CN213694944U - Building top surface greening equipment convenient to installation is used - Google Patents

Building top surface greening equipment convenient to installation is used Download PDF

Info

Publication number
CN213694944U
CN213694944U CN202021724074.7U CN202021724074U CN213694944U CN 213694944 U CN213694944 U CN 213694944U CN 202021724074 U CN202021724074 U CN 202021724074U CN 213694944 U CN213694944 U CN 213694944U
Authority
CN
China
Prior art keywords
device body
plate
limiting plate
installation
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021724074.7U
Other languages
Chinese (zh)
Inventor
左振国
史佳静
孙晓静
高鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021724074.7U priority Critical patent/CN213694944U/en
Application granted granted Critical
Publication of CN213694944U publication Critical patent/CN213694944U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The utility model discloses a building top surface afforestation equipment convenient to installation usefulness, concretely relates to building technical field, the device comprises a device body, the installation through-hole has been seted up on the surface of device body, the fixed surface of device body is connected with the backup pad, the first limiting plate of top fixedly connected with of backup pad, the fixed surface in top of backup pad is connected with the second limiting plate, the collecting box has been placed to the top surface of backup pad, fastening bolt is installed to the equal screw thread in surface of first limiting plate and second limiting plate. The utility model discloses a set up two limiting plates and backup pad, at first with the inside that the surface that the locking screw runs through the installation through-hole extends to the wall to hang the device body on the wall, played very big fixed action, utilized two limiting plates simultaneously with the spacing chucking of collecting box at the top surface of backup pad, avoided the influence of strong wind to the collecting box, thereby increased the device's stability.

Description

Building top surface greening equipment convenient to installation is used
Technical Field
The utility model relates to a building technical field, more specifically say, the utility model relates to a building top surface afforestation equipment convenient to installation usefulness.
Background
The roof greening is the greening of the roof of a building, and can be widely understood as the general term of planting trees and flowers on the roofs, terraces, balcony, balconies or large artificial rockery of various ancient and modern buildings, structures, urban walls, bridges (overpasses) and the like, and the roof greening is used for increasing the area of urban greenbelts and improving the space of the living environment of the people which gradually worsens; the method improves the stand of urban high-rise buildings and the current situation of natural land and plants which are replaced by hard pavement of a plurality of roads; the damage to human beings caused by excessive cutting down of natural forests, urban heat island effect caused by pollution of various waste gases, sand storm and the like is improved; the flower plant placing rack has the advantages that the human greening space is developed, the rural city is built, the living condition of people is improved, the living quality is improved, the urban environment is beautified, and the ecological effect is improved, and particularly the flower plant placing rack is easy to install.
However, in practical use, there still exist some disadvantages, such as:
one, the current device is generally through foam case or wooden case with some plantlets plant in the inside, then directly place on the roof of building, because roof relief is high, the trend is big, blows these foam case and wooden case easily down, topples the plant on these cases very easily to cause the death of plant, be unfavorable for the practical function of device.
Second, some plantlets are generally planted inside through foam case or wooden case to current device, then directly place the roof of building on, this kind of mode all utilizes the weight of self to fix the operation, and only leans on gravity to stabilize, and fixed effect is limited, is unfavorable for the device to place for a long time to the practical value of the device has been reduced.
Therefore, it is highly desirable to provide a greening apparatus for the top surface of a building, which has good fixing property and is easy to install.
SUMMERY OF THE UTILITY MODEL
In order to overcome the above-mentioned defect of prior art, the embodiment of the utility model provides a building top surface afforestation equipment convenient to installation usefulness, through setting up two limiting plates and backup pad, at first run through the inside of surface extension to wall of installation through-hole with the locking screw, thereby hang the device body on the wall, very big fixed action has been played, utilized two limiting plates simultaneously with the spacing chucking of collecting box at the top surface of backup pad, the influence of strong wind to the collecting box has been avoided, thereby the device's stability has been increased, the collecting box has been avoided toppling over and has been caused the death of plant, thereby the device's practicality has been increased, in order to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a building top surface greening device convenient to install comprises a device body, wherein an installation through hole is formed in the surface of the device body, a supporting plate is fixedly connected to the surface of the device body, a first limiting plate is fixedly connected to the top end of the supporting plate, a second limiting plate is fixedly connected to the top end surface of the supporting plate, a collecting box is placed on the top surface of the supporting plate, fastening bolts are installed on the surfaces of the first limiting plate and the second limiting plate in a threaded mode, a fixing plate is detachably installed on the back surface of the device body, an oblique supporting rod is fixedly installed on the surface of the fixing plate, a layer of fixing backing plate is fixedly bonded to the end portion of the oblique supporting rod, a supporting cross rod is fixedly installed on the outer surface of the oblique supporting rod, a connecting rod is detachably installed at the top, the bottom surface of the supporting plate is fixedly connected with a triangular supporting block.
In a preferred embodiment, the number of the mounting through holes is six, and the six mounting through holes are equally divided into two groups, which are respectively positioned at the left side and the right side of the device body.
In a preferred embodiment, the support plate is installed perpendicular to the apparatus body, and the support plate has a rectangular shape as a whole.
In a preferred embodiment, the spacing value between the first and second limiting plates is adapted to the collection box.
In a preferred embodiment, the inclined angle of the inclined supporting rod is thirty degrees to twenty-five degrees, and the whole material of the inclined supporting rod is a metal component.
In a preferred embodiment, the fixing pad is made of a rubber member, and the thickness of the fixing pad ranges from one millimeter to three millimeters.
In a preferred embodiment, the fastening bolt is fixedly installed through the surface of the first limiting plate and the inner wall of the collection tank.
In a preferred embodiment, the other side of the triangular support block is fixedly installed with the surface of the device body, and the triangular support block is located at one end of the bottom surface of the support plate.
The utility model discloses a technological effect and advantage:
1. the utility model discloses a set up two limiting plates and backup pad, at first with the inside that the surface that the locking screw runs through the installation through-hole extends to the wall to hang the device body on the wall, played very big fixed action, utilized two limiting plates simultaneously with the spacing chucking of collecting box at the top surface of backup pad, avoided the influence of strong wind to the collecting box, thereby increased the device's stability, avoided the collecting box to topple and caused the death of plant, thereby increased the device's practicality.
2. The utility model discloses a set up limiting plate and backup pad and device body, utilized the limiting plate to fix the collecting box in the inside backup pad of device body, then utilized the locking screw with the device body fixed to the wall on to place the influence of strong wind to the collecting box, thereby greatly increased the device's practicality.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic side view of the device body of the present invention.
Fig. 3 is a schematic diagram of a first limiting plate structure of the present invention.
Fig. 4 is a schematic view of the structure of the fixed umbrella of the present invention.
Fig. 5 is a schematic structural view of the collecting box of the present invention.
The reference signs are: 1. a device body; 2. mounting a through hole; 3. a support plate; 4. a first limit plate; 5. a second limiting plate; 6. a collection box; 7. fastening a bolt; 8. a fixing plate; 9. an oblique supporting rod; 10. fixing the base plate; 11. a support rail; 12. a connecting rod; 13. fixing the umbrella; 14. triangular support block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in the attached figures 1-5, the building top surface greening device convenient for installation comprises a device body 1, wherein the surface of the device body 1 is provided with an installation through hole 2, the surface of the device body 1 is fixedly connected with a support plate 3, the top end of the support plate 3 is fixedly connected with a first limit plate 4, the top end surface of the support plate 3 is fixedly connected with a second limit plate 5, the top surface of the support plate 3 is provided with a collection box 6, the surfaces of the first limit plate 4 and the second limit plate 5 are respectively provided with a fastening bolt 7 by screw thread, the back surface of the device body 1 is detachably provided with a fixed plate 8, the surface of the fixed plate 8 is fixedly provided with an inclined support rod 9, the end part of the inclined support rod 9 is fixedly bonded with a layer of fixed backing plate 10, the outer surface of the inclined support rod 9 is fixedly provided with a support cross, the bottom surface fixedly connected with triangular support piece 14 of backup pad 3, the quantity of installation through-hole 2 is six, six installation through-hole 2 equant divisions are two sets of, be located the left and right sides of device body 1 respectively, backup pad 3 is installed perpendicularly with device body 1, and backup pad 3's whole is rectangle, interval value and the mutual adaptation of collecting box 6 between first limiting plate 4 and the second limiting plate 5, the material of fixing backing plate 10 is the rubber component, and the thickness value scope of fixing backing plate 10 is one millimeter to three millimeters, fastening bolt 7 runs through the surface of first limiting plate 4 and the inner wall fixed mounting of collecting box 6.
Referring to the attached fig. 2 of the specification, the inclined angle of the inclined supporting rod 9 is thirty degrees to twenty-five degrees, and the whole material of the inclined supporting rod 9 is a metal member.
The implementation mode is specifically as follows: the inclination angle and the supporting function of the inclined supporting rod 9 are utilized, so that the device body 1 can be directly placed on the top surface of a roof, and the adaptive direction and the practicability of the device are improved.
Referring to the attached fig. 1, the other side of the triangular support block 14 is fixedly installed on the surface of the device body 1, and the triangular support block 14 is located at one end of the bottom surface of the support plate 3.
The implementation mode is specifically as follows: the supporting function of the triangular supporting block 14 is utilized, so that the fixing performance of the supporting plate 3 on the device is good, and the practical effect and the adaptation range of the device are increased.
The utility model discloses the theory of operation:
the first step is as follows: the operator first assembles the various components of the device normally and then starts the device normally.
The second step is that: then according to the in-service use condition, install and put device body 1, can directly utilize the inclination and the supporting role of diagonal bracing piece 9, make device body 1 can directly be placed on the top surface on roof, under the high and great condition of wind-force in roof, earlier take off fixed plate 8 and diagonal bracing piece 9 from the back of device body 1 through unscrewing the bolt, laminate the back of device body 1 on the wall of suitable position after that, run through the surface of installation through-hole 2 with the locking screw and extend to the inside of wall, thereby hang device body 1 on the wall, very big fixed action has been played, utilized two limiting plates simultaneously with the spacing chucking of collecting box 6 at the top surface of backup pad 3, the influence of strong wind to collecting box 6 has been avoided, thereby the practical function and the security of the device have been increased.
The third step: the operator first closes the device normally, then checks whether the fixity between the various components of the device is normal, and then replaces and repairs the more aged and worn parts inside the device.
The points to be finally explained are: first, in the description of the present application, it should be noted that, unless otherwise specified and limited, the terms "mounted," "connected," and "connected" should be understood broadly, and may be a mechanical connection or an electrical connection, or a communication between two elements, and may be a direct connection, and "upper," "lower," "left," and "right" are only used to indicate a relative positional relationship, and when the absolute position of the object to be described is changed, the relative positional relationship may be changed;
secondly, the method comprises the following steps: in the drawings of the disclosed embodiments of the present invention, only the structures related to the disclosed embodiments are referred to, and other structures can refer to the common design, and under the condition of no conflict, the same embodiment and different embodiments of the present invention can be combined with each other;
and finally: the above description is only for the preferred embodiment of the present invention and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a building top surface afforestation equipment convenient to installation usefulness, includes device body (1), installation through-hole (2) have been seted up on the surface of device body (1), the fixed surface of device body (1) is connected with backup pad (3), the first limiting plate of top fixedly connected with (4) of backup pad (3), its characterized in that: the top end surface of the supporting plate (3) is fixedly connected with a second limiting plate (5), a collecting box (6) is arranged on the top surface of the supporting plate (3), fastening bolts (7) are arranged on the surfaces of the first limiting plate (4) and the second limiting plate (5) in a threaded manner, the back surface of the device body (1) is detachably provided with a fixed plate (8), the surface of the fixed plate (8) is fixedly provided with an oblique supporting rod (9), a layer of fixed backing plate (10) is fixedly bonded at the end part of the oblique supporting rod (9), a supporting cross rod (11) is fixedly arranged on the outer surface of the oblique supporting rod (9), the top end of the device body (1) is detachably provided with a connecting rod (12), the other end of the connecting rod (12) is fixedly connected with a fixed umbrella (13), and the bottom surface of the supporting plate (3) is fixedly connected with a triangular supporting block (14).
2. A building roof greening apparatus as claimed in claim 1, wherein: the number of the installation through holes (2) is six, the installation through holes (2) are equally divided into two groups which are respectively positioned at the left side and the right side of the device body (1).
3. A building roof greening apparatus as claimed in claim 1, wherein: the supporting plate (3) is vertically installed with the device body (1), and the whole supporting plate (3) is rectangular.
4. A building roof greening apparatus as claimed in claim 1, wherein: the distance value between the first limiting plate (4) and the second limiting plate (5) is matched with the collecting box (6) mutually.
5. A building roof greening apparatus as claimed in claim 1, wherein: the inclination angle of the inclined supporting rod (9) is thirty-five degrees to twenty-five degrees, and the whole material of the inclined supporting rod (9) is a metal component.
6. A building roof greening apparatus as claimed in claim 1, wherein: the fixed backing plate (10) is made of rubber components, and the thickness value range of the fixed backing plate (10) is one millimeter to three millimeters.
7. A building roof greening apparatus as claimed in claim 1, wherein: and the fastening bolt (7) penetrates through the surface of the first limiting plate (4) and is fixedly installed on the inner wall of the collecting box (6).
8. A building roof greening apparatus as claimed in claim 1, wherein: the other side of the triangular supporting block (14) is fixedly installed on the surface of the device body (1), and the triangular supporting block (14) is located at one end of the bottom surface of the supporting plate (3).
CN202021724074.7U 2020-08-18 2020-08-18 Building top surface greening equipment convenient to installation is used Active CN213694944U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021724074.7U CN213694944U (en) 2020-08-18 2020-08-18 Building top surface greening equipment convenient to installation is used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021724074.7U CN213694944U (en) 2020-08-18 2020-08-18 Building top surface greening equipment convenient to installation is used

Publications (1)

Publication Number Publication Date
CN213694944U true CN213694944U (en) 2021-07-16

Family

ID=76792719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021724074.7U Active CN213694944U (en) 2020-08-18 2020-08-18 Building top surface greening equipment convenient to installation is used

Country Status (1)

Country Link
CN (1) CN213694944U (en)

Similar Documents

Publication Publication Date Title
KR101050127B1 (en) Greening Solar Cell Complex System
CN209780397U (en) Novel electronic information engineering communication tower
CN204443344U (en) A kind of flowerpot retaining device for urban landscaping engineering
CN213694944U (en) Building top surface greening equipment convenient to installation is used
DE102008051332A1 (en) Device for manufacturing assembly system for flat roof-solar plants, particularly for assembly on flat roofs, has block comprising hard weather-resistant polyurethane foam, where bottom surface of block corresponds to size of solar system
CN107447865A (en) One species Wood construction frame structure and preparation method thereof
CN218364613U (en) Vertical fixing and supporting device for tower drum
CN217151511U (en) Assembled concrete greening construction enclosure wall
CN209723674U (en) A kind of falling object from high altitude protective device for building
CN213233478U (en) Foundation pit supporting structure
CN208220327U (en) A kind of vibration abatement of sea integral type anemometer tower
CN207572386U (en) A kind of photovoltaic panel sub-assembly
CN112282403A (en) Outer hanging protection frame of high-rise steel construction regularization of assembled
CN214170014U (en) Building wall reinforcing apparatus
CN219887391U (en) Safety railing for green building design
CN209384604U (en) Up-side down triangle installation part and up-side down triangle mounting operation platform
CN214090310U (en) Effectual building structure of anti-wind rain
CN208028851U (en) A kind of roofing photovoltaic power station inverter fixing rack structure
CN213625692U (en) Prevention of seepage waterwall structure
CN213738327U (en) Conversion support for connecting foundation bolt and tower crane support leg
CN220247342U (en) Assembled building roof steel framework optimizing structure
CN217540121U (en) High and cold area construction sewage treatment system
CN214117607U (en) House water leakage repairing structure
CN206313708U (en) New type solar energy support and ground foundation attachment means
CN209924280U (en) Novel solar tile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant