CN213741631U - Cast-in-situ plate pre-embedded water supply pipe hanging support - Google Patents
Cast-in-situ plate pre-embedded water supply pipe hanging support Download PDFInfo
- Publication number
- CN213741631U CN213741631U CN202022413087.9U CN202022413087U CN213741631U CN 213741631 U CN213741631 U CN 213741631U CN 202022413087 U CN202022413087 U CN 202022413087U CN 213741631 U CN213741631 U CN 213741631U
- Authority
- CN
- China
- Prior art keywords
- connecting rod
- cast
- built
- fitting
- water supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 20
- 238000011065 in-situ storage Methods 0.000 title description 2
- 238000010079 rubber tapping Methods 0.000 claims abstract description 11
- 239000003292 glue Substances 0.000 claims description 6
- 230000006378 damage Effects 0.000 abstract description 9
- 238000004080 punching Methods 0.000 abstract description 5
- 239000000428 dust Substances 0.000 abstract description 3
- 238000009434 installation Methods 0.000 abstract description 3
- 210000002345 respiratory system Anatomy 0.000 abstract description 2
- 239000002893 slag Substances 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 6
- 238000010276 construction Methods 0.000 description 5
- 239000000463 material Substances 0.000 description 3
- 239000000853 adhesive Substances 0.000 description 2
- 230000001070 adhesive effect Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a cast-in-place board is pre-buried to feed pipe hangs support, including the built-in fitting, the built-in fitting below is equipped with the connecting rod, is connected through self-tapping screw between connecting rod and the built-in fitting, and self-tapping screw carries out pre-buried installation with the built-in fitting along the lofting setpoint on the template, and the connecting rod bottom is connected with the expansion connector, enlarges connector below and is equipped with water piping connection annular buckle in addition, and water piping connection annular buckle is two symmetry semicircle arcuations and detains, connects by a set of supporting bolt. The time for using the herringbone ladder and the electric drill by workers is reduced, and the safety management cost is saved. Meanwhile, the damage of punching and slag dropping to the eyes of workers is avoided, and the harm of dust to the respiratory system of the workers is reduced.
Description
Technical Field
The utility model relates to a construction process method field specifically is a cast-in-place board is pre-buried to feed pipe and is hung support.
Background
The traditional construction method is that after a floor slab is poured and demoulded, secondary drilling is carried out to embed an expansion bolt fixing and hanging support. The consumed materials and labor are large, and the quality defects of secondary damage such as damage to a water and electricity embedded pipeline, damage to a steel bar protection layer, damage to a floor slab, water resistance and the like exist. Aiming at the current situation, the construction method of the hydroelectric installation hoisting support is improved by our company, the water pipe hoisting support is fixed on a template in advance by changing the working procedures, and then concrete is poured. The construction process can improve the construction efficiency, save materials and avoid the damage of the cast-in-place floor slab.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model discloses a cast-in-place board is pre-buried to feed pipe and is hung support.
The technical scheme of the utility model is that: cast-in-place board is pre-buried to feed pipe hangs support, including the built-in fitting, the built-in fitting below is equipped with the connecting rod, is connected through self-tapping screw between connecting rod and the built-in fitting, and the connecting rod bottom is connected with the enlarged connector, enlarges connector below and is equipped with water piping connection annular buckle additional, and water piping connection annular buckle is two symmetry semicircle arcuations and detains, is connected by a set of supporting bolt.
Further, the embedded part is in a horn mouth shape.
Furthermore, the joints among the connecting rods, the embedded parts and the self-tapping screws are coated with adhesive glue.
Furthermore, the inner diameter of the enlarged connector is matched with the outer diameter of the connecting rod, and special connecting glue is coated on the connecting part of the connecting rod and the enlarged connector.
The utility model discloses an useful part: the time for workers to use the herringbone ladder and the electric drill is reduced, and the safety management cost is saved. Meanwhile, the damage of punching and slag dropping to the eyes of workers is avoided, and the harm of dust to the respiratory system of the workers is reduced. For the traditional process of embedding expansion bolts after punching, the punching production of building rubbish is reduced, and the punching production noise and dust pollution are effectively avoided. The field workload is greatly reduced, the use of expansion bolts is saved, and the purpose of saving labor and material cost is achieved. Embodies the people-oriented spirit and accords with the policy road of sustainable development of China.
Drawings
Fig. 1 is a schematic diagram of the structure of the pre-embedding stage of the present invention;
figure 2 shows the mounting stage of the hanging bracket of the utility model
FIG. 3 is a sectional view of the components and the installation of the hanging bracket of the present invention
Wherein: 1. the concrete wall is characterized by comprising an embedded part, 2, a template, 3, a self-tapping screw, 4, concrete, 5, a connecting rod, 6 and an enlarged connecting head, 7, a water pipe connecting annular buckle, 8 and a matched bolt.
Detailed Description
In order to deepen the understanding of the present invention, the following detailed description is given with reference to the accompanying drawings, which are only used for explaining the present invention and do not constitute a limitation to the protection scope of the present invention.
As shown in figures 1-3, the cast-in-place plate pre-buried water supply pipe hanging bracket support comprises an embedded part 1, wherein the embedded part 1 is in a horn mouth shape, a connecting rod 5 is arranged below the embedded part 1, the connecting rod 5 is connected with the embedded part 1 through a self-tapping screw 3, the connecting part between the connecting rod 5, the embedded part 1 and the self-tapping screw 3 is coated with adhesive glue, the connecting capacity is enhanced, and the connection quality problem generated after the screw is aged and rusted in the later period is prevented, the self-tapping screw 3 pre-buries and installs the embedded part 1 on a template 2 along a lofting positioning point, an enlarged connecting head 6 is connected to the bottom of the connecting rod 5, the inner diameter of the enlarged connecting head 6 is matched with the outer diameter of the connecting rod 5, the connecting rod 5 and the enlarged connecting head 6 are coated with special connecting glue, a water pipe connecting annular buckle 7 is arranged below the enlarged connecting head 6, the water pipe connecting annular buckle 7 is two semicircular symmetrical arc buckles, the buckle is for making things convenient for maintenance and the change of later stage water pipe, is connected by a set of supporting bolt, and the in-process of being pour in concrete 4 after built-in fitting 1 is accomplished all needs nurse and the inspection to built-in fitting 1, pours when this layer of concrete 4 and accomplishes to expose the screw mouth to built-in fitting and the self-tapping screw 3 of built-in fitting and inspect, whether have by concrete pollution. If the abnormity is found, measures are required to be taken in time to clean.
Claims (4)
1. Cast-in-place board is pre-buried to feed pipe hangs support, its characterized in that: the novel water pipe connecting structure is characterized by comprising an embedded part, wherein a connecting rod is arranged below the embedded part, the connecting rod is connected with the embedded part through a self-tapping screw, the bottom of the connecting rod is connected with an expanding connecting head, a water pipe connecting annular buckle is additionally arranged below the expanding connecting head, the water pipe connecting annular buckle is two symmetrical semicircular arc-shaped buckles, and the two symmetrical semicircular arc-shaped buckles are connected through a group of matched bolts.
2. The cast-in-place plate embedded water supply pipe hanging support seat as claimed in claim 1, wherein: the embedded part is in a horn mouth shape.
3. The cast-in-place plate embedded water supply pipe hanging support seat as claimed in claim 1, wherein: and the joint among the connecting rod, the embedded part and the self-tapping screw is coated with bonding glue.
4. The cast-in-place plate embedded water supply pipe hanging support seat as claimed in claim 1, wherein: the inner diameter of the enlarged connector is matched with the outer diameter of the connecting rod, and the connecting rod and the enlarged connector are coated with special connecting glue at the connecting part.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022413087.9U CN213741631U (en) | 2020-10-27 | 2020-10-27 | Cast-in-situ plate pre-embedded water supply pipe hanging support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022413087.9U CN213741631U (en) | 2020-10-27 | 2020-10-27 | Cast-in-situ plate pre-embedded water supply pipe hanging support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213741631U true CN213741631U (en) | 2021-07-20 |
Family
ID=76854341
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022413087.9U Expired - Fee Related CN213741631U (en) | 2020-10-27 | 2020-10-27 | Cast-in-situ plate pre-embedded water supply pipe hanging support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213741631U (en) |
-
2020
- 2020-10-27 CN CN202022413087.9U patent/CN213741631U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103498523B (en) | Floor system | |
CN103061504B (en) | Concrete slab Pipe installing hole to be provided construction mould and construction method | |
CN201217619Y (en) | Repeatedly-usable assembled tower crane attachment support | |
CN206616862U (en) | Formwork root bracing means | |
CN206655356U (en) | A kind of precast facade hanging plate and agent structure attachment means | |
CN102518300B (en) | Embedded conical bearing joint type steel structural support and construction method thereof | |
CN213741631U (en) | Cast-in-situ plate pre-embedded water supply pipe hanging support | |
CN204001270U (en) | A kind of reinforced concrete wall and masonry wall syndeton | |
CN210273410U (en) | Pre-buried fixing device of block terminal | |
CN211058344U (en) | Simple, quick and efficient beam penetrating steel sleeve pre-embedding structure | |
CN115628327A (en) | A pre-buried device for electromechanical pipeline gallows | |
CN104831924A (en) | Construction method for PVC piping of incoming and outgoing lines of distribution box at beam bottom | |
CN205476491U (en) | Outer wall post template bottom consolidates uses pre -cast screw | |
CN204677906U (en) | Integral riser | |
CN202416340U (en) | Mounting structure of support for large-diameter air duct | |
CN112809891A (en) | Construction method of prefabricated wall board and used preformed hole tool | |
CN217500581U (en) | Fixing device for suspension pipeline | |
CN218933847U (en) | Anti-eccentric sleeve inner and outer support system | |
CN212561934U (en) | Novel connecting device for avoiding collision between wire pipe and composite floor truss rib | |
CN216949503U (en) | Can have enough to meet need buried sleeve pipe in advance | |
CN217500583U (en) | A mould for producing suspension member embedded nut | |
CN205242695U (en) | Take superimposed shear wall of keyway that shears | |
CN211816425U (en) | Runner fast-supporting mold | |
CN213709891U (en) | Threaded connection pre-embedding device for fixing suspender | |
CN211572575U (en) | Template supporting structure at outer wall construction joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210720 |
|
CF01 | Termination of patent right due to non-payment of annual fee |