CN205666589U - Wire deicing instrument - Google Patents

Wire deicing instrument Download PDF

Info

Publication number
CN205666589U
CN205666589U CN201620535784.2U CN201620535784U CN205666589U CN 205666589 U CN205666589 U CN 205666589U CN 201620535784 U CN201620535784 U CN 201620535784U CN 205666589 U CN205666589 U CN 205666589U
Authority
CN
China
Prior art keywords
boom
deicing
groove
assembly
instrument
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620535784.2U
Other languages
Chinese (zh)
Inventor
赵丙军
张龙飞
陈乐强
何长涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KUITUN POWER SUPPLY COMPANY STATE GRID XINJIANG ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Original Assignee
KUITUN POWER SUPPLY COMPANY STATE GRID XINJIANG ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KUITUN POWER SUPPLY COMPANY STATE GRID XINJIANG ELECTRIC POWER Co Ltd, State Grid Corp of China SGCC filed Critical KUITUN POWER SUPPLY COMPANY STATE GRID XINJIANG ELECTRIC POWER Co Ltd
Priority to CN201620535784.2U priority Critical patent/CN205666589U/en
Application granted granted Critical
Publication of CN205666589U publication Critical patent/CN205666589U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cleaning Of Streets, Tracks, Or Beaches (AREA)

Abstract

The utility model discloses a wire deicing instrument, icing or the snowberg of solving present high voltage transmission lines lower extreme adhesion in time do not handle and lead to the fact the transmission line broken string, the shaft tower collapses and the wire collision results in short -circuit fault's problem, this deicing instrument includes stores pylon and deicing subassembly, and the stores pylon contains an arm A and frame arm B at least, is equipped with the pulley between two arms, puts up arm B's length more than or equal to frame arm A's length, the deicing subassembly sets up in arm A's an one end, this deicing subassembly and perpendicular setting of frame arm A, and this deicing subassembly can contact or the separation around the A rotation of frame arm and with an arm B, frame arm B corresponds the position with the deicing subassembly and is equipped with locking device, the snowberg or the icing of high voltage transmission lines lower extreme adhesion can be eradicateed to the deicing subassembly when deicing instrument in this application removed, avoided present and in time do not driven icing or the snowberg of high voltage transmission lines lower extreme adhesion and led to the fact the transmission line broken string, the shaft tower collapses and the wire collides the problem that leads to short -circuit fault.

Description

A kind of conducting wire deicing instrument
Technical field
This utility model belongs to deicing tool technical field, particularly relates to a kind of conducting wire deicing instrument.
Background technology
In the winter time after heavy snow and foggy weather, there is the phenomenon of wire snowberg in various degree in high voltage transmission line Louis, Owing to weather difference variation in Xinjiang region is big in recent years, this snowberg can melt under the change of temperature and be formed during falling Icing sticks in the lower end of high-tension line, if cleared up not in time, this icing not only can bond more accumulated snow or accumulated ice, and And blocked up icing or snowberg are it would be possible to cause transmission line of electricity broken string, shaft tower to collapse and wire collision causes short trouble etc. to be asked Topic, therefore analyses based on the problems referred to above, design a kind of icing that can clear up the adhesion of high-tension line lower end in time or snowberg work Tool is the technical problem that the application is urgently to be resolved hurrily.
Summary of the invention
The purpose of this utility model is to provide a kind of conducting wire deicing instrument, solves the icing of existing high-tension line lower end adhesion Or snowberg processes the most in time and causes the problem that transmission line of electricity broken string, shaft tower collapse and wire collision causes short trouble.
In order to solve the problems referred to above, this application provides a kind of conducting wire deicing instrument, including hanger (1) and deicing assembly (2), described hanger (1) includes at least boom A (11) and boom B (12), and the length of described boom B (12) is more than or equal to described frame The length of arm A (11), is provided with at least one pulley (14) between described boom A (11) and described boom B (12);
Described deicing assembly (2) is arranged on one end of described boom A (11), described deicing assembly (2) and described boom A (11) it is vertically arranged, and described deicing assembly (2) can rotate around described boom A (11) and contact with described boom B (12) or divide From;
Described boom B (12) and described deicing assembly (2) correspondence position are equipped with locker.
As the preferred version of the application, the end of described boom A (11) is provided with adjusting rod (13), described deicing assembly (2) it is vertically set on this adjusting rod (13), utilizes this adjusting rod (13) deicing assembly (2) can be realized described boom A (11) The regulation of vertical direction position.
As the preferred version of the application, described deicing assembly (2) comprises ice remover (21), union joint (22) and insulating bar (23), described insulating bar (23) is connected with described union joint (22), and described union joint (22) is arranged on described ice remover (21).
As the preferred version of the application, comprising operating direction rope (25), described operating direction rope (25) is arranged on described On union joint (22);
Or described ice remover (21) or described union joint (22) are provided with clasp (24), described operating direction rope (25) is arranged In described clasp (24).
As the preferred version of the application, the concrete structure of described locker is, is arranged on described deicing assembly (2) The shackle (212) of end or groove A (211), be arranged on the fastener of described boom B (12) one end, and described fastener is at least one Individual and described shackle (212) or groove B (121) corresponding to groove A (211), or at least one and described shackle (212) or groove The snap ring (122) that A (211) mutually fastens.
As the preferred version of the application, comprising hit agency (3), described hit agency (3) is arranged on described boom A (11) and/or the side of boom B (12), described hit agency (3) comprises hammer (31) and lifting rope (32).
Compared with prior art, this application provides a kind of conducting wire deicing instrument, this deicing tool includes hanger 1 and deicing Assembly 2, hanger 1, including at least boom A11 and boom B12, is provided with pulley 14, in the present embodiment, boom B12 between two booms Length more than or equal to the length of boom A11;In order to root out snowberg or the icing of the adhesion of high-tension line lower end, preferably deicing in time Assembly 2 is arranged on one end of boom A11, and this deicing assembly 2 is vertically arranged with boom A11, and this deicing assembly 2 can be around boom A11 rotates and contacts with described boom B12 or separate, and boom B12 and deicing assembly 2 correspondence position are provided with locker, utilizes Deicing assembly 2 described in this locker rotates around described boom A11 and can realize and the tripping or snap close, when removing of described boom B12 After ice assembly 2 and boom B12 snap close, deicing assembly 2, boom B12, boom A11 and pulley 14 define wire 4 and accommodate chamber, Time specifically used, pulley 14 frame, on high-tension line, is arranged on the lower end of high-tension line after deicing assembly 2 and boom B12 snap close, Along with the movement of deicing tool, deicing assembly 2 can root out snowberg or the icing of high-tension line lower end adhesion, it is to avoid existing not and Time remove the icing of high-tension line lower end adhesion or snowberg and cause transmission line of electricity broken string, shaft tower to collapse and wire 4 collision causes The problem of short trouble.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of conducting wire deicing instrument that this utility model embodiment one provides;
Fig. 2 is the side view of a kind of boom B that this utility model embodiment one provides;
Fig. 3 is the side view of a kind of deicing assembly that this utility model embodiment one provides;
Fig. 4 is the side view of the another kind of boom B that this utility model embodiment one provides;
Fig. 5 is the side view of the another kind of deicing assembly that this utility model embodiment one provides;
Fig. 6 is the structural representation of a kind of adjusting rod that this utility model embodiment two provides;
Fig. 7 is the structural representation of the conducting wire deicing instrument being provided with hit agency that this utility model embodiment three provides.
Reference
Hanger 1, boom A11, boom B12, groove B121, snap ring 122, adjusting rod 13, pulley 14, central shaft 15, crossbeam Arm 16, deicing assembly 2, ice remover 21, groove A211, shackle 212, union joint 22, insulating bar 23, clasp 24, operating direction rope 2525, hit agency 3, play hammer 31, lifting rope 32, wire 4.
Detailed description of the invention
For making the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with accompanying drawing to this The embodiment of utility model is described in detail.
Embodiment 1:
Present embodiments provide a kind of simple in construction, conducting wire deicing instrument easy to use, see Fig. 1, this deicing tool Including hanger 1 and deicing assembly 2;Hanger 1 is including at least boom A11 and boom B12, flat between described boom A11 and boom B12 Row is arranged or non-parallel setting, and the length that the length of described boom B12 is more than or equal to boom A11;Described boom A11 and boom Being provided with at least one pulley 14 between B12, described pulley 14 welds or is screwed onto described boom A11 and boom by central shaft 15 Between B12, during use, described pulley 14 frame is on the wire 4 of described high-tension line, so, can facilitate deicing tool at height Walk on pressure wire 4.
In the present embodiment, the described U-shaped structure of hanger 1 or trapezium structure, the most described hanger 1 U-shape structure in back-off, Be exactly i.e. described hanger 1 in addition to being provided with boom A11 and boom B12, be additionally provided with connection described boom A11 and the horizontal stroke of boom B12 Beam arm 16.
It is arranged on boom A11's to root out snowberg or the icing of the adhesion of high-tension line lower end, preferably deicing assembly 2 in time End or side, this deicing assembly 2 is vertically arranged with boom A11, and this deicing assembly 2 can rotate and with described around boom A11 Boom B12 contact or separation, boom B12 and deicing assembly 2 correspondence position are equipped with locker, utilize described in this locker Deicing assembly 2 rotates around described boom A11 and can realize and the tripping or snap close, when deicing assembly 2 and boom of described boom B12 After B12 snap close, deicing assembly 2, boom B12, boom A11 and pulley 14 define wire 4 and accommodate chamber.
Time specifically used, directly by pulley 14 frame of deicing tool on high-tension line, or in order to deicing effect is more preferable, strike Hit the icing on high-tension line or snowberg makes wire 4 exposed outside ice and snow, then by pulley 14 frame of deicing tool at this high pressure On the wire 4 that circuit is exposed, it is arranged on the lower end of high-tension line after deicing assembly 2 and boom B12 snap close, along with deicing tool Mobile, deicing assembly 2 can root out snowberg or the icing of high-tension line lower end adhesion, it is to avoid existing removes high-tension line the most in time Icing or the snowberg of lower end adhesion and cause transmission line of electricity broken string, shaft tower to collapse and wire 4 collides the problem causing short trouble.
Further, in the present embodiment, described locker concrete structure is, is arranged on described deicing assembly 2 one end Groove A211 and the fastener being arranged on described boom B12 one end, described fastener is at least one and described groove A211 pair The groove B121 answered, sees Fig. 2-3;During use, deicing assembly 2 rotates 180 ° around boom A11, then by groove A211 thereon It is fastened in the groove B121 on boom B12, and then realizes the fastening of deicing assembly 2 and boom B12.
Or in the present embodiment, described fastener is at least one snap ring 122 mutually fastened with described groove A211, ginseng See that Fig. 4, described snap ring 122 are arranged on the medial surface of boom B12 or are arranged on the end of boom B12, during use, deicing assembly 2 Rotate 180 ° around boom A11, then groove A211 thereon is fastened in the snap ring 122 on boom B12, and then realizes deicing The fastening of assembly 2 and boom B12.
Or in the present embodiment, one end of described deicing assembly 2 is provided with shackle 212, described boom B12 is provided with groove B121 or snap ring 122, see Fig. 5, and during use, deicing assembly 2 rotates 180 ° around boom A11, is then blocked by shackle 212 thereon In the snap ring 122 being combined on boom B12 or groove B121, and then realize the fastening of deicing assembly 2 and boom B12.
Further, in the present embodiment, keep flat in order to ensure this wire 4 deicing tool moment on high-tension line Weighing apparatus, is arranged on this wire 4 deicing tool on high-tension line simultaneously for convenience, and the most described deicing assembly 2 comprises ice remover 21, union joint 22 and insulating bar 23, described insulating bar 23 is connected with described union joint 22, described union joint 22 be arranged on described in remove The lower surface of ice assembly 2, in the present embodiment, the most described locker is arranged on the corresponding position of ice remover 21 and boom B12 Put.
In the present embodiment, described insulating bar 23 is preferably insulating telescopic bar.
During use, operator can control the conduct on high-tension line of this deicing tool at any time by insulating bar 23, with Time, staff utilizes this insulating bar 23 to be erected on high-tension line by wire 4 deicing tool, and rotating insulated bar 23, And then drive ice remover 21 to rotate around boom A11, it is achieved the fastening between ice remover 21 and boom B12.
Further, in the present embodiment, the walking of this wire 4 deicing tool, the most described deicing group are dragged for convenience Part 2 also includes that operating direction rope 25, described operating direction rope 25 are bundled on union joint 22;
Or described ice remover 21 or described union joint 22 are provided with clasp 24, described operating direction rope 25 is arranged on described button In ring 24;
During use, can artificial this operating direction rope 25 of tractive, or by driven by motor direction operating direction rope 25.
Embodiment 2:
Compared with Example 1, difference in this case is that, for icing or cover in the size according to wire 4 or wire 4 The thickness of snow regulates the closed position between deicing assembly 2 and boom B12 at any time, and the end of the most described boom A11 is provided with tune Pole 13, described deicing assembly 2 is vertically set on this adjusting rod 13, utilizes this adjusting rod 13 can realize deicing assembly 2 in institute State the regulation of boom A11 vertical direction position, and then realize the regulation of deicing assembly 2 and boom B12 closed position.
In the present embodiment, described adjusting rod 13 is screw-rod structure or is Telescopic rod structure, sees Fig. 6.
In the present embodiment, described adjusting rod 13 is wholely set with described boom A11;Or be individual components, by connecting Part is connected with described boom A11, and the present embodiment preferably this adjusting rod 13 is screw-rod structure, and it is welded on the one of described boom A11 Side or end.
Embodiment 3:
Compared with embodiment 1 or 2, difference in this case is that, in order to avoid on high-tension line, the existence of some position is covered Ice or snowberg are difficult to clear up thoroughly problem, and the present embodiment preferably this deicing tool comprises hit agency 3, described hit agency 3 Being arranged on described boom A11 and/or the side of boom B12, described hit agency 3 comprises hammer 31 and lifting rope 32, sees figure 7;During use, utilize and swing insulating bar 23 and then drive this deicing tool to swing on high-tension line, owing to striking mechanism is arranged In boom A11 and/or the side of boom B12, therefore, it also swings with deicing tool, while swinging, the most permissible Icing on wire 4 or snowberg near tapping.
Above content is to combine specific embodiment further detailed description of the utility model, it is impossible to assert Of the present utility model being embodied as is confined to these explanations.For this utility model person of an ordinary skill in the technical field For, without departing from the concept of the premise utility, it is also possible to make some simple deduction or replace, all should be considered as belonging to In protection domain of the present utility model.

Claims (10)

1. a conducting wire deicing instrument, including hanger (1) and deicing assembly (2), it is characterised in that:
Described hanger (1) includes at least boom A (11) and boom B (12), and the length of described boom B (12) is more than or equal to described frame The length of arm A (11), is provided with at least one pulley (14) between described boom A (11) and described boom B (12);
Described deicing assembly (2) is arranged on one end of described boom A (11), and described deicing assembly (2) is hung down with described boom A (11) Directly arrange, and described deicing assembly (2) can rotate around described boom A (11) and contact with described boom B (12) or separate;
Described boom B (12) and described deicing assembly (2) correspondence position are equipped with locker.
2. conducting wire deicing instrument as claimed in claim 1, it is characterised in that:
The end of described boom A (11) is provided with adjusting rod (13), and described deicing assembly (2) is vertically set on this adjusting rod (13) On, utilize this adjusting rod (13) that the deicing assembly (2) regulation in described boom A (11) vertical direction position can be realized.
3. conducting wire deicing instrument as claimed in claim 1 or 2, it is characterised in that: described deicing assembly (2) comprises ice remover (21), union joint (22) and insulating bar (23), described insulating bar (23) is connected with described union joint (22), described union joint (22) It is arranged on described ice remover (21).
4. conducting wire deicing instrument as claimed in claim 3, it is characterised in that:
Comprising operating direction rope (25), described operating direction rope (25) is arranged on described union joint (22);
Or described ice remover (21) or described union joint (22) are provided with clasp (24), described operating direction rope (25) is arranged on institute State in clasp (24).
5. conducting wire deicing instrument as claimed in claim 1 or 2, it is characterised in that: the concrete structure of described locker is, if Put the shackle (212) in described deicing assembly (2) one end or groove A (211), be arranged on the buckle of described boom B (12) one end Part, described fastener is the groove B (121) that at least one is corresponding with described shackle (212) or groove A (211), or at least one The snap ring (122) mutually fastened with described shackle (212) or groove A (211).
6. conducting wire deicing instrument as claimed in claim 3, it is characterised in that: the concrete structure of described locker is, arranges At shackle (212) or the groove A (211) of described deicing assembly (2) one end, it is arranged on the fastener of described boom B (12) one end, Described fastener is the groove B (121) that at least one is corresponding with described shackle (212) or groove A (211), or at least one with The snap ring (122) that described shackle (212) or groove A (211) mutually fasten.
7. conducting wire deicing instrument as claimed in claim 4, it is characterised in that: the concrete structure of described locker is, arranges At shackle (212) or the groove A (211) of described deicing assembly (2) one end, it is arranged on the fastener of described boom B (12) one end, Described fastener is the groove B (121) that at least one is corresponding with described shackle (212) or groove A (211), or at least one with The snap ring (122) that described shackle (212) or groove A (211) mutually fasten.
8. conducting wire deicing instrument as claimed in claim 1 or 2, it is characterised in that: comprise hit agency (3), described impact machine Structure (3) is arranged on described boom A (11) and/or the side of boom B (12), described hit agency (3) comprise hammer (31) and Lifting rope (32).
9. conducting wire deicing instrument as claimed in claim 3, it is characterised in that: comprise hit agency (3), described hit agency (3) being arranged on described boom A (11) and/or the side of boom B (12), described hit agency (3) comprises hammer (31) and hangs Rope (32).
10. conducting wire deicing instrument as claimed in claim 4, it is characterised in that: comprise hit agency (3), described hit agency (3) being arranged on described boom A (11) and/or the side of boom B (12), described hit agency (3) comprises hammer (31) and hangs Rope (32).
CN201620535784.2U 2016-06-03 2016-06-03 Wire deicing instrument Expired - Fee Related CN205666589U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620535784.2U CN205666589U (en) 2016-06-03 2016-06-03 Wire deicing instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620535784.2U CN205666589U (en) 2016-06-03 2016-06-03 Wire deicing instrument

Publications (1)

Publication Number Publication Date
CN205666589U true CN205666589U (en) 2016-10-26

Family

ID=57157930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620535784.2U Expired - Fee Related CN205666589U (en) 2016-06-03 2016-06-03 Wire deicing instrument

Country Status (1)

Country Link
CN (1) CN205666589U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106898985A (en) * 2017-03-17 2017-06-27 国家电网公司 Multifunction power conducting wire deicing device
CN107294037A (en) * 2016-11-11 2017-10-24 国网山东省电力公司济南市长清区供电公司 A kind of deicer for power transmission line
CN108183455A (en) * 2017-12-20 2018-06-19 国网北京市电力公司 Conducting wire deicing device
CN110571743A (en) * 2019-09-16 2019-12-13 南方电网科学研究院有限责任公司 Handheld defroster of low-voltage transmission line
CN111585235A (en) * 2020-06-01 2020-08-25 蓝枫电气(杭州)有限公司 Cable maintenance tool
CN114006340A (en) * 2021-11-11 2022-02-01 中国南方电网有限责任公司超高压输电公司百色局 Electric wire deicing device

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107294037A (en) * 2016-11-11 2017-10-24 国网山东省电力公司济南市长清区供电公司 A kind of deicer for power transmission line
CN106898985A (en) * 2017-03-17 2017-06-27 国家电网公司 Multifunction power conducting wire deicing device
CN106898985B (en) * 2017-03-17 2024-02-06 国家电网公司 Multifunctional electric power wire deicer
CN108183455A (en) * 2017-12-20 2018-06-19 国网北京市电力公司 Conducting wire deicing device
CN108183455B (en) * 2017-12-20 2020-03-13 国网北京市电力公司 Wire defroster
CN110571743A (en) * 2019-09-16 2019-12-13 南方电网科学研究院有限责任公司 Handheld defroster of low-voltage transmission line
CN111585235A (en) * 2020-06-01 2020-08-25 蓝枫电气(杭州)有限公司 Cable maintenance tool
CN111585235B (en) * 2020-06-01 2021-06-08 蓝枫电气(杭州)有限公司 Cable maintenance tool
CN114006340A (en) * 2021-11-11 2022-02-01 中国南方电网有限责任公司超高压输电公司百色局 Electric wire deicing device
CN114006340B (en) * 2021-11-11 2024-04-02 中国南方电网有限责任公司超高压输电公司百色局 Wire deicing device

Similar Documents

Publication Publication Date Title
CN205666589U (en) Wire deicing instrument
CN106505471B (en) A kind of handgrip adjustable high-voltage pylon removes bird's nest device
CN103904603A (en) Distribution line typhoon-preventing integrated device capable of achieving pole and wire protecting and achieving pole protecting, wire abandoning, energy absorbing and disengaging
CN108599075A (en) Cable deicing device
CN213717577U (en) Line deicing device for operation and maintenance operation of 10kV distribution line
CN203983921U (en) A kind of simple and easy lead wire and earth wire deicer
CN105811308A (en) Special belaying tool for power transmission line
CN205141523U (en) Drive bird equipment fixing dismounting device
CN203242960U (en) Suspended telescopic rigid ladder
CN107018366A (en) High-altitude apparatus for obtaining evidence for 110kV electrical equipments
CN102938545B (en) A kind of 10KV distribution line stringing optical cable crossover device
CN203787913U (en) Typhoon-proof pole-protecting wire-protecting and pole-protecting wire-abandoning energy-absorbing disengaging integrated device of distribution line
CN207339038U (en) Electrodynamic type substation deicer
CN206782067U (en) A kind of power equipment makes an inspection tour unmanned plane
CN107749605B (en) Windage yaw prevention device for high-voltage transmission line
CN105140869B (en) Power transmission line mechanical de-icer
CN205039455U (en) Frame construction with patrol and examine electric ranaway
CN202136710U (en) Anti-falling structure for pole and tower climbing on power transmission line
CN107294039A (en) Alive circuit deicing apparatus for work
CN208707274U (en) A kind of mountain area open-air high-voltage line portable icing icebreaking device
CN109888663A (en) A kind of fuse can live line work insulating shield
CN203275242U (en) Hydrophobicity test tool of insulator
CN210659900U (en) Anti-falling power maintenance ladder
CN209748064U (en) Operating device for removing foreign matters
CN102868131B (en) A kind of power transmission cable device for expelling ice and snow

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161026

Termination date: 20170603

CF01 Termination of patent right due to non-payment of annual fee