CN213391145U - Construction hanging flower basket is built in room - Google Patents

Construction hanging flower basket is built in room Download PDF

Info

Publication number
CN213391145U
CN213391145U CN202022051563.7U CN202022051563U CN213391145U CN 213391145 U CN213391145 U CN 213391145U CN 202022051563 U CN202022051563 U CN 202022051563U CN 213391145 U CN213391145 U CN 213391145U
Authority
CN
China
Prior art keywords
platform
construction
construction platform
rod
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022051563.7U
Other languages
Chinese (zh)
Inventor
林友钦
赵乐新
赵彬
林栋�
林文杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Jinyuxin Construction Co ltd
Original Assignee
Fujian Chuangyun Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Chuangyun Construction Co ltd filed Critical Fujian Chuangyun Construction Co ltd
Priority to CN202022051563.7U priority Critical patent/CN213391145U/en
Application granted granted Critical
Publication of CN213391145U publication Critical patent/CN213391145U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The application discloses construction hanging flower basket is built in room, relate to the technical field that the construction was built in the room, the lower problem of hanging flower basket suitability has been solved, it is including the construction platform that is the rectangle structure, enclose two dead levers of establishing at the guardrail on two long limits of construction platform and connecting two guardrails, the dead lever both ends are connected respectively in the top of two guardrails with one side, the equal movable mounting in both ends of the long limit direction of construction platform has flexible platform, flexible platform includes movable mounting in construction platform bottom plate and sets up the backplate of keeping away from construction platform center one side perpendicularly on the bottom plate, the last mounting that is provided with the flexible platform of locking that is provided with of construction platform. This application can improve the suitability of hanging flower basket.

Description

Construction hanging flower basket is built in room
Technical Field
The application relates to the technical field of building construction, in particular to a building construction hanging basket.
Background
The hanging mechanism is erected on a building or a structure, the lifting mechanism is used for driving the hanging platform, and the hanging mechanism is a construction facility which runs up and down along the vertical surface of the building or the structure through a steel wire rope and is also an operation platform for operators.
Referring to fig. 7, the construction basket includes a construction platform 1 having a rectangular structure and guard rails 2 enclosed on the platform. The construction is carried out on the surface of the building by driving the construction hanging basket to move up and down through the cantilever mechanism, the lifting mechanism and the steel wire rope.
With respect to the related art among the above, the inventors consider that the following drawbacks exist: for example, when a raised structure appears at a corner of an outer wall of a building, the raised structure is arranged from bottom to top and does not extend to the whole building wall. When in normal construction, the hanging basket is driven to ascend from the bottom of the building from bottom to top, the surface of the protruding structure is constructed, and when the hanging basket ascends to the position of a wall body without the protruding structure, the construction hanging basket cannot be constructed due to the fact that the length of the construction hanging basket cannot be adjusted, and the construction hanging basket is far away from the wall body at the corner; the horizontal position of the whole cantilever mechanism relative to the building wall body needs to be readjusted so that the hanging basket is close to the corner of the wall body for construction, operation is complex, manpower and material resources are consumed, and therefore the hanging basket cannot be well adapted to some special conditions, and applicability is poor.
SUMMERY OF THE UTILITY MODEL
In order to improve the suitability of hanging flower basket, this application provides a construction hanging flower basket is built in room.
The application provides a construction hanging flower basket is built in room adopts following technical scheme:
the utility model provides a construction hanging flower basket is built in room, includes the construction platform that is the rectangle structure, encloses and establishes at the guardrail on two long limits of construction platform and connects two dead levers of two guardrails, the dead lever both ends are connected respectively in the top of two guardrails with one side, the equal movable mounting in both ends of the long limit direction of construction platform has flexible platform, flexible platform includes movable mounting bottom plate in construction platform and sets up the backplate of keeping away from construction platform center one side on the bottom plate perpendicularly, the last mounting that is provided with the flexible platform of locking of construction platform.
Through adopting above-mentioned technical scheme, remove the fixed of mounting to flexible platform, move flexible platform towards the direction of keeping away from suitable platform to increase the length of whole hanging flower basket, with this suitability that improves the hanging flower basket.
Preferably, the mounting includes a plurality of fastening bolt, the gliding cavity of confession telescopic platform along construction platform length direction is all seted up at construction platform's both ends, a plurality of spliced eye has been seted up along construction platform width direction's both sides to the bottom plate, the spliced eye is along construction platform length direction interval distribution, construction platform's tip is seted up and is supplied fastening bolt male fixed orifices.
By adopting the technical scheme, the fastening bolt penetrates through the fixing hole and then is in threaded connection with the inserting hole in the bottom plate, so that the telescopic platform can be fixed; in the air, the locking or unlocking operation of the fixing piece can be carried out.
Preferably, the upper side wall and the lower side wall of the bottom plate are attached to the inner wall of the cavity.
Through adopting above-mentioned technical scheme, the upper and lower both sides wall and the laminating of cavity inner wall of bottom plate can improve telescopic platform's horizontal stability.
Preferably, both ends of the fixed rod are provided with inclined pulling pieces for enhancing the bearing capacity of the telescopic platform, and the inclined pulling pieces are connected between the fixed rod and the guard plate.
Through adopting above-mentioned technical scheme, can further improve the stability behind the flexible platform shifts out construction platform through the setting of drawing the piece to one side, strengthen flexible platform's bearing capacity, improve the security performance.
Preferably, draw the piece to one side and include iron chain and fixed hook, the fixed hook is installed in the tip of dead lever, the iron chain comprises a plurality of annular iron rings mutual lock joint in proper order, one of them iron ring is withheld to the fixed hook, the one end that the fixed hook was kept away from to the iron chain is connected in the backplate bottom.
Through adopting above-mentioned technical scheme, the one end of iron chain is fixed in the backplate bottom, shifts out construction platform's length according to the bottom plate, with one of them iron ring lock joint on the iron chain on the fixed hook, further improves telescopic platform's security.
Preferably, the mounting groove has all been seted up at a lateral wall both ends that the backplate is close to construction platform, the vertical setting of mounting groove, be provided with the dwang in the mounting groove, the both ends of dwang are rotated and are connected on the cell wall of mounting groove, the both ends of dwang are provided with the coil spring, on the one end of coil spring was fixed in the dwang, on the other end was fixed in the mounting groove cell wall, it has protective cloth to coil on the dwang, on protective cloth's one end was fixed in the dwang lateral wall, the other end was connected with the fender rod, the fender rod is vertical to be installed between dead lever and construction platform, and two fender rods distribute in the dead lever both ends, under the effect.
By adopting the technical scheme, the arrangement of the protective cloth can reduce the occurrence of the condition that articles fall off from the telescopic platform and improve the protection of workers; and under the action of the coil spring, the protective cloth is always in a tensioning state no matter how long the telescopic platform extends out.
Preferably, the both ends of protective bar have all seted up the sliding tray along its length direction, slidable mounting slide bar in the sliding tray, the length of slide bar is less than the sliding tray, all set up on dead lever and the construction platform and supply the slide bar to insert the connecting hole of establishing, the lateral wall of slide bar is provided with the driving lever perpendicularly, the protective bar sets up the kidney slot that supplies the driving lever to remove along sliding tray length direction, still be provided with the spring in the sliding tray, the one end and the sliding tray of spring are close to the cell wall butt at protective bar center, and the other end and slide bar terminal surface butt, the spring is in compression state all the time.
Through adopting above-mentioned technical scheme, when advancing dead lever and construction platform time with the initial installation of fender rod, with the driving lever at fender rod both ends towards the spring extrusion back, aim at the link hole on dead lever and construction platform, loosen the driving lever, the connecting hole is inserted to the slide bar under the effect of spring, is about to the fender rod fixed, and the installation is convenient simple.
Preferably, a sealing cover is installed on a notch of the installation groove, and the sealing cover is provided with a long groove for the protective cloth to pass through.
Through adopting above-mentioned technical scheme, when flexible platform portion shifts out construction platform, can reduce the pollution that is located the mounting groove protection cloth through setting up of closing cap.
In summary, the present application includes at least one of the following benefits:
1. when the telescopic platform needs to be pulled out of the construction platform, the fastening bolt is loosened, the iron chain is moved out of the fixed hook, the guard plate is pushed out for a proper distance, the telescopic platform is fixed on the construction platform through the fastening bolt, and then the iron chain is buckled on the fixed hook; the applicability of the hanging basket is improved through the arrangement of the telescopic platform;
2. the situation that the tool falls can be reduced through the arrangement of the protective cloth.
Drawings
FIG. 1 is a schematic view of the overall structure of the present embodiment;
FIG. 2 is a sectional view of the present embodiment;
FIG. 3 is an enlarged schematic view at A in FIG. 2;
FIG. 4 is an exploded schematic view of the present implementation;
FIG. 5 is an enlarged schematic view at B in FIG. 4;
FIG. 6 is an enlarged schematic view at C in FIG. 4;
fig. 7 is a structural view of a construction basket in the related art.
Description of reference numerals: 1. a construction platform; 11. a cavity; 12. a fixing hole; 2. a guardrail; 3. fixing the rod; 4. a telescopic platform; 41. a base plate; 411. inserting holes; 42. a guard plate; 421. mounting grooves; 422. rotating the rod; 423. a coil spring; 424. protective cloth; 425. a guard bar; 4251. a sliding groove; 4252. a slide bar; 4253. a deflector rod; 4254. a kidney-shaped groove; 4255. a spring; 426. sealing the cover; 5. fastening a bolt; 6. a diagonal pull member; 61. an iron chain; 62. a fixed hook; 7. and connecting the holes.
Detailed Description
The present application is described in further detail below with reference to figures 1-6.
The embodiment of the application discloses construction hanging flower basket is built in room. Referring to fig. 1, the construction hanging basket comprises a construction platform 1 with a rectangular structure, guardrails 2 arranged on two long edges of the construction platform 1 in an enclosing mode, and a fixing rod 3 connected with the two guardrails 2. The both ends of construction platform 1 long limit direction all have flexible platform 4 movably mounted, and flexible platform 4 includes movable mounting in construction platform 1 bottom plate 41 and perpendicular welding in bottom plate 41 keeps away from the backplate 42 of construction platform 1 center one side. The construction platform 1 is provided with a fixing piece for fixing the telescopic platform 4 after extending out of the construction platform 1. Through the setting of flexible platform 4, improve the suitability of hanging flower basket.
Referring to fig. 2 and 3, the fixing member includes a plurality of fastening bolts 5. Both ends of the construction platform 1 are provided with cavities 11 for the telescopic platform 4 to slide along the length direction of the construction platform 1. The telescopic platform 4 is provided with a plurality of inserting holes 411 along both sides of the width direction of the construction platform 1, and the inserting holes 411 are distributed at intervals along the long section direction of the construction platform 1. The end of the construction platform 1 is provided with a fixing hole 12 for inserting the fastening bolt 5. The fastening bolt 5 passes through the fixing hole 12 and then is screwed in the inserting hole 411 to fix and lock the telescopic platform 4. The upper and lower both sides wall of bottom plate 41 and the laminating of cavity 11 inner wall, after flexible platform 4 stretches out construction platform 1, can keep the horizontal stability of flexible platform 4.
Referring to fig. 1 and 4, two ends of a fixing rod 3 are respectively welded to the top of the same side of two guardrails 2, and a steel wire rope is connected to the fixing rod 3 on two sides of the hanging basket. The two ends of the fixed rod 3 are provided with diagonal pulling pieces 6 used for enhancing the bearing capacity of the telescopic platform 4.
Referring to fig. 4, the diagonal member 6 includes an iron chain 61 and a fixing hook 62. The fixing hook 62 is welded to the end of the fixing rod 3, and the tip of the fixing hook 62 is disposed upward. The iron chain 61 is formed by fastening a plurality of annular iron rings in sequence. The fixing hook 62 is fastened to one of the iron rings, and the end of the iron chain 61 away from the fixing hook 62 is connected to the bottom of the guard plate 42.
Referring to fig. 4 and 5, the guard plate 42 has mounting grooves 421 formed at both ends of a side wall thereof adjacent to the construction platform 1. The mounting groove 421 is vertically arranged, and the rotating rod 422 is rotatably mounted in the mounting groove 421. Both ends of the rotating lever 422 are provided with coil springs 423. One end of the coil spring 423 is embedded in the side wall of the end of the rotating rod 422, and the other end is fixedly embedded in the wall of the mounting groove 421.
Referring to fig. 4 and 5, a protective cloth 424 is wound around the rotating rod 422, one end of the protective cloth 424 is fixedly adhered to the side wall of the rotating rod 422, and the other end is connected to a protective rod 425. The protection rods 425 are vertically installed between the fixing rod 3 and the construction platform 1, and the protection rods 425 are distributed at both ends of the fixing rod 3. Under the action of the coil spring 423, the rotating rod 422 always tends to wind and retract the protection cloth 424. A sealing cover 426 is welded at the notch of the mounting groove 421, and the protective cloth 424 penetrates through the sealing cover 426 to be fixedly adhered with the protective rod 425.
Referring to fig. 2 and 6, in order to facilitate installation of the protection bar 425, to which the protection cloth 424 has been attached, between the fixing bar 3 and the construction platform 1. Both ends of the guard bar 425 are provided with sliding grooves 4251 along the length direction, sliding rods 4252 are slidably mounted in the sliding grooves 4251, and the length of each sliding rod 4252 is smaller than that of each sliding groove 4251. The fixed rod 3 and the construction platform 1 are both provided with connecting holes 7 for the sliding rods 4252 to be inserted into. A shift lever 4253 is vertically embedded in the side wall of the sliding rod 4252. The guard bar 425 is provided with a waist-shaped groove 4254 along the length direction of the sliding groove 4251 for the shift lever 4253 to move. A spring 4255 is arranged in the kidney-shaped groove 4254, one end of the spring 4255 is tightly abutted with the groove wall of the sliding groove 4251 close to the center of the guard bar 425, and the other end of the spring 4255 is abutted with the end surface of the sliding bar 4252. The spring 4255 is always in a compressed state, and the sliding rod 4252 is tightly pressed in the connecting hole 7.
The implementation principle of the construction hanging basket for building construction in the embodiment of the application is as follows:
when the telescopic platform 4 needs to be pulled out of the construction platform 1, the fastening bolt 5 is loosened, the guard plate 42 is pushed out after the iron chain 61 is moved out of the fixing hook 62, the guard rod 425 is fixed at the moment, and the guard cloth 424 is released from the rotating rod 422; the telescopic table is pushed out by a proper distance and then is fixed on the construction platform 1 through the fastening bolt 5, and then the iron chain 61 is buckled on the fixing hook 62. The operation process of moving the telescopic platform 4 out of the construction platform 1 can be carried out in high altitude. Through the setting of flexible platform 4, improve the suitability of hanging flower basket.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a construction hanging flower basket is built in room which characterized in that: including construction platform (1) that is the rectangle structure, enclose two dead levers (3) of establishing guardrail (2) and connecting two guardrail (2) on two long limits of construction platform (1), dead lever (3) both ends are connected respectively in the top with one side of two guardrail (2), the equal movable mounting in both ends of the long limit direction of construction platform (1) has telescopic platform (4), telescopic platform (4) include movable mounting bottom plate (41) in construction platform (1) and set up backplate (42) of keeping away from construction platform (1) center one side perpendicularly on bottom plate (41), be provided with the mounting of locking telescopic platform (4) on construction platform (1).
2. The building construction hanging basket according to claim 1, characterized in that: the mounting includes a plurality of fastening bolt (5), the gliding cavity (11) of confession telescopic platform (4) along construction platform (1) length direction is all seted up at the both ends of construction platform (1), a plurality of spliced eye (411) have been seted up along construction platform (1) width direction's both sides in bottom plate (41), construction platform (1) length direction interval distribution is followed in spliced eye (411), confession fastening bolt (5) male fixed orifices (12) have been seted up to the tip of construction platform (1).
3. The building construction hanging basket according to claim 2, characterized in that: the upper side wall and the lower side wall of the bottom plate (41) are attached to the inner wall of the cavity (11).
4. The building construction hanging basket according to claim 1, characterized in that: the two ends of the fixed rod (3) are provided with inclined pulling pieces (6) used for enhancing the bearing capacity of the telescopic platform (4), and the inclined pulling pieces (6) are connected between the fixed rod (3) and the guard plate (42).
5. The building construction hanging basket according to claim 4, characterized in that: draw piece (6) to one side including iron chain (61) and fixed hook (62), fixed hook (62) are installed in the tip of dead lever (3), iron chain (61) are by a plurality of annular iron rings mutual lock joint in proper order and are constituteed, one of them iron ring is withheld in fixed hook (62), the one end that fixed hook (62) were kept away from in iron chain (61) is connected in backplate (42) bottom.
6. The building construction hanging basket according to claim 1, characterized in that: mounting groove (421) have all been seted up at a lateral wall both ends that backplate (42) are close to construction platform (1), mounting groove (421) vertical setting, be provided with dwang (422) in mounting groove (421), the both ends of dwang (422) are rotated and are connected on the cell wall of mounting groove (421), the both ends of dwang (422) are provided with wind spring (423), the one end of wind spring (423) is fixed in on dwang (422), and the other end is fixed in on mounting groove (421) cell wall, it has protecting cloth (424) to coil on dwang (422), the one end of protecting cloth (424) is fixed in on dwang (422) lateral wall, and the other end is connected with fender rod (425), fender rod (425) vertical installation is between dead lever (3) and construction platform (1), and two fender rods (425) distribute in dead lever (3) both ends, under the effect of wind spring (423), the rotating rod (422) always tends to wind and retract the protective cloth (424).
7. The building construction hanging basket according to claim 6, characterized in that: the safety rod is characterized in that sliding grooves (4251) are formed in two ends of the safety rod (425) along the length direction of the safety rod, sliding rods (4252) are installed in the sliding grooves (4251) in a sliding mode, the length of each sliding rod (4252) is smaller than that of each sliding groove (4251), connecting holes (7) for the sliding rods (4252) to insert are formed in the fixed rod (3) and the construction platform (1), shift levers (4253) are vertically arranged on the side walls of the sliding rods (4252), kidney-shaped grooves (4254) for the shift levers (4253) to move are formed in the safety rod (425) along the length direction of the sliding grooves (4251), springs (4255) are further arranged in the sliding grooves (4251), one ends of the springs (4255) are abutted to groove walls, close to the centers of the safety rods (425), the other ends of the springs are abutted to end faces of the sliding rods (4252), and the springs (4255) are in a.
8. The building construction hanging basket according to claim 6, characterized in that: a sealing cover (426) is installed on the notch of the installation groove (421), and a long groove for the protective cloth (424) to pass through is formed in the sealing cover (426).
CN202022051563.7U 2020-09-17 2020-09-17 Construction hanging flower basket is built in room Active CN213391145U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022051563.7U CN213391145U (en) 2020-09-17 2020-09-17 Construction hanging flower basket is built in room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022051563.7U CN213391145U (en) 2020-09-17 2020-09-17 Construction hanging flower basket is built in room

Publications (1)

Publication Number Publication Date
CN213391145U true CN213391145U (en) 2021-06-08

Family

ID=76179407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022051563.7U Active CN213391145U (en) 2020-09-17 2020-09-17 Construction hanging flower basket is built in room

Country Status (1)

Country Link
CN (1) CN213391145U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323371A (en) * 2021-06-28 2021-08-31 苏雅拉图 Hanging flower basket for construction
CN113882650A (en) * 2021-10-11 2022-01-04 中国建筑土木建设有限公司 Telescopic safe construction hanging basket
CN114961198A (en) * 2022-05-05 2022-08-30 温州益德建设有限公司 House construction work platform and construction method thereof
CN115749230A (en) * 2022-09-01 2023-03-07 中建八局第二建设有限公司 Intelligent telescopic lifting primary-secondary hanging basket and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323371A (en) * 2021-06-28 2021-08-31 苏雅拉图 Hanging flower basket for construction
CN113882650A (en) * 2021-10-11 2022-01-04 中国建筑土木建设有限公司 Telescopic safe construction hanging basket
CN114961198A (en) * 2022-05-05 2022-08-30 温州益德建设有限公司 House construction work platform and construction method thereof
CN114961198B (en) * 2022-05-05 2024-01-02 温州益德建设有限公司 Construction work platform for house building and construction method thereof
CN115749230A (en) * 2022-09-01 2023-03-07 中建八局第二建设有限公司 Intelligent telescopic lifting primary-secondary hanging basket and construction method thereof

Similar Documents

Publication Publication Date Title
CN213391145U (en) Construction hanging flower basket is built in room
CN209605686U (en) Close on both wired deep desulphurization blast working safety protection components
CN109630050B (en) Novel working face recovery channel supporting process
CN217151153U (en) Steel column construction regularization temporary operation platform
CN111697503A (en) Crane span structure lifting device is used in water and electricity installation
CN217812777U (en) Temporary enclosing and blocking mechanism for construction of subway deep foundation pit
CN216190208U (en) People goods ladder protection platform
CN215101440U (en) Upright column hoisting auxiliary tool
CN211547278U (en) Suspension bridge mounting structure on rock
CN212689498U (en) Multifunctional scaffold for building construction
CN211200105U (en) Hanging flower basket is used in bridge construction
CN111622514A (en) Working method of unloading platform for building construction
CN211342119U (en) Safety protective guard is used in building engineering construction
CN220666205U (en) Pile casing structure for engineering pile
CN217582114U (en) Top cover plate extension device of coal mining machine and coal mining machine
CN218991001U (en) Operation floor elevator well limb protection device
CN210563316U (en) Auxiliary overhaul construction platform for fence type transformer
CN216785448U (en) Shackle for hoisting and mounting
CN217925001U (en) Steel construction upper portion faces limit protector
CN219409056U (en) Crane winding drum convenient to disassemble and assemble
CN218597712U (en) Protective device for inward picking of disc buckle scaffold
CN114000690B (en) Side wall steel bar construction support body operation platform
CN218493169U (en) Water conservancy construction is with preventing weighing down net
CN217925053U (en) Prevent subsiding formula cement pole reinforcing apparatus
CN214330008U (en) Safety protection system on concrete tower section of thick bamboo

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240322

Address after: Shop 114, Building 4, Block B, Bijie International Auto Parts City, Lishu Town, Qixingguan District, Bijie City, Guizhou Province, 551700

Patentee after: Guizhou Jinyuxin Construction Co.,Ltd.

Country or region after: China

Address before: Room 602, Building 2, No.1 Xinghaiwan, No. 366 Guishanzhuang, Tancheng Town, Pingtan County, Fuzhou City, Fujian Province, 350400

Patentee before: Fujian chuangyun Construction Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right