CN213528879U - Metal recovery plant is used in new energy automobile production - Google Patents

Metal recovery plant is used in new energy automobile production Download PDF

Info

Publication number
CN213528879U
CN213528879U CN202022437163.XU CN202022437163U CN213528879U CN 213528879 U CN213528879 U CN 213528879U CN 202022437163 U CN202022437163 U CN 202022437163U CN 213528879 U CN213528879 U CN 213528879U
Authority
CN
China
Prior art keywords
box
box body
conveyer belt
metal
conveyor belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022437163.XU
Other languages
Chinese (zh)
Inventor
邹学仕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Youershi Technology Co ltd
Original Assignee
Qingdao Youershi Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Youershi Technology Co ltd filed Critical Qingdao Youershi Technology Co ltd
Priority to CN202022437163.XU priority Critical patent/CN213528879U/en
Application granted granted Critical
Publication of CN213528879U publication Critical patent/CN213528879U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model discloses a metal recovery equipment is used in new energy automobile production relates to automobile production processing technology field, including smashing box and conveyer belt, smash the inside rotation of box and set up the nip rolls, it accesss to first box to smash the bottom half and be the toper, it passes through support and first box fixed connection to smash the box, the level sets up the conveyer belt in the first box, the conveyer belt is located and smashes the box below, the second box is established on first box right side, the second box is located conveyer belt middle part top, the level sets up magnetism and inhales the conveyer belt in the second box, magnetism inhales the perpendicular conveyer belt direction setting of conveyer belt, the third box is established on second box right side, the third box is located the conveyer belt right-hand member. The utility model discloses simple structure, reasonable in design, metal recovery efficiency is high, effectively rejects impurity from the metal, has improved the quality of retrieving the metal, excellent in use effect.

Description

Metal recovery plant is used in new energy automobile production
Technical Field
The utility model belongs to the technical field of the automotive production processing technique and specifically relates to a metal recovery plant is used in new energy automobile production.
Background
With the increasing requirements of the society on environmental protection and energy conservation, hybrid electric vehicles and pure electric vehicles are more and more paid attention by governments and automobile manufacturers. Can produce a large amount of metal residues in new energy automobile production, in order to avoid extravagant, reduce cost, need retrieve the metal, current metal recovery plant is low to the recovery efficiency of metal, and dopes plastic products and other impurity easily, has reduced metal recovery efficiency.
SUMMERY OF THE UTILITY MODEL
In order to overcome the above-mentioned defect that exists among the prior art, the utility model provides a metal recovery plant is used in new energy automobile production.
The utility model provides a technical scheme that its technical problem adopted is: the utility model provides a new energy automobile production is with metal recovery plant, is including smashing box and conveyer belt, smash the inside rotation of box and set up the nip roll, the nip roll sets up in pairs, it accesss to first box to smash the bottom half toper, it passes through support and first box fixed connection to smash the box, the level sets up the conveyer belt in the first box, first box is located the conveyer belt left end, the conveyer belt is located and smashes the box below, the second box is established on first box right side, the second box is located conveyer belt middle part top, the conveyer belt is inhaled to level setting magnetism in the second box, the setting of conveyer belt perpendicular conveyer belt direction is inhaled to magnetism, the third box is established on second box right side, the third box is located the conveyer belt right-hand member.
Foretell metal recovery plant is used in new energy automobile production, 2 ~ 4 groups are vertically set up to the nip rolls.
Foretell metal recovery plant is used in new energy automobile production, the vertical magnetism suction disc that sets up in first box left side, the chamber door is established in first box top left side, the pull box is established to first bottom half, the fan is established on first box top right side, the below slope of air outlet nozzle to the left side of fan.
Foretell metal recovery plant is used in new energy automobile production, second box inner wall fixed connection scraper blade, the scraper blade is inhaled the conveyer belt bottom with magnetism and is contradicted, metal recycling box is established to second bottom of the box opening and second box below, metal recycling box is located the scraper blade below.
Foretell metal recycling equipment is used in new energy automobile production, the third box is debris collection box.
The beneficial effects of the utility model are that, the utility model discloses a metal waste who produces in the new energy automobile production puts into crushing box, bold metal material is through the nip rolls crushing, fragment such as metal fragment and plastics drop on the conveyer belt, the fan blows down first box with the less piece of quality from the conveyer belt, metal fragment adsorbs on the magnetism suction disc and the accessible chamber door takes out, plastic fragment drops in the pull box, when great fragment reachs the magnetism through the conveyer belt and inhales the conveyer belt below, the metal is inhaled on the conveyer belt by the adsorption band magnetism, scrape to fall in the metal recovery box by the scraper blade, surplus plastic fragment and other debris fall in the third box, moreover, the steam generator is simple in structure, and reasonable design, metal recovery efficiency is high, effectively reject impurity from the metal, the quality of retrieving the metal has been improved, excellent in use effect.
Drawings
The present invention will be further explained with reference to the drawings and examples.
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a left side view of the present invention.
In the figure, 1, a crushing box body, 2, a conveyor belt, 3, a nip roll, 4, a first box body, 5, a support, 6, a second box body, 7, a magnetic suction conveyor belt, 8, a third box body, 9, a magnetic suction plate, 10, a box door, 11, a drawing box, 12, a fan, 13, an air outlet nozzle, 14, a scraper blade, 15 and a metal recovery box are arranged.
Detailed Description
In order to more clearly illustrate the technical solution of the present invention, the following provides a further description of the present invention with reference to the accompanying drawings, and obviously, the following described drawings are only one embodiment of the present invention, and for those skilled in the art, other embodiments can be obtained according to the drawings and the embodiment without any creative work, and all belong to the protection scope of the present invention.
The utility model provides a new energy automobile production is with metal recovery plant, is including smashing box 1 and conveyer belt 2, smash 1 inside rotations of box and set up nip roll 3, nip roll 3 sets up in pairs, it accesss to first box 4 to smash 1 bottom of box to be the toper, it passes through support 5 and first box 4 fixed connection to smash box 1, level sets up conveyer belt 2 in first box 4, first box 4 is located 2 left ends of conveyer belt, conveyer belt 2 is located and smashes 1 below of box, second box 6 is established on 4 right sides of first box, second box 6 is located 2 middle parts tops of conveyer belt, conveyer belt 7 is inhaled to horizontal setting magnetism in second box 6, magnetism is inhaled 2 directions settings of conveyer belt 7 perpendicular conveyer belt, third box 8 is established on 6 right sides of second box, third box 8 is located conveyer belt 2 right-hand members.
In detail, 2 groups of 3 vertical settings of nip rolls, the vertical magnetism suction disc 9 that sets up in first box 4 left side, chamber door 10 is established in 4 top left sides of first box, pull box 11 is established to 4 bottoms of first box, fan 12 is established on 4 top right sides of first box, the left side below slope of gas outlet nozzle 13 of fan 12, 6 inner wall fixed connection scraper blades 14 of second box, the scraper blade 14 is contradicted with magnetism 7 bottoms of conveyer belt, metal recycling box 15 is established to 6 bottom openings of second box and 6 below of second box, metal recycling box 15 is located the scraper blade 14 below, third box 8 is the debris recycling box.
During the use, put into crushing box 1 with the metal waste material that produces in the new energy automobile production, bold metal material is through the nip rolls 3 crushing, fragment such as metal fragment and plastics drop on conveyer belt 2, fan 13 blows off first box 4 with the less piece of quality from conveyer belt 2, metal fragment adsorbs on magnetic suction plate 9 and accessible chamber door 10 takes out, plastic fragment drops in pull box 11, when great fragment reachs magnetism conveyer belt 7 below through conveyer belt 2, the metal is inhaled on the conveyer belt 7 by the adsorption band magnetism, receive scraper blade 14 to scrape and fall in metal recovery box 15, surplus plastic fragment and other debris fall in third box 8.
The above embodiments are only exemplary embodiments of the present invention, and are not intended to limit the present invention, and the protection scope of the present invention is defined by the claims. Various modifications and equivalents of the invention can be made by those skilled in the art within the spirit and scope of the invention, and such modifications and equivalents should also be considered as falling within the scope of the invention.

Claims (5)

1. The utility model provides a new energy automobile production is with metal recovery plant, is including smashing box (1) and conveyer belt (2), its characterized in that: the inside material pressing roller (3) that rotates of the crushing box body (1), the material pressing roller (3) that sets up in pairs, the bottom of the crushing box body (1) is a cone and leads to the first box body (4), the crushing box body (1) is fixedly connected with the first box body (4) through the bracket (5), the first box body (4) is horizontally provided with the conveyor belt (2), the first box body (4) is positioned at the left end of the conveyor belt (2), the conveyor belt (2) is positioned below the crushing box body (1), the right side of the first box body (4) is provided with the second box body (6), the second box body (6) is positioned above the middle part of the conveyor belt (2), the second box body (6) is horizontally provided with the magnetic suction conveyor belt (7), the magnetic suction conveyor belt (7) is arranged in the direction perpendicular to the conveyor belt (2), the right side of the second box body (6) is provided with the third box, the third box body (8) is positioned at the right end of the conveyor belt (2).
2. The metal recovery equipment for producing the new energy automobile is characterized in that the nip rolls (3) are vertically arranged in 2-4 groups.
3. The metal recycling equipment for the new energy automobile production according to claim 1, wherein a magnetic absorption plate (9) is vertically arranged on the left side of the first box body (4), a box door (10) is arranged on the left side of the top of the first box body (4), a drawing box (11) is arranged at the bottom of the first box body (4), a fan (12) is arranged on the right side of the top of the first box body (4), and an air outlet nozzle (13) of the fan (12) is inclined towards the lower left.
4. The metal recycling equipment for the new energy automobile production according to claim 1, wherein the inner wall of the second box body (6) is fixedly connected with a scraper (14), the scraper (14) is abutted against the bottom of the magnetic suction conveyor belt (7), the bottom of the second box body (6) is open, a metal recycling box (15) is arranged below the second box body (6), and the metal recycling box (15) is located below the scraper (14).
5. The metal recycling equipment for producing the new energy automobile according to claim 1, wherein the third box body (8) is a sundry recycling box.
CN202022437163.XU 2020-10-28 2020-10-28 Metal recovery plant is used in new energy automobile production Expired - Fee Related CN213528879U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022437163.XU CN213528879U (en) 2020-10-28 2020-10-28 Metal recovery plant is used in new energy automobile production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022437163.XU CN213528879U (en) 2020-10-28 2020-10-28 Metal recovery plant is used in new energy automobile production

Publications (1)

Publication Number Publication Date
CN213528879U true CN213528879U (en) 2021-06-25

Family

ID=76501365

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022437163.XU Expired - Fee Related CN213528879U (en) 2020-10-28 2020-10-28 Metal recovery plant is used in new energy automobile production

Country Status (1)

Country Link
CN (1) CN213528879U (en)

Similar Documents

Publication Publication Date Title
CN108043156B (en) Energy-saving treatment device for dust-containing waste gas
CN205609702U (en) Old and useless lithium cell complete set divides material separation collection device
CN102339006B (en) Recovery method and recovery device for waste carbon powder, and regenerated plastic thereof
CN213528879U (en) Metal recovery plant is used in new energy automobile production
CN113954271B (en) Plastic recycling device for resource recycling industry
CN116462189B (en) Method for removing metal impurities of carbon nano tube
CN209715386U (en) A kind of rubbish magnetic separating device
CN209349045U (en) Lithium battery screening installation after one kind is broken
CN207270893U (en) Ramp type dust-removing recovery device for LiFePO4 production
CN212352576U (en) Rubber reducing mechanism
CN201405459Y (en) Environment-friendly waste tyre and rubber grinder
CN210013036U (en) Novel bagasse depither for papermaking
CN209222847U (en) A kind of straw millstone with dedusting function
CN220995121U (en) Fluoroplastic efficient recycling device
CN208526720U (en) A kind of waste electrical equipment reclaimer
CN220371868U (en) Dust collecting mechanism of ball machine
CN208514798U (en) A kind of anti-remodeling crusher of ultra-fine plastic powders purification
CN112657592A (en) Sorting equipment for hardware electric appliance parts
CN209735228U (en) Energy-saving treatment device for dust-containing waste gas
CN217663571U (en) Raw materials refines breaker for active carbon production
CN219804924U (en) White carbon black recycling device
CN219886448U (en) Kraft paper processing is with stoving electrostatic precipitator equipment
CN217313772U (en) Air blowing device and airflow crushing system
CN218053474U (en) PE plastic particle impurity removal device
CN221065929U (en) Separator of shot blasting machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210625

CF01 Termination of patent right due to non-payment of annual fee