CN218597712U
CN218597712U CN202223099790.2U CN202223099790U CN218597712U CN 218597712 U CN218597712 U CN 218597712U CN 202223099790 U CN202223099790 U CN 202223099790U CN 218597712 U CN218597712 U CN 218597712U
Authority
CN
China
Prior art keywords
sliding block
sliding
horizontal pole
block
telescopic link
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223099790.2U
Other languages
Chinese (zh)
Inventor
邓兴国
高明
胡立国
苏鹏
曹峰坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN202223099790.2U priority Critical patent/CN218597712U/en
Application granted granted Critical
Publication of CN218597712U publication Critical patent/CN218597712U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/25Greenhouse technology, e.g. cooling systems therefor

Landscapes

  • Ladders (AREA)

Abstract

The utility model belongs to the technical field of building construction, in particular to a disk buckle scaffold inner-picking protective device, a cross rod is connected with a disk buckle through a fixing clamp, a sliding sleeve is sleeved on the outer wall of a vertical rod, a connecting block is fixedly connected to one side of the sliding sleeve, a sliding block is sleeved on the outer side of the cross rod, the sliding block is connected with the connecting block through a telescopic rod, two ends of the telescopic rod are respectively hinged with the connecting block and the sliding block, and an arc-shaped groove is formed in the top of the sliding block; can place horizontal pole mutually perpendicular's horizontal pole through the arc recess at sliding block top and make the interval between the pole setting too big time can build the platform through the sliding block, the workman of being convenient for carries out the operation of take the altitude, and crisscross the placing between the telescopic link simultaneously can reduce great clearance between the pole setting, and convenient to use personnel installs the protection network, and the protection workman is in scaffold frame safety work.

Description

Protective device for inward picking of disc buckle scaffold
Technical Field
The utility model belongs to the technical field of the construction, concretely relates to protector is chosen in scaffold is detained to dish.
Background
The enclosure is set up to the application steel pipe fastener, the dense mesh safety net is hung to the outside, by present, still generally utilize this kind of protection mode, but this kind of safeguard measure's security is limited, along with improve gradually and attach importance to the requirement of construction safety, safer swift dish knot formula steel pipe support just applies gradually in the protection frame, use dish knot formula scaffold frame to support house roof template in the construction, when construction worker installs the roof template in the scaffold frame, because the roof has certain height, construction worker need independent construction platform that erects again, increase working time, and when the interval between the scaffold frame pole setting is too long, construction worker is not convenient for set up the template, and because horizontal pole length overlength, the workman carries out the during operation in the scaffold frame, the interval between the pole setting causes the risk that the workman dropped from the scaffold frame too greatly easily.
SUMMERY OF THE UTILITY MODEL
The utility model provides a protector is chosen in dish knot scaffold has and solves the scaffold and when playing the roof mould and support the effect, the workman of being not convenient for installs the roof mould to when the clearance is too big, take place the dangerous characteristics that drop easily.
The utility model provides a following technical scheme: including a plurality of pole setting, pole setting outer wall fixedly connected with dish is buckled, be equipped with the horizontal pole between the pole setting, the horizontal pole both ends are equipped with the fixation clamp, the horizontal pole passes through the fixation clamp with the dish is buckled and is connected, pole setting outer wall cover is equipped with the sliding sleeve, sliding sleeve one side fixedly connected with connecting block, horizontal pole outside cover is equipped with the sliding block, the sliding block with connect through the telescopic link between the connecting block, the telescopic link both ends respectively with the connecting block with the sliding block is articulated, the arc recess has been seted up at the sliding block top.
Wherein, the dish detain with the assorted through-hole has all been seted up to the fixation clamp, the dish detain with the fixation clamp top is equipped with and is used for carrying out spacing pulling out to the through-hole and inserts incidentally.
Wherein, a plurality of hole has been seted up at the horizontal pole top, sliding block top sliding connection have be used for right the horizontal pole top hole carries out spacing stopper.
The sliding block is provided with a sliding groove, the sliding groove is used for enabling the limiting block to slide up and down, protruding blocks protruding out of the body are arranged on two sides of the limiting block, and the protruding blocks are connected with sliding grooves formed in the sliding block in a sliding mode.
The telescopic rods are staggered with each other, and bolts for limiting the telescopic rods after being stretched are arranged on the outer sides of the telescopic rods.
The beneficial effects of the utility model are that: through the connecting block, telescopic link and sliding block constitute can change and choose the piece in between pole setting and the horizontal pole, make the clearance between the pole setting reduce through crisscross the placing of telescopic link, the constructor of being convenient for installs the protection network, improve the security performance of scaffold frame, and can make constructor can carry out quick setting up temporarily with construction platform through setting up with horizontal pole vertically horizontal pole on the arc recess through the arc recess at sliding block top, improve workman's efficiency of construction and reduce its amount of labour.
The parts of the device not involved are the same as or can be implemented using prior art.
Drawings
Fig. 1 is a front view of the present invention;
fig. 2 is a schematic diagram of the movement of the present invention;
FIG. 3 is a front view of the inner part of the present invention
Fig. 4 is the schematic view of the cross-section structure of the middle sliding block of the present invention.
In the figure: 1. erecting a rod; 11. coiling and buckling; 12. a sliding sleeve; 2. a cross bar; 21. a fixing clip; 22. plugging and unplugging; 3. connecting blocks; 31. a telescopic rod; 32. a slider; 33. an arc-shaped groove; 34. and a limiting block.
Detailed Description
Referring to fig. 1-4, the present invention provides the following technical solutions: including a plurality of pole setting 1, 11 are detained to 1 outer wall fixedly connected with dish in pole setting, be equipped with horizontal pole 2 between the pole setting 1, 2 both ends of horizontal pole are equipped with fixation clamp 21, horizontal pole 2 is detained 11 through fixation clamp 21 and dish and is connected, 1 outer wall cover in pole setting is equipped with sliding sleeve 12, 12 one side fixedly connected with connecting block 3 of sliding sleeve, 2 outside covers of horizontal pole are equipped with sliding block 32, be connected through telescopic link 31 between sliding block 32 and the connecting block 3, telescopic link 31 both ends are articulated with connecting block 3 and sliding block 32 respectively, arc recess 33 has been seted up at sliding block 32 top.
In this embodiment: the upright 1 is a vertical support of a disk buckle type scaffold, the upright 1 supports a roof mould of a house at the top through a certain height per se, the disk buckles 11 fixedly connected with the outer wall of the upright 1 at intervals are connected with the fixing clamps 21 at two ends of the cross rod 2 through a plurality of through holes arranged on the upper surface of the upright 1, so that the vertical support of the upright 1 cannot incline, thereby influencing the support of the roof mould of the house, the sliding sleeve 12 sleeved outside the upright 1 can slide on the outer wall of the upright 1, the connecting block 3 fixedly connected with the outer side of the sliding sleeve 12 is hinged with the telescopic rod 31, so that the telescopic rod 31 can change the angle between the connecting block 3 and the upright 1, and the sliding block 32 can slide left and right on the cross rod 2 because the other end of the telescopic rod 31 is hinged with the bottom of the sliding block 32, so that the sliding block 32 can be hinged with the sliding block 31 when sliding, the telescopic rod 31 can be extended and contracted to adjust the angle between the upright rods 1 so as to change the supported position, so that the connection between the upright rods 1 and the cross rods 2 has a certain reinforcing effect, meanwhile, the distance between the two sliding blocks 32 can be changed to form an inner cantilever structure of the scaffold, when a constructor works on the scaffold, the cross rods 2 which are perpendicular to the cross rods 2 connected with the upright rods 1 can be erected on the arc-shaped grooves 33 formed in the tops of the sliding blocks 32 by adjusting the distance between the sliding blocks 32, so that the constructor can construct a construction platform according to the size of the existing flat plate of a construction site, when the constructor installs a top plate mold to be supported on the tops of the scaffold, the constructor can conveniently work on the scaffold, and the telescopic rod 31 can play a role of obliquely supporting the bottoms of the cross rods 2 after the angle is changed, after the construction platform is set up at the top that reduces horizontal pole 2, receive too big easy bearing of pressure and take place to warp, influence the security performance of scaffold to the relatively poor setting between two telescopic links 31 can dwindle the great space that pole setting 1 and horizontal pole 2 formed, and the workman of being convenient for installs the protection network in the scaffold outside, improves the security performance of workman when carrying out the operation on the scaffold.
The disc buckle 11 and the fixing clamp 21 are both provided with matched through holes, and the tops of the disc buckle 11 and the fixing clamp 21 are provided with plug-in and pull-out piggy-backs 22 for limiting the through holes; through with fixation clamp 21 centre gripping on the dish is detained 11, make the through-hole of fixation clamp 21 and the through-hole on the dish is detained 11 and correspond each other, through pulling out to insert piggyback 22 and connect two through connecting to it is the structure of toper form to pull out to insert piggyback 22, when from the top down alternates the through-hole on fixation clamp 21 and the dish is detained 11, can make to pull out to insert piggyback 22 and fix it, can not drop from the through-hole.
The top of the cross rod 2 is provided with a plurality of holes, and the top of the sliding block 32 is connected with a limiting block 34 for limiting the holes in the top of the cross rod 2 in a sliding manner; can carry on spacingly through the stopper 34 at top in the sliding block 32 to the hole of horizontal pole 2 after the interval between user's adjustment sliding block 32, prevent to set up the platform on sliding block 32 when, the incident appears in sliding block 32 slip.
The top of the sliding block 32 is provided with a groove for the limiting block 34 to slide up and down, two sides of the limiting block 34 are provided with convex blocks protruding out of the body, and the convex blocks are connected with a sliding groove arranged on the sliding block 32 in a sliding manner; carry on spacingly through the recess to the convex lug in stopper 34 both sides, prevent that it from breaking away from sliding block 32 top, influence spacing effect, when upwards pulling it, can cancel spacing between sliding block 32 and the horizontal pole 2, make it slide once.
The two telescopic rods 31 are staggered with each other, and bolts for limiting the telescopic rods 31 after being stretched are arranged on the outer sides of the telescopic rods 31; through the crisscross setting of telescopic link 31 between the pole setting 1, make two telescopic links 31 can not produce the collision and influence its support angle that changes self, after telescopic link 31 extension, fix telescopic link 31 through the bolt, prevent that its self elasticity can influence its support effect to horizontal pole 2.
The utility model discloses a theory of operation and use flow: pole setting 1 and horizontal pole 2 are buckled 11 through the dish and are built the scaffold with fixation clamp 21, articulated telescopic link 31 can adjust the interval between it between sliding block 32 on sliding sleeve 12 and the horizontal pole 2 in the pole setting 1, prevent 2 length overlengths of horizontal pole, influence constructor and build interim construction platform, can place 2 mutually perpendicular's horizontal pole 2 through the arc recess 33 at sliding block 32 top and make the interval between the pole setting 1 too big the time can build the platform through sliding block 32, be convenient for the workman carry out the operation of take the altitude, crisscross the placing between the telescopic link 31 simultaneously, can reduce great clearance between the pole setting 1, be convenient for user of use installation protection network, the protection workman is safe operation in the scaffold.
As mentioned above, although the present invention has been shown and described with reference to certain preferred embodiments, it should not be construed as limiting the invention itself. Various changes in form and details may be made therein without departing from the spirit and scope of the invention as defined by the appended claims.

Claims (5)

1. The utility model provides a protector is chosen in dish knot scaffold which characterized in that: including a plurality of pole setting, pole setting outer wall fixedly connected with dish is buckled, be equipped with the horizontal pole between the pole setting, the horizontal pole both ends are equipped with the fixation clamp, the horizontal pole passes through the fixation clamp with the dish is buckled and is connected, pole setting outer wall cover is equipped with the sliding sleeve, sliding sleeve one side fixedly connected with connecting block, horizontal pole outside cover is equipped with the sliding block, the sliding block with connect through the telescopic link between the connecting block, the telescopic link both ends respectively with the connecting block with the sliding block is articulated, the arc recess has been seted up at the sliding block top.
2. The inner cantilever protection device for the disc-buckle scaffold according to claim 1, wherein: the dish detain with the assorted through-hole has all been seted up to the fixation clamp, the dish detain with the fixation clamp top is equipped with and is used for carrying out spacing pulling out to the through-hole and inserts incidentally.
3. The inner pick protection device for the disc buckle scaffold according to claim 1, wherein: a plurality of hole has been seted up at the horizontal pole top, sliding block top sliding connection have be used for right the horizontal pole top hole carries out spacing stopper.
4. The inner cantilever protection device for the disc-buckle scaffold according to claim 1, wherein: the top of the sliding block is provided with a groove for enabling the limiting block to slide up and down, two sides of the limiting block are provided with convex blocks protruding out of the body, and the convex blocks are connected with sliding grooves formed in the sliding block in a sliding mode.
5. The inner pick protection device for the disc buckle scaffold according to claim 1, wherein: two crisscross each other between the telescopic link, the telescopic link outside is equipped with right carry out spacing bolt after the telescopic link is flexible.
CN202223099790.2U 2022-11-22 2022-11-22 Protective device for inward picking of disc buckle scaffold Active CN218597712U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223099790.2U CN218597712U (en) 2022-11-22 2022-11-22 Protective device for inward picking of disc buckle scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223099790.2U CN218597712U (en) 2022-11-22 2022-11-22 Protective device for inward picking of disc buckle scaffold

Publications (1)

Publication Number Publication Date
CN218597712U true CN218597712U (en) 2023-03-10

Family

ID=85407236

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223099790.2U Active CN218597712U (en) 2022-11-22 2022-11-22 Protective device for inward picking of disc buckle scaffold

Country Status (1)

Country Link
CN (1) CN218597712U (en)

Similar Documents

Publication Publication Date Title
CN204762466U (en) Watermelon rattan support
CN104303892A (en) Novel agricultural greenhouse
CN218597712U (en) Protective device for inward picking of disc buckle scaffold
CN212053859U (en) Horizontal overhanging flexible protective net for construction of main structure of building
CN210659348U (en) Safety protection structure that building support set up
CN218205601U (en) Scaffold with telescopic auxiliary stay pole
CN207048357U (en) A kind of civil engineering building guardrail
CN210636781U (en) Hanging flower basket of safety support for building
CN213742159U (en) Scaffold for building of convenient quick combination
CN211313451U (en) Edge protection structure for prefabricated building construction
CN205314515U (en) Scaffold of building a wall
CN211873918U (en) Overhanging type anti-falling net for construction site
CN210316466U (en) Lifting scaffold board and protective net system
CN111576901A (en) Multifunctional safety protection device for building construction and high-rise construction
CN209082960U (en) A kind of construction equipment
CN207647451U (en) A kind of water conservancy work climbing ladder being easily installed dismounting
CN207004080U (en) One kind faces side opening protective device
CN214885693U (en) Safety vertical net of chemical fiber rope for construction site
CN214942646U (en) Movable balcony faces limit protection instrument
CN219080920U (en) Scaffold frame that construction was used is taken
CN220849544U (en) Cage-type vertical ascending hanging ladder
CN209924392U (en) Scaffold frame for building engineering convenient to concatenation
CN213742439U (en) Adjustable assembled edge opening protection device
CN214740126U (en) Adjustable protective guard
CN211396566U (en) Safety device is used in construction