CN213418524U - Detachable temporary support structure for construction of constructional engineering - Google Patents

Detachable temporary support structure for construction of constructional engineering Download PDF

Info

Publication number
CN213418524U
CN213418524U CN202021915296.7U CN202021915296U CN213418524U CN 213418524 U CN213418524 U CN 213418524U CN 202021915296 U CN202021915296 U CN 202021915296U CN 213418524 U CN213418524 U CN 213418524U
Authority
CN
China
Prior art keywords
construction
supporting
rod
fixing
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021915296.7U
Other languages
Chinese (zh)
Inventor
盛继玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021915296.7U priority Critical patent/CN213418524U/en
Application granted granted Critical
Publication of CN213418524U publication Critical patent/CN213418524U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a construction engineering construction is with detachable interim supporting construction, the camera includes a supporting plate, the bottom fixedly connected with swivel mount on backup pad surface, the transposable inner wall has the dead lever through pivot swing joint, the draw-in groove has been seted up on the surface of dead lever, the spout has been seted up on the surface of backup pad, the inner wall sliding connection of spout has the slider, the fixed surface of slider is connected with the connecting block, the inner wall of connecting block has the support sleeve through pivot swing joint, the inner wall sliding connection of support sleeve has the bracing piece. This detachable interim supporting construction is used in building engineering construction sets up through the cooperation of backup pad and dead lever, can place the dead lever subaerial, sets up through the cooperation of connecting plate and staple, can fix the dead lever in the bottom surface, and the assurance device can not slide, sets up through the cooperation of support sleeve and bracing piece, can play the supporting role to the backup pad, supports the building.

Description

Detachable temporary support structure for construction of constructional engineering
Technical Field
The utility model relates to a construction is with strutting arrangement technical field specifically is a detachable interim supporting construction is used in building engineering construction.
Background
The construction is a production process for building various building products in a certain space and time by using various building materials and mechanical equipment according to a specific design blueprint, and comprises all production processes from construction preparation, earth breaking work to completion acceptance, wherein the production processes comprise construction preparation, construction organization design and management, earthwork, blasting work, foundation work, reinforcing steel bar work, formwork work, scaffold work, concrete work, prestressed concrete work, masonry work, steel structure work, wood structure work, structural installation work and the like, and in the construction process, safety needs to be ensured, the building needs to be supported, and the existing supporting device is mostly poured by cement and is inconvenient to install and disassemble.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a detachable interim supporting construction is used in building engineering construction has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a detachable temporary supporting structure for building engineering construction comprises a supporting plate, wherein a rotary seat is fixedly connected to the bottom of the surface of the supporting plate, a fixed rod is movably connected to the inner wall of the rotary seat through a rotary shaft, a clamping groove is formed in the surface of the fixed rod, a sliding groove is formed in the surface of the supporting plate, a sliding block is slidably connected to the inner wall of the sliding groove, a connecting block is fixedly connected to the surface of the sliding block, a supporting sleeve is movably connected to the inner wall of the connecting block through a rotary shaft, a supporting rod is slidably connected to the inner wall of the supporting sleeve, a positioning groove is formed in the surface of the supporting rod, a positioning rod is inserted into the surface of the supporting sleeve, a positioning rod is inserted into the inner wall of the positioning groove, a fixed block is fixedly connected to the surface of, the surface of the fixed block is inserted with a connecting rod, the surface of the limiting rod is provided with a positioning hole, and the inner wall of the positioning hole is inserted with a connecting rod.
Optionally, one end of the fixing rod, which is far away from the supporting plate, is fixedly connected with a connecting plate.
Optionally, the surface of the connecting plate is inserted with four fixing nails.
Optionally, the inner wall of the chute is fixedly connected with a limiting block.
Optionally, the bottom of the supporting rod is fixedly connected with a non-slip mat.
Optionally, the number of the fixing blocks is three, and fixing holes are formed in the surfaces of the three fixing blocks.
(III) advantageous effects
The utility model provides a detachable interim supporting construction is used in building engineering construction possesses following beneficial effect:
1. this detachable interim supporting construction is used in building engineering construction sets up through the cooperation of backup pad and dead lever, can place the dead lever subaerial, sets up through the cooperation of connecting plate and staple, can fix the dead lever in the bottom surface, and the assurance device can not slide, sets up through the cooperation of support sleeve and bracing piece, can play the supporting role to the backup pad, supports the building.
2. This detachable interim supporting construction is used in building engineering construction sets up through the cooperation of constant head tank and locating lever, can carry out the bracing piece that stretches out fixed of length, can adjust the angle of support as required, sets up through the cooperation of spout and slider, can slide the support sleeve away when packing up, and convenient folding is placed.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the support sleeve of the present invention;
FIG. 3 is an enlarged schematic view of the structure of FIG. 1;
fig. 4 is a schematic structural diagram of the fixing block of the present invention.
In the figure: 1. a support plate; 2. rotating; 3. fixing the rod; 4. a connecting plate; 5. fixing nails; 6. a card slot; 7. a chute; 8. a limiting block; 9. a slider; 10. connecting blocks; 11. a support sleeve; 12. a support bar; 13. positioning a groove; 14. positioning a rod; 15. a non-slip mat; 16. a fixed block; 17. a fixing hole; 18. a limiting rod; 19. a connecting rod; 20. and (7) positioning the holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 4, the present invention provides a technical solution: a detachable temporary supporting structure for construction of constructional engineering comprises a supporting plate 1;
in order to fix the device on the ground and prevent the device from sliding, a swivel mount 2 is fixedly connected to the bottom of the surface of a supporting plate 1, a fixing rod 3 is movably connected to the inner wall of the swivel mount 2 through a rotating shaft, the fixing rod 3 can be placed on the ground through the matching arrangement of the supporting plate 1 and the fixing rod 3, a connecting plate 4 is fixedly connected to one end, away from the supporting plate 1, of the fixing rod 3, fixing nails 5 are inserted into the surface of the connecting plate 4, the number of the fixing nails 5 is four, and the fixing rod 3 can be fixed to the bottom surface through the matching arrangement of the connecting plate 4 and the fixing nails 5;
in order to firmly support the supporting plate 1, a clamping groove 6 is arranged on the surface of the fixing rod 3, a sliding groove 7 is arranged on the surface of the supporting plate 1, a limiting block 8 is fixedly connected to the inner wall of the sliding groove 7, the sliding block 9 can be prevented from falling due to overlong sliding distance by the arrangement of the limiting block 8, a sliding block 9 is slidably connected to the inner wall of the sliding groove 7, a supporting sleeve 11 can be slid away when the supporting sleeve is folded by the matching arrangement of the sliding groove 7 and the sliding block 9, the folding placement is convenient, a connecting block 10 is fixedly connected to the surface of the sliding block 9, the supporting sleeve 11 is movably connected to the inner wall of the connecting block 10 through a rotating shaft, a supporting rod 12 is slidably connected to the inner wall of the supporting sleeve 11, the supporting plate 1 can be supported by the matching arrangement of the supporting sleeve 11 and the supporting rod 12, the building is, the positioning rod 14 is inserted into the inner wall of the positioning groove 13, the length of the extending supporting rod 12 can be fixed through the matching arrangement of the positioning groove 13 and the positioning rod 14, the supporting angle can be adjusted according to needs, the bottom of the supporting rod 12 is fixedly connected with the anti-slip mat 15, and the anti-slip support can prevent sliding during supporting through the matching arrangement of the clamping groove 6 and the anti-slip mat 15;
in order to make better accomodating of device, consequently fixed surface at backup pad 1 is connected with fixed block 16, the quantity of fixed block 16 is three, fixed orifices 17 have all been seted up on the surface of three fixed block 16, dead lever 3, fixed orifices 17 have all been seted up on the surface of backup sleeve 11 and fixed block 16, the inner wall of fixed orifices 17 is pegged graft and is had gag lever post 18, through fixed block 16, fixed orifices 17 and gag lever post 18's cooperation setting, can be when dead lever 3 and backup sleeve 11 are packed up, fix it, the surface of fixed block 16 is pegged graft and is had connecting rod 19, locating hole 20 has been seted up on the surface of gag lever post 18, the inner wall of locating hole 20 is pegged graft and is had connecting rod 19, cooperation setting through connecting rod 19 and locating hole 20, can fix gag lever post 18.
To sum up, this construction engineering construction is with detachable interim supporting construction, the use step is as follows:
1. the connecting rod 19 is pulled out, the limiting rod 18 is pulled out, the fixing rod 3 is laid flat, the supporting plate 1 leans against the surface of a building to be supported, the fixing nail 5 is inserted into the ground, the supporting sleeve 11 slides towards two sides under the matching of the sliding block 9 and the sliding groove 7, the supporting sleeve 11 slides to the upper side of the fixing rod 3, the positioning rod 14 is pulled out, the supporting rod 12 is pulled out, the anti-skid pad 15 is supported into the clamping groove 6, and the positioning rod 14 is inserted into the positioning groove 13 again.
2. The positioning rod 14 is pulled out, the supporting rod 12 is retracted, the positioning rod 14 is inserted into the positioning groove 13 again, the supporting sleeve 11 slides away through the sliding block 9, the fixing nail 5 is pulled out from the bottom surface, the fixing rod 3 is folded, the limiting rod 18 is inserted into the fixing hole 17, and the connecting rod 19 is inserted into the positioning hole 20.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a construction engineering construction is with detachable temporary support structure, includes backup pad (1), its characterized in that: the bottom of the surface of the supporting plate (1) is fixedly connected with a rotary seat (2), the inner wall of the rotary seat (2) is movably connected with a fixed rod (3) through a rotary shaft, the surface of the fixed rod (3) is provided with a clamping groove (6), the surface of the supporting plate (1) is provided with a sliding groove (7), the inner wall of the sliding groove (7) is slidably connected with a sliding block (9), the surface of the sliding block (9) is fixedly connected with a connecting block (10), the inner wall of the connecting block (10) is movably connected with a supporting sleeve (11) through a rotary shaft, the inner wall of the supporting sleeve (11) is slidably connected with a supporting rod (12), the surface of the supporting rod (12) is provided with a positioning groove (13), the surface of the supporting sleeve (11) is spliced with a positioning rod (14), the inner wall of the positioning groove (13, the fixing rod (3), the supporting sleeve (11) and the fixing block (16) are all provided with fixing holes (17) on the surfaces, limiting rods (18) are inserted into the inner walls of the fixing holes (17), connecting rods (19) are inserted into the surfaces of the fixing blocks (16), positioning holes (20) are formed in the surfaces of the limiting rods (18), and the connecting rods (19) are inserted into the inner walls of the positioning holes (20).
2. The detachable temporary supporting structure for construction of construction engineering according to claim 1, wherein: one end of the fixing rod (3) far away from the supporting plate (1) is fixedly connected with a connecting plate (4).
3. The detachable temporary supporting structure for construction of building engineering according to claim 2, wherein: the surface of the connecting plate (4) is inserted with four fixing nails (5), and the number of the fixing nails (5) is four.
4. The detachable temporary supporting structure for construction of construction engineering according to claim 1, wherein: the inner wall of the sliding groove (7) is fixedly connected with a limiting block (8).
5. The detachable temporary supporting structure for construction of construction engineering according to claim 1, wherein: the bottom of the supporting rod (12) is fixedly connected with an anti-skid pad (15).
6. The detachable temporary supporting structure for construction of construction engineering according to claim 1, wherein: the number of the fixing blocks (16) is three, and fixing holes (17) are formed in the surfaces of the three fixing blocks (16).
CN202021915296.7U 2020-09-04 2020-09-04 Detachable temporary support structure for construction of constructional engineering Active CN213418524U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021915296.7U CN213418524U (en) 2020-09-04 2020-09-04 Detachable temporary support structure for construction of constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021915296.7U CN213418524U (en) 2020-09-04 2020-09-04 Detachable temporary support structure for construction of constructional engineering

Publications (1)

Publication Number Publication Date
CN213418524U true CN213418524U (en) 2021-06-11

Family

ID=76260562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021915296.7U Active CN213418524U (en) 2020-09-04 2020-09-04 Detachable temporary support structure for construction of constructional engineering

Country Status (1)

Country Link
CN (1) CN213418524U (en)

Similar Documents

Publication Publication Date Title
CN105220874B (en) The construction method of basement superelevation exterior wall self-supporting single side formwork system
CN103469815B (en) A kind of reinforced concrete retaining wall slope protection construction method
CN104060629B (en) The superimposed wall construction method in covered back-digging subway station and portable side wall formwork jumbo
CN114542079B (en) Efficient shaft creeping formwork construction system
CN108005255A (en) A kind of construction method of wall
CN213418524U (en) Detachable temporary support structure for construction of constructional engineering
CN110593309B (en) Construction method of full-hall scaffold supporting system with slope comprehensive pipe gallery
CN105696796A (en) Cantilever scaffold steel girder anchoring method
CN211472518U (en) Removable supporting is used in building engineering construction
US2916245A (en) Adjustable scaffold bracket
CN105804396B (en) A kind of non-type, template system precast stair bench and construction can be had enough to meet the need
CN205713091U (en) A kind of diagonal column mold plate system
CN207934490U (en) A kind of detachable tripod post-cast strip independent support device
CN113235645B (en) Tower crane foundation reserved joint bar assembly type forming die construction method
CN113605718B (en) Leather counting rod device for controlling flatness of masonry
CN213359377U (en) Building templates support frame
CN109138397B (en) Overhanging type scaffold and building method thereof
CN113846858A (en) Protection system for horizontal hole in building construction process and construction method
CN213868904U (en) Template supporting mechanism for civil engineering floor
KR200294830Y1 (en) Supporting structure of scaffold for mold
CN201521128U (en) Non-hole seamless construction device
CN212927017U (en) Light steel and light concrete template
CN218204409U (en) Gymnasium construction brick fetal membrane structure
CN214329784U (en) Efficient terrace levelling tool
CN209780296U (en) Ground safety protection shed fixing device for high-rise building story-adding reconstruction