CN213681742U - Wet joint reinforcing bar correcting unit - Google Patents

Wet joint reinforcing bar correcting unit Download PDF

Info

Publication number
CN213681742U
CN213681742U CN202021912772.XU CN202021912772U CN213681742U CN 213681742 U CN213681742 U CN 213681742U CN 202021912772 U CN202021912772 U CN 202021912772U CN 213681742 U CN213681742 U CN 213681742U
Authority
CN
China
Prior art keywords
steel
wet joint
wire rope
frame
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021912772.XU
Other languages
Chinese (zh)
Inventor
冷曦
谭文鹏
王荣兴
卢勇
程芳芳
郑国辉
戚浩
高财
陈双辉
陈美杰
胡波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Datong Road Bridge Engineering Construction Co ltd
Original Assignee
Guizhou Datong Road Bridge Engineering Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Datong Road Bridge Engineering Construction Co ltd filed Critical Guizhou Datong Road Bridge Engineering Construction Co ltd
Priority to CN202021912772.XU priority Critical patent/CN213681742U/en
Application granted granted Critical
Publication of CN213681742U publication Critical patent/CN213681742U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a wet seam reinforcing bar correcting unit, including the frame, electric block is installed at the frame top, and the last wire rope coiling of electric block is on steering pulley, and wire rope's the other end and steel sheet anchor clamps are connected. The utility model discloses a be provided with diverting pulley for the wire rope direction is parallel with the direction that sets up of the reinforcing bar that needs to rectify, and under electric block's traction, the both sides face of steel sheet anchor clamps is drawn the extrusion and needs the reinforcing bar of rectifying, thereby realizes the mechanization that the thick steel bar rectifies, has accelerated thick steel bar welding work's efficiency, has shortened the time limit for a project.

Description

Wet joint reinforcing bar correcting unit
Technical Field
The utility model relates to a reinforcing bar correcting unit, especially a wet seam reinforcing bar correcting unit.
Background
After the bridge deck precast slabs are installed, longitudinal and transverse steel bars of two adjacent precast slabs need to be welded so that the bridge deck slabs are connected into a whole and stressed cooperatively. Due to objective reasons in all aspects, the distance between thick steel bars at the wet joint is large, and the steel bars cannot be welded. Therefore, the thick steel bars need to be corrected through external force, and the thick steel bars can be welded only when two adjacent steel bars are close to each other. The traditional correction method is to use a chain block or a steel chisel to correct the thick steel bars manually. However, the conventional method has the following problems: 1. all work is completed through manpower, and welding efficiency is slow, causes the time limit for a project to delay easily. 2. If the project progress needs to be accelerated, more personnel and equipment need to be equipped, so that the economic cost is greatly increased, and the risk occurrence probability is increased. 3. Workers sometimes can directly carry out heat treatment on the crude steel bars by oxygen and acetylene for convenience of drawing in the working process, and the structure and the performance of the steel bars can be easily damaged. To sum up, the traditional correction mode has the defects of large manpower consumption, long working time, low working efficiency, large destructiveness on the thick steel bars, high construction cost, certain potential safety hazards and the like.
Disclosure of Invention
An object of the utility model is to provide a wet seam reinforcing bar correcting unit. The device can rectify thick reinforcing bar fast, convenient operation, and the installation is convenient, and work efficiency is high, rectifies effectually moreover.
The technical scheme of the utility model: a wet joint reinforcing steel bar correcting device comprises a frame, wherein an electric block is installed at the top of the frame, a steel wire rope on the electric block is wound on a steering pulley, and the other end of the steel wire rope is connected with a steel plate clamp.
In the wet joint reinforcing steel bar correcting device, the steel plate clamp is of a Z-shaped folding structure.
In the wet joint reinforcing steel bar correcting device, the other end of the steel wire rope is connected with the steel plate clamp through a shackle and a round steel pull ring.
In the wet joint reinforcing steel bar correcting device, universal wheels and spiral steel are arranged on the periphery of the bottom of the frame.
In the wet joint reinforcing steel bar correcting device, the steering pulley is provided with a hook.
In the wet joint reinforcing steel bar correcting device, the frame is of a frame structure and is made of section steel.
The utility model has the advantages that: compared with the prior art, the utility model discloses a be provided with diverting pulley for the wire rope direction is parallel with the direction that sets up of the reinforcing bar that needs to rectify, and under electric block's traction, the both sides face of steel sheet anchor clamps is drawn the extrusion and needs the reinforcing bar of rectifying, thereby realizes the mechanization that the thick reinforcing bar was rectified, has accelerated thick steel bar welding work's efficiency, has shortened the time limit for a project. The steel plate clamp and the design of the steering pulley are convenient for quick correction of the steel bar, and the structure and the stress state of the steel bar are not influenced. The device is provided with the universal wheels, so that the movement is very convenient, the switching of the working surface can be rapidly carried out, and the transfer time of the device is saved.
The device's simple structure, it is comparatively convenient to operate, compares with traditional correction mode, has reduced personnel's participation degree, and to a great extent has avoided the accident that appears among the manpower correction process.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a mounting structure of the steel plate clamp;
fig. 3 is a schematic diagram of the operation of the present invention.
Reference numerals: 1-electric block, 2-frame, 3-steering pulley, 4-wire rope, 5-steel plate clamp, 6-screw steel, 7-universal wheel, 8-walking steel plate, 9-shackle, 10-round steel pull ring, 11-steel bar to be corrected, and 12-hook.
Detailed Description
The following description is made with reference to the accompanying drawings and examples, but not to be construed as limiting the invention.
The embodiment of the utility model provides a: a wet joint reinforcing steel bar correcting device is shown in attached figures 1-3 and comprises a frame 2, wherein the top of the frame 2 is fixedly provided with 1 electric hoist 1, after a steel wire rope 4 on the electric hoist 1 is wound on a steering pulley 3, the other end of the steel wire rope 4 is fixedly connected with a steel plate clamp 5.
In use, the diverting pulley 3 and the steel plate clamp 5 are placed on the sides of the steel reinforcement 11 whose wet joint is to be corrected, respectively, and the diverting pulley 3 is fixed, as described in connection with fig. 2-3. After the diverting pulley 3 is fixed, the steel wire rope 4 can rotate around the diverting pulley 3 to receive and release the steel plate clamp 5, so that the working stroke range of the device is enlarged. The steel wire rope 4 is steered and adjusted through the steering pulley 3, so that the arrangement direction of the steel wire rope 4 between the steering pulley 3 and the steel plate clamp 5 is parallel to the arrangement direction of the steel bars 11 to be corrected. The contact surface of the steel plate clamp 5 and the steel bar 11 to be corrected is adjusted, so that the steering pulley 3 and the steel plate clamp 5 can be attached to the steel bar 11 to be corrected of the wet joint to the maximum extent, and the steel bar 11 to be corrected can be stressed well. The electric hoist 1 on the upper portion of the frame 2 is started, the steel wire rope 4 is tightened, the steel wire rope 4 pulls to tighten the steering pulley 3 and the steel plate clamp 5, the side face of the steel plate clamp 5 generates horizontal extrusion force to the steel bar 11 to be corrected in the process of tensioning and rotating, and the distance between the steel bars 11 to be corrected is reduced under the action of the extrusion force until the distance meets the welding requirement.
After welding is completed, when the device needs to be moved to the next working surface, the walking steel plate 8 needs to be erected at the wet joint, so that the device can span the wet joint, and the device is convenient to move.
The steel plate clamp 5 is of a Z-shaped structure, the steel plate clamp 5 of the structure is placed as shown in the attached drawings 2-3, the steel plate clamp 5 in the shape can simultaneously correct the upper layer and the lower layer of the steel bars 11 to be corrected at the wet joint position in the using process, and the welding efficiency of the steel bars is accelerated.
The other end of the steel wire rope 4 is connected with the steel plate clamp 5 through a shackle 9 and a round steel pull ring 10, and after the steel plate clamp 5 is pulled and deformed for a long time, the shackle 9 is opened, and then the steel plate clamp 5 can be replaced by a new steel plate clamp 5. A round steel pull ring 10 is welded on the steel plate clamp 5, and is conveniently buckled with the shackle 9.
The supporting legs on the periphery of the bottom of the frame 2 are respectively provided with 1 universal wheel 7 and 1 nut, and 1 screw steel 6 is screwed into the middle thread of each nut. In the whole working process of the device, the screw steel 6 arranged on the supporting legs of the frame 2 is placed on the ground and screwed down, so that the effect of braking is achieved, and the correction effect cannot be influenced by shaking of the device. After the steel bar is welded, the screw steel 6 is lifted, and the device can move on the bridge deck. The screw steel 6 is connected with the frame 2 through nuts welded on the four supporting legs, and the movement and the stability of the control device are controlled. The universal wheels 7 are arranged, so that the device can move freely and change working surfaces quickly.
When the steel plate clamp 5 is used for correcting the thick steel bars, the length of the steel plate clamp 5 is not too long, so that the steel plate clamp 5 can be easily taken out of the thick steel bars.
The diverting pulley 3 is provided with a hook 12, and the steel bar 11 to be corrected is hooked by the hook 12, so that the diverting pulley 3 is fixed.
The frame 2 is of a frame structure and is made of section steel, so that local materials are convenient to use.
The steel plate clamp 5 and the diverting pulley 3 are brought into contact with the reinforcement 11 to be corrected before the correction is started with the contact surface with the reinforcement 11 to be corrected as large as possible. Therefore, the shapes of the steel plate clamp 5 and the steering pulley 3 are considered during design, and the linear radian of the contact surface of the steel bar 11 to be corrected is better, so that the steel bar 11 to be corrected can be better attached.

Claims (6)

1. The utility model provides a wet joint reinforcing bar correcting unit which characterized in that: the electric hoist comprises a frame (2), an electric hoist (1) is installed at the top of the frame (2), a steel wire rope (4) on the electric hoist (1) is wound on a steering pulley (3), and the other end of the steel wire rope (4) is connected with a steel plate clamp (5).
2. The wet joint rebar correction device of claim 1, wherein: the steel plate clamp (5) is of a Z-shaped structure.
3. The wet joint rebar correction device of claim 1, wherein: the other end of the steel wire rope (4) is connected with the steel plate clamp (5) through a shackle (9) and a round steel pull ring (10).
4. The wet joint rebar correction device of claim 1, wherein: the universal wheels (7) and the spiral steel (6) are installed on the periphery of the bottom of the frame (2).
5. The wet joint rebar correction device of claim 1, wherein: the diverting pulley (3) is provided with a hook (12).
6. The wet joint rebar correction device of claim 1, wherein: the frame (2) is of a frame structure and is made of section steel.
CN202021912772.XU 2020-09-04 2020-09-04 Wet joint reinforcing bar correcting unit Active CN213681742U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021912772.XU CN213681742U (en) 2020-09-04 2020-09-04 Wet joint reinforcing bar correcting unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021912772.XU CN213681742U (en) 2020-09-04 2020-09-04 Wet joint reinforcing bar correcting unit

Publications (1)

Publication Number Publication Date
CN213681742U true CN213681742U (en) 2021-07-13

Family

ID=76746257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021912772.XU Active CN213681742U (en) 2020-09-04 2020-09-04 Wet joint reinforcing bar correcting unit

Country Status (1)

Country Link
CN (1) CN213681742U (en)

Similar Documents

Publication Publication Date Title
CN105484514A (en) Method for strengthening circular reinforced concrete pier column
CN105821773B (en) The electronic penetrating device of Precast T-Beam hogging moment steel strand wires
CN109339458A (en) A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation
CN111335610A (en) High-altitude large-span cantilever formwork operation platform and erection method thereof
CN213681742U (en) Wet joint reinforcing bar correcting unit
CN106758883B (en) The interim pocket device for hoisting of steel wire rope for steel pipe truss concrete arch-type bridge suspender replacement and its for the method for suspender replacement
CN106012834B (en) A kind of spatial warping curve abnormal shape antisymmetry steel king-tower inner support and tensioning system
CN209308433U (en) A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation
CN105672688B (en) The prestressing force intensifier and its construction method of a kind of continued access timber structure
CN216809608U (en) Wet seam template piece supporting device
CN207537885U (en) The anchoring mechanism in inclined guy cable stretching stage
CN105569368A (en) Annular steel plate strengthening device for reinforced concrete column with circular cross section
CN214329599U (en) Steel reinforcement cage interfacing apparatus
CN206110810U (en) Fixed armful of pole structure of staple bolt that slides
CN212956944U (en) Special fixing device for hoisting pipe truss structure system equipment
CN214033704U (en) Anchor rope and anchor backing plate
CN211519531U (en) Curb handling tool
CN205243062U (en) Annular steel sheet reinforcing apparatus
CN212105057U (en) High-altitude large-span cantilever formwork operation platform
CN209816682U (en) Bridge steel box girder aerial working operation platform
WO2019068228A1 (en) Formwork adjustment tool for railway bridge formwork
CN210080379U (en) High-strength prestressed steel wire drawing die matching device
CN209721363U (en) A kind of lifting pipeline auxiliary device
CN103669219B (en) Many limbs height pier is with sliding construction equipment
CN209779468U (en) Lifting type truss working platform for bridge maintenance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant