CN213686584U - Tunnel engineering construction device - Google Patents

Tunnel engineering construction device Download PDF

Info

Publication number
CN213686584U
CN213686584U CN202120028974.6U CN202120028974U CN213686584U CN 213686584 U CN213686584 U CN 213686584U CN 202120028974 U CN202120028974 U CN 202120028974U CN 213686584 U CN213686584 U CN 213686584U
Authority
CN
China
Prior art keywords
motor
support frame
base
lead screw
output end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120028974.6U
Other languages
Chinese (zh)
Inventor
阮景
范立峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Meige Communication Engineering Co ltd
Original Assignee
Hubei Meige Communication Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Meige Communication Engineering Co ltd filed Critical Hubei Meige Communication Engineering Co ltd
Priority to CN202120028974.6U priority Critical patent/CN213686584U/en
Application granted granted Critical
Publication of CN213686584U publication Critical patent/CN213686584U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a tunnel engineering construction equipment, the on-line screen storage device comprises a base, four corners in base bottom are equipped with the support column, every support column bottom all is equipped with the decurrent recess of opening, all be equipped with electric telescopic handle in every recess, every electric telescopic handle's output all is equipped with the universal wheel, base top left side is equipped with the battery, the base top just is located the battery right side and is equipped with first motor, be equipped with the support frame on the first motor output end, the inside bottom of support frame is equipped with the second motor, be equipped with the lead screw on the second motor output end, the one end that the second motor output was kept away from to the lead screw is equipped with the bearing frame, the cover is equipped with screw-nut on the lead. The utility model discloses a lighting apparatus's mobility in the tunnel work progress, the more extensive of scope of illumination has simultaneously prevented still that the stone from appearing dropping in the work progress and damaging the emergence of the light condition.

Description

Tunnel engineering construction device
Technical Field
The utility model relates to a tunnel engineering construction equipment.
Background
A tunnel is a building constructed underground or underwater or in a mountain, with railways or roads for motor vehicles to pass through. The tunnel can be divided into three categories of mountain tunnels, underwater tunnels and urban tunnels according to the positions of the tunnels. A tunnel traversing from a mountain or under a hill to shorten the distance and avoid a large slope is called a mountain tunnel; underwater tunnels passing under a river or sea floor to cross a river or channel; urban tunnels are used to cross underground cities to meet the needs of railways to pass through large cities. The most constructed of these three types of tunnels are mountain tunnels. At present, dust, water vapor and gravels generated by tunnel construction exist in the tunnel construction process, and the tunnel illuminating lamp is very easy to damage, so that the tunnel illuminating lamp is provided
The existing product technology has certain defects, and along with the construction progress of a tunnel, the position of the illuminating lamp is changed, so that the illuminating lamp needs to be moved, and the conditions that the moving of the illuminating lamp is inconvenient and the like exist.
Present product technique has certain defect, need excavate the massif in the work progress in tunnel, owing to the condition that rubble or earth piece dropped can appear at the in-process of excavating, drops and will cause the damage of light on the light.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a tunnel engineering construction equipment to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a tunnel engineering construction device comprises a base, wherein support columns are arranged at four corners of the bottom end of the base, a groove with a downward opening is formed in the bottom end of each support column, an electric telescopic rod is arranged in each groove, a universal wheel is arranged at the output end of each electric telescopic rod, the left side of the top end of the base is provided with a storage battery, the top end of the base and the right side of the storage battery are provided with a first motor, a support frame is arranged on the output end of the first motor, a chute is arranged on the side wall of the right side of the support frame, a second motor is arranged at the bottom end in the support frame, a screw rod is arranged on the output end of the second motor, a bearing seat is arranged at one end of the screw rod, which is far away from the output end of the second motor, a screw rod nut is sleeved on the screw rod, the right side of the screw rod nut is provided with an installation block, the right side of the installation block is provided with an illuminating lamp, and a protective cover is arranged on the periphery of the illuminating lamp.
Furthermore, the diameter of the universal wheel rotating for one circle is smaller than the aperture of the groove.
Furthermore, the periphery of the storage battery is provided with a protection box, and the side wall of the protection box is provided with a charging interface.
Furthermore, a motor protection box is arranged on the periphery of the first motor.
Furthermore, the support frame is fixedly connected with the output end of the first motor
Furthermore, the screw rod nut is fixedly connected with the mounting block.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a four corners in base bottom are equipped with the support column, and every support column bottom all is equipped with the decurrent recess of opening, all is equipped with electric telescopic handle in every recess, and every electric support pole's output all is equipped with the universal wheel, and the position of being under construction in the tunnel changes the back like this, the utility model discloses also can take place to remove, increased the efficiency of construction.
2. The utility model discloses a base top just is located the battery right side and is equipped with first motor, be equipped with the support frame on the first motor output, be equipped with the spout on the lateral wall of support frame right side, the inside bottom of support frame is equipped with the second motor, be equipped with the lead screw on the second motor output, the one end that the second motor output was kept away from to the lead screw is equipped with the bearing frame, the cover is equipped with screw-nut on the lead screw, the light passes through the installation piece to be connected on screw-nut, just so realized reciprocating and rotatory, more extensive illumination tunnel area of.
Drawings
Fig. 1 is a schematic structural view of a tunnel engineering construction device of the present invention;
FIG. 2 is a right side view of the tunnel construction device of the present invention;
fig. 3 is the utility model relates to a tunnel engineering construction equipment's support column inner structure schematic diagram.
The reference numerals are explained below:
in the figure: 1. a base; 2. a support pillar; 3. a groove; 4. an electric telescopic rod; 5. a universal wheel; 6. a storage battery; 7. a first motor; 8. a second motor; 9. a support frame; 10. a screw rod; 11. a bearing seat; 12. a feed screw nut; 13. mounting blocks; 14. an illuminating lamp; 15. a chute; 16. a protective cover.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, rather than all embodiments, and all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the protection scope of the present invention based on the embodiments of the present invention.
In order to facilitate understanding of the present invention, the present invention will be described more fully hereinafter with reference to the accompanying drawings. Several embodiments of the invention are given in the accompanying drawings. The invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a tunnel engineering construction equipment, which comprises a base 1, four corners in 1 bottom of base are equipped with support column 2, 2 bottoms in every support column all are equipped with the decurrent recess 3 of opening, all be equipped with electric telescopic handle 4 in every recess 3, the output of every electric telescopic handle 4 all is equipped with universal wheel 5, 1 top left side of base is equipped with battery 6, 1 top of base just is located the battery 6 right side and is equipped with first motor 7, be equipped with support frame 9 on the 7 output of first motor, be equipped with spout 15 on the lateral wall of support frame 9 right side, the inside bottom of support frame 9 is equipped with second motor 8, be equipped with lead screw 10 on the 8 output of second motor, the one end that 8 outputs of second motor were kept away from to lead screw 10 is equipped with bearing frame 11, the cover is equipped with screw-nut 12 on the lead screw 10, screw-nut.
For better improvement a tunnel engineering construction equipment's performance, the diameter of 5 rotatory a week of universal wheel is less than the aperture of recess 3, has guaranteed freely reciprocating of universal wheel, the condition such as card is dead can not appear.
For better improvement a tunnel engineering construction equipment's performance, battery 6 periphery is equipped with the guard box, and is equipped with the interface that charges on the guard box lateral wall.
For better improvement a tunnel engineering construction equipment's performance, first motor 7 periphery is equipped with the motor guard box, has prevented that the motor from taking place to damage and leading to the unable normal use condition of equipment to take place.
In order to better improve the service performance of the tunnel engineering construction device, the support frame 9 is fixedly connected with the output end of the first motor 7.
In order to better improve the service performance of the tunnel engineering construction device, the lead screw nut 12 is fixedly connected with the mounting block 13, and the stability is improved.
The operation process comprises the following steps: the utility model discloses before the use, it charges to hold battery 6 to use the interface that charges on the battery 6 earlier, then 4 movements of electric telescopic handle in the support column 2, make universal wheel 5 expose, then pushing equipment removes, after removing suitable position, open first motor 7, the device in support frame 9 and the support frame 9 can be taken in the motion of first motor 7 rotates, stop after rotatory suitable position, then 8 starting motions of second motor, an upper and lower position for adjusting light 14, stop after moving suitable position, it then can the operation to open light 14.
The foregoing illustrates and describes the principles, general features, and advantages of the present invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a tunnel engineering construction equipment, includes base (1), its characterized in that: four corners of the bottom of the base (1) are provided with support columns (2), the bottom of each support column (2) is provided with a groove (3) with a downward opening, each groove (3) is internally provided with an electric telescopic rod (4), the output end of each electric telescopic rod (4) is provided with a universal wheel (5), the left side of the top end of the base (1) is provided with a storage battery (6), the top end of the base (1) is provided with a first motor (7) positioned on the right side of the storage battery (6), the output end of the first motor (7) is provided with a support frame (9), the side wall of the right side of the support frame (9) is provided with a chute (15), the bottom inside the support frame (9) is provided with a second motor (8), the output end of the second motor (8) is provided with a screw rod (10), and one end of the screw rod, the lead screw is characterized in that a lead screw nut (12) is sleeved on the lead screw (10), an installation block (13) is arranged on the right side of the lead screw nut (12), an illuminating lamp (14) is arranged on the right side of the installation block (13), and a protective cover (16) is arranged on the periphery of the illuminating lamp (14).
2. A tunneling construction apparatus according to claim 1, characterized in that: the diameter of the universal wheel (5) rotating for one circle is smaller than the aperture of the groove (3).
3. A tunneling construction apparatus according to claim 1, characterized in that: the periphery of the storage battery (6) is provided with a protection box, and the side wall of the protection box is provided with a charging interface.
4. A tunneling construction apparatus according to claim 1, characterized in that: and a motor protection box is arranged on the periphery of the first motor (7).
5. A tunneling construction apparatus according to claim 1, characterized in that: the support frame (9) is fixedly connected with the output end of the first motor (7).
6. A tunneling construction apparatus according to claim 1, characterized in that: the screw rod nut (12) is fixedly connected with the mounting block (13).
CN202120028974.6U 2021-01-07 2021-01-07 Tunnel engineering construction device Expired - Fee Related CN213686584U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120028974.6U CN213686584U (en) 2021-01-07 2021-01-07 Tunnel engineering construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120028974.6U CN213686584U (en) 2021-01-07 2021-01-07 Tunnel engineering construction device

Publications (1)

Publication Number Publication Date
CN213686584U true CN213686584U (en) 2021-07-13

Family

ID=76741590

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120028974.6U Expired - Fee Related CN213686584U (en) 2021-01-07 2021-01-07 Tunnel engineering construction device

Country Status (1)

Country Link
CN (1) CN213686584U (en)

Similar Documents

Publication Publication Date Title
CN110428651A (en) A kind of traffic lights with emergency function for wisdom traffic
CN108518086A (en) One kind is kept off the rain adjustable electronic intelligent bus platform
CN213686584U (en) Tunnel engineering construction device
CN209561447U (en) A kind of assembling device of solar panel production
CN111228950A (en) Building engineering construction dust collector
CN208119309U (en) A kind of bicycle Intelligent navigator
CN210326756U (en) Automatic location over-and-under type electrical wiring special-purpose vehicle
CN205231588U (en) Rain -proof safe high -voltage board that takes precautions against earthquakes
CN210439453U (en) Multifunctional ecological landscape building body
CN209478456U (en) The mold of quick Fabrication cement control point prefabricated component
CN206758032U (en) A kind of traffic intelligence information display screen
CN220604055U (en) Unmanned equipment of patrolling and examining of iron ore
CN213930256U (en) Public security system is with portable solar energy device of shooing of collecting evidence
CN112095672A (en) Device for replacing road well cover
CN216075490U (en) Box culvert is with visual high pressure desilting device
CN212966527U (en) Pedestrian inductor for urban traffic intelligent control system
CN215281301U (en) Guardrail grinding device for highway engineering
CN210441131U (en) Lighting device for tunnel construction
CN204754829U (en) Core machine drill sediment collector is got to concrete
CN216383600U (en) Gas producing and storing device for town safety gas engineering
CN218381682U (en) Construction exploration device
CN215007262U (en) Warning sign for rush repair of traffic engineering
CN217653710U (en) Temporary lighting device for building construction
CN217982714U (en) Display device for mine site safety warning
CN217637654U (en) Town road construction monitoring platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210713

Termination date: 20220107

CF01 Termination of patent right due to non-payment of annual fee