CN213683276U - A pole is counted to skin for infilled wall builds by laying bricks or stones - Google Patents

A pole is counted to skin for infilled wall builds by laying bricks or stones Download PDF

Info

Publication number
CN213683276U
CN213683276U CN202022253865.2U CN202022253865U CN213683276U CN 213683276 U CN213683276 U CN 213683276U CN 202022253865 U CN202022253865 U CN 202022253865U CN 213683276 U CN213683276 U CN 213683276U
Authority
CN
China
Prior art keywords
rod
pole
spooler
vernier
alignment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022253865.2U
Other languages
Chinese (zh)
Inventor
寇娟娟
高鹏
张运
骆军
李�根
赵涛
李黎
王一斌
张晓通
白杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Seventh Construction Group Co ltd
Original Assignee
Gansu Seventh Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Seventh Construction Group Co ltd filed Critical Gansu Seventh Construction Group Co ltd
Priority to CN202022253865.2U priority Critical patent/CN213683276U/en
Application granted granted Critical
Publication of CN213683276U publication Critical patent/CN213683276U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a pole is counted to skin for infilled wall is built by laying bricks or stones, the electric iron comprises a pole body, it has a plurality of accurate wares that hang down to inlay on the body of rod, the top of the body of rod is installed and is tightly held up the head, adjustable base is installed to the bottom of the body of rod, install spooler and a plurality of vernier on the body of rod, the vernier includes the vernier sliding sleeve, the front end fixed mounting of vernier sliding sleeve has accurate line to hold in the palm, accurate line holds in the palm and is equipped with datum line lead wire groove, the spooler includes spooler sliding sleeve and spooler casing, the inside of spooler casing is equipped with the axis, it coils spring and take-up pulley to receive the line. The utility model can fix the pole with the number of leather between the upper and the lower floor slabs by adjusting the adjustable base and the jacking head, and the pole does not need to be attached to other fixed objects, so the fixation is firm and reliable; adopt many vernier designs, through the upper and lower activity of vernier, can reset the skin number line of brickwork, need not constantly carve the skin number line on the body of rod, just can used repeatedly.

Description

A pole is counted to skin for infilled wall builds by laying bricks or stones
Technical Field
The utility model belongs to the technical field of the building engineering construction, concretely relates to a skin number pole for infilled wall is built by laying bricks or stones.
Background
With the rapid development of domestic construction technology, the construction of a frame structure or a frame-shear wall structure (hereinafter referred to as a "frame-shear structure") has become the mainstream structure of urban construction, the frame or frame-shear structure construction uses steel bars and concrete as raw materials, beams, columns, plates and horizontal shear walls of the building are poured to form a main body frame of the building, then building and filling the wall body with building blocks, and then the projects of door and window installation, water heating and electricity, equipment installation, decoration and the like are carried out to finally complete the construction of the whole building, wherein the building of the filling wall body is a key process of the whole project next to the main body frame construction, the building has large engineering quantity and higher requirements on construction quality, the functional requirements of the building are ensured, and the verticality, the surface smoothness, the mortar joint thickness and width of the building body, the mortar plumpneumability of mortar of the mortar joint, and the like of the mortar joint are ensured, The construction method comprises the following steps of constructing the building columns and the building beams, designing the positions and the sizes of the building columns and the building beams, the height and the width of the door and window openings, the deviation condition of upper and lower windows of an outer wall and the like, wherein in order to meet the construction requirements, before masonry construction, brick arrangement design is generally needed, and detailed deepening design is carried out on the positions and the sizes of building blocks, mortar joints, doors and windows, the building columns and the building beams of each wall so as to achieve the purposes of ensuring the construction quality, improving the construction efficiency and saving the construction cost. After the design of the row of bricks is finished, lofting is carried out on site, a large sample of the row of bricks is drawn on site, horizontal positions of building blocks, mortar joints, holes and constructional columns can be laid, vertical positions of the building blocks, the mortar joints, the holes and the constructional beams can be drawn on vertical members such as walls, columns and the like by ink strokes, but the method has large labor consumption and low efficiency, and errors are easy to occur in the position line drawing process. However, the wooden pole with the number of bark has some problems, for example, the pole with the number of bark made for a wall can only be used for the wall, although the wooden pole can be reused, the carved lines on the wooden pole must be removed firstly, and then the number of bark is carved again, so that the making of the pole with the number of bark is time-consuming and labor-consuming, meanwhile, the function of the pole with the number of bark is single, only a plane wall body can be built, and the pole with the number of bark can not be used for building a fancy wall body with a protruding or sunken pattern on the wall surface.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the technical problem existing in the prior art and providing a pole is counted to skin that is used for infilled wall to build by laying bricks or stones that simple structure, safe and reliable, multiple functional, repeatedly usable and convenient to use.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a pole is counted to skin for infilled wall is built by laying bricks or stones, body of rod including vertical setting, it has a plurality of accurate wares that hang down to inlay on the body of rod, the puller head is installed at the top of the body of rod, adjustable base is installed to the bottom of the body of rod, install spooler and a plurality of vernier on the body of rod, the vernier includes the vernier sliding sleeve of suit on the body of rod, the front end fixed mounting of vernier sliding sleeve has accurate line to hold in the palm, be equipped with datum line wire casing on the accurate line holds in the palm, the spooler includes the spooler sliding sleeve of suit on the body of rod and fixes the spooler casing on the spooler sliding sleeve, the inside of spooler casing is equipped with axis, receives line steel sheet and coils spring and take-up pulley, centraxonial one end is fixed on the spooler casing, the other end suit of receiving line steel sheet coiled spring is in epaxial, the take-up pulley twine A lead groove.
Further, adjustable base includes the location base, the location base includes body of rod bottom grafting piece and suit at the outside location base sleeve of body of rod bottom grafting piece, the middle part of body of rod bottom grafting piece is equipped with bottom grafting piece round through-hole, positioning bolt is installed to the vertical cooperation in the bottom grafting piece round through-hole, last locknut and the locknut of installing of positioning bolt is located the below of location base.
Further, the tight head in top includes the tight base in top, the tight base in top includes body of rod top grafting piece and suit at the outside tight base sleeve in top of the body of rod grafting piece, the telescopic lateral part in top is equipped with the tight locking bolt in top, the middle part of body of rod top grafting piece is equipped with top grafting piece round through-hole, the tight bolt in top is installed to the interior vertical cooperation of top grafting piece round through-hole, install the top tight nut in top and the top that the tight nut in top is located the tight base in top on the tight bolt in top.
Furthermore, the two sides of the wire aligning support are respectively and vertically provided with a vertical lead groove, the middle of the wire aligning support is provided with a transverse lead groove, and the two ends of the transverse lead groove are respectively communicated with the corresponding vertical lead grooves.
Furthermore, the rear end side portion of the vernier sliding sleeve is provided with a vernier sliding sleeve locking bolt, the other two sides of the vernier sliding sleeve are respectively provided with an alignment rack sliding groove, an alignment rack is inserted in the alignment rack sliding groove, the alignment rack can slide along the alignment rack sliding groove, and the alignment rack sliding groove is provided with an alignment rack locking bolt.
Further, the alignment rack comprises wing plates capable of sliding along the sliding grooves of the alignment rack and webs fixed on the wing plates, and alignment hooks are arranged on the wing plates and the webs in a mutually perpendicular mode and are arranged on the webs at intervals of 10 mm.
Furthermore, the lateral part of spooler sliding sleeve is equipped with spooler sliding sleeve locking bolt, the take-up pulley includes well section of thick bamboo and fixes the side shield in well section of thick bamboo both sides.
Further, the body of rod is square steel pipe or aluminum alloy side pipe, the body of rod includes the long-rod body and with the short body of rod of long-rod body suit.
Furthermore, the vertical alignment device comprises a leveling pipe shell and a long leveling pipe arranged in the leveling pipe shell, and the two vertical alignment devices are arranged on two side surfaces of the upper portion of the rod body, which are vertical to each other.
The utility model discloses relative prior art has following beneficial effect:
1. the utility model discloses a pole is counted to skin for infilled wall masonry mainly includes the body of rod, hangs down accurate ware, puller head, adjustable base, spooler and vernier, can make the pole be counted to skin fix between upper and lower floor through adjusting adjustable base and puller head, need not adhere to on other fixed objects, and fixed firm reliable; the wire rewinding device is arranged on the rod body and comprises a wire rewinding device sliding sleeve, a wire rewinding device shell, a middle shaft, a wire rewinding steel sheet coiling spring and a wire rewinding wheel, wherein the wire rewinding steel sheet coiling spring can provide certain tension force to enable a drawn lead to be tightened; the rod body is provided with a plurality of cursors, the design of multiple cursors is adopted, the leather number lines of the brickwork can be reset through the up-and-down movement of the cursors, and the leather number rods can be repeatedly used without continuously carving the leather number lines on the rod body; simultaneously, each vernier is including installing the vernier sliding sleeve on the body of rod, fix the alignment on the vernier sliding sleeve and hold in the palm and set up the reference line lead wire groove on the alignment holds in the palm, winding lead wire on the take-up pulley passes in proper order and sets up the wire hole on the spooler casing and the alignment holds in the palm behind the reference line lead wire groove on with the lead wire connection that corresponding vernier was drawn out on another picot pole forms a horizontal alignment, the position of each horizontal alignment is the upper surface of each skin brickwork promptly, be convenient for act as go-between, can effectively guarantee to build by laying bricks or stones the quality.
2. The utility model discloses be equipped with alignment frame spout respectively in the other both sides of vernier sliding sleeve, it has alignment line frame to peg graft in the alignment frame spout, alignment line frame can be followed and be equipped with alignment line frame locking bolt on alignment frame spout slides and alignment frame spout, when building the decoration wall body that has concave-convex pattern by laying bricks or stones, according to row's brick picture design, adjust alignment line frame in the alignment frame spout from beginning to end, get many cotton ropes as required and hang on the corresponding alignment line couple of alignment line frame, can provide many reference alignment lines that are located the coplanar and have a determining deviation, be convenient for decorate building by laying bricks or stones of wall body, be applicable to and build by laying bricks or stones the wall body of decorating that the wall.
3. The utility model discloses an adjustable base mainly includes the location base, positioning bolt and lock nut, the location base includes body of rod bottom plug-in block, location base sleeve and bottom plug-in block round through hole, the tight head in top mainly includes the tight base in top, the tight bolt in top and the tight nut in top, the tight base in top includes body of rod top plug-in block, the tight base sleeve in top, the tight locking bolt in top and top plug-in block round through hole, the positioning bolt of adjustable base, the distance and the on-the-spot one meter datum line highly uniform of a meter datum line on making the pi number pole, tighten lock nut again, prevent that positioning bolt is not hard up. The jacking nut is rotated on the jacking bolt, so that the relative length of the jacking bolt in the jacking base can be adjusted until the upper floor is jacked, and the pole with the number of leather sheets can be firmly fixed between the upper floor and the lower floor.
4. The utility model discloses it has a plurality of accurate wares that hang down to inlay on the body of rod, can directly provide the reference of body of rod vertical state when the fixed body of rod, need not adopt other outside reference methods, also can detect the straightness that hangs down of wall body according to this simultaneously.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the short rod body of the present invention;
FIG. 3 is a schematic structural view of a long rod body according to the present invention;
fig. 4 is a schematic structural view of the adjustable base of the present invention;
FIG. 5 is a schematic structural view of the tightening head of the present invention;
FIG. 6 is a schematic view of the cursor of the present invention;
FIG. 7 is a schematic structural view of the present invention with the alignment frame removed;
fig. 8 is a schematic diagram of threading of the lead in the datum line lead groove according to the present invention;
FIG. 9 is a schematic structural view of the wire alignment rack of the present invention;
FIG. 10 is a schematic structural view of the wire rewinding device of the present invention;
fig. 11 is an exploded view of the wire rewinding device of the present invention;
fig. 12 is a schematic structural view of the plummet of the present invention.
The utility model discloses the reference sign is as follows: 1. a rod body; 101. a long rod body; 102. a short rod body; 2. an adjustable base; 201. a positioning base; 202. positioning the bolt; 203. a locknut; 204. the bottom of the rod body is inserted with a block; 205. positioning the base sleeve; 3. tightly pushing the head; 301. tightly propping the base; 302. tightly jacking the locking bolt; 303. jacking the bolt; 304. tightly pushing the nut; 305. tightly supporting the base sleeve; 4. A cursor; 401. a vernier sliding sleeve; 402. a vernier sliding sleeve locking bolt; 403. aligning a wire support; 404. a guideline frame chute; 405. aligning a wire frame; 406. a quasi-wire rack locking bolt; 407. a reference line lead groove; 409. a vertical lead groove; 410. a transverse lead groove; 411. a wing plate; 412. a web; 413. a line aligning hook; 5. a wire rewinding device; 501. a sliding sleeve of the wire rewinding device; 502. a sliding sleeve locking bolt of the wire rewinding device; 503. a spooler housing; 504. a middle shaft; 505. coiling a spring by taking up a steel sheet; 506. a take-up pulley; 507. a middle cylinder; 508. a side dam; 509. a wire outlet hole; 6. a plumb aligner; 601. a long leveling tube; 602. a level vial.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and the following detailed description.
The directions indicated by "up", "down", "left", "right", "front", "rear", etc. in the present invention are based on the positions shown in fig. 1. As shown in fig. 1-12, a pole for filling wall masonry comprises a vertically arranged pole body 1, wherein the pole body 1 is a square steel tube or an aluminum alloy square tube, the pole body 1 is determined according to indoor clear height, the pole body 1 can be a single pole or can adopt a multi-pole splicing mode to adapt to wall masonry construction with different floor heights, and when the multi-pole splicing mode is adopted, the pole body 1 comprises a long pole body 101 and a short pole body 102 sleeved with the long pole body 101. Inlay on the body of rod 1 and have a plurality of vertical alignment ware 6, vertical alignment ware 6 includes the level tube 602 and installs the long level pipe 601 in the level tube 602, and the axis of long level pipe 601 is perpendicular with the axis of the body of rod 1, and vertical alignment ware 6 is two and installs on two sides of body of rod 1 upper portion mutually perpendicular. The bottom of the rod body 1 is provided with an adjustable base 2, the adjustable base 2 comprises a positioning base 201, the positioning base 201 comprises a rod body bottom inserting block 204 and a positioning base sleeve 205 sleeved outside the rod body bottom inserting block 204, the outer diameter of the rod body bottom inserting block 204 is the same as the inner diameter of the rod body 1, the outer diameter of the positioning base sleeve 205 is the same as the outer diameter of the rod body 1, the rod body bottom inserting block 204 can be inserted into the bottom end of the rod body 1, is connected with the bottom end of the rod body 1, the middle part of the rod body bottom inserting block 204 is vertically provided with a bottom inserting block round through hole, a positioning bolt 202 is vertically matched and arranged in the bottom inserting block round through hole (the head of the positioning bolt 202 is downward), a locknut 203 is arranged on the positioning bolt 202, the locknut 203 is positioned below the positioning base 201, when the set bolt 202 is screwed to a predetermined position, the set bolt 202 can be prevented from loosening by rotating the locknut 203. The top of the rod body 1 is provided with a puller head 3, the puller head 3 comprises a puller base 301, the puller base 301 comprises a rod body top insertion block and a puller base sleeve 305 sleeved outside the rod body top insertion block, the outer diameter of the rod body top insertion block is the same as the inner diameter of the rod body 1, the outer diameter of the puller base sleeve 305 is the same as the outer diameter of the rod body 1, the rod body top insertion block can be inserted into the top end of the rod body 1 and connected with the top end of the rod body 1, the side part of the puller base sleeve 305 is provided with a puller locking bolt 302, the middle part of the rod body top insertion block is vertically provided with a top insertion block round through hole, a puller bolt 303 is vertically matched and arranged in the top insertion block round through hole (the head of the puller bolt 303 is upward, the rod body top insertion block can be prevented from moving by screwing the puller locking bolt 302 and further can be prevented from freely moving the puller bolt 303), a puller nut 304 is arranged on the puller bolt 303, and the puller nut 304, by rotating the puller nut 304 on the puller bolt 303, the relative length of the puller bolt 303 within the puller base 301 can be adjusted. Install spooler 5 and a plurality of vernier 4 on the body of rod 1, vernier 4 is including the vernier sliding sleeve 401 of suit on the body of rod 1, the rear end lateral part of vernier sliding sleeve 401 is equipped with vernier sliding sleeve locking bolt 402, through screwing up vernier sliding sleeve locking bolt 402, can fix vernier 4 on the body of rod 1, unscrew vernier sliding sleeve locking bolt 402, vernier 4 can freely slide on the axial on the body of rod 1, the front end fixed mounting of vernier sliding sleeve 401 has the accurate line to hold in the palm 403, the left and right sides of accurate line support 403 respectively vertically is equipped with vertical lead wire groove 409, the middle part of accurate line support 403 is equipped with horizontal lead wire groove 410 and the both ends of horizontal lead wire groove 410 are linked together with corresponding vertical lead wire groove 409 respectively (vertical lead wire groove 409 and horizontal lead wire groove 410 constitute reference wire groove 407 on the accurate line support 403. The other two sides (left and right sides) of vernier sliding sleeve 401 are respectively equipped with alignment line frame sliding groove 404, alignment line frame 405 (the cross-section of alignment line frame 405 is "horizontal T" type cross-section) is spliced in alignment line frame sliding groove 404, alignment line frame 405 can slide along alignment line frame sliding groove 404 and be equipped with alignment line frame locking bolt 406 on alignment line frame sliding groove 404, through screwing up alignment line frame locking bolt 406, alignment line frame 405 can be fixed in alignment line frame sliding groove 404, unscrew alignment line frame locking bolt 406, alignment line frame 405 can move along alignment line frame sliding groove 404. The alignment frame 405 comprises a wing plate 411 capable of sliding along the alignment frame sliding groove 405 and a web plate 412 fixed on the wing plate 411, wherein the wing plate 411 and the web plate 412 are arranged perpendicular to each other, and an alignment hook 413 is arranged on the web plate 412 at intervals of 10 mm. The spooler 5 comprises a spooler sliding sleeve 501 sleeved on the rod body 1 and a spooler housing 503 fixed on one side of the spooler sliding sleeve 501 (the spooler housing 503 is used for protecting the internal structure and providing a fixed point for the internal structure), the other side of the spooler sliding sleeve 501 is provided with a spooler sliding sleeve locking bolt 502, the spooler 5 can be fixed on the corresponding position of the rod body 1 by screwing down the spooler sliding sleeve locking bolt 502, the spooler sliding sleeve locking bolt 502 is unscrewed, the spooler 5 can freely slide on the rod body 1 in the axial direction, a center shaft 504, a take-up steel coil spring 505 and a take-up pulley 506 are arranged inside the spooler housing 503, the take-up pulley 506 comprises a middle barrel 507 and side baffles 508 fixed on two sides of the middle barrel 507, one end of the center shaft 504 is fixed on the inner wall of the spooler housing 503, one end of the take-up steel coil spring 505 is sleeved on the, the wire take-up pulley 506 is wound with a lead wire, and the lead wire sequentially passes through a wire outlet 509 arranged on the wire take-up housing 503 and the reference wire lead groove 407 on the alignment wire holder 403.
When in use, the leather counting rods are generally matched with one another in a pair manner, and the number of the leather counting rods can be increased according to the requirement. Before setting up the pith pole, should mark the pith pole one meter reference line according to the brickwork row brick drawing design of wall body on the body of rod 1 of field measurement according to the field measurement, rotatory positioning bolt 202 for the distance of one meter reference line on the pith pole is highly unanimous with on-the-spot one meter reference line, screws up lock nut 203 again, prevents that positioning bolt 202 is not hard up. Referring to the position of the bubble of the long level pipe 601 of the vertical calibrator 6, the top of the rod body 1 is moved back and forth and left to make the rod body 1 vertical, at this time, the puller locking bolt 302 is unscrewed, the puller nut 304 is rotated on the puller bolt 303, and the relative length of the puller bolt 303 in the puller base 301 is adjusted until the head of the puller bolt 303 tightly pushes the upper floor, and at this time, the piconumber rod is firmly fixed between the upper floor and the lower floor. And in the same way, the setting of other corresponding pole with the skin number is completed. And loosening the vernier sliding sleeve locking bolt 402, moving the vernier 4 up and down to the corresponding position along the rod body 1, and tightening the vernier sliding sleeve locking bolt 402 to fix the vernier 4. During masonry, a lead is pulled out from a wire outlet 509 on the wire rewinding device shell 503, the lead sequentially penetrates through a vertical lead groove 409 and a horizontal lead groove 410 on the vernier 4 and then is connected with a lead led out from the vernier 4 corresponding to the other rod with the same number of piles, and under the action of a wire rewinding steel sheet coiling spring 505, the lead is tightened to form a horizontal alignment line, so that a reference surface is provided for masonry work. After the brick is built, the alignment line is moved to the corresponding vernier 4. When the pole with the number of piles is demolishd after a wall is built by laying bricks or stones, only need unscrew puller nut 304, puller bolt 303 descends certain height, and the head of puller bolt 303 leaves upper floor bottom surface, pack up the number of piles pole can.
When building the decorative wall body with the concave-convex patterns, according to the design of a brick arrangement diagram, the alignment frame locking bolt 406 is loosened, the position of the alignment frame 405 in the alignment frame sliding groove 404 is adjusted, the alignment frame locking bolt 406 is screwed after the adjustment, the alignment frame 405 is fixed at the corresponding position of the alignment frame sliding groove 404, a plurality of ropes are taken again, the ropes are hung on the alignment hook 413 corresponding to the alignment frame 405, a plurality of reference alignment lines positioned on the same plane can be provided, and the building of the decorative wall body with the concave-convex patterns is facilitated.

Claims (9)

1. The utility model provides a skin number pole for infilled wall is built by laying bricks or stones, includes the body of rod (1) of vertical setting, it has a plurality of accurate ware (6), its characterized in that to inlay on the body of rod (1): the utility model discloses a take-up device, including the body of rod (1), the top of the body of rod (1) is installed and is tightly held (3), adjustable base (2) are installed to the bottom of the body of rod (1), install spooler (5) and a plurality of vernier (4) on the body of rod (1), vernier sliding sleeve (401) on the body of rod (1) are drawn together including suit to vernier (4), the front end fixed mounting of vernier sliding sleeve (401) has the accurate line to hold in the palm (403), be equipped with datum line lead wire groove (407) on accurate line support (403), spooler (5) are including the spooler sliding sleeve (501) of suit on the body of rod (1) and fix spooler casing (503) on spooler sliding sleeve (501), the inside of spooler casing (503) is equipped with axis (504), receives line steel sheet and coils spring (505) and take-up wheel (506), the one end of axis (504) is fixed on spooler casing (503), the one end, The other end of the wire winding wheel is sleeved in a wire winding wheel (506), a lead is wound on the wire winding wheel (506) and sequentially penetrates through a wire outlet hole (509) formed in a wire winding device shell (503) and a datum line lead groove (407) formed in a datum line support (403).
2. A pick-up pole for infill wall masonry, according to claim 1, wherein: adjustable base (2) are including location base (201), location base (201) are including body of rod bottom insertion piece (204) and suit at the outside location base sleeve (205) of body of rod bottom insertion piece (204), the middle part of body of rod bottom insertion piece (204) is equipped with bottom insertion piece circle through-hole, positioning bolt (202) are installed to the interior vertical cooperation of bottom insertion piece circle through-hole, install locknut (203) and locknut (203) on positioning bolt (202) and be located the below of location base (201).
3. A pick-up pole for infill wall masonry, according to claim 1, wherein: tight head in top (3) are including the tight base in top (301), the tight base in top (301) are including body of rod top plug-in block and suit at the outside tight base sleeve in top of the body of rod (305), the lateral part of the tight base sleeve in top (305) is equipped with the tight locking bolt in top (302), the middle part that the block was inserted at body of rod top is equipped with the piece round through hole of top plug-in, the tight bolt in top (303) are installed to the interior vertical cooperation of piece round through hole of top plug-in, install the top tight nut (304) in top and the top tight nut (304) are located the top of the tight base in top (301) on the tight bolt in top (303).
4. A pick-up pole for infill wall masonry, according to claim 1, wherein: the two sides of the wire aligning support (403) are respectively and vertically provided with a vertical lead groove (409), the middle of the wire aligning support (403) is provided with a transverse lead groove (410), and the two ends of the transverse lead groove (410) are respectively communicated with the corresponding vertical lead grooves (409).
5. A pick-up pole for infill wall masonry, according to claim 1, wherein: the rear end side portion of vernier sliding sleeve (401) is equipped with vernier sliding sleeve locking bolt (402), the other both sides of vernier sliding sleeve (401) are equipped with alignment frame spout (404) respectively, it has alignment line frame (405) to peg graft in alignment line frame spout (404), alignment line frame (405) can be followed alignment line frame spout (404) and slide and be equipped with alignment line frame locking bolt (406) on alignment line frame spout (404).
6. A pick up pole for infill wall masonry according to claim 5, wherein: the alignment frame (405) comprises wing plates (411) capable of sliding along the alignment frame sliding grooves (404) and webs (412) fixed on the wing plates (411), wherein the wing plates (411) and the webs (412) are perpendicular to each other, and alignment hooks (413) are arranged on the webs (412) at intervals of 10 mm.
7. A pick-up pole for infill wall masonry, according to claim 1, wherein: the side of spooler sliding sleeve (501) is equipped with spooler sliding sleeve locking bolt (502), take-up pulley (506) are including well section of thick bamboo (507) and fix side shield (508) in well section of thick bamboo (507) both sides.
8. A pick-up pole for infill wall masonry, according to claim 1, wherein: the rod body (1) is a square steel pipe or an aluminum alloy square pipe, and the rod body (1) comprises a long rod body (101) and a short rod body (102) sleeved with the long rod body (101).
9. A pick up pole for infill wall masonry according to claim 8, wherein: the vertical alignment device (6) comprises a level pipe shell (602) and a long level pipe (601) arranged in the level pipe shell (602), and the two vertical alignment devices (6) are arranged on two side faces of the upper portion of the rod body (1) which are vertical to each other.
CN202022253865.2U 2020-10-12 2020-10-12 A pole is counted to skin for infilled wall builds by laying bricks or stones Active CN213683276U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022253865.2U CN213683276U (en) 2020-10-12 2020-10-12 A pole is counted to skin for infilled wall builds by laying bricks or stones

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022253865.2U CN213683276U (en) 2020-10-12 2020-10-12 A pole is counted to skin for infilled wall builds by laying bricks or stones

Publications (1)

Publication Number Publication Date
CN213683276U true CN213683276U (en) 2021-07-13

Family

ID=76752524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022253865.2U Active CN213683276U (en) 2020-10-12 2020-10-12 A pole is counted to skin for infilled wall builds by laying bricks or stones

Country Status (1)

Country Link
CN (1) CN213683276U (en)

Similar Documents

Publication Publication Date Title
CN106836806B (en) Method and device for constructing special-shaped concrete structure by using BIM technology and precision control method and device in process of constructing special-shaped concrete structure by using BIM technology
CN103510715B (en) A kind of method and caliberating device demarcating concrete prefabricated wallboard installation construction datum
CN108952165B (en) Construction method for prefabricating and embedding row of sleeve pipe assemblies
CN203383508U (en) One-sided formwork body structure backing onto brick concrete retaining wall
CN113502944B (en) PC exterior wall cladding structure and construction process thereof
CN213683276U (en) A pole is counted to skin for infilled wall builds by laying bricks or stones
CN213742414U (en) Masonry mold
CN215368811U (en) Assembled suspension wire construction equipment of infilled wall brickwork
CN210768144U (en) Civil engineering encloses fender connecting device
CN213980025U (en) Thermal insulation building block for thermal insulation layer transformed from old city
CN111005583B (en) Wall building block transverse mortar joint and vertical mortar joint control device
CN216552720U (en) Fixing point instrument of roofing tile is fixed a position fast to oblique roofing
CN218405294U (en) Guiding device for embedded steel pipe of diaphragm wall body
CN212866868U (en) Concrete cantilever beam template reinforcing apparatus
CN215594912U (en) Special-shaped column template reinforcement device
CN211873882U (en) Prefabricated part exposes pre-buried muscle and buries device underground
CN215905762U (en) Combined tower body and base structure thereof
CN209780930U (en) Device for reinforcing tunnel bottom of weak laminar surrounding rock and soft laminar surrounding rock tunnel bottom reinforcing structure thereof
CN216275827U (en) Protective plate for building well chamber
CN217601689U (en) Horizontal structure seam pulling system for non-bearing wall of full cast-in-place outer wall
CN218623685U (en) Assembled concrete fence
CN217871898U (en) Telescopic adjustable interval pole of counting with skin
CN216587791U (en) Verticality control device
CN118110342A (en) Method for building hollow brick wall body poured by core
CN212316716U (en) Sound insulation board for municipal construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant