CN213627675U - Filling system for reserved hole of upward tunnel - Google Patents

Filling system for reserved hole of upward tunnel Download PDF

Info

Publication number
CN213627675U
CN213627675U CN202021806077.5U CN202021806077U CN213627675U CN 213627675 U CN213627675 U CN 213627675U CN 202021806077 U CN202021806077 U CN 202021806077U CN 213627675 U CN213627675 U CN 213627675U
Authority
CN
China
Prior art keywords
roadway
bottom suction
concrete wall
target bottom
reserved
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021806077.5U
Other languages
Chinese (zh)
Inventor
韩瑞军
辛宪耀
冯建文
姚富强
李武军
李海涛
张文彬
杨竹军
刘志亮
李亚鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN202021806077.5U priority Critical patent/CN213627675U/en
Application granted granted Critical
Publication of CN213627675U publication Critical patent/CN213627675U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of roadway backfilling, in particular to a filling system for reserved holes of an uphill roadway; the grouting main pipe is laid in a coal seam roadway parallel to a target bottom suction roadway, the grouting main pipe is communicated with a high pressure pump in a well, a concrete wall body for preventing fluid from descending is arranged in the target bottom suction roadway in a segmented mode, a gap is reserved between the concrete wall body and a target bottom suction roadway top plate, a layer penetrating hole communicated with the coal seam roadway is constructed in the target bottom suction roadway top plate between the two concrete wall bodies, a branch pipeline is inserted in the layer penetrating hole, and the branch pipeline is communicated with the grouting main pipe. The utility model discloses a reserve the pipeline to according to the bottom suction lane slope situation of change, construct the wall body in advance, the accessible is reserved the pipeline and is carried out the segmentation to the tunnel of going up a hill and fill when filling, solves the problem that the tunnel of going up a hill can't fill.

Description

Filling system for reserved hole of upward tunnel
Technical Field
The utility model belongs to the technical field of the tunnel is backfilled, concretely relates to go up mountain tunnel preformed hole filling system.
Background
According to the national environmental protection requirement and treatment planning, the situation that the existing waste rock is not treated to reach the standard in 2022 years, and all the waste rocks which cannot be used in a newly-built mine are returned to the mine is realized, the yield of the waste rocks of about 45 million tons in the mine of the unit of the application is about in the bottom suction roadway every year, and according to the green filling planning of the mine, the waste rocks of the bottom suction roadway can be filled to the abandoned bottom suction roadway by using a pipeline by using a pumping waste rock filling technology after the waste rocks of the bottom suction roadway are crushed and stirred. At present, the domestic roadway filling technology is mainly researched for the filling of a downhill roadway, and when the uphill roadway is filled, because the crushed and stirred gangue slurry is filled in the uphill roadway and is difficult to block, the filling of the uphill roadway is difficult to realize in many mines, and the technology is a blank in domestic technology.
The working surface topography of the north wing of a five-panel mine excavated by the unit of the application is north high, south low, and most of tunnels are excavated in the upward direction; the existing mine bottom suction roadway waste rock filling system is characterized in that waste rocks are crushed and stirred and then conveyed to a waste bottom suction roadway through a pipeline by using a high-pressure pump, and due to the fact that a north-wing roadway of a five-panel area is used for driving upwards, waste rock slurry conveyed through the pipeline is difficult to block in the upwards driving roadway, and the mine upwards driving bottom suction roadway cannot be filled.
SUMMERY OF THE UTILITY MODEL
The utility model discloses to the great tunnel of the excavation slope of going up a hill in the pit, solve the problem that the tunnel of going up a hill is difficult to realize the slip casting and fills.
In order to realize the above-mentioned purpose, the utility model provides an upward hill tunnel preformed hole filling system lays the grout in the coal seam tunnel parallel with the target end suction lane and is responsible for, the grout is responsible for the high-pressure pump on the UNICOM's well, the concrete wall body that prevents the descending of fluid has been arranged to the subsection in the target end suction lane, leave the clearance between concrete wall body and the target end suction lane roof, the target end between two concrete wall bodies takes out the tunnel roof in the construction have with the wearing layer hole of coal seam tunnel intercommunication, the downthehole interlude of wearing layer has the lateral conduit, the lateral conduit is responsible for the UNICOM with the grout.
Furthermore, a gap with the width of 20-30 cm is reserved between the concrete wall and the target bottom suction roadway top plate.
Compared with the prior art, the utility model has the advantages that:
the utility model provides a pair of go up mountain tunnel preformed hole filling system reserves wearing layer hole through the construction pipeline in advance in the target bottom suction lane roof to build concrete wall in the target bottom suction lane tunnel, solved go up mountain abandonment bottom suction lane fill slurry and be difficult to the difficult problem that shutoff and bottom suction lane abandonment back personnel can't get into.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a side view of a through-layer hole.
In the figure: 1-concrete wall body; 2-filling the slurry; 3-coal seam roadway; 4-grouting a main pipe; 5-perforation of the layer; 6-branch pipeline; 7-target bottom suction lane.
Detailed Description
In order to clearly understand the technical features, objects, and effects of the present invention, embodiments of the present invention will be described with reference to the accompanying drawings. The drawings are only for the purpose of understanding the technical content of the invention and do not represent the actual scale and the actual shape of the product, wherein the same reference numbers indicate parts which are identical in structure or function but similar in structure.
In this context, "parallel", "perpendicular", and the like are not strictly mathematical and/or geometric limitations, but may also include tolerances as would be understood by one skilled in the art and allowed for in the manufacture or use of the product. In addition, "perpendicular" includes not only mutually perpendicular in which two objects are directly connected in space but also mutually perpendicular in which two objects are not connected in space.
As shown in fig. 1 and 2; a filling system for reserved holes of an uphill roadway comprises a grouting main pipe 4 laid in a coal seam roadway 3 parallel to a target bottom suction roadway 7, a high-pressure pump communicated with a shaft is arranged in the grouting main pipe 4, a concrete wall body 1 for preventing fluid from descending is arranged in the target bottom suction roadway 7 in a segmented mode, a gap is reserved between the concrete wall body 1 and a top plate of the target bottom suction roadway 7, a layer penetrating hole 5 communicated with the coal seam roadway 3 is constructed in the top plate of the target bottom suction roadway 7 between the two concrete wall bodies 1, a branch pipeline 6 is inserted in the layer penetrating hole 5, and the branch pipeline 6 is communicated with the grouting main pipe 4.
And a gap with the width of 20-30 cm is reserved between the concrete wall 1 and the top plate of the target bottom suction roadway 7.
The utility model discloses a during the use is taken out the tunnel tunnelling at the bottom of going up, through taking out tunnel roof construction wearing layer hole 5 and upper portion coal seam tunnel 3 at the bottom and lining up, pre-buried laying branch pipeline 6 in advance, and according to the tunnel slope situation of change of going up, concrete wall 1 is built in segments, treat the airtight back of bottom and take out tunnel abandonment, be responsible for 4 through laying the grout in coal seam tunnel 3, be responsible for 4 interface connections to the pipeline in preformed hole with the grout, the waste rock slurry after will breaking the stirring, the tunnel of going up is filled to the segmentation, realize the filling of waste rock tunnel of going up, reach the mine waste rock and backfill, the purpose of green filling.
It should be understood that although the present description has been described in terms of various embodiments, not every embodiment includes only a single embodiment, and such description is for clarity purposes only, and those skilled in the art will recognize that the embodiments described herein may be combined as suitable to form other embodiments, as will be appreciated by those skilled in the art.
The above detailed description is only for the purpose of illustrating the practical embodiments of the present invention, and they are not intended to limit the scope of the present invention, and all equivalent embodiments or modifications that do not depart from the technical spirit of the present invention are intended to be included within the scope of the present invention.

Claims (2)

1. The utility model provides a go up mountain tunnel preformed hole filling system which characterized in that includes: the grouting main pipe (4) is laid in a coal seam roadway (3) parallel to a target bottom suction roadway (7), the grouting main pipe (4) is communicated with a high-pressure pump in a well, a concrete wall body (1) for preventing fluid from descending is arranged in the target bottom suction roadway (7) in a segmented mode, a gap is reserved between the concrete wall body (1) and a top plate of the target bottom suction roadway (7), a layer penetrating hole (5) communicated with the coal seam roadway (3) is constructed in the top plate of the target bottom suction roadway (7) between the two concrete wall bodies (1), a branch pipeline (6) is inserted in the layer penetrating hole (5), and the branch pipeline (6) is communicated with the grouting main pipe (4).
2. The system for filling the reserved hole of the upward roadway according to claim 1, wherein: and a gap with the width of 20-30 cm is reserved between the concrete wall body (1) and the top plate of the target bottom suction roadway (7).
CN202021806077.5U 2020-08-26 2020-08-26 Filling system for reserved hole of upward tunnel Active CN213627675U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021806077.5U CN213627675U (en) 2020-08-26 2020-08-26 Filling system for reserved hole of upward tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021806077.5U CN213627675U (en) 2020-08-26 2020-08-26 Filling system for reserved hole of upward tunnel

Publications (1)

Publication Number Publication Date
CN213627675U true CN213627675U (en) 2021-07-06

Family

ID=76645147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021806077.5U Active CN213627675U (en) 2020-08-26 2020-08-26 Filling system for reserved hole of upward tunnel

Country Status (1)

Country Link
CN (1) CN213627675U (en)

Similar Documents

Publication Publication Date Title
CN102644464B (en) Constructing method for mining embedded artificial boundary ore pillar from open-pit to underground mine
CN107542470B (en) Existing railway Business Line construction method is worn under the shallow tunnel of karst broken region
CN106907177B (en) A kind of girdle gob side entry retaining roadside packing method for protecting support
CN207377565U (en) Constructing metro tunnel structure containing complicated geological and without shield launching place
CN107747488B (en) The construction method of big cross section shape of a hoof shield launching
CN100590294C (en) Waste filling thin coal seam tunnelling method
CN102400694A (en) Reinforcement method for combined part of shield tunnel and mining-method tunnel
WO2022247176A1 (en) Filling caving mining method
CN107503754A (en) A kind of construction method of VI grade of country rock rich water Shallow tunnel with large cross-section
CN104500070A (en) Continuous coal mining machine paste filling mining method
CN103993881A (en) Long-wall roadway type cemented filling mining method
CN103388478B (en) Forming method for transportation road of bucket shovel applied to open pit coal mine
WO2019109602A1 (en) Short-face coal-pillar-free mining method having zero gangue discharge
CN102011610B (en) Supporting method of no-pillar mining mode for medium-thick coal seams
CN205577998U (en) Shield constructs propulsion system of machine
CN112145227B (en) Facility for preventing water inrush and mud gushing of tunnel and construction method
CN213627675U (en) Filling system for reserved hole of upward tunnel
KR101437443B1 (en) Pressure apparatus for boring tunnel
CN112282758A (en) Coal face double-roadway circulating mining and filling integrated process
CN208293588U (en) A kind of Cut Slopes of Expansive Soil reinforcement formula, which is changed, fills out compages
CN107013213B (en) A kind of method that pattern presets tunnel
CN206070573U (en) It is a kind of be applied under wear the big of heavily loaded highway and reinforce foundation ditch combinative structure across open trench tunnel and steel pipe
CN104763437A (en) Strong permeable stratum tunnel excavation method
CN211115996U (en) Reinforced structure in tunnel section at junction of upper soft and lower hard stratum shield method and mine method
CN206071599U (en) A kind of bull slurries injection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant