CN213653330U - Ice-making cold guide pipe support - Google Patents

Ice-making cold guide pipe support Download PDF

Info

Publication number
CN213653330U
CN213653330U CN202021960850.3U CN202021960850U CN213653330U CN 213653330 U CN213653330 U CN 213653330U CN 202021960850 U CN202021960850 U CN 202021960850U CN 213653330 U CN213653330 U CN 213653330U
Authority
CN
China
Prior art keywords
ice
hoop
pipe
making cold
hoop member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021960850.3U
Other languages
Chinese (zh)
Inventor
苏阵江
程占玉
慎旭双
吕玉圣
吕鹏飞
蓝杭焜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN202021960850.3U priority Critical patent/CN213653330U/en
Application granted granted Critical
Publication of CN213653330U publication Critical patent/CN213653330U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses an ice-making cold guide pipe support, include: a fixed base; the lower ends of the plurality of hanging rods are fixed on the fixed base; the finished product pipe hoop part is used for hooping the ice-making cold guide pipe, and the finished product pipe hoop part is arranged at the upper end of the hanging rod in a height-adjustable manner; and the limiting part is used for positioning the height position of the finished pipe hoop part and is fixed on the rod body of the suspender. The utility model relates to an ice-making pipe support is used in the ice rink construction, can satisfy ice-making and lead cold effect, can the effective thickness of high-efficient control concrete again.

Description

Ice-making cold guide pipe support
Technical Field
The utility model relates to a construction technical field relates to a refrigeration pipe support makes ice particularly.
Background
With the steady development of society, the living standard of people is improved, and entertainment becomes an important part of daily life, wherein skating is more popular among most people.
At present, the concrete on the surface layer of the ice field in the competition needs to meet the requirements of compression resistance and stability of later-stage field operation while meeting the requirement of circulating freeze-thaw frost resistance. Meanwhile, the ice-making and cold-conducting effect requires that the distance between the cooling pipe and the concrete surface of the surface layer is less than or equal to 4 cm. At present, the ice-making guide pipe bracket is in a single PE module bracket or an M-shaped steel bar bracket.
PE module support be the pipe of practical PE material, lay interval and place the recess of ice making cold guide pipe apart from ground height cutting department on the pipeline according to ice making cold guide pipe, according to ice making cold guide pipe and PE module leg joint during the construction, concrete is pour to the place after laying the completion, this kind of construction mode PE pipe self space range does not have the concrete and fills, and PE module support very easily is forced to move when concreting, lead to laying ice field surface course concrete thickness not up to standard, ice making cold guide pipe interval changes.
When the M-shaped steel bar support bracket is constructed on site, steel bars need to be cut into sections, folded into a specified shape, welded and fixed, and then the ice making and cooling guide pipe is laid, so that the construction mode has large processing amount, and the ice making and cooling guide pipe has large position control difficulty during actual construction.
SUMMERY OF THE UTILITY MODEL
In view of the above situation, the utility model provides an ice making pipe support reaches and to satisfy ice making and lead the purpose that can control the effective thickness of concrete again when cold effect.
In order to achieve the above object, the utility model discloses the technical scheme who takes is, a refrigeration pipe support, include: a fixed base; the lower ends of the plurality of hanging rods are fixed on the fixed base; the finished product pipe hoop part is used for hooping the ice-making cold guide pipe, and the finished product pipe hoop part is arranged at the upper end of the hanging rod in a height-adjustable manner; and the limiting part is used for positioning the height position of the finished pipe hoop part and is fixed on the rod body of the suspender.
The utility model discloses a set up a plurality of jibs on unable adjustment base, set up finished product pipe hoop spare and install ice making and lead the cold pipe in the upper end of every jib, can lead the cold pipe to erect firmly in the predetermined position ice making, when using, only need to fix unable adjustment base on the construction ground can; furthermore, the finished product pipe hoop part is adjustable in height relative to the hanging rod, the mounting height of the ice guide cold pipe can be modulated in a micro mode, in addition, a limiting part is arranged on the hanging rod according to the preset height of the ice guide cold pipe, the height of the finished product pipe hoop part can be adjusted to achieve a limiting effect, and site construction is facilitated.
The utility model relates to a further improvement of an ice-making cold guide pipe bracket, a fixed base comprises a plurality of sections of plate bodies which are spliced in sequence, and a plurality of suspenders are arranged on each section of plate body at intervals; the effect can be according to the size adjustment unable adjustment base of construction place size.
The utility model relates to a further improvement of ice-making cold-conducting pipe support, the finished product pipe hoop member comprises a first hoop member and a second hoop member, the first hoop member and the second hoop member are enclosed to form a hoop space for installing the ice-making cold-conducting pipe, the first end of the first hoop member is rotatably connected with the first end of the second hoop member, and the second end of the first hoop member is connected with the second end of the second hoop member through a bolt; the effect is that can convenient installation system ice leads cold pipe, improves the efficiency of construction.
The utility model relates to a further improvement of a bracket of an ice-making cold guide pipe, the second hoop also comprises an internal thread sleeve fixed at the bottom; the rod body of the suspender is provided with an external thread, and the internal thread sleeve is screwed on the external thread; the effect is convenient for the equipment of finished product pipe hoop spare and jib.
The utility model relates to a further improvement of an ice-making cold guide pipe bracket, the distance between a limiting part and the top of a suspender is less than the height of an internal thread sleeve; the effect is that the height of the finished pipe hoop is controlled by screwing to further control the height from the ice making cold guide pipe to the base so as to control the effective height of the concrete poured in the site during the subsequent construction.
The utility model relates to a further improvement of an ice-making cold guide pipe bracket, wherein the limiting part is a rod body which is parallel to a fixed base and is simultaneously fixed on the rod bodies of a plurality of suspenders; the effect is that the locating part only needs the location once, need not the repeated location locating part on every jib, and can link together a plurality of jibs with a body of rod.
The utility model relates to a further improvement of an ice-making cold guide pipe bracket, the vertical distance between a limiting part and a fixed base is within the range of 5mm-10 mm; the effect is to carry out accurate control and then control follow-up site concreting's thickness to the height of support.
Drawings
Fig. 1 is a schematic structural view of the ice-making cold guide pipe bracket of the present invention.
Detailed Description
To facilitate understanding of the present invention, the following description is made with reference to the accompanying drawings and examples.
Referring to fig. 1, a schematic structural diagram of the ice making cooling duct support of the present invention is shown. The correspondence of reference numerals to components is as follows: the device comprises a fixed base 1, a suspension rod 2, a finished pipe hoop part 3, a first hoop part 31, a second hoop part 32, a bolt 33, an internal thread sleeve 34 and a limiting part 4.
The ice making cold guide pipe support of the present invention is described below with reference to fig. 1, and includes: the device comprises a fixed base 1, a suspender 2, a finished pipe hoop part 3 and a limiting part 4.
Wherein, the lower ends of a plurality of suspenders 2 are fixed on the fixed base 1; a plurality of finished product pipe hoop pieces 3 set up the upper end at many jibs 2 with adjustable height, and the quantity of jib 2 is the same and the one-to-one connection with finished product pipe hoop piece 3, and finished product pipe hoop piece 3 is used for hooping the ice cooling pipe of establishing. The limiting member 4 is fixed on the body of the suspension rod 2 and used for positioning the height position of the finished pipe hoop member 3. The number of the limiting member 4 may be one or a plurality of limiting members, and when the number of the limiting member 4 is one, the limiting member 4 may be a rod body (sheet-shaped or column-shaped) parallel to the fixing base 1, and the rod body is fixed to the shafts of the plurality of suspension rods 2 on the fixing base 1 at the same time, for example, welded to the same side portion of the shafts of the plurality of suspension rods 2. When the limiting members 4 are plural, the number of the limiting members is the same as that of the plurality of suspenders 2, and the plurality of suspenders are connected in a one-to-one correspondence manner.
Further, unable adjustment base 1 is equipped with a plurality of jibs 2 including the multistage plate body that splices in proper order on every section plate body.
Preferably, thick steel plate strips with the width and height of 50mm 2mm are cut from the thick steel plate and are sequentially welded to serve as a base, and the size of the fixed base is adjusted according to the size of a construction site.
Preferably, fixed points are drawn on the fixed base 1 according to the actual installation distance of the ice making cold guide pipes, the specific distance is determined according to the installation requirements of a construction site, and the lower ends of the suspenders 2 are welded and fixed at the drawn fixed points.
Further, the finished pipe hoop member 3 comprises a first hoop member 31 and a second hoop member 32, the first hoop member 31 and the second hoop member 32 enclose to form a hoop space for installing the ice making cold conducting pipe, a first end of the first hoop member 31 and a first end of the second hoop member 32 are rotatably connected, and a second end of the first hoop member 31 and a second end of the second hoop member 32 are connected through a bolt 33.
Preferably, the first end of the first hoop member 31 and the first end of the second hoop member 32 can be connected by a hinge or a hinge, the second end of the first hoop member 31 and the second end of the second hoop member 32 are respectively provided with an ear plate, the two ear plates are attached to each other when the first hoop member 31 and the second hoop member 32 are closed, and bolt holes are formed in the two ear plates, and the bolts 33 are screwed in the bolt holes; or, the two ear plates are provided with through holes, and the bolt 33 is fixed by matching with a nut after passing through the through holes.
Further, the second band 32 also includes an internally threaded sleeve 34 or nut secured to the bottom. The rod body of the suspender 2 is provided with an external thread, the internal thread sleeve 34 is screwed on the external thread, and the height position of the finished product pipe hoop part 3 relative to the suspender 2 can be controlled by changing the screwing length of the internal thread sleeve 34 and the external thread of the suspender 2, so that the height of the finished product pipe hoop part 3 can be adjusted.
Preferably, the desired hanger bar 2 is cut from a commercially available conventional hanger bar that matches the size of the internally threaded socket of the second hoop member 32, in lengths of 20mm each.
Preferably, one end of the prepared suspender 2 is vertically welded at the drawn fixed point of the prepared fixed base 1 by using an electric welding machine, and the screw thread part at the other end of the suspender 2 is ground into an arc shape, so as to be conveniently screwed with the internal thread sleeve.
Further, the distance from the limiting part 4 to the top of the suspender 2 is less than the height of the internal thread sleeve.
Specifically, the vertical distance between the limiting part 4 and the fixed base 1 is within the range of 5mm-10mm, and the height of the support can be accurately controlled so as to control the thickness of concrete poured in a subsequent site.
Preferably, a steel wire with a diameter of 5mm is used as the limiting member 4, and the limiting member 4 can control the screwing height of the finished pipe hoop member to further control the height from the ice making cold guide pipe to the base so as to control the effective height of concrete poured in the site during subsequent construction.
The following description is made on a preferred using process of the ice-making cold guide pipe bracket of the present invention with reference to the accompanying drawings:
after the ice making cold guide pipe bracket is assembled according to the above operation, the bolt 33 of the bracket is loosened, then the first hoop member 31 and the second hoop member 32 are unscrewed, the ice making cold guide pipe is laid in the hoop space of the first hoop member 31 and the second hoop member 32, and then the first hoop member 31 and the second hoop member 32 are closed and the bolt 33 is screwed to fix the ice making cold guide pipe, thereby preventing the ice making cold guide pipe from rotating.
Then, reinforcing steel bars are bound along the parallel and vertical spaces of the ice making cold guide pipes paved on the construction site, the ice making cold guide pipes are further fixed, and meanwhile, the toughness of the concrete of the ice field can be improved.
The back is bound to last reinforcing bar, and concrete placement that will prepare is in the place, this moment the utility model discloses an ice-making leads cold pipe support, ice-making leads cold pipe, and the reinforcing bar is whole to be covered in the concrete, and the predetermined height is laid to the concrete, and this part construction finishes.
Need notice in the concrete implementation, because the utility model relates to a follow-up concrete that need cover of refrigeration guide cold pipe support, so the utility model relates to a refrigeration guide cold pipe support each welding site quality must guarantee, avoids later stage concrete placement in-process, and concrete placement's effort causes destruction to this support, and the rust-resistant treatment need be done to each position of refrigeration guide cold pipe support of making ice simultaneously, increases the utility model relates to a refrigeration guide cold pipe support's life.
The utility model discloses owing to adopted above technical scheme, make it have following beneficial effect:
(1) the thickness and quality of the ice field surface layer concrete are greatly improved;
(2) the ice making and cold guiding effects of the ice field are improved by improving the thickness of the concrete of the ice field surface layer;
(3) the principle of the bracket component is clear and easy to process and manufacture;
(4) the utility model has simple using method and greatly improves the engineering efficiency;
(5) the utility model discloses a material is cheap easily obtained, has greatly practiced thrift engineering cost.
The present invention has been described in detail with reference to the drawings and the embodiments, and those skilled in the art can make various modifications to the present invention based on the above description. Therefore, certain details of the embodiments should not be construed as limitations of the invention, which are intended to be covered by the following claims.

Claims (7)

1. An ice making cold conductor support, comprising:
a fixed base;
the lower ends of the plurality of hanging rods are fixed on the fixed base;
the finished product pipe hoop piece is used for hooping the ice-making cold guide pipe, and is arranged at the upper end of the hanging rod in a height-adjustable manner;
and the limiting part is used for positioning the height position of the finished pipe hoop part and is fixed on the rod body of the suspender.
2. An ice making cold pipe support according to claim 1, wherein said fixing base comprises a plurality of sections of plate bodies which are sequentially spliced, and a plurality of said hanging rods are arranged on each section of said plate body at intervals.
3. An ice making cold pipe support according to claim 1, wherein said finished pipe hoop member comprises a first hoop member and a second hoop member, said first hoop member and said second hoop member enclose a hoop space for installing said ice making cold pipe, a first end of said first hoop member and a first end of said second hoop member are rotatably connected, and a second end of said first hoop member and a second end of said second hoop member are connected by a bolt.
4. An ice making cold conductor support according to claim 3, wherein said second hoop member further comprises an internally threaded sleeve fixed to the bottom, and the shaft of said hanger bar is provided with an external thread, and said internally threaded sleeve is screwed to said external thread.
5. An ice making cold conductor support according to claim 4, wherein the distance from said retainer to the top of said hanger bar is less than the height of said internally threaded sleeve.
6. An ice making cold pipe support according to claim 1, wherein said limiting member is a rod body parallel to said fixing base, said rod body being simultaneously fixed to the shafts of a plurality of said hanger rods.
7. An ice making cold duct bracket according to claim 6, wherein the vertical distance of said retainer from said fixed base is in the range of 5mm-10 mm.
CN202021960850.3U 2020-09-09 2020-09-09 Ice-making cold guide pipe support Active CN213653330U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021960850.3U CN213653330U (en) 2020-09-09 2020-09-09 Ice-making cold guide pipe support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021960850.3U CN213653330U (en) 2020-09-09 2020-09-09 Ice-making cold guide pipe support

Publications (1)

Publication Number Publication Date
CN213653330U true CN213653330U (en) 2021-07-09

Family

ID=76695437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021960850.3U Active CN213653330U (en) 2020-09-09 2020-09-09 Ice-making cold guide pipe support

Country Status (1)

Country Link
CN (1) CN213653330U (en)

Similar Documents

Publication Publication Date Title
US6206613B1 (en) Configurable support apparatus for flexible pipe and method
CN106836445B (en) Trapezoidal drainage ditch pouring forming method based on adjustable groove forming die
CN213653330U (en) Ice-making cold guide pipe support
CN205852606U (en) Three dimensions tubular truss assembly moulding bed
US2808135A (en) Metal pole structure and method
CN207003427U (en) The tubular plate device in photovoltaic bracket in situ concrete pile basis
CN205985998U (en) But regulation cable mount
US6115988A (en) Methods of raising utility pole transmission hardware
CN113550616A (en) Reinforcing rod based on hoop connection and reinforcing method thereof
CN217353535U (en) Template reinforcing apparatus is hung to floor structure board position of falling
CN210490303U (en) Cable joint support device suitable for channel
CN209482822U (en) Assembling type fence in concrete
CN207048397U (en) 110kV transformer stations single tube outlet structure
CN207001891U (en) Spiral wire terminal Winder
CN205713391U (en) A kind of electric power is with remotely carrying support column
CN220585857U (en) Fixing structure for cable duct bank construction
CN219432637U (en) Water pipe jacking frame
CN217782795U (en) Safe operation platform for prefabricating construction of circular pipe culvert
CN216008014U (en) Self-supporting pole is embraced to high stability
CN218992049U (en) Connection structure between geotechnical grid room groups
CN216289884U (en) Liftable and rotatable fixing support for cable laying
CN210928896U (en) Mount for ornamental trees and shrubs
CN219571111U (en) Auxiliary frame for fixing and placing pipeline
CN213143861U (en) Length-adjustable cross rod
CN213335737U (en) Air cooling island platform rooting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant