CN213390776U - Steel construction building roof structure - Google Patents

Steel construction building roof structure Download PDF

Info

Publication number
CN213390776U
CN213390776U CN202021830841.2U CN202021830841U CN213390776U CN 213390776 U CN213390776 U CN 213390776U CN 202021830841 U CN202021830841 U CN 202021830841U CN 213390776 U CN213390776 U CN 213390776U
Authority
CN
China
Prior art keywords
support column
column
welding
fixed
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021830841.2U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Huagong Construction Engineering Co ltd
Original Assignee
Sichuan Huagong Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Huagong Construction Engineering Co ltd filed Critical Sichuan Huagong Construction Engineering Co ltd
Priority to CN202021830841.2U priority Critical patent/CN213390776U/en
Application granted granted Critical
Publication of CN213390776U publication Critical patent/CN213390776U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a steel construction building roof structure, including the room roof beam, the top of room roof beam all inlays in proper order after to in the past and is equipped with fixed case, the inner chamber of fixed case is provided with latch mechanism, fixed case and fixedly connected with support column are all run through to latch mechanism's both sides, the welding of the center department of support column one side in opposite directions has the fixed column, the welding of the center department at fixed column top has spacing post. The utility model discloses a remove the post, the movable plate, a spring, the fixture block, the cooperation of lug and draw-in groove, convenient to use person carries out quick joint to the lug spacing to it is spacing to carry out quick joint to the support column, improved the stability between support column and the room roof beam, convenient to use person carries out the fast weld to room roof beam and support column, avoided needing to carry out manual laminating with the support column earlier through the manpower, recycle welding equipment welds, very big improvement the security when user welds, welding efficiency has been improved simultaneously.

Description

Steel construction building roof structure
Technical Field
The utility model relates to a steel construction field specifically is a steel construction building roof structure.
Background
The steel structure is a structure formed by steel materials, is one of main building structure types, and mainly comprises beam steel, steel columns, steel trusses and other members made of section steel, steel plates and the like, and adopts rust removal and prevention processes such as silanization, pure manganese phosphating, washing drying, galvanization and the like, all the members or parts are usually connected by welding lines, bolts or rivets, and the steel structure is easy to rust because of light dead weight and simple and convenient construction, is widely applied to the fields of large-scale factory buildings, venues, super-high buildings and the like, and is generally required to remove rust, galvanize or paint and is required to be regularly maintained.
However, when traditional steel construction building roof structure is assembling and welding the roof, can't carry out the joint spacing to room roof beam and support column in advance, mostly carry out manual laminating with the support column with room roof beam earlier through the manpower, recycle welding equipment and weld, the very big reinforcing of this kind of mode operating personnel's working strength, there is very big potential safety hazard simultaneously.
Disclosure of Invention
An object of the utility model is to provide a steel construction building roof structure is in order to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a steel construction building roof structure, includes the room roof beam, the top of room roof beam all inlays in proper order after to in the past and is equipped with fixed case, the inner chamber of fixed case is provided with latch mechanism, fixed case and fixedly connected with support column are all run through to latch mechanism's both sides, the welding of center department of one side in opposite directions of support column has the fixed column, the welding of center department at fixed capital portion has spacing post, the top of spacing post and the bottom welding of room roof beam.
Preferably, the clamping mechanism includes removal post, movable plate, spring, fixture block, lug and draw-in groove, the through-hole has been seted up to the center department at fixed roof portion, and the inner chamber sliding connection of through-hole has the removal post, the bottom fixedly connected with movable plate of removal post, the equal fixedly connected with fixture block in both sides of movable plate bottom, the equal fixedly connected with lug in top of one side in opposite directions of support column, the lug one side in opposite directions runs through room roof beam and fixed case in proper order and extends to the inner chamber of fixed case, the draw-in groove has been seted up to one side in opposite directions of lug top, the inner chamber of draw-in groove and the surface joint of fixture block, the both sides at movable plate top all are bolted to have the spring, the top of spring and the top.
Preferably, the centers of the tops of the two sides of the inner cavity of the fixed box are vertically provided with sliding grooves, the inner cavity of each sliding groove is connected with a sliding block in a sliding mode, and one opposite side of each sliding block penetrates through the corresponding sliding groove and is bolted to the two sides of the corresponding movable plate.
Preferably, the top of the moving column penetrates through the through hole and is bolted with a disc, and a handle is welded at the center of the top of the disc.
Preferably, a supporting block is bolted at the center of the bottom of the inner cavity of the fixed box, and the top of the supporting block is movably connected with the bottom of the bump.
Preferably, the constant head tank has all been seted up after to in the past in the top of room roof beam both sides in proper order, the inner chamber joint of constant head tank has the locating lever, the outside and the support column one side fixed connection in opposite directions of locating lever.
Preferably, the bottom welding of support column has the gag lever post, the strengthening rib has all been welded in the center department of spacing post both sides, one side that spacing post was kept away from to the strengthening rib welds with support column one side in opposite directions.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a remove the post, the movable plate, a spring, the fixture block, the cooperation of lug and draw-in groove, it is spacing that convenient to use person carries out quick joint to the lug, thereby it is spacing to carry out quick joint to the support column, stability between support column and the room roof beam has been improved, convenient to use person carries out the fast weld to room roof beam and support column, avoided needing to carry out manual laminating with the support column earlier through the manpower, recycle welding equipment welds, very big improvement the security when user welds, welding efficiency has been improved simultaneously, traditional steel construction building roof structure is when assembling the welding to the roof, can't carry out the spacing problem of joint to room roof beam and support column in advance.
2. The utility model improves the welding efficiency of users by matching the movable column, the movable plate, the spring, the fixture block, the lug and the clamping groove, the convenient users clamp and limit the house beam and the support column to be welded in advance, the convenient users limit the movable plate by matching the chute and the slider, the stability of the movable plate is improved, the movable plate is prevented from greatly deviating in the moving process, the convenient users can rapidly move the movable column by matching the disc and the handle, the convenient users support the lug by matching the support block, the stability of the lug is improved, the stability of the house beam and the support column when clamping is improved by matching the positioning groove and the positioning rod, the support column and the wallboard are rapidly clamped by the convenient users by matching the limiting rod, the strength of the support column is enhanced by matching the reinforcing rib, thereby enhancing the strength of the roof.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a sectional view of the fixing box of the present invention;
fig. 3 is a perspective view of the structure of the support column of the present invention.
In the figure: 1. a house beam; 2. fixing a column; 3. a limiting column; 4. reinforcing ribs; 5. a support pillar; 6. a clamping mechanism; 61. moving the column; 62. moving the plate; 63. a spring; 64. a clamping block; 65. a bump; 66. a card slot; 7. a limiting rod; 8. a fixed box; 9. a disc; 10. a slider; 11. a chute; 12. positioning a rod; 13. positioning a groove; 14. and (7) a supporting block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-3, the present invention provides an embodiment: a steel structure building roof structure comprises a house beam 1, wherein fixed boxes 8 are sequentially embedded in the top of the house beam 1 from front to back, a clamping mechanism 6 is arranged in an inner cavity of each fixed box 8, two sides of each clamping mechanism 6 penetrate through the fixed boxes 8 and are fixedly connected with supporting columns 5, fixed columns 2 are welded in the centers of opposite sides of the supporting columns 5, limiting columns 3 are welded in the centers of the tops of the fixed columns 2, the tops of the limiting columns 3 are welded with the bottom of the house beam 1, through the matching of a moving column 61, a moving plate 62, a spring 63, a clamping block 64, a lug 65 and a clamping groove 66, a user can conveniently and quickly clamp and limit the lug 65, so that the supporting columns 5 can be quickly clamped and limited, the stability between the supporting columns 5 and the house beam 1 is improved, the user can conveniently and quickly weld the house beam 1 and the supporting columns 5, the need of manually laminating the house beam 1 and the, welding equipment is recycled to weld, and the safety of users during welding is greatly improved, welding efficiency is improved simultaneously, and the problem that the roof beam and the support column cannot be clamped and limited in advance when the roof is assembled and welded by a traditional steel structure building roof structure is solved.
The clamping mechanism 6 comprises a moving column 61, a moving plate 62, a spring 63, a clamping block 64, a convex block 65 and a clamping groove 66, a through hole is formed in the center of the top of the fixed box 8, the inner cavity of the through hole is connected with the moving column 61 in a sliding manner, the bottom of the moving column 61 is fixedly connected with the moving plate 62, the clamping blocks 64 are fixedly connected to two sides of the bottom of the moving plate 62, the convex block 65 is fixedly connected to the top of one opposite side of the supporting column 5, one opposite side of the convex block 65 sequentially penetrates through the house beam 1 and the fixed box 8 and extends to the inner cavity of the fixed box 8, the clamping groove 66 is formed in one opposite side of the top of the convex block 65, the inner cavity of the clamping groove 66 is clamped with the surface of the clamping block 64, the spring 63 is bolted to two sides of the top of the moving plate 62, the top of the spring 63 is bolted with the top of the inner cavity of the fixed box 8, and through the matching of the, the welding efficiency of the user is improved.
The equal vertical spout 11 of having seted up in center department at 8 inner chamber both sides tops of fixed box, the inner chamber sliding connection of spout 11 has slider 10, and slider 10 one side in opposite directions runs through spout 11 and with the both sides bolt joint of movable plate 62, through the cooperation of spout 11 and slider 10, and convenient to use person carries on spacingly to movable plate 62, has improved movable plate 62's stability, prevents that movable plate 62 from taking place to squint by a wide margin at the in-process that removes.
The top of the movable column 61 penetrates through the through hole and is bolted with the disc 9, the handle is welded at the center of the top of the disc 9, and the movable column 61 is convenient to move quickly by a user through the matching of the disc 9 and the handle.
The supporting block 14 is bolted at the center of the bottom of the inner cavity of the fixed box 8, the top of the supporting block 14 is movably connected with the bottom of the lug 65, and through the matching of the supporting block 14, a user can support the lug 65 conveniently, so that the stability of the lug 65 is improved.
Constant head tank 13 has all been seted up in proper order after to in the past at the top of 1 both sides in room roof beam, and the inner chamber joint of constant head tank 13 has locating lever 12, and one side fixed connection in opposite directions is in the outside and the support column 5 of locating lever 12, through the cooperation of constant head tank 13 and locating lever 12, stability when having improved room roof beam 1 and support column 5 joint.
The welding of the bottom of support column 5 has gag lever post 7, and the strengthening rib 4 has all been welded in the center department of 3 both sides of spacing post, and one side that spacing post 3 was kept away from to strengthening rib 4 welds with support column 5 one side in opposite directions, and through the cooperation of gag lever post 7, convenient to use person with support column 5 and wallboard quick joint, through the cooperation of strengthening rib 4, increased the intensity of support column 5 in the chamber to the intensity on roof has been strengthened.
The working principle is as follows: during operation, a user moves the supporting column 5 inwards at the same time, and simultaneously lifts the lifting handle upwards, the lifting handle drives the moving column 61 to move upwards through the disc 9, so as to drive the moving plate 62 to move upwards and extrude the spring 63, then the moving plate 62 drives the clamping block 64 to move upwards, at the same time, the supporting column 5 drives the lug 65 to enter the inner cavity of the fixed box 8 until the opposite side of the supporting column 5 is attached to the two sides of the house beam 1, meanwhile, the positioning rod 12 enters the inner cavity of the positioning groove 13, then, the user loosens the lifting handle, at the same time, the elastic resilience of the spring 63 is rebounded, so as to drive the moving plate 62 to move downwards, further, the clamping block 64 is driven to be rapidly clamped into the inner cavity of the clamping groove 66, so as to rapidly clamp and limit the lug 65, then, the user carries out pre-clamping and, and welding by using welding equipment, and then welding the house beam 1 and the supporting column 5 by a user.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. The utility model provides a steel construction building roof structure, includes room roof beam (1), its characterized in that: the top of room roof beam (1) all inlays in proper order after to in the past and is equipped with fixed case (8), the inner chamber of fixed case (8) is provided with latch mechanism (6), fixed case (8) and fixedly connected with support column (5) all run through in the both sides of latch mechanism (6), the welding of center department of one side in opposite directions of support column (5) has fixed column (2), the welding of center department at fixed column (2) top has spacing post (3), the top of spacing post (3) and the bottom welding of room roof beam (1).
2. The steel structural building roof structure of claim 1, wherein: the clamping mechanism (6) comprises a movable column (61), a movable plate (62), a spring (63), a clamping block (64), a convex block (65) and a clamping groove (66), a through hole is formed in the center of the top of the fixed box (8), the inner cavity of the through hole is connected with the movable column (61) in a sliding mode, the bottom of the movable column (61) is fixedly connected with the movable plate (62), the clamping block (64) is fixedly connected to the two sides of the bottom of the movable plate (62), the convex block (65) is fixedly connected to the top of one opposite side of the supporting column (5), one opposite side of the convex block (65) sequentially penetrates through the house beam (1) and the fixed box (8) and extends to the inner cavity of the fixed box (8), the clamping groove (66) is formed in one opposite side of the top of the convex block (65), the inner cavity of the clamping groove (66) is clamped with the surface of the clamping block (64), the spring (, the top of the spring (63) is bolted with the top of the inner cavity of the fixed box (8).
3. The steel structural building roof structure of claim 1, wherein: the fixed box is characterized in that sliding grooves (11) are vertically formed in the centers of the tops of the two sides of the inner cavity of the fixed box (8), sliding blocks (10) are connected to the inner cavity of the sliding grooves (11) in a sliding mode, and one opposite sides of the sliding blocks (10) penetrate through the sliding grooves (11) and are bolted to the two sides of the movable plate (62).
4. A steel structural building roof structure according to claim 2, wherein: the top of the moving column (61) penetrates through the through hole and is bolted with a disc (9), and a handle is welded at the center of the top of the disc (9).
5. The steel structural building roof structure of claim 1, wherein: the center of the bottom of the inner cavity of the fixed box (8) is bolted with a supporting block (14), and the top of the supporting block (14) is movably connected with the bottom of the bump (65).
6. The steel structural building roof structure of claim 1, wherein: constant head tank (13) have all been seted up in proper order after to in the past in the top of room roof beam (1) both sides, the inner chamber joint of constant head tank (13) has locating lever (12), one side fixed connection in opposite directions with support column (5) in the outside of locating lever (12).
7. The steel structural building roof structure of claim 1, wherein: the welding of the bottom of support column (5) has gag lever post (7), the center department of spacing post (3) both sides all welds and has strengthening rib (4), one side and the support column (5) one side welding in opposite directions that spacing post (3) were kept away from in strengthening rib (4).
CN202021830841.2U 2020-08-27 2020-08-27 Steel construction building roof structure Active CN213390776U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021830841.2U CN213390776U (en) 2020-08-27 2020-08-27 Steel construction building roof structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021830841.2U CN213390776U (en) 2020-08-27 2020-08-27 Steel construction building roof structure

Publications (1)

Publication Number Publication Date
CN213390776U true CN213390776U (en) 2021-06-08

Family

ID=76212918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021830841.2U Active CN213390776U (en) 2020-08-27 2020-08-27 Steel construction building roof structure

Country Status (1)

Country Link
CN (1) CN213390776U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115012579A (en) * 2022-07-21 2022-09-06 新余学院 Assembled board house building roof steel construction
CN115030385A (en) * 2022-07-11 2022-09-09 永盟绿建科技(南通)有限公司 Novel building roof steel structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115030385A (en) * 2022-07-11 2022-09-09 永盟绿建科技(南通)有限公司 Novel building roof steel structure
CN115030385B (en) * 2022-07-11 2024-02-20 永盟绿建科技(南通)有限公司 Building roof steel structure
CN115012579A (en) * 2022-07-21 2022-09-06 新余学院 Assembled board house building roof steel construction

Similar Documents

Publication Publication Date Title
CN213390776U (en) Steel construction building roof structure
CN213626041U (en) Construction locking device for building steel structure
CN214884653U (en) Connecting piece for installing light steel keel partition wall under steel structure condition
CN209850215U (en) Auxiliary welding clamp for connecting lug parts of large-sized steel members
CN213735115U (en) Steel structural component transfer device
CN213418061U (en) Steel structure crossbeam of convenient connection
CN216781737U (en) Special production platform of steel construction
CN213038595U (en) Connecting mechanism between steel structure stand column and cross beam
CN218667935U (en) Part connecting mechanism for steel structure
CN220117717U (en) Novel bolt fixing device for overhanging scaffold
CN214069469U (en) Electrical construction fixing device convenient to dismouting
CN211102497U (en) Tool for preventing welding deformation of foundation ring splicing flange of wind power generation tower cylinder
CN213034560U (en) I-shaped reinforced profiled steel structure for building
CN218933794U (en) Detachable back-shaped hanging basket with column holding steel structure
CN214423589U (en) Steel structure beam column connecting and assembling structure
CN214220536U (en) Quick-dismantling scaffold for building
CN217045174U (en) Steel construction welding auxiliary fixtures for civil engineering
CN216865987U (en) Stair tread template reinforcing device
CN219364965U (en) Steel structure connecting piece
CN213979828U (en) Assembly type steel construction dismouting platform for building
CN218136104U (en) Steel beam steel structure welding device
CN220318798U (en) Assembled steel frame beam column connected node
CN215977725U (en) Steel construction mosaic structure of circulated use
CN212388972U (en) Building template for building safety
CN215926289U (en) Steel house assembling connecting part

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20231121

Granted publication date: 20210608