box is fixedly connected with a dust suction pump, the dust suction pump is fixedly connected with a dust suction pipe, the middle part of the upper end of the bottom plate is fixedly provided with a control switch, the upper end of the left side of the bottom plate is provided with an adjusting mechanism, the adjusting mechanism comprises an adjusting handle, a rotating rod, a driving gear, a driven gear, a screw rod, a shell and a bearing seat, the shell is fixedly arranged at the upper end of the bottom plate, the shell is internally provided with a cavity, the side wall at one end in the shell is provided with the rotating rod in a penetrating way, one end of the rotating rod is fixedly connected with the adjusting handle, the other end of the rotating rod is fixedly provided with the driving gear, the device can perforate according to different positions, and can prevent that the in-process of punching, the dust that flies upward from causing the injury to the user.

Description

Wall perforating device is used to construction fitment
Technical Field
The utility model belongs to the technical field of the construction, specifically be a wall perforating device is used to construction fitment.
Background
In recent years, with the development of social economy, the land industry is also developing vigorously, and along with the development of building decoration; the decoration not only can make the building better look, but also can better utilize limited space, obtain better life and experience. At present, holes are often needed to be drilled on the wall in building decoration, wiring, air conditioning equipment installation and the like, and holes are also needed to be drilled at the high position of the wall in many times.
The traditional operation mode adopts manual operation by taking a scaffold or a ladder, because the ladder is unreliable in stability, workers have the risk of falling, and construction workers hold the drilling equipment for a long time, so that the labor intensity is high, fatigue is easy to occur, and the problem of unsmooth drilling is easy to occur; in addition, a large amount of dust is generated in the punching process, and a constructor manually punches holes in a short distance, so that dust is easily sucked, respiratory tract and lung diseases are caused, and great hidden danger is brought to health; after the hole is punched, the inside of the hole is also provided with scraps which need to be manually cleaned, so that the later use is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: in order to solve the problem, the wall surface punching device for building construction decoration is provided.
The utility model adopts the technical scheme as follows: the utility model provides a wall perforating device is used to construction fitment, includes the bottom plate, the bottom plate bottom is provided with the auto-lock universal wheel, bottom plate right side upper end fixed mounting has the dirt case of depositing, deposit dirt case upper end fixedly connected with dust absorption pump, fixedly connected with dust absorption pipe on the dust absorption pump, bottom plate upper end middle part fixed mounting has control switch, bottom plate left side upper end is provided with adjustment mechanism, adjustment mechanism includes adjustment handle, dwang, driving gear, driven gear, lead screw, casing and bearing frame, casing fixed mounting is in the bottom plate upper end, the inside cavity that is provided with of casing, it is equipped with the dwang to run through on the one end lateral wall in the casing, the one end fixedly connected with adjustment handle of dwang.
In a preferred embodiment, the other end of dwang is fixed with the driving gear, there is the lead screw shells inner wall upper end through bearing frame movable mounting, be fixed with driven gear on the lead screw, driven gear and driving gear intermeshing.
In a preferred embodiment, both sides of the inner wall of the top of the shell are fixedly provided with limiting rods, the screw rod is sleeved with a movable column and a lifting seat in a threaded manner, the upper end of the lifting seat is fixed at the lower end of the movable column, and the upper end of the movable column penetrates through the upper side of the shell and is fixedly arranged at the bottom of the mounting seat.
In a preferred embodiment, mount pad upper end fixed mounting is in frame right side bottom, the inside pneumatic cylinder that is provided with in frame right side, the left side of pneumatic cylinder is provided with hydraulic telescoping rod, hydraulic telescoping rod left side fixedly connected with motor, the motor left side is run through the frame lateral wall and is provided with the mechanism of punching.
In a preferred embodiment, the punching mechanism comprises a drill bit, a spring rod, a sleeve, a dust receiving port, a fixing plate, a dust guard, a connecting block and a dust receiving pipe, the left side of the motor penetrates through the connecting block fixedly connected with the frame, the drill bit is fixedly connected with the left side of the connecting block, and the fixing plate is fixedly mounted at the outer end of the left side of the frame.
In a preferred embodiment, the sleeve pipe is installed to fixed plate left side screw thread, sleeve pipe left side movable mounting has the spring beam, spring beam left end fixedly connected with dust guard, the dust proof chamber has been seted up at the dust guard middle part, the dust guard setting is run through in the drill bit left side at the dust guard middle part, fixed plate upper end fixed mounting connects the dirt pipe, connect dirt pipe right side and be connected with the dust absorption pipe, connect dirt pipe left end fixedly connected with and connect the dirt mouth.
To sum up, owing to adopted above-mentioned technical scheme, the beneficial effects of the utility model are that:
1. the utility model discloses in, drive the dwang motion through rotating the handle, drive the driving gear through the dwang and rotate, the driving gear drives driven gear and rotates, drives the lead screw then and rotates, through gag lever post and lift seat cooperation, alright drive the removal post and reciprocate, alright drive mount pad vertical adjustment, driving hydraulic telescoping rod motion through the pneumatic cylinder, alright realization is to different positions processing of driling.
2. In the utility model, the dustproof cavity arranged in the dustproof plate can block the waste in the drilling process, thereby avoiding the splashing of the drilling waste; the dust guard makes the waste material that the drilling produced store, then through the separation of sleeve pipe and fixed plate, alright change the washing with quick convenient taking out of dust guard, then the cooperation through sleeve pipe and spring beam can improve the precision of drilling, after drilling finishes, hydraulic telescoping rod opposite direction motion, then connect the dirt mouth to descend, through the inside waste material suction of the hole after dust absorption pump will drill, then discharge into through the dust absorption pipe and deposit the dirt case, improved practical function.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a left side view of the structure of the anti-slip cover, the water-absorbing sponge strip and the anti-slip strip;
fig. 3 is a sectional view of the mounting frame and the limiting pulling plate of the present invention.
The labels in the figure are: 1-punching mechanism, 111-dust receiving port, 112-dust guard, 113-drill bit, 114-dust receiving pipe, 115-spring rod, 116-fixing plate, 117-connecting block, 118-sleeve, 2-limiting rod, 3-lifting seat, 4-adjusting mechanism, 401-shell, 402-rotating rod, 403-adjusting handle, 404-driving gear, 405-bearing seat, 406-driven gear, 407-screw rod, 5-bottom plate, 6-control switch, 7-self-locking universal wheel, 8-dust storage box, 9-dust suction pump, 10-dust suction pipe, 11-mounting seat, 12-moving column, 13-frame, 14-hydraulic cylinder, 15-hydraulic telescopic rod and 16-motor.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the invention.
Referring to fig. 1-3, a wall perforating device for building construction decoration comprises a bottom plate 5, a self-locking universal wheel 7 is arranged at the bottom of the bottom plate 5, a dust storage box 8 is fixedly arranged at the upper end of the right side of the bottom plate 5, a dust suction pump 9 is fixedly connected to the upper end of the dust storage box 8, a dust suction pipe 10 is fixedly connected to the dust suction pump 9, a hydraulic telescopic rod 15 moves in the opposite direction, a dust receiving port 111 descends, waste materials inside a drilled hole are sucked out through the dust suction pump 9 and then discharged into the dust storage box 8 through the dust suction pipe 10, the practical effect is improved, a control switch 6 is fixedly arranged in the middle of the upper end of the bottom plate 5, a driving device is driven to move to a position needing to be drilled through the self-locking universal wheel 7, then an external power supply is connected, the control switch 6 controls the device to operate, an adjusting mechanism 4 is arranged at the upper end of the left side of the bottom plate 5, the adjusting mechanism 4 comprises an adjusting handle 403, a rotating rod 402, Driving gear 404, driven gear 406, lead screw 407, casing 401 and bearing frame 405, casing 401 fixed mounting is in bottom plate 5 upper end, the inside cavity that is provided with of casing 401, it is equipped with dwang 402 to run through on the one end lateral wall in the casing 401, the one end fixedly connected with regulation handle 403 of dwang 402, through adjusting rotation handle 403, drive dwang 402 motion through rotating handle 403, drive driving gear 404 through dwang 402 and rotate, driving gear 404 drives driven gear 406 and rotates, then drive lead screw 407 and rotate, through gag lever post 2 and lift seat 3 cooperation, alright drive removal post 12 reciprocates, alright drive mount pad 11 vertical regulation, rethread pneumatic cylinder 14 drives hydraulic telescoping rod 15 motion, alright realize carrying out drilling treatment to different positions.
A driving gear 404 is fixed to the other end of the rotating rod 402, a lead screw 407 is movably mounted on the upper end of the inner wall of the housing 401 through a bearing seat 405, a driven gear 406 is fixed to the lead screw 407, and the driven gear 406 is meshed with the driving gear 404.
It should be noted that, both sides of the inner wall of the top of the housing 401 are fixedly provided with the limiting rods 2, the screw rod 407 is screwed with the movable column 12 and the lifting seat 3, the upper end of the lifting seat 3 is fixed at the lower end of the movable column 12, and the upper end of the movable column 12 penetrates through the upper side of the housing 401 and is fixedly mounted at the bottom of the mounting seat 11.
It should be noted that the upper end of the mounting seat 11 is fixedly mounted at the bottom of the right side of the frame 13, a hydraulic cylinder 14 is arranged inside the right side of the frame 13, a hydraulic telescopic rod 15 is arranged on the left side of the hydraulic cylinder 14, a motor 16 is fixedly connected to the left side of the hydraulic telescopic rod 15, and a punching mechanism 1 is arranged on the left side of the motor 16 penetrating through the side wall of the frame 13.
It should be noted that, the punching mechanism 1 includes a drill bit 113, a spring rod 115, a sleeve 118, a dust receiving port 111, a fixing plate 116, a dust-proof plate 112, a connecting block 117 and a dust receiving pipe 114, the left side of the motor 16 runs through the connecting block 117 fixedly connected to the frame 13, the drill bit 113 is fixedly connected to the left side of the connecting block 117, the fixing plate 116 is fixedly mounted at the outer end of the left side of the frame 13, the hydraulic telescopic rod 15 is driven by the hydraulic cylinder 14 to move, the drill bit 113 can be driven to move to a drilling position, then the dust-proof plate 112 can be in contact with the wall surface, then the drill bit 113 is driven to rotate by the motor 16, and a workpiece is drilled.
It should be noted that a sleeve 118 is installed on the left side of the fixing plate 116 in a threaded manner, a spring rod 115 is movably installed on the left side of the sleeve 118, the dust guard 112 is fixedly connected to the left end of the spring rod 115, and a dust-proof cavity is formed in the dust guard 112 so that waste materials are blocked in the drilling process, and the drilling waste materials are prevented from splashing everywhere; dust guard 112 makes the waste material that the drilling produced store, and the dust-proof chamber has been seted up at dust guard 112 middle part, and 113 left sides of drill bit run through dust guard 112 and set up in dust guard 112 middle part, and fixed plate 116 upper end fixed mounting has connects dirt pipe 114, connects dirt pipe 114 right side to be connected with dust absorption pipe 10, connects dirt pipe 114 left end fixedly connected with to connect dirt mouth 111.
The working principle is as follows: when using, move the position that needs punched through 7 drive arrangement of auto-lock universal wheel, then external power supply, control switch 6 controlling means functions, rotate handle 403 through the regulation, drive dwang 402 motion through rotating handle 403, drive driving gear 404 through dwang 402 and rotate, driving gear 404 drives driven gear 406 and rotates, then drive lead screw 407 and rotate, cooperate through gag lever post 2 and lift seat 3, alright drive removal post 12 reciprocates, alright drive mount pad 11 vertical regulation, rethread pneumatic cylinder 14 drives the motion of hydraulic telescoping rod 15, alright realize carrying out drilling treatment to different positions.
In the drilling process, the hydraulic telescopic rod 15 is driven to move through the hydraulic cylinder 14, so that the drill bit 113 can be driven to move to the drilling position, then the dust guard 112 can be in contact with the wall surface, then the drill bit 113 is driven to rotate through the motor 16, the workpiece is drilled, and the dust-proof cavity formed in the dust guard 112 blocks waste materials in the drilling process, so that the drilling waste materials are prevented from splashing everywhere; dust guard 112 makes the waste material that the drilling produced store, then through the separation of sleeve pipe 118 with fixed plate 116, alright change the washing with quick convenient taking out of dust guard 112, then the precision of drilling can be improved through the cooperation of sleeve pipe 118 and spring beam 115, after drilling finishes, hydraulic telescoping rod 15 opposite direction motion, then connect dirt mouth 111 to descend, through the inside waste material suction of the hole after dust absorption pump 9 will drill, then discharge into through dust absorption pipe 10 and deposit dirt case 8, and the practical function is improved.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (6)

1. The utility model provides a wall perforating device is used to construction fitment, includes bottom plate (5), its characterized in that: the bottom of the bottom plate (5) is provided with a self-locking universal wheel (7), the upper end of the right side of the bottom plate (5) is fixedly provided with a dust storage box (8), the upper end of the dust storage box (8) is fixedly connected with a dust suction pump (9), the dust suction pump (9) is fixedly connected with a dust suction pipe (10), a control switch (6) is fixedly arranged in the middle of the upper end of the bottom plate (5), an adjusting mechanism (4) is arranged at the upper end of the left side of the bottom plate (5), the adjusting mechanism (4) comprises an adjusting handle (403), a rotating rod (402), a driving gear (404), a driven gear (406), a screw rod (407), a shell (401) and a bearing seat (405), the shell (401) is fixedly arranged at the upper end of the bottom plate (5), a cavity is arranged in the shell (401), a rotating rod (402) penetrates through the side wall of one end in the shell (401), one end of the rotating rod (402) is fixedly connected with an adjusting handle (403).
2. A wall surface perforating device for building construction and finishing as claimed in claim 1, wherein: the other end of dwang (402) is fixed with driving gear (404), there is lead screw (407) casing (401) inner wall upper end through bearing frame (405) movable mounting, be fixed with driven gear (406) on lead screw (407), driven gear (406) and driving gear (404) intermeshing.
3. A wall surface perforating device for building construction and finishing as claimed in claim 1, wherein: the equal fixed mounting in casing (401) top inner wall both sides has gag lever post (2), screw thread sleeve has moved post (12) and lift seat (3) on lead screw (407), the lower extreme at removing post (12) is fixed to the upper end of lift seat (3), the upper end of removing post (12) runs through casing (401) upside and fixed mounting in mount pad (11) bottom.
4. A wall surface perforating device for building construction and finishing as claimed in claim 3, characterized in that: mount pad (11) upper end fixed mounting is in frame (13) right side bottom, frame (13) right side inside is provided with pneumatic cylinder (14), the left side of pneumatic cylinder (14) is provided with hydraulic telescoping rod (15), hydraulic telescoping rod (15) left side fixedly connected with motor (16), motor (16) left side is run through frame (13) lateral wall and is provided with mechanism (1) of punching.
5. A wall perforating device for building construction and finishing as claimed in claim 4, wherein: punching mechanism (1) includes drill bit (113), spring beam (115), sleeve pipe (118), connects dirt mouth (111), fixed plate (116), dust guard (112), connecting block (117) and connects dirt pipe (114), motor (16) left side runs through frame (13) fixedly connected with connecting block (117), connecting block (117) left side fixedly connected with drill bit (113), frame (13) left side outer end fixed mounting has fixed plate (116).
6. A wall perforating device for building construction and finishing as claimed in claim 5, wherein: sleeve pipe (118) are installed to fixed plate (116) left side screw thread, sleeve pipe (118) left side movable mounting has spring beam (115), spring beam (115) left end fixedly connected with dust guard (112), the dust-proof chamber has been seted up at dust guard (112) middle part, drill bit (113) left side is run through dust guard (112) and is set up at dust guard (112) middle part, fixed plate (116) upper end fixed mounting has connects dirt pipe (114), connect dirt pipe (114) right side and be connected with dust absorption pipe (10), connect dirt pipe (114) left end fixedly connected with to connect dirt mouth (111).
CN202022299206.2U 2020-10-15 2020-10-15 Wall perforating device is used to construction fitment Active CN213797417U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022299206.2U CN213797417U (en) 2020-10-15 2020-10-15 Wall perforating device is used to construction fitment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022299206.2U CN213797417U (en) 2020-10-15 2020-10-15 Wall perforating device is used to construction fitment

Publications (1)

Publication Number Publication Date
CN213797417U true CN213797417U (en) 2021-07-27

Family

ID=76959323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022299206.2U Active CN213797417U (en) 2020-10-15 2020-10-15 Wall perforating device is used to construction fitment

Country Status (1)

Country Link
CN (1) CN213797417U (en)

Similar Documents

Publication Publication Date Title
CN210389700U (en) Wall drilling equipment for construction
CN111673917B (en) Building wall punching device and using method thereof
CN212311054U (en) Cutting device is used in door and window production
CN107553419A (en) One kind building monitoring mark installation auxiliary bore hole device
CN213797417U (en) Wall perforating device is used to construction fitment
CN210850850U (en) Fitment is with fixed perforating device
CN210112982U (en) Machine part drilling equipment
CN211072811U (en) Drilling equipment is used in mechanical equipment production
CN111267240A (en) A perforating device for decoration
CN116658084A (en) Drilling machine for stone blasting and use method
CN216506007U (en) Wall body perforating device
CN214819786U (en) Dustproof perforating device of building wall
CN214687015U (en) Multifunctional engraving machine with rotating mechanism
CN211389559U (en) Outer wall body perforating device is built in room
CN211616160U (en) Furred ceiling support that punches
CN210025185U (en) Punching tool for punching indoor decorative ceiling
CN212121725U (en) Interior decoration perforating device
CN210651358U (en) Perforating device is used to home decoration
CN211866672U (en) But height-adjusting's machining drilling machine
CN211842620U (en) Wall drilling device for indoor construction of high-rise building
CN112720866A (en) Drilling equipment for municipal building with dustproof function
CN212577808U (en) U-shaped cover lifting structure of laser marking machine
CN213971922U (en) Trompil device based on indoor outer decoration work effect
CN112247194A (en) Drilling equipment is used to interior design fitment
CN219061568U (en) Dust removing mechanism of pneumatic caterpillar drilling machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant