CN213545339U - Construction monitoring system based on bim technology - Google Patents

Construction monitoring system based on bim technology Download PDF

Info

Publication number
CN213545339U
CN213545339U CN202022801745.1U CN202022801745U CN213545339U CN 213545339 U CN213545339 U CN 213545339U CN 202022801745 U CN202022801745 U CN 202022801745U CN 213545339 U CN213545339 U CN 213545339U
Authority
CN
China
Prior art keywords
card
system server
communication unit
attendance machine
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022801745.1U
Other languages
Chinese (zh)
Inventor
陈小瑞
李发珍
朱泽松
朱永祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chuzhou Vocational and Technical College
Original Assignee
Chuzhou Vocational and Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chuzhou Vocational and Technical College filed Critical Chuzhou Vocational and Technical College
Priority to CN202022801745.1U priority Critical patent/CN213545339U/en
Application granted granted Critical
Publication of CN213545339U publication Critical patent/CN213545339U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model discloses a construction monitored control system based on bim technique, include: the system server, the control end, attendance machine and locker, the control end includes the identification element, communication unit and control unit, the control unit includes that a plurality of sets up at the attendance machine, the camera of locker and each station department, the camera carries out face identification to the workman of checking card and will check card data transmission to the system server through communication unit in, the attendance machine includes the fingerprint and checks card, the work number is checked card, the work card is checked card and communication unit, the attendance machine will check card data and transmit to the system server through communication unit and combine with face identification data, transfer the corresponding data in the database and compare. The utility model discloses a face identification of control and attendance machine's fingerprint or job number or the dual mode of checking the card of worker's tablet stop to take place for the phenomenon of checking the card to in time report to the server when taking place "walking post and bunching the post" the condition in the course of the work, reduce the workman and steal lazy phenomenon at last time limit.

Description

Construction monitoring system based on bim technology
Technical Field
The utility model relates to a construction monitoring technology field, more specifically are a construction monitored control system based on bim technique.
Background
The whole process engineering consultation relates to management services of each stage of planning consultation, early-stage research, engineering design, bidding agency, construction cost consultation, engineering supervision, construction early-stage preparation, construction process management, completion acceptance and operation guarantee and the like in the whole life cycle of a construction project.
At present, the following problems exist in the monitoring of the existing constructors: most general contractors of building construction manage the personnel of subcontractor, and traditional personnel attendance mode is mainly based on modes such as equipment mode of checking card and manages, and degree of automation is low, exists the condition of taking the place of checking card in order to evade work in the in-process of checking the attendance of doing the job. For this reason, a new scheme needs to be designed to give improvements.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction monitored control system based on bim technique has solved the problem that proposes in the background art, satisfies the in-service use demand.
In order to achieve the above object, the utility model provides a following technical scheme: a construction monitoring system based on bim technology includes: system server, control end, attendance machine and locker, the control end includes identification element, communication unit and monitoring element, the monitoring element includes the camera of a plurality of setting in attendance machine, locker and each station department, the camera carries out face identification to the workman of checking card and will check card data transmission to system server through the communication unit in, the attendance machine includes fingerprint checking card, job number checking card, worker's tablet checking card and communication unit, the attendance machine will check card data and transmit to system server and combine with face identification data through the communication unit, transfer the corresponding data in the database and compare, compare and accomplish normal current, compare unusually and send out false alarm and the failure of checking card through the attendance machine.
As the utility model discloses a preferred embodiment, the locker includes sensor and communication unit, the sensor adopts weighing sensor and installs the interior bottom at the locker, and the sensor detects the inside weight of locker and transmits data to system server through communication unit.
As a preferred embodiment of the utility model, system server numbers the locker and with the personnel information phase-match in the database, judge whether personnel use the locker.
As a preferred embodiment of the present invention, the system server includes a matching unit, a simulation unit and a database, the database includes personal information, work information, position information, a shift list of personnel, and facial recognition data and fingerprint data of personnel phase-match.
As the utility model discloses a preferred embodiment, system server carries out information statistics to the worker kind to set for with worker kind assorted positional information, divide work area, with data transmission to system server in behind the non-this regional personnel of camera identification on the station record.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model discloses, the mode of the fingerprint of face identification and attendance machine through the control or the dual mode of checking the card of worker's tablet stops to take place for the phenomenon of checking the card to in time report to the server when taking place "walking post and bunching the post" the condition in the course of the work, reduce the workman and steal lazy phenomenon at last time limit.
Drawings
Fig. 1 is a system framework diagram of a construction monitoring system based on bim technology.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, the present invention provides a technical solution: a construction monitoring system based on bim technology includes: the system server, the monitoring terminal, the attendance machine and the storage cabinet, wherein the monitoring terminal comprises an identification unit, a communication unit and a monitoring unit, the monitoring unit comprises a plurality of cameras arranged at the attendance machine, the storage cabinet and each station, the cameras identify the face of a punch card worker and transmit the punch card data to the system server through the communication unit, the attendance machine comprises a fingerprint card punching unit, a job number card punching unit, a job card punching unit and a communication unit, the attendance machine transmits the card punching data to the system server through the communication unit and combines the card punching data with the face identification data, corresponding data in the database are called and compared, normal passing is completed through the comparison, and the face recognition is matched with an attendance machine to carry out double card punching so as to avoid the occurrence of the card punching phenomenon, error alarm is sent out through the attendance machine when the comparison is abnormal, the card punching fails, the card punching is carried out again after the card punching fails, and the face data of the card punching person is recorded after the card punching fails for a plurality of times and is recorded together with the matched personnel information in the database.
Further improved ground, the locker includes sensor and communication unit, and the sensor adopts weighing sensor and installs at the interior bottom of locker, and the sensor detects the inside weight of locker and transmits data to system server through communication unit, can monitor the in service behavior of locker.
In a further improvement, the system server numbers the storage cabinet, matches the storage cabinet with the personnel information in the database, and judges whether the personnel use the storage cabinet.
In a further improvement, the system server comprises a matching unit, a simulation unit and a database, the database comprises personal information, work information, position information, a shift schedule, face identification data and fingerprint data matched with the personnel, workers need to go on duty according to the shift schedule, and need to enter the shift schedule in advance when overtime is needed, if the workers do not enter the shift schedule, the situation of card punching failure can occur during card punching, and overtime can be carried out in the system server after the card punching failure.
Specifically, the system server carries out information statistics on the work type, sets position information matched with the work type, divides a work area, and transmits data to the system server for recording after a camera on a station identifies personnel in the area.
The utility model discloses come to carry out face identification to this staff through the camera when the staff punches the card, and wireless transmission to system server in, combine with the data of punching the card in the attendance machine, combine to punch the card after the correctness and pass through, combine to punch the card failure after the mistake, the database takes notes it when failing of punching the card many times, the sensor detects the condition of opening of locker, and will open the number of times and transmit to system server and including time tag and correspond the staff and match, the station camera lasts and monitors, when the staff appears in the non-work area, with its information data transmission to system server in, data and derivation are looked over to administrator's accessible system server.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. A construction monitoring system based on bim technology includes: system server, control end, attendance machine and locker, its characterized in that: the control end includes identification element, communication unit and monitoring unit, the monitoring unit includes that a plurality of sets up the camera in attendance machine, locker and each station department, the camera carries out face identification to the workman of checking card and will check card data transmission to system server through communication unit, the attendance machine includes fingerprint card punching, job number card punching, worker's tablet card punching and communication unit, the attendance machine will check card data and transmit to system server and combine with face identification data through communication unit, transfer the corresponding data in the database and compare, compare and accomplish normal current, compare unusually and send wrong alarm and the failure of checking card through the attendance machine.
2. The bim technology based construction monitoring system as claimed in claim 1, wherein: the locker comprises a sensor and a communication unit, the sensor adopts a weighing sensor and is installed at the inner bottom of the locker, and the sensor detects the weight inside the locker and transmits data to the system server through the communication unit.
3. The bim technology based construction monitoring system as claimed in claim 2, wherein: the system server numbers the storage cabinet, matches the storage cabinet with the personnel information in the database, and judges whether the personnel use the storage cabinet.
4. The bim technology based construction monitoring system as claimed in claim 1, wherein: the system server comprises a matching unit, a simulation unit and a database, wherein the database comprises personal information, work information, position information, a schedule, face identification data matched with personnel and fingerprint data of the personnel.
5. The bim technology based construction monitoring system as claimed in claim 1, wherein: the system server carries out information statistics on the work type, sets position information matched with the work type, divides a work area, and transmits data to the system server for recording after a camera on a station identifies personnel in the area.
CN202022801745.1U 2020-11-28 2020-11-28 Construction monitoring system based on bim technology Active CN213545339U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022801745.1U CN213545339U (en) 2020-11-28 2020-11-28 Construction monitoring system based on bim technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022801745.1U CN213545339U (en) 2020-11-28 2020-11-28 Construction monitoring system based on bim technology

Publications (1)

Publication Number Publication Date
CN213545339U true CN213545339U (en) 2021-06-25

Family

ID=76485285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022801745.1U Active CN213545339U (en) 2020-11-28 2020-11-28 Construction monitoring system based on bim technology

Country Status (1)

Country Link
CN (1) CN213545339U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113674445A (en) * 2021-08-20 2021-11-19 王可 Working hour statistical system for improving office efficiency
CN114387732A (en) * 2022-01-24 2022-04-22 京东方科技集团股份有限公司 Control method, control device, storage system and storage medium

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113674445A (en) * 2021-08-20 2021-11-19 王可 Working hour statistical system for improving office efficiency
CN114387732A (en) * 2022-01-24 2022-04-22 京东方科技集团股份有限公司 Control method, control device, storage system and storage medium

Similar Documents

Publication Publication Date Title
CN213545339U (en) Construction monitoring system based on bim technology
CN110991584A (en) Power distribution room asset checking system, method and device and computer equipment
CN102367742B (en) Monitoring system
CN102140929A (en) Mine safety production inspection system
US20060058980A1 (en) Electronic maintenance record file system for equipment such as a elevators
CN110084718A (en) A kind of family Tai Qu becomes the accurate method of calibration of relationship and device
CN103198391A (en) Electric power communication spare part management system and method based on ant colony algorithm
CN110083640A (en) A kind of recognition methods of platform area and device based on power failure data
CN112800910A (en) Communication machine room maintenance operation efficiency evaluation method and system
CN110826962A (en) Unmanned aerial vehicle intelligent management platform
CN111243156A (en) Transformer substation safety access and operation and maintenance system
CN110908325A (en) Operation and maintenance monitoring system for power equipment of information machine room of high-speed rail station
CN114049663A (en) Management method of construction site personnel health information system based on face recognition
CN111260003A (en) Full-life intelligent management method and system for fire-fighting equipment
CN206069118U (en) A kind of elevator repair and maintenance supervisory systems
CN112465480A (en) A real name system management system of labor affairs for building trade
CN107895218A (en) Personnel and equipment management system in bearing manufacture process
WO2013137507A1 (en) Aidc-based cloud-type logistics information synchronization system
CN103839137A (en) Passive box body management system based on internet of things
CN116505660A (en) Energy storage operation and maintenance system and operation and maintenance method
CN110516828A (en) Monitoring information processing system and method
CN214376583U (en) Management system for grounding wire of power line operation site
CN114358572A (en) Intelligent supervision project visual management method and system
CN106532954A (en) Grounding state monitoring method and system
CN111679946A (en) Novel computer application automatic detection equipment and operation steps thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant