CN213717577U - Line deicing device for operation and maintenance operation of 10kV distribution line - Google Patents

Line deicing device for operation and maintenance operation of 10kV distribution line Download PDF

Info

Publication number
CN213717577U
CN213717577U CN202022842233.XU CN202022842233U CN213717577U CN 213717577 U CN213717577 U CN 213717577U CN 202022842233 U CN202022842233 U CN 202022842233U CN 213717577 U CN213717577 U CN 213717577U
Authority
CN
China
Prior art keywords
fixedly connected
block
circuit
rod
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022842233.XU
Other languages
Chinese (zh)
Inventor
刘明
张乐
高楚越
丛伟岩
王国宇
李文浩
索力
张博
王含宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022842233.XU priority Critical patent/CN213717577U/en
Application granted granted Critical
Publication of CN213717577U publication Critical patent/CN213717577U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a 10kV distribution lines fortune dimension circuit defroster for operation, including the dead lever, the bottom fixedly connected with baffle of dead lever, the bottom fixedly connected with handle of baffle, the top fixedly connected with fixed block of dead lever, the top fixedly connected with connecting rod of fixed block, the first fixed plate of top fixedly connected with of connecting rod, the utility model relates to a power equipment technical field. This 10kV distribution lines fortune dimension circuit defroster for operation has reached staff operation dead lever and pull rod for first guide pulley cooperatees with the second guide pulley, and it is fixed to carry out the centre gripping to the circuit, and the staff of being convenient for stimulates, and then extrudees the circuit, reduces the ice-cube on circuit surface, sets up and hits the device of beating, is convenient for hit the circuit of centre gripping and hit the device, further reduces the ice-cube on circuit surface, makes things convenient for the staff to operate, satisfies user demand's purpose.

Description

Line deicing device for operation and maintenance operation of 10kV distribution line
Technical Field
The utility model relates to a power equipment field, more specifically say, relate to a 10kV distribution lines fortune dimension circuit defroster for operation.
Background
In winter every year, the phenomenon of icing of transmission lines in China is very common, the mechanical and electrical properties of the transmission lines are rapidly reduced due to icing and accumulated snow, serious electric power accidents such as conductor galloping, tower inclination and even collapse, line breakage, insulator flashover and the like are caused, the safe operation of an electric power system is seriously influenced, and workers need to regularly deice the lines. At present, current 10kV distribution lines fortune dimension line defroster for operation, the structure is complicated, and the staff of being not convenient for operates, influences the efficiency of construction, and work efficiency is low, can't satisfy the user demand.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
Aiming at the problems of complex structure, inconvenient operation by workers, influence on construction efficiency, low working efficiency and incapability of meeting the use requirement of the existing line deicer for the operation and maintenance operation of the 10kV distribution line in the prior art, the utility model aims to provide a line deicer for the operation and maintenance operation of the 10kV distribution line, which can realize that a fixed rod, a baffle, a handle, a fixed block, a connecting rod, a first fixed plate, a first installation frame, a first guide wheel, a pull rod, a second fixed plate, a second installation frame and a second guide wheel form a whole, the workers operate the fixed rod and the pull rod to enable the first guide wheel to be matched with the second guide wheel to clamp and fix the line, thereby facilitating the pulling of the workers to extrude the line, reducing ice blocks on the surface of the line, arranging a striking device to strike the clamped line conveniently, further reduce the circuit surface ice-cube, make things convenient for the staff to operate, satisfy the user demand.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
The utility model provides a 10kV distribution lines fortune dimension circuit defroster for operation, includes the dead lever, the bottom fixedly connected with baffle of dead lever, the bottom fixedly connected with handle of baffle, the top fixedly connected with fixed block of dead lever, the top fixedly connected with connecting rod of fixed block, the first fixed plate of top fixedly connected with of connecting rod, the first installing frame of lateral wall fixedly connected with of first fixed plate, the inside of first installing frame is provided with first guide pulley, connecting rod sliding connection has the second fixed plate, the bottom fixedly connected with pull rod of second fixed plate, pull rod and fixed block sliding connection, the lateral wall fixedly connected with second installing frame of second fixed plate, the inside of second installing frame is provided with the second guide pulley, the second guide pulley is corresponding with first guide pulley.
Preferably, the side wall of the fixed block is provided with a striking device, and the striking device is fixedly connected with the fixed block through a fixed bolt.
Preferably, hit and beat the device and include the mounting panel, the top fixedly connected with limiting plate of mounting panel, limiting plate sliding connection has the motion pole, the top fixedly connected with supporting shoe of motion pole, the top fixedly connected with installation piece of supporting shoe, the top fixedly connected with metal block of installation piece, the bottom fixedly connected with supporting spring of supporting shoe, supporting spring cup joints with the motion pole, the supporting shoe is connected with the limiting plate through supporting spring, the bottom fixedly connected with stopper of motion pole.
Preferably, the bottom of the limiting block is fixedly connected with a pulling rope, and the bottom of the pulling rope is fixedly connected with a pull ring.
Preferably, the bottom side wall of the pull rod is fixedly connected with a handle, the side wall of the pull rod is provided with a mounting bolt, the side wall of the fixed rod is provided with a clamping groove, and the mounting bolt corresponds to the clamping groove.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of: through the fixed rod, the baffle, the handle, the fixed block, the connecting rod, the first fixed plate, the first installation frame, the first guide wheel, the pull rod, the second fixed plate, the second installation frame and the second guide wheel form a whole, a worker operates the fixed rod and the pull rod to enable the first guide wheel to be matched with the second guide wheel to clamp and fix the line, the worker can conveniently pull the handle to drive the whole to move and further extrude the line to reduce ice blocks on the surface of the line, the striking device is arranged to conveniently strike the clamped line and further reduce the ice blocks on the surface of the line, the worker pulls the limiting block to move downwards to drive the moving rod to move to drive the supporting block to move downwards to drive the installation block to move downwards to drive the metal block to move downwards to increase the elastic potential energy of the supporting spring and then loosens the limiting block, the elastic potential energy of the supporting spring is converted into kinetic energy, the metal block is driven to reset, the metal block strikes the circuit to crush the ice block, the ice block is convenient for workers to deice, the pull ring and the traction rope are arranged to facilitate the workers to operate, when the workers clamp and fix the circuit, the mounting bolt is clamped with the clamping groove to limit the first guide wheel and the second guide wheel, the mounting stability is improved, the workers can clean the circuit conveniently, the fixing rod, the baffle plate, the handle, the fixing block, the connecting rod, the first fixing plate, the first mounting frame, the first guide wheel, the pull rod, the second fixing plate, the second mounting frame and the second guide wheel are integrated, the fixing rod and the pull rod are operated by the workers to match the first guide wheel and the second guide wheel to clamp and fix the circuit, the workers can pull the circuit conveniently to extrude the circuit, and the ice block on the surface of the circuit is reduced, the setting is hit and is beaten the device, is convenient for hit the circuit of centre gripping and hit, further reduces the surperficial ice-cube of circuit, makes things convenient for the staff to operate, satisfies user demand's purpose.
Drawings
Fig. 1 is a schematic view of the overall installation structure of the present invention;
fig. 2 is a schematic view of the mounting structure of the first guide wheel and the second guide wheel of the present invention;
FIG. 3 is a schematic structural view of the striking device of the present invention;
fig. 4 is a schematic view of a part of an enlarged structure of fig. 2 according to the present invention.
The reference numbers in the figures illustrate:
1. fixing the rod; 2. a baffle plate; 3. a handle; 4. a fixed block; 5. a connecting rod; 6. a first fixing plate; 7. a first mounting frame; 8. a first guide wheel; 9. a pull rod; 10. a second fixing plate; 11. a second mounting frame; 12. a second guide wheel; 13. a striking device; 131. mounting a plate; 132. a limiting plate; 133. a motion bar; 134. a support block; 135. mounting blocks; 136. a metal block; 137. a support spring; 138. a limiting block; 14. fixing the bolt; 15. a hauling rope; 16. a pull ring; 17. a grip; 18. installing a bolt; 19. a clamping groove.
Detailed Description
The drawings in the embodiments of the present invention will be combined; the technical scheme in the embodiment of the utility model is clearly and completely described; obviously; the described embodiments are only some of the embodiments of the present invention; rather than all embodiments. Based on the embodiment of the utility model; all other embodiments obtained by a person skilled in the art without making any inventive step; all belong to the protection scope of the utility model.
Example 1:
referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a 10kV distribution lines fortune dimension circuit defroster for operation, including dead lever 1, the bottom fixedly connected with baffle 2 of dead lever 1, the bottom fixedly connected with handle 3 of baffle 2, the top fixedly connected with fixed block 4 of dead lever 1, the top fixedly connected with connecting rod 5 of fixed block 4, the first fixed plate 6 of the top fixedly connected with of connecting rod 5, the first installing frame 7 of the lateral wall fixedly connected with of first fixed plate 6, the inside of first installing frame 7 is provided with first guide pulley 8, 5 sliding connection of connecting rod have second fixed plate 10, the bottom fixedly connected with pull rod 9 of second fixed plate 10, pull rod 9 and 4 sliding connection of fixed block, the lateral wall fixedly connected with second installing frame 11 of second fixed plate 10, the inside of second installing frame 11 is provided with second guide pulley 12, second guide pulley 12 is corresponding with first guide pulley 8. Dead lever 1, baffle 2, handle 3, fixed block 4, connecting rod 5, first fixed plate 6, first installing frame 7, first guide pulley 8, pull rod 9, second fixed plate 10, second installing frame 11 constitutes a whole with second guide pulley 12, staff operation dead lever 1 and pull rod 9, make first guide pulley 8 and second guide pulley 12 cooperate, it is fixed to carry out the centre gripping to the circuit, the staff of being convenient for stimulates handle 3, drive whole removal, and then extrude the circuit, reduce the ice-cube on circuit surface.
Example 2:
referring to fig. 1, a line deicing device for operation and maintenance of a 10kV distribution line is substantially the same as in embodiment 1, and further, a striking device 13 is disposed on a side wall of a fixed block 4, and the striking device 13 is fixedly connected to the fixed block 4 through a fixing bolt 14. The striking device 13 is arranged, so that striking can be conveniently carried out on the clamped circuit, and ice blocks on the surface of the circuit are further reduced.
Example 3:
referring to fig. 3, a line deicing device for operation and maintenance of a 10kV distribution line is substantially the same as in embodiment 2, and further, the striking device 13 includes an installation plate 131, a top portion of the installation plate 131 is fixedly connected with a limiting plate 132, the limiting plate 132 is slidably connected with a moving rod 133, a top portion of the moving rod 133 is fixedly connected with a supporting block 134, a top portion of the supporting block 134 is fixedly connected with an installation block 135, a top portion of the installation block 135 is fixedly connected with a metal block 136, a bottom portion of the supporting block 134 is fixedly connected with a supporting spring 137, the supporting spring 137 is sleeved with the moving rod 133, the supporting block 134 is connected with the limiting plate 132 through the supporting spring 137, and a bottom portion of the moving. Staff pulls the limiting block 138 to move downwards to drive the moving rod 133 to move, the supporting block 134 is driven to move downwards to drive the mounting block 135 to move, the metal block 136 is driven to move downwards to increase the elastic potential energy of the supporting spring 137, then the limiting block 138 is loosened, the elastic potential energy of the supporting spring 137 is converted into kinetic energy to drive the metal block 136 to reset, the metal block 136 hits a line, ice blocks are further crushed, and the staff can conveniently deice.
Example 4:
referring to fig. 1, a line deicing device for operation and maintenance of a 10kV distribution line is substantially the same as in embodiment 3, and further, a pull rope 15 is fixedly connected to the bottom of the limiting block 138, and a pull ring 16 is fixedly connected to the bottom of the pull rope 15. The pull ring 16 and the pull rope 15 are arranged, so that the operation of workers is facilitated.
Example 5:
referring to fig. 4, a 10kV distribution line deicing device for operation and maintenance work is substantially the same as in embodiment 1, and further, a handle 17 is fixedly connected to a bottom side wall of the pull rod 9, a mounting bolt 18 is disposed on a side wall of the pull rod 9, a clamping groove 19 is disposed on a side wall of the fixing rod 1, and the mounting bolt 18 corresponds to the clamping groove 19. When the staff carries out the centre gripping fixedly to the circuit, utilize construction bolt 18 and draw-in groove 19 to carry out the joint, and then restrict first guide pulley 8 and second guide pulley 12, improve installation stability, make things convenient for the staff to clear up the circuit ice-cube.
The above; is only a preferred embodiment of the present invention; however, the scope of protection of the present invention is not limited thereto; any person skilled in the art is within the technical scope of the present disclosure; according to the technical scheme of the utility model and the improvement conception, equivalent substitution or change is carried out; are all covered by the protection scope of the utility model.

Claims (5)

1. The utility model provides a 10kV distribution lines fortune dimension line defroster for operation, includes dead lever (1), its characterized in that: the bottom of the fixing rod (1) is fixedly connected with a baffle (2), the bottom of the baffle (2) is fixedly connected with a handle (3), the top of the fixing rod (1) is fixedly connected with a fixing block (4), the top of the fixing block (4) is fixedly connected with a connecting rod (5), the top of the connecting rod (5) is fixedly connected with a first fixing plate (6), the side wall of the first fixing plate (6) is fixedly connected with a first mounting frame (7), a first guide wheel (8) is arranged inside the first mounting frame (7), the connecting rod (5) is slidably connected with a second fixing plate (10), the bottom of the second fixing plate (10) is fixedly connected with a pull rod (9), the pull rod (9) is slidably connected with the fixing block (4), and the side wall of the second fixing plate (10) is fixedly connected with a second mounting frame (11), and a second guide wheel (12) is arranged in the second mounting frame (11), and the second guide wheel (12) corresponds to the first guide wheel (8).
2. The line deicing device for the operation and maintenance work of the 10kV distribution line according to claim 1, characterized in that: the side wall of the fixed block (4) is provided with a striking device (13), and the striking device (13) is fixedly connected with the fixed block (4) through a fixed bolt (14).
3. The line deicing device for the operation and maintenance work of the 10kV distribution line according to claim 2, characterized in that: hit and put (13) including mounting panel (131), top fixedly connected with limiting plate (132) of mounting panel (131), limiting plate (132) sliding connection has motion pole (133), top fixedly connected with supporting shoe (134) of motion pole (133), the top fixedly connected with installation piece (135) of supporting shoe (134), the top fixedly connected with metal block (136) of installation piece (135), the bottom fixedly connected with supporting spring (137) of supporting shoe (134), supporting spring (137) cup joint with motion pole (133), supporting shoe (134) are connected with limiting plate (132) through supporting spring (137), the bottom fixedly connected with limiting block (138) of motion pole (133).
4. The line deicing device for operation and maintenance work of a 10kV distribution line according to claim 3, characterized in that: the bottom of the limiting block (138) is fixedly connected with a hauling rope (15), and the bottom of the hauling rope (15) is fixedly connected with a pull ring (16).
5. The line deicing device for the operation and maintenance work of the 10kV distribution line according to claim 1, characterized in that: the handle (17) is fixedly connected to the side wall of the bottom of the pull rod (9), the mounting bolt (18) is arranged on the side wall of the pull rod (9), the clamping groove (19) is formed in the side wall of the fixed rod (1), and the mounting bolt (18) corresponds to the clamping groove (19).
CN202022842233.XU 2020-12-02 2020-12-02 Line deicing device for operation and maintenance operation of 10kV distribution line Expired - Fee Related CN213717577U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022842233.XU CN213717577U (en) 2020-12-02 2020-12-02 Line deicing device for operation and maintenance operation of 10kV distribution line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022842233.XU CN213717577U (en) 2020-12-02 2020-12-02 Line deicing device for operation and maintenance operation of 10kV distribution line

Publications (1)

Publication Number Publication Date
CN213717577U true CN213717577U (en) 2021-07-16

Family

ID=76785704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022842233.XU Expired - Fee Related CN213717577U (en) 2020-12-02 2020-12-02 Line deicing device for operation and maintenance operation of 10kV distribution line

Country Status (1)

Country Link
CN (1) CN213717577U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113765040A (en) * 2021-10-20 2021-12-07 山东职业学院 Transmission line icing removing device on railway electric power electrical engineering
CN114421353A (en) * 2021-12-22 2022-04-29 贵州电网有限责任公司 Rapid vine removing device for 10KV distribution line
CN115400989A (en) * 2022-08-12 2022-11-29 国网河北省电力有限公司元氏县供电分公司 Electrified overhead line foreign matter removing equipment for electric power construction
CN115739714A (en) * 2022-10-26 2023-03-07 贵州电网有限责任公司 Distribution lines icing clearing device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113765040A (en) * 2021-10-20 2021-12-07 山东职业学院 Transmission line icing removing device on railway electric power electrical engineering
CN113765040B (en) * 2021-10-20 2023-03-10 山东职业学院 Transmission line icing removing device on railway electric power electrical engineering
CN114421353A (en) * 2021-12-22 2022-04-29 贵州电网有限责任公司 Rapid vine removing device for 10KV distribution line
CN114421353B (en) * 2021-12-22 2024-01-02 贵州电网有限责任公司 A remove rattan device fast for 10KV distribution lines
CN115400989A (en) * 2022-08-12 2022-11-29 国网河北省电力有限公司元氏县供电分公司 Electrified overhead line foreign matter removing equipment for electric power construction
CN115739714A (en) * 2022-10-26 2023-03-07 贵州电网有限责任公司 Distribution lines icing clearing device

Similar Documents

Publication Publication Date Title
CN213717577U (en) Line deicing device for operation and maintenance operation of 10kV distribution line
CN205666589U (en) Wire deicing instrument
CN201466633U (en) Deicing combination tool for substation
CN201975744U (en) Electric-power deicing tool
CN207339038U (en) Electrodynamic type substation deicer
CN116885656A (en) Deicing device for high-voltage cable of power distribution network
CN209608293U (en) A kind of transmission line deicer
CN102611064A (en) Manual line icing cleaning machine
CN208337026U (en) A kind of distribution cable deicing bar
CN201639196U (en) Insulating tool set
CN212435211U (en) Universal fixture for live replacement of strain duplex insulator string
CN201821069U (en) Deicing device for pylon
CN201601453U (en) Manual deicer for overhead transmission lines
CN201478734U (en) Insulator chain splitting and taking off tool
CN209881230U (en) 500 kV transmission line jumper insulator string replacing device
CN208062663U (en) The special line lifter of concurrent
CN204118586U (en) A kind of Simple line mechanical deicing device
CN207053148U (en) A kind of power line network deicer
CN112900342A (en) A instrument for step deicing
CN219960072U (en) Equipment deicer based on overhead transmission line operation and maintenance
CN207144169U (en) A kind of fast easily buckle assembly and containing its quick installation tool
CN214379988U (en) Power transmission and transformation circuit installation and maintenance device
CN112825424A (en) Icing and icebreaking device for high-voltage line in snow disaster
CN206135298U (en) Insulator chain anticreep frame
CN213846191U (en) Lightning protection device for power transmission line

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210716

Termination date: 20211202

CF01 Termination of patent right due to non-payment of annual fee