CN213572943U - High-altitude operation hanging basket with high-suspension support - Google Patents

High-altitude operation hanging basket with high-suspension support Download PDF

Info

Publication number
CN213572943U
CN213572943U CN202022188666.8U CN202022188666U CN213572943U CN 213572943 U CN213572943 U CN 213572943U CN 202022188666 U CN202022188666 U CN 202022188666U CN 213572943 U CN213572943 U CN 213572943U
Authority
CN
China
Prior art keywords
pillar
hanging
basket
rope
suspension bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022188666.8U
Other languages
Chinese (zh)
Inventor
郭娜
游滔
刘彦明
王洋洋
陈雪娇
赵昕桐
郭伟
李玉平
李继航
牟银山
刘炎
唐杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Divison Group Huajiang Construction Co Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction First Divison Group Huajiang Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction First Divison Group Huajiang Construction Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202022188666.8U priority Critical patent/CN213572943U/en
Application granted granted Critical
Publication of CN213572943U publication Critical patent/CN213572943U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a high-altitude operation hanging basket with a high hanging bracket, which comprises a hanging mechanism and a hanging basket, wherein the hanging mechanism is arranged on a building roof, the hanging basket is connected below two hanging mechanisms which are arranged in parallel, and the rear ends of the two hanging mechanisms are connected through a connecting rod; the suspension mechanism comprises a front pillar and a rear pillar which are arranged in front and at back, the upper pillar and the beam pillar are arranged on the front pillar, the connecting rope is connected to the beam pillar by bypassing the upper pillar, and the connecting rope is arranged on the rear pillar; the hanging basket comprises a hanging platform and a lifting device, and the hanging platform is connected to the beam column through the lifting device. The utility model discloses the requirement that high pergola roofing erects hanging flower basket device is satisfied with the increase of the preceding pillar and the back pillar that will hang the mechanism to set up the connecting rod and link together two suspension mechanism and guarantee stability, effectively guarantee the safety of hanging flower basket device.

Description

High-altitude operation hanging basket with high-suspension support
Technical Field
The utility model relates to a building engineering technical field, concretely relates to high altitude construction hanging flower basket of high suspension support.
Background
When the existing high-rise building is used for constructing the outer wall, the high-altitude operation hanging basket is generally adopted to replace a scaffold for construction, so that the high-rise building outer wall construction method has the advantages of better safety and convenience, lower cost, suitability for the outer wall with an irregular shape, convenience, flexibility and strong operability. But can decorate the pergola roof beam of effect on some building roofs, when the major structure pergola was too high, need increase the support of hanging flower basket and satisfy and erect the requirement, but the stability of the outrigger after increasing can reduce, reduces the supporting effect to the hanging flower basket, has great potential safety hazard, the utility model provides a high altitude construction hanging flower basket of high hanging support overcomes above-mentioned defect.
SUMMERY OF THE UTILITY MODEL
The utility model provides a high altitude construction hanging flower basket of high suspension support sets up the connecting rod and hangs two mechanism connection connections, and the reinforcing hangs the stability of mechanism.
The utility model provides a technical scheme that above-mentioned technical problem adopted is:
a high-altitude operation hanging basket with a high hanging support comprises hanging mechanisms and hanging baskets, wherein the hanging mechanisms are arranged on a building roof, the hanging baskets are connected below two hanging mechanisms which are arranged in parallel, and the rear ends of the two hanging mechanisms are connected through a connecting rod;
the suspension mechanism comprises a front pillar, an upper pillar, a beam column, a connecting rope, a rear pillar and a balance weight, wherein the front pillar is vertically arranged on a roof, the beam column is horizontally arranged, the middle part of the beam column is arranged at the top end of the front pillar, two ends of the connecting rope are connected to the inner end and the outer end of the beam column, the middle part of the connecting rope bypasses the top end of the upper pillar, the upper pillar is vertically arranged at the top end of the front pillar, the rear pillar is vertically arranged at the rear side of the front pillar, the top end of the rear pillar is connected with the inner end of the beam column, and the balance weight; the connecting rod is connected to the rear pillars of the two suspension mechanisms.
Further, the hanging basket comprises a hanging platform and two hanging devices, the two hanging devices are arranged at two ends of the hanging platform respectively, the hanging platform comprises a working lifting rope and a lifting device, the working lifting rope is connected with the lifting device, and the hanging platform is connected to the outer ends of the beam columns of the two hanging mechanisms through the working lifting rope.
Further, preceding pillar and back pillar all include inserted bar and bottom support, the inserted bar is T type structure, including the connecting pipe of level setting and the connecting rod of vertical setting, the top at the bottom support can be dismantled to vertical connecting rod.
Furthermore, the beam column comprises a front beam, a middle beam and a rear beam, the front beam is arranged in the connecting pipe of the inserting rod, connecting holes are formed in the front beam at intervals, two ends of the middle beam are connected to the inner end of the front beam and the inner end of the rear beam respectively, and the outer end of the rear beam is connected with the top end of the rear support.
Furthermore, the two connecting rods are horizontally arranged and are respectively arranged at the upper part and the lower part of the inserted rod.
Furthermore, connecting holes are formed in the front beam and the insertion rod at intervals, the front beam is connected with the connecting pipe through bolts, and the insertion rod is connected with the bottom support through bolts.
Further, still include safety device, safety device prevents weighing down safety rope and life safety rope including, prevent weighing down the top of safety rope and connect in the beam column outer end, and the middle part is passed through the safety lock and is connected on the lifting rope of work, the top fixed connection of life safety rope is on the fixed knot of building roofing constructs, and the bottom is connected on one's body operating personnel.
Preferably, the bottom support of the front pillar is a triangular support, the bottom support of the rear pillar is an inverted T-shaped support, and the counterweight is arranged on the bottom support of the rear pillar through a counterweight branch pipe.
Preferably, the front beam is a square tube with the length of 80 × 80mm, the middle beam is a square tube with the length of 70 × 70mm, the rear beam is a square tube with the length of 80 × 80mm, and the connecting rod is an angle steel with the length of L50 × 4 mm.
The utility model discloses beneficial effect as follows:
the front support and the rear support of the suspension mechanism are heightened to meet the requirement of erecting the hanging basket device on the roof of the high flower stand, and the two suspension mechanisms are connected together by the connecting rod to ensure the stability and effectively ensure the safety of the hanging basket device; connecting holes are formed in the inserted rods of the front support and the rear support at intervals, and the height can be flexibly adjusted according to construction conditions, so that the adaptability to flower stands with different heights can be met; the beam column adopts the square union coupling of unidimensional not, and the safety of high suspension support is guaranteed to reinforced structure intensity and connection stability.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the arrangement of the front pillars of the present invention;
FIG. 3 is a schematic view of the basket arrangement of the present invention;
fig. 4 is a side view of the present invention.
Reference numerals: 1-suspension mechanism, 11-front pillar, 12-upper pillar, 13-beam column, 14-connecting rope, 15-rear pillar, 16-counterweight, 2-hanging basket, 21-suspension platform, 22-working hanging rope, 23-lifting device and 3-connecting rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are only some embodiments, not all embodiments, of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of this patent, it is to be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the drawings for the convenience of describing the patent and for the simplicity of description, and are not intended to indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the patent.
As shown in figures 1, 2 and 3, the aerial work hanging basket with the high hanging support comprises a hanging mechanism 1 and a hanging basket 2, wherein the hanging mechanism 1 is arranged on a building roof, the hanging basket 2 is connected below the hanging mechanisms 1 which are arranged in parallel, and the rear ends of the two hanging mechanisms 1 are connected through a connecting rod 3.
As shown in fig. 1, 3 and 4, the suspension mechanism 1 includes a front pillar 11, an upper pillar 12, a beam column 13, a connecting rope 14, a rear pillar 15 and a counterweight 16, the front pillar 11 is vertically disposed on a roof, the beam column 13 is horizontally disposed, the middle portion of the beam column 13 is disposed at the top end of the front pillar 11, two ends of the connecting rope 14 are connected to the inner end and the outer end of the beam column 13, the middle portion bypasses the top end of the upper pillar 12, the upper pillar 12 is vertically disposed at the top end of the front pillar 11, the rear pillar 15 is vertically disposed at the rear side of the front pillar 11, the top end of the rear pillar is connected to the inner end of the beam column 13, and the counterweight 16 is disposed on the; the connecting rods 3 are connected to the rear legs 15 of the two suspension mechanisms 1.
As shown in fig. 3, further, the gondola 2 includes two groups of hanging platforms 21 and two groups of hanging devices, the two groups of hanging devices are respectively disposed at two ends of the hanging platform 21, the hanging platform 21 includes a working hanging rope 22 and a lifting device 23, the working hanging rope 22 is connected to the lifting device 23, and the hanging platform 21 is connected to outer ends of the beam columns 13 of the two hanging mechanisms 1 through the working hanging rope 22.
Further, front prop 11 and rear prop 15 all include inserted bar and bottom support, the inserted bar is T type structure, including the connecting pipe of level setting and the connecting rod of vertical setting, the top at the bottom support can be dismantled to vertical connecting rod.
Further, the beam column 13 includes a front beam, a middle beam and a rear beam, the front beam is arranged in the connecting pipe of the jack, connecting holes are arranged at intervals on the front beam, two ends of the middle beam are respectively connected to the inner end of the front beam and the inner end of the rear beam, and the outer end of the rear beam is connected with the top end of the rear column 15.
Further, the two connecting rods 3 are horizontally arranged and are respectively arranged at the upper part and the lower part of the inserted link. Two connecting rods 3 are provided to ensure and enhance the stability of the connection.
Furthermore, connecting holes are formed in the front beam and the insertion rod at intervals, the front beam is connected with the connecting pipe through bolts, and the insertion rod is connected with the bottom support through bolts. The front beam is provided with a connecting hole for adjusting the distance between the hanging basket and the building outer wall and reasonably matching front and rear moments to ensure the safety and stability of the suspension mechanism; the inserted link is provided with a connecting hole for adjusting the height of the front support 11 and the rear support 15 so as to adapt to flower stands with different heights.
Further, the inserted rod is inserted into the bottom bracket and connected through a bolt; one end of the middle beam is inserted into the inner end of the front beam, the inner end of the rear beam is inserted into the other end of the middle beam, and the two ends are connected through bolts.
Further, still include safety device, safety device prevents weighing down safety rope and life safety rope including, prevent weighing down the top of safety rope and connect in beam column 13 outer end, and the middle part is passed through the safety lock and is connected on work lifting rope 22, the top fixed connection of life safety rope is on the fixed knot of building roofing constructs, and the bottom is connected on one's body operating personnel.
As shown in figure 3, three kinds of ropes are arranged on the hanging basket, the working lifting rope 22 is used for lifting and descending the hanging basket, the anti-falling safety rope is used for playing an anti-falling role in an emergency situation that the working lifting rope 22 is broken or falls off, and the life safety rope is bound on the body of a constructor and is used for protecting the operator when the hanging basket falls off to serve as the last safety.
Preferably, the bottom support of the front pillar 11 is a triangular support, the bottom support of the rear pillar 15 is an inverted T-shaped support, and the counterweight 16 is arranged on the bottom support of the rear pillar 15 through a counterweight branch pipe.
Furthermore, the lifting device 23 is a winch, and the lifting devices 23 of the two sets of lifting devices are controlled by the same control device, so that the simultaneous starting and stopping are realized, and the stable lifting of the hanging basket 2 is ensured.
Preferably, the suspension platform 21 comprises front and rear railings, a bottom frame and side railings, the front and rear railings are connected with the side railings through bolts, and a lifting device mounting frame and a safety lock mounting plate are arranged on the side railings.
The utility model discloses preferred embodiment, front beam outer end and front pillar 11 distance are 1900mm, and back beam outer end and front pillar 11 distance are 4400mm, and 16 weight of counter weight are 1000kg, and hanging flower basket maximum load is 350 kg.
Preferably, the front beam is a square tube with the length of 80 × 80mm, the middle beam is a square tube with the length of 70 × 70mm, the rear beam is a square tube with the length of 80 × 80mm, and the connecting rod 3 is an angle steel with the length of L50 × 4 mm.
The utility model discloses an installation method as follows: the method comprises the steps of pre-assembling a hanging platform 21 of a hanging basket 2 on a roof in time and assembling a lifting device 23 and a connecting working lifting rope 22 simultaneously, and installing a hanging mechanism 1 simultaneously, wherein a front pillar 11 is arranged on the roof, then the height of an inserted rod is adjusted to meet the requirement that the inserted rod is higher than a flower stand, then an upper pillar 12 is installed and fixed on the front pillar 11, a front beam, a middle beam and a rear beam of a beam column 13 are sequentially installed, the length of the inserted rod is adjusted to meet the design requirement, a connecting rope 14 is connected to the upper pillar 12 and the beam column 13, a rear pillar 15 is installed and fixed according to the length of the beam column 13, a counterweight 16 is fixed on the rear pillar 15, and after the installation and adjustment of two hanging mechanisms 1 are completed, the two rear pillars 15 are connected through two connecting rods 3 to complete; after the suspension mechanism 1 is installed, the hanging basket 2 is connected to the outer end of the beam column 13 through the anti-falling safety rope and the working lifting rope 22 and is debugged by connecting a power supply.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein, and any reference signs in the claims are not intended to be construed as limiting the claim concerned.

Claims (9)

1. A high-altitude operation hanging basket with a high hanging support is characterized by comprising hanging mechanisms (1) and hanging baskets (2), wherein the hanging mechanisms (1) are arranged on a building roof, the hanging baskets (2) are connected below the two hanging mechanisms (1) which are arranged in parallel, and the rear ends of the two hanging mechanisms (1) are connected through connecting rods (3);
the suspension mechanism (1) comprises a front pillar (11), an upper pillar (12), a beam column (13), a connecting rope (14), a rear pillar (15) and a counterweight (16), wherein the front pillar (11) is vertically arranged on a roof, the beam column (13) is horizontally arranged, the middle part of the beam column is arranged at the top end of the front pillar (11), two ends of the connecting rope (14) are connected to the inner end and the outer end of the beam column (13), the middle part of the connecting rope bypasses the top end of the upper pillar (12), the upper pillar (12) is vertically arranged at the top end of the front pillar (11), the rear pillar (15) is vertically arranged at the rear side of the front pillar (11), the top end of the rear pillar is connected with the inner end of the beam column (13), and the counterweight (16) is arranged on the rear pillar (15); the connecting rod (3) is connected to the rear pillars (15) of the two suspension mechanisms (1).
2. The aerial work basket with the high suspension bracket as claimed in claim 1, wherein: hanging flower basket (2) are including suspending platform (21) in midair and hoisting the device, it sets up two sets ofly to hoist the device, establishes respectively at the both ends of suspending platform (21) in midair, it includes work lifting rope (22) and hoisting device (23) to suspend platform (21) in midair, work lifting rope (22) are connected with hoisting device (23), it connects beam column (13) outer end at two suspension mechanism (1) through work lifting rope (22) to suspend platform (21) in midair.
3. The aerial work basket with the high suspension bracket as claimed in claim 1, wherein: preceding pillar (11) and back pillar (15) all include inserted bar and bottom support, the inserted bar is T type structure, including the connecting pipe of level setting and the connecting rod of vertical setting, the top at the bottom support can be dismantled to vertical connecting rod.
4. An aerial work basket with a high suspension bracket as claimed in claim 3, wherein: the beam column (13) comprises a front beam, a middle beam and a rear beam, wherein the front beam is arranged in the connecting pipe of the inserting rod, connecting holes are formed in the front beam at intervals, two ends of the middle beam are connected to the inner end of the front beam and the inner end of the rear beam respectively, and the outer end of the rear beam is connected with the top end of the rear column (15).
5. An aerial work basket with a high suspension bracket as claimed in claim 3, wherein: the two connecting rods (3) are horizontally arranged and are respectively arranged at the upper part and the lower part of the inserted rod.
6. The aerial work basket with the high suspension bracket as claimed in claim 4, wherein: the front beam and the inserted bar are provided with connecting holes at intervals, the front beam is connected with the connecting pipe through a bolt, and the inserted bar is connected with the bottom bracket through a bolt.
7. The aerial work basket with the high suspension bracket as claimed in claim 2, wherein: still include safety device, safety device prevents weighing down safety rope and life safety rope including, prevent weighing down the top of safety rope and connect in beam column (13) outer end, and the middle part is passed through the safety lock and is connected on work lifting rope (22), the top fixed connection of life safety rope is on the fixed knot of building roofing constructs, and the bottom is connected on one's body operating personnel.
8. An aerial work basket with a high suspension bracket as claimed in claim 3, wherein: the bottom support of front pillar (11) is the triangle-shaped support, the bottom support of back pillar (15) is the type of falling T support, counter weight (16) are established on the bottom support of back pillar (15) through the counter weight branch pipe.
9. The aerial work basket with the high suspension bracket as claimed in claim 4, wherein: the front beam is a square tube with the length of 80-80 mm, the middle beam is a square tube with the length of 70-70 mm, the rear beam is a square tube with the length of 80-80 mm, and the connecting rod (3) is an angle steel with the length of L50-4 mm.
CN202022188666.8U 2020-09-29 2020-09-29 High-altitude operation hanging basket with high-suspension support Active CN213572943U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022188666.8U CN213572943U (en) 2020-09-29 2020-09-29 High-altitude operation hanging basket with high-suspension support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022188666.8U CN213572943U (en) 2020-09-29 2020-09-29 High-altitude operation hanging basket with high-suspension support

Publications (1)

Publication Number Publication Date
CN213572943U true CN213572943U (en) 2021-06-29

Family

ID=76579656

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022188666.8U Active CN213572943U (en) 2020-09-29 2020-09-29 High-altitude operation hanging basket with high-suspension support

Country Status (1)

Country Link
CN (1) CN213572943U (en)

Similar Documents

Publication Publication Date Title
CN102383588B (en) Lifting platform for protecting safety of high-level construction
CN201598820U (en) Single point suspension external hanging bracket
CN212836630U (en) All-steel integrated operation scaffold
CN213572943U (en) High-altitude operation hanging basket with high-suspension support
CN210483094U (en) Inverted triangular pipe truss lifting device
CN216587570U (en) Viscous damper's mounting platform
CN210886924U (en) Maintenance platform in retractable double-cable-plane cable-stayed bridge tower stay cable area
CN214302804U (en) Double-layer hanging basket of riding horse type
CN214785847U (en) Be applied to hanging flower basket device of single structure concrete beam
CN213572944U (en) Overhead working hanging basket arranged on flower stand beam
CN212053667U (en) Building outer wall construction scaffold convenient to installation
CN113445723A (en) Construction platform for mounting overhanging structure curtain wall and mounting method
CN2216104Y (en) Hanging lift scaffold
CN209780229U (en) Jacking platform system of integrated tower crane
CN2276046Y (en) Divided multistage automatic climbing external scaffold
CN213326369U (en) Hoisting frame
CN218522201U (en) Hanging basket supporting platform at high parapet wall
CN211622697U (en) Anti-falling device for building construction
CN215364769U (en) High-efficient installation work platform of high altitude steel construction
CN217518116U (en) Lifting operation platform for construction of steel structure factory building top layer
CN209778232U (en) Self-elevating gantry lifter
CN109972845A (en) The installation method of steel roof truss
CN214615362U (en) A collapsible flexible intelligence is climbed for heterotypic outer contour line building
CN218541445U (en) Hanging type construction protection platform device
CN219118715U (en) Elevator well safety protection and operation platform integrated device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant