CN218381682U - Construction exploration device - Google Patents

Construction exploration device Download PDF

Info

Publication number
CN218381682U
CN218381682U CN202222175861.6U CN202222175861U CN218381682U CN 218381682 U CN218381682 U CN 218381682U CN 202222175861 U CN202222175861 U CN 202222175861U CN 218381682 U CN218381682 U CN 218381682U
Authority
CN
China
Prior art keywords
exploration
construction
lead screw
lifting
lifting box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222175861.6U
Other languages
Chinese (zh)
Inventor
陈国英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Jinchen Construction Group Co ltd
Original Assignee
Huang Liancheng
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huang Liancheng filed Critical Huang Liancheng
Priority to CN202222175861.6U priority Critical patent/CN218381682U/en
Application granted granted Critical
Publication of CN218381682U publication Critical patent/CN218381682U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model discloses a building construction exploration device, which comprises a moving seat, wherein a vertical frame is fixedly arranged at the left end of the top of the moving seat, a lifting box is slidably arranged at the left side of the vertical frame along the vertical direction, an exploration sampling cylinder is fixedly arranged at the bottom of the lifting box, a spiral rod is arranged in the exploration sampling cylinder, and a spiral sampling blade is arranged on the spiral rod; a driving motor is fixedly arranged on the inner wall of the top of the lifting box, and an output shaft of the driving motor rotates and extends into the exploration sampling cylinder and is fixedly connected with the top end of the spiral rod; the right side fixedly connected with elevator block of lift box, the left side of grudging post is equipped with the chute. This construction exploration device not only is convenient for explore the sample to the soil in the building work process, and overall structure is simple moreover, has reduced the input cost when surveying the sample of borrowing, and whole device is convenient for remove simultaneously, has improved portability and the efficiency of removal use.

Description

Construction exploration device
Technical Field
The utility model relates to a construction technical field especially relates to a construction exploration device.
Background
The construction exploration is an important stage in construction, and the task is to determine whether the geological conditions and the natural environment of a construction project site are suitable for engineering construction, the achievement provides required engineering geological hydrological and geological data for the design and construction of single buildings, and also provides various technical services for the whole process construction, such as foundation basic scheme demonstration, engineering monitoring and the like.
At present, in the construction and exploration process of buildings, exploration and sampling are often carried out on soil at a construction position. The prior art patent CN113588323A discloses a building construction exploration device, which comprises an environment monitor and a support rod, wherein the environment monitor is fixedly arranged on the support rod, and a soil sample collecting mechanism is arranged on the side wall of the support rod; can take out soil sample from equipment automatically, save, can reach the effect of convenient operation like this.
However, the structure of sampling soil in the existing construction exploration device is complex, so that the investment cost for surveying, sampling soil is high, the portability during movement is poor, time and labor are wasted during operation, and the problem of low efficiency in the actual sampling process is easily caused. Therefore, the utility model provides a construction exploration device.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a construction exploration device.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a building construction exploration device comprises a moving seat, wherein a vertical frame is fixedly mounted at the left end of the top of the moving seat, a lifting box is slidably mounted on the left side of the vertical frame along the vertical direction, an exploration sampling cylinder is fixedly mounted at the bottom of the lifting box, a spiral rod is arranged in the exploration sampling cylinder, and spiral sampling blades are arranged on the spiral rod; a driving motor is fixedly arranged on the inner wall of the top of the lifting box, and an output shaft of the driving motor rotates and extends into the exploration sampling cylinder and is fixedly connected with the top end of the spiral rod;
the right side of the lifting box is fixedly connected with a lifting block, the left side of the vertical frame is provided with a slide way groove, the lifting block is slidably arranged in the slide way groove along the vertical direction, the inner wall of the top of the slide way groove is rotatably provided with a screw rod, and the screw rod penetrates through the lifting block and is in threaded connection with the lifting block; a mounting cavity is formed in the left end of the movable seat, a lead screw motor is fixedly mounted in the mounting cavity, and the bottom end of a lead screw rotatably extends into the mounting cavity and is fixedly connected with an output shaft of the lead screw motor;
the equal fixed mounting in both ends of removing the seat has the mounting panel, and the bottom fixed mounting of mounting panel has electronic jar, and the universal wheel is installed to the output of electronic jar.
Preferably, the right upper portion fixed mounting of grudging post has the handle, is provided with control switch on hand, removes the inside of seat and still is equipped with the power, and power and control switch all are connected with lead screw motor and driving motor, electronic jar electricity.
Preferably, the lifting block is fixedly sleeved with a screw rod transmission cylinder, and the screw rod penetrates through the screw rod transmission cylinder and is in transmission connection with the screw rod transmission cylinder through threads.
Preferably, the right side of elevator block is provided with the slider, is equipped with the spout on the right side inner wall in spout groove, and slider along vertical direction slidable mounting in the spout.
Preferably, a bearing seat is arranged on the inner wall of the top of the slide way groove, and the top end of the screw rod is rotatably arranged on the bearing seat.
Preferably, the bottom of the lifting box is fixedly sleeved with a bearing, and the screw rod is rotatably installed on the bearing.
Compared with the prior art, the beneficial effects of the utility model are that:
1. in the utility model, the screw rod is driven to rotate by the screw rod motor, so that the screw rod transmission cylinder can perform downward screw transmission on the screw rod, the lifting block and the lifting box are driven to move downwards when the screw rod transmission cylinder moves downwards, and the lifting box drives the exploration sampling cylinder, the screw rod and the spiral sampling blade to move downwards integrally; meanwhile, still drive the hob and the spiral sampling blade is rotatory through driving motor, hob and spiral sampling blade move down at rotatory in-process like this, and then can survey the sample to soil to can be with soil sample spiral input to the exploration thief bowl in, later through the reverse work of lead screw motor, and then with the exploration thief bowl that the sample is good upwards take out can.
2. The utility model discloses in, through stretching out of electronic jar output, and then can release the universal wheel downwards to can support whole device through the universal wheel, utilize the universal wheel to come to remove to whole device at last can, and simple structure, the people of being convenient for remove the use, improved the portability that removes the use.
To sum up, this construction exploration device not only is convenient for explore the sample to the soil in the building construction process, and overall structure is simple moreover, has reduced the input cost when surveying the sample of borrowing, and whole device is convenient for remove simultaneously, has improved portability and the efficiency of removal use.
Drawings
Fig. 1 is a schematic structural diagram of a construction exploration device provided by the utility model;
FIG. 2 is an enlarged schematic view of a portion A of FIG. 1 according to the present invention;
fig. 3 is a schematic structural view of the screw rod transmission cylinder of the present invention.
In the figure: 1. a movable seat; 2. erecting a frame; 3. a lifting box; 4. a drive motor; 5. a screw rod; 501. a helical sampling blade; 6. an exploration sampling cylinder; 7. a bearing; 8. a mounting cavity; 9. a screw motor; 10. a screw rod; 11. a screw rod transmission cylinder; 12. a lifting block; 13. a slider; 14. a chute; 15. a bearing seat; 16. a handle; 17. an electric cylinder; 18. a universal wheel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, the building construction exploration device comprises a moving seat 1, wherein a vertical frame 2 is fixedly installed at the left end of the top of the moving seat 1, a lifting box 3 is installed on the left side of the vertical frame 2 in a sliding manner along the vertical direction, an exploration sampling cylinder 6 is fixedly installed at the bottom of the lifting box 3, a spiral rod 5 is arranged in the exploration sampling cylinder 6, and a spiral sampling blade 501 is arranged on the spiral rod 5; a driving motor 4 is fixedly arranged on the inner wall of the top of the lifting box 3, and an output shaft of the driving motor 4 rotatably extends into the exploration sampling cylinder 6 and is fixedly connected with the top end of the spiral rod 5;
the right side of the lifting box 3 is fixedly connected with a lifting block 12, the left side of the vertical frame 2 is provided with a slide way groove 14, the lifting block 12 is slidably installed in the slide way groove 14 along the vertical direction, the inner wall of the top of the slide way groove 14 is rotatably provided with a screw rod 10, and the screw rod 10 penetrates through the lifting block 12 and is in threaded connection with the lifting block 12; a mounting cavity 8 is formed in the left end of the movable seat 1, a lead screw motor 9 is fixedly mounted in the mounting cavity 8, and the bottom end of a lead screw 10 rotatably extends into the mounting cavity 8 and is fixedly connected with an output shaft of the lead screw motor 9;
the equal fixed mounting in both ends of removing seat 1 has the mounting panel, and the bottom fixed mounting of mounting panel has electronic jar 17, and universal wheel 18 is installed to electronic jar 17's output.
In this example, a handle 16 is fixedly installed on the upper portion of the right side of the stand 2, a control switch is arranged on the handle 16, a power supply is further arranged inside the movable seat 1, and the power supply and the control switch are electrically connected with the lead screw motor 9, the driving motor 4 and the electric cylinder 17.
In this example, the lifting block 12 is fixedly sleeved with a lead screw transmission cylinder 11, and the lead screw 10 penetrates through the lead screw transmission cylinder 11 and is in threaded transmission connection with the lead screw transmission cylinder 11.
In this example, a sliding block 13 is disposed on the right side of the lifting block 12, a sliding groove is disposed on the inner wall of the right side of the sliding groove 14, and the sliding block 13 is slidably mounted in the sliding groove along the vertical direction.
In this example, a bearing seat 15 is provided on the top inner wall of the chute 14, and the top end of the screw 10 is rotatably mounted on the bearing seat 15.
In this example, the bottom of the lifting box 3 is fixedly sleeved with a bearing 7, and the screw rod 5 is rotatably mounted on the bearing 7.
The utility model discloses a building construction exploration device, when needing to survey the sample to soil in the construction process, drive lead screw 10 through lead screw motor 9 and rotate, utilize the lead screw transmission principle, can make lead screw transmission cylinder 11 screw-thread drive downwards on lead screw 10, when lead screw transmission cylinder 11 moves down, drive elevator 12 and lifting box 3 to move down again, lifting box 3 drives and surveys sampling cylinder 6 and hob 5, spiral sampling blade 501 and moves down wholly again; meanwhile, the driving motor 4 drives the spiral rod 5 and the spiral sampling blade 501 to rotate, so that the spiral rod 5 and the spiral sampling blade 501 move downwards in the rotating process, and further exploration and sampling can be performed on soil, a soil sample can be spirally input into the exploration sampling cylinder 6, and then the sampled exploration sampling cylinder 6 is taken out upwards through reverse work of the screw rod motor 9; and, whole device still is convenient for people to remove, when needs remove promptly, through stretching out of electronic jar 17 output, and then can push out universal wheel 18 downwards to can support whole device through universal wheel 18, utilize at last universal wheel 18 to remove whole device can, and simple structure, the people of being convenient for remove the use, improved the portability of removing the use. This construction exploration device like this, the soil of not only being convenient for in to the construction process of construction is surveyed the sample, and overall structure is simple moreover, has reduced the input cost when surveying the sample of borrowing, and whole device is convenient for remove simultaneously, has improved portability and the efficiency of removal use.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. A building construction exploration device comprises a moving seat (1), and is characterized in that a vertical frame (2) is fixedly mounted at the left end of the top of the moving seat (1), a lifting box (3) is slidably mounted on the left side of the vertical frame (2) along the vertical direction, an exploration sampling cylinder (6) is fixedly mounted at the bottom of the lifting box (3), a spiral rod (5) is arranged in the exploration sampling cylinder (6), and a spiral sampling blade (501) is arranged on the spiral rod (5); a driving motor (4) is fixedly installed on the inner wall of the top of the lifting box (3), and an output shaft of the driving motor (4) rotatably extends into the exploration sampling cylinder (6) and is fixedly connected with the top end of the spiral rod (5);
the right side of the lifting box (3) is fixedly connected with a lifting block (12), the left side of the vertical frame (2) is provided with a slide way groove (14), the lifting block (12) is slidably installed in the slide way groove (14) along the vertical direction, the inner wall of the top of the slide way groove (14) is rotatably provided with a screw rod (10), and the screw rod (10) penetrates through the lifting block (12) and is in threaded connection with the lifting block (12); a mounting cavity (8) is formed in the left end of the movable seat (1), a lead screw motor (9) is fixedly mounted in the mounting cavity (8), and the bottom end of a lead screw (10) rotatably extends into the mounting cavity (8) and is fixedly connected with an output shaft of the lead screw motor (9);
the equal fixed mounting in both ends of removing seat (1) has the mounting panel, and the bottom fixed mounting of mounting panel has electronic jar (17), and universal wheel (18) are installed to the output of electronic jar (17).
2. The construction exploration device according to claim 1, wherein a handle (16) is fixedly mounted on the upper portion of the right side of the vertical frame (2), a control switch is arranged on the handle (16), a power supply is further arranged inside the movable seat (1), and the power supply and the control switch are electrically connected with the screw rod motor (9), the driving motor (4) and the electric cylinder (17).
3. The construction and exploration device according to claim 1, wherein a lead screw transmission cylinder (11) is fixedly sleeved on the lifting block (12), and the lead screw (10) penetrates through the lead screw transmission cylinder (11) and is in threaded transmission connection with the lead screw transmission cylinder (11).
4. The construction and exploration device according to claim 1, wherein a sliding block (13) is arranged on the right side of the lifting block (12), a sliding groove is formed in the inner wall of the right side of the sliding channel groove (14), and the sliding block (13) is slidably installed in the sliding groove in the vertical direction.
5. A construction equipment according to claim 1 wherein the top inner wall of the chute (14) is provided with a bearing block (15) and the top end of the screw (10) is rotatably mounted on the bearing block (15).
6. The construction and exploration device according to claim 1, wherein a bearing (7) is fixedly sleeved at the bottom of the lifting box (3), and the screw rod (5) is rotatably mounted on the bearing (7).
CN202222175861.6U 2022-08-18 2022-08-18 Construction exploration device Active CN218381682U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222175861.6U CN218381682U (en) 2022-08-18 2022-08-18 Construction exploration device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222175861.6U CN218381682U (en) 2022-08-18 2022-08-18 Construction exploration device

Publications (1)

Publication Number Publication Date
CN218381682U true CN218381682U (en) 2023-01-24

Family

ID=84966642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222175861.6U Active CN218381682U (en) 2022-08-18 2022-08-18 Construction exploration device

Country Status (1)

Country Link
CN (1) CN218381682U (en)

Similar Documents

Publication Publication Date Title
CN214309612U (en) Highway engineering is supervised with sampling device that fetches earth
CN210571483U (en) Town road soil detects sampling device
CN212872460U (en) Silt mixes backfill compactness detection sampling device
CN218381682U (en) Construction exploration device
CN116678668B (en) Environment protection engineering is with detecting soil sampling device
CN110763507B (en) A time delay sampling device for normal position detects soil and restores medicament efficiency
CN219636843U (en) Maintenance operation platform
CN210316474U (en) Power equipment installs hanging flower basket
CN111504690A (en) Surface soil sampling device for soil detection
CN112816249A (en) A quick water intaking equipment for geothermol power investigation
CN219245035U (en) Sampling device for soil exploration
CN218381780U (en) Environmental monitoring sewage sampling device
CN213022376U (en) Sampling device for soil monitoring
CN213091742U (en) Lifting electric meter box
CN212364276U (en) A sewage detection device for environmental protection
CN210462268U (en) Mounting rack for mounting security and protection equipment
CN207662653U (en) Earth boring auger device and earth boring auger for soil sampling
CN212807690U (en) Soil sampler for highway engineering
CN215178759U (en) Ground reconnaissance is with supplementary sand sample sampling device
CN220153940U (en) Sediment sampler based on soil and water conservation monitoring
CN117168887B (en) Sampling device for solid waste detection
CN217276991U (en) Portable soil sample sampler for soil detection
CN217155897U (en) Foundation detection sampling device for hydraulic engineering
CN221038125U (en) Geological survey sampling device
CN220437817U (en) Concrete detection sampling device for hydraulic engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230427

Address after: 400072 building 10, No. 1, Jiangxia Road, Nan'an District, Chongqing

Patentee after: Chongqing Jinchen Construction (Group) Co.,Ltd.

Address before: 643036 No. 21, Shijie, Fuquan Town, Yantan District, Zigong City, Sichuan Province

Patentee before: Huang Liancheng