CN213626802U - Intelligence fixed stay frame for building - Google Patents

Intelligence fixed stay frame for building Download PDF

Info

Publication number
CN213626802U
CN213626802U CN202021942806.XU CN202021942806U CN213626802U CN 213626802 U CN213626802 U CN 213626802U CN 202021942806 U CN202021942806 U CN 202021942806U CN 213626802 U CN213626802 U CN 213626802U
Authority
CN
China
Prior art keywords
fixedly connected
base
support frame
limiting
wedge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021942806.XU
Other languages
Chinese (zh)
Inventor
何龙
蒋思良
皮颖超
甘明昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202021942806.XU priority Critical patent/CN213626802U/en
Application granted granted Critical
Publication of CN213626802U publication Critical patent/CN213626802U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses an intelligence is fixed bolster for building, including support frame and base, two limiting plates of two lower extreme fixedly connected with of support frame and two support columns that are located two limiting plate outsides, be equipped with stop gear between base and two first wedges respectively, the both ends outside of base is equipped with rolling mechanism respectively. The utility model discloses, rational in infrastructure, first spring is elongated respectively when its two dwangs upwards rotate, make two first stoppers block respectively into first dead slot, two second stoppers just in time block respectively into the second dead slot, accomplish the installation of support frame promptly, under the effect of two first springs and two second springs, two first stoppers break away from first dead slot respectively, two second stoppers break away from the second dead slot respectively, accomplish the dismantlement of support frame promptly, the installation of its support frame is simple with the dismantlement all, easy operation, and four universal wheels can drive base quick travel.

Description

Intelligence fixed stay frame for building
Technical Field
The utility model relates to an intelligence building technical field especially relates to an intelligence is fixed bolster for building.
Background
The intelligent building refers to the structure, system, service and management of the building which are optimally combined according to the requirements of users, thereby providing an efficient, comfortable and convenient humanized building environment for the users. The intelligent building is a product integrating modern science and technology. The technical foundation mainly comprises modern building technology, modern computer technology, modern communication technology and modern control technology.
The intelligent building fixing support frame can not be separated from the intelligent building in the process of intelligent building, however, the existing fixing support frame for the intelligent building is inconvenient to move, and the support frame is very troublesome to install and detach in actual operation, so that inconvenience is brought to workers, and the corresponding working efficiency is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the fixed bolster for intelligent building that proposes, first spring is lengthened respectively when two its dwangs make progress the pivoted, make two first stoppers block into first dead slots respectively, two second stoppers just in time block into in the second dead slot respectively, accomplish the installation of support frame promptly, under the effect of two first springs and two second springs, two first stoppers break away from first dead slots respectively, two second stoppers break away from the second dead slot respectively, accomplish the dismantlement of support frame promptly, the installation and the dismantlement of its support frame are all simple, easy operation, and four universal wheels can drive the base quick travel.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a fixed support frame for an intelligent building comprises a support frame and a base, wherein the lower end of the support frame is fixedly connected with two limiting plates and two supporting columns positioned outside the two limiting plates, the opposite ends of the two limiting plates are respectively provided with a first empty groove in a penetrating way, the opposite ends of the two limiting plates are respectively provided with a second empty groove in a penetrating way, the lower ends of the two limiting plates are respectively fixedly connected with a T-shaped block, the lower ends of the two T-shaped blocks are respectively fixedly connected with a first wedge-shaped block, the upper end of the base is provided with a through groove in a penetrating way, the inner wall of the through groove is rotatably connected with two rotating rods, the upper ends of the two rotating rods are respectively fixedly connected with a first limiting block, the upper end of the base is fixedly connected with two sleeves matched with the supporting columns, the two sleeves are respectively connected with the supporting columns in a, two support the piece respectively and the dwang between the first spring of fixedly connected with, be equipped with stop gear between base and two first wedge pieces respectively, the both ends outside of base is equipped with rolling mechanism respectively.
Preferably, stop gear includes the rotor plate of being connected with the inner wall rotation of base, two the relative one end of rotor plate fixedly connected with gag lever post and second stopper respectively, two the relative one end of gag lever post fixedly connected with second wedge respectively, two the one end that the rotor plate was carried on the back mutually is fixedly connected with second spring, two respectively the second spring with the inner wall fixed connection of base.
Preferably, the rolling mechanism includes the inside groove of setting on the base, the inner wall sliding connection of inside groove has two briquetting, two the lower extreme of briquetting all installs two universal wheels, two the outer wall fixedly connected with of base has two screw blocks, two equal threaded connection has the lead screw handle on the screw block, two the equal fixedly connected with fixture block of lower extreme of lead screw handle.
Preferably, two the one end that first wedge was carried on the back mutually all is established to first inclined plane, two the opposite one end of second wedge is established to the second inclined plane, first inclined plane and second inclined plane phase-match.
Preferably, the two limiting grooves are trapezoidal, and the two limiting grooves are respectively matched with the first wedge block.
Preferably, the lower ends of the four pressing blocks are fixedly connected with universal wheels, and the four universal wheels are fixedly connected with the pressing blocks through screws.
Compared with the prior art, the utility model, its beneficial effect does:
1. when the support frame is installed, when the support frame pushes down, the two rotating rods respectively elongate the first springs while rotating upwards, so that the two first limit blocks are respectively clamped into the first empty grooves, meanwhile, the two second wedge blocks respectively support and press the limit rods to drive the rotating plates to rotate in opposite directions, the two rotating plates respectively compress the second springs while rotating in opposite directions, the two second limit blocks are just respectively clamped into the second empty grooves, and the support frame is fixed.
2. When removing the support frame, the staff lifts up the one end of base a little, rotate two lead screw handles, the fixture block that makes lead screw handle lower extreme offsets with the upper end of briquetting in time, the briquetting can not slide on the inner tank this moment, accomplish four universal wheels and ground contact, when the base removes suitable position, two lead screw handles of staff antiport, two briquetting slide base and ground contact play the supporting role with the support frame on the inner tank respectively, can be with quick travel, when need not remove the support frame, the base supports the support frame.
3. When the support frame is required to be disassembled, the support frame is upwards lifted by a worker, under the action of the two first springs, the two first limit blocks rotate relatively to be separated from the first empty grooves respectively, the two first wedge blocks do not extrude the second wedge blocks respectively, and under the action of the two second springs, the two second limit blocks are separated from the second empty grooves respectively, so that the support frame is disassembled.
To sum up, two dwangs lengthen first spring respectively when upwards pivoted, make two first stoppers block respectively into first dead slot, two second stoppers just in time block respectively into the second dead slot simultaneously, accomplish the installation of support frame promptly, under the effect with two second springs of two first springs, two first stoppers break away from first dead slot respectively, two second stoppers break away from the second dead slot respectively, accomplish the dismantlement of support frame promptly, the installation of its support frame is all simple with the dismantlement, easy to operate, and four universal wheels can drive the base short-term travel.
Drawings
Fig. 1 is a schematic structural view of a fixing support frame for an intelligent building provided by the present invention;
fig. 2 is the utility model provides a top view of gag lever post in intelligence fixed bolster for building's structure.
In the figure: the support frame 1, 2 first dead slots, 3 second dead slots, 4T-shaped blocks, 5 first wedge-shaped blocks, 6 first limiting blocks, 7 rotating rods, 8 abutting blocks, 9 limiting slots, 10 supporting columns, 11 sleeves, 12 thread blocks, 13 second springs, 14 limiting rods, 15 second wedge-shaped blocks, 16 second limiting blocks, 17 rotating plates, 18 limiting plates, 19 bases, 20 first springs, 21 screw rod handles, 22 clamping blocks, 23 universal wheels and 24 pressing blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-2, a smart building fixed bolster, including support frame 1 and base 19, two limiting plates 18 of lower extreme fixedly connected with of support frame 1 and two support columns 10 that are located two limiting plates 18 outsides, the looks remote site of two limiting plates 18 all runs through and is equipped with first dead slot 2, the one end that two limiting plates 18 carried on the back mutually all runs through and is equipped with second dead slot 3, the equal fixedly connected with T-shaped piece 4 of lower extreme of two limiting plates 18, the width of T-shaped piece 4 lower extreme is the same with the width of limiting plate 18, the first wedge 5 of the equal fixedly connected with of lower extreme of two T-shaped piece 4, the one end that two first wedge 5 carried on the back mutually all establishes to first inclined plane, the one end that two second wedge 15 are relative is established to the second inclined plane, first inclined plane and second inclined plane phase-match, the upper end of base 19 is run through.
The inner wall of the through groove is rotatably connected with two rotating rods 7, the upper ends of the two rotating rods 7 are fixedly connected with first limiting blocks 6, the upper end of a base 19 is fixedly connected with two sleeves 11 matched with a support column 10, the two sleeves 11 are respectively connected with the support column 10 in a sliding manner, the inner wall of the base 19 is fixedly connected with two abutting blocks 8, limiting grooves 9 are respectively arranged on the two abutting blocks 8, the two limiting grooves 9 are respectively in a trapezoid shape, the two limiting grooves 9 are respectively matched with first wedge blocks 5, first springs 20 are respectively fixedly connected between the two abutting blocks 8 and the rotating rods 7, limiting mechanisms are respectively arranged between the base 19 and the two first wedge blocks 5, each limiting mechanism comprises a rotating plate 17 rotatably connected with the inner wall of the base 19, one ends, opposite to the two rotating plates 17, are respectively and fixedly connected with a limiting rod 14 and a second limiting block 16, one ends, opposite to the two limiting rods 14 are respectively, the one end that two rotor plates 17 carried on the back mutually is fixedly connected with second spring 13 respectively, two second springs 13 respectively with the inner wall fixed connection of base 19, two second springs 13 carry on spacingly to rotor plates 17 respectively.
The both ends outside of base 19 is equipped with rolling mechanism respectively, rolling mechanism is including setting up the inside groove on base 19, the inner wall sliding connection of inside groove has two briquetting 24, two universal wheels 23 are all installed to the lower extreme of two briquetting 24, the equal fixedly connected with universal wheel 23 of the lower extreme of four briquetting 24, four universal wheels 23 pass through screw and briquetting 24 fixed connection, two thread blocks 12 of outer wall fixedly connected with of base 19, equal threaded connection has lead screw handle 21 on two thread blocks 12, the equal fixedly connected with fixture block 22 of lower extreme of two lead screw handles 21, the lower extreme at the lead screw is fixed to fixture block 22, and be separated by suitable distance with thread block 12.
In the utility model, the worker aligns two support columns 10 at the lower end of the support frame 1 with the sleeve 11 respectively, then presses the support frame 1 downwards until the two T-shaped blocks 4 extrude the rotating rods 7 respectively, the two rotating rods 7 respectively elongate the first springs 20 while rotating upwards, so that the two first stoppers 6 are respectively clamped into the first hollow grooves 2, meanwhile, the two first wedges 5 respectively extrude the second wedges 15, the two second wedges 15 respectively press the limiting rods 14 to drive the rotating plates 17 to rotate oppositely, the two rotating plates 17 respectively compress the second springs 13 while rotating oppositely, so that the two second stoppers 16 rotate relatively, when the two first stoppers 6 are respectively clamped into the first hollow grooves 2, the two second stoppers 16 are respectively clamped into the second hollow grooves 3, at this time, the two first wedges 5 are respectively pressed against the inner walls of the limiting grooves 9, the mounting of the support 1 is completed.
When the support frame 1 needs to be moved, the worker slightly lifts up one end of the base 19, the two screw rod handles 21 are rotated, the clamping block 22 at the lower end of the screw rod handle 21 is just abutted to the upper end of the pressing block 24, the pressing block 24 cannot slide on the inner groove at the moment, namely, the two universal wheels 23 are contacted with the ground, the other end of the base 19 is slightly lifted up by the same principle, the four universal wheels 23 are contacted with the ground, the base 19 can be rapidly moved, when the base 19 does not need to be moved, the worker reversely rotates the two screw rod handles 21, the two clamping blocks 22 are not abutted to the upper end of the pressing block 24, the two pressing blocks 24 respectively slide on the inner groove, the four universal wheels 23 are not contacted with the ground, the base 19 is contacted with the ground and plays a.
When the support frame 1 needs to be disassembled, the worker lifts the support frame 1 upwards, the two T-shaped blocks do not support the first limiting blocks 6, the two first limiting blocks 6 rotate relatively to be separated from the first empty grooves 2 respectively under the action of the two first springs 20, the two first wedge blocks 5 do not extrude the second wedge blocks 15 respectively, the two second limiting blocks 16 are separated from the second empty grooves 3 respectively and restore to the initial state under the action of the two second springs 13, and the support frame 1 can be disassembled.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The fixing support frame for the intelligent building comprises a support frame (1) and a base (19), and is characterized in that the lower end of the support frame (1) is fixedly connected with two limiting plates (18) and two supporting columns (10) positioned outside the two limiting plates (18), opposite ends of the two limiting plates (18) are respectively provided with a first empty groove (2) in a penetrating manner, opposite ends of the two limiting plates (18) are respectively provided with a second empty groove (3) in a penetrating manner, the lower ends of the two limiting plates (18) are respectively fixedly connected with a T-shaped block (4), the lower ends of the two T-shaped blocks (4) are respectively fixedly connected with a first wedge-shaped block (5), the upper end of the base (19) is provided with a through groove in a penetrating manner, the inner wall of the through groove is rotatably connected with two rotating rods (7), the upper ends of the two rotating rods (7, the utility model discloses a bearing support device, including base (19), upper end fixedly connected with two and support column (10) assorted sleeves (11), two sleeve (11) respectively with support column (10) sliding connection, two of the inner wall fixedly connected with of base (19) support piece (8), two support all to be equipped with spacing groove (9) on piece (8), two support piece (8) respectively with dwang (7) between the first spring of fixedly connected with (20), be equipped with stop gear between base (19) and two first wedge (5) respectively, the both ends outside of base (19) is equipped with rolling mechanism respectively.
2. The fixing support frame for the intelligent building as claimed in claim 1, wherein the limiting mechanism comprises a rotating plate (17) rotatably connected with the inner wall of the base (19), two opposite ends of the rotating plate (17) are respectively and fixedly connected with a limiting rod (14) and a second limiting block (16), two opposite ends of the limiting rod (14) are respectively and fixedly connected with a second wedge block (15), two opposite ends of the rotating plate (17) are respectively and fixedly connected with a second spring (13), and two second springs (13) are respectively and fixedly connected with the inner wall of the base (19).
3. The fixing support frame for the intelligent building as claimed in claim 2, wherein the rolling mechanism comprises an inner groove arranged on a base (19), the inner wall of the inner groove is slidably connected with two pressing blocks (24), two universal wheels (23) are mounted at the lower ends of the two pressing blocks (24), two threaded blocks (12) are fixedly connected to the outer wall of the base (19), a screw rod handle (21) is in threaded connection with each threaded block (12), and a clamping block (22) is fixedly connected to the lower ends of each screw rod handle (21).
4. The fixing support frame for the intelligent building as claimed in claim 3, wherein the two ends of the first wedge-shaped block (5) opposite to each other are both provided with a first inclined surface, the two ends of the second wedge-shaped block (15) opposite to each other are provided with a second inclined surface, and the first inclined surface is matched with the second inclined surface.
5. The fixing support frame for the intelligent building as claimed in claim 4, wherein the two limiting grooves (9) are trapezoidal, and the two limiting grooves (9) are respectively matched with the first wedge-shaped block (5).
6. The fixing support frame for the intelligent building as claimed in claim 5, wherein the lower ends of the four pressing blocks (24) are fixedly connected with universal wheels (23), and the four universal wheels (23) are fixedly connected with the pressing blocks (24) through screws.
CN202021942806.XU 2020-09-08 2020-09-08 Intelligence fixed stay frame for building Active CN213626802U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021942806.XU CN213626802U (en) 2020-09-08 2020-09-08 Intelligence fixed stay frame for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021942806.XU CN213626802U (en) 2020-09-08 2020-09-08 Intelligence fixed stay frame for building

Publications (1)

Publication Number Publication Date
CN213626802U true CN213626802U (en) 2021-07-06

Family

ID=76647261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021942806.XU Active CN213626802U (en) 2020-09-08 2020-09-08 Intelligence fixed stay frame for building

Country Status (1)

Country Link
CN (1) CN213626802U (en)

Similar Documents

Publication Publication Date Title
CN116490718A (en) Marine environment marine monitoring instrument mounting platform and method thereof
CN213626802U (en) Intelligence fixed stay frame for building
CN210177695U (en) Movable assembly type building device
CN209780277U (en) Novel light partition plate installation dolly
CN208965589U (en) A kind of connection structure for preventing well lid from falling off
CN217748894U (en) Punch press is used in steel member processing with location structure
CN210001305U (en) clamping mechanism for processing metal screw thread
CN215803206U (en) Framework column formwork structure
CN213773821U (en) Green building steel structure frame convenient to dismantle
CN112942893B (en) Fixing device and fixing method for steel structure construction
CN215111381U (en) Wisdom supervision data collection station fixing device
CN212866991U (en) Building walking type translation device
CN111576859A (en) Floor laying-out opening template supporting structure
CN210189171U (en) Auxiliary angle steel machining device
CN211234458U (en) Encoder mechanism
CN202943306U (en) Perforating device
CN212388977U (en) Floor laying-out opening template supporting structure
CN213885043U (en) 3, 4-dichloronitrobenzene continuous efficient rectification device
CN218596034U (en) EMUs bogie lift
CN215107631U (en) A consolidate bearing structure for building engineering
CN220848972U (en) Construction strutting arrangement convenient to adjust
CN220128697U (en) Fire hydrant rapid overhaul and maintenance device
CN214995755U (en) A foot rest for green fitment construction
CN216489448U (en) 5G basic station circuit is laid and is used support
CN216843427U (en) Water pipe jacking frame for construction engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant