CN213626041U - Construction locking device for building steel structure - Google Patents

Construction locking device for building steel structure Download PDF

Info

Publication number
CN213626041U
CN213626041U CN202022439409.7U CN202022439409U CN213626041U CN 213626041 U CN213626041 U CN 213626041U CN 202022439409 U CN202022439409 U CN 202022439409U CN 213626041 U CN213626041 U CN 213626041U
Authority
CN
China
Prior art keywords
plate
screw rod
steel
steel part
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022439409.7U
Other languages
Chinese (zh)
Inventor
王永辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Auburn Steel Structure Beijing Co ltd
Original Assignee
Auburn Steel Structure Beijing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Auburn Steel Structure Beijing Co ltd filed Critical Auburn Steel Structure Beijing Co ltd
Priority to CN202022439409.7U priority Critical patent/CN213626041U/en
Application granted granted Critical
Publication of CN213626041U publication Critical patent/CN213626041U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of the steel construction, specifically disclose a building steel construction locking device, including steel member girder and steel member secondary beam, the steel member secondary beam sets up in one side of steel member girder, and the equal rigid coupling in upper and lower side of steel member secondary beam has the fixed block, and the both sides of fixed block are equipped with the logical groove of mutual intercommunication, and the rigid coupling has the fixed plate on the steel member girder, and the fixed plate runs through logical groove and sets up; the steel part main beam is symmetrically provided with a fixing mechanism, the fixing mechanism comprises a transverse plate, a first screw rod movably penetrates through the transverse plate, one end of the first screw rod is fixedly connected with a first rotating button, and the other end of the first screw rod is inserted into the through groove and connected with the fixing plate; one end of the transverse plate is fixedly connected with a vertical plate, one side of the vertical plate is movably provided with a supporting plate, the supporting plate is movably sleeved outside the fixed plate, the top end of the supporting plate is fixedly connected with a tray, a second screw rod movably penetrates through the supporting plate, one end of the second screw rod is fixedly connected with a second rotating button, and the other end of the second screw rod is connected with the vertical plate; the utility model discloses can effectively avoid the not firm problem of rigid structure locking.

Description

Construction locking device for building steel structure
Technical Field
The utility model relates to a steel construction technical field specifically is a locking device for construction steel structure construction.
Background
Steel structures are structures composed of steel materials and are one of the main building structure types. The structure mainly comprises steel beams, steel columns, steel trusses and other members made of section steel, steel plates and the like, and rust removing and preventing processes such as silanization, pure manganese phosphating, washing drying, galvanization and the like are adopted. Because of its light dead weight, and construction is simple and convenient, widely apply to fields such as large-scale factory building, venue, superelevation layer.
In the practical application process, modes such as welding or bolted connection are generally adopted in the connection between the component of steel construction, often need use locking device to consolidate in the building construction process, and current locking device structure is too simple, and locking effect is poor, insecure, has the potential safety hazard.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a locking device for construction steel structure construction to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a construction locking device for a building steel structure comprises a steel part main beam and a steel part secondary beam, wherein the steel part secondary beam is arranged on one side of the steel part main beam, fixed blocks are fixedly connected to the upper side and the lower side of the steel part secondary beam, the fixed blocks are attached to the steel part main beam, through grooves which are mutually communicated are formed in two sides of each fixed block, a fixed plate is fixedly connected to the corresponding position of the steel part main beam and the through grooves, and the fixed plate penetrates through the through grooves; the fixing mechanism comprises a transverse plate fixedly connected with the steel part girder, a first screw rod movably penetrates through the transverse plate, one end of the first screw rod is fixedly connected with a first rotating button, and the other end of the first screw rod is inserted into the through groove and connected with the fixing plate; the one end rigid coupling that the steel girder was kept away from to the diaphragm has the riser, and the riser is kept away from one side activity of diaphragm and is equipped with the backup pad, and the backup pad movable sleeve is established in the outside of fixed plate, and the top rigid coupling of backup pad has the tray, and the activity runs through there is the second lead screw in the backup pad, and the one end rigid coupling of second lead screw has the second knob, and the other end is connected with the riser.
Preferably, a slot is formed in one side of the steel main beam, and one end of the steel secondary beam is embedded in the slot.
Preferably, the fixing plate is connected with the through groove in an embedded mode, a first connecting hole used for being connected with the first screw rod is formed in the fixing plate, and an internal thread matched with the first screw rod in a threaded mode is formed in the first connecting hole.
Preferably, the supporting plate is provided with a sleeving groove for sleeving the fixing plate, the width of the sleeving groove is consistent with that of the fixing plate, and the height of the sleeving groove is larger than the thickness of the fixing plate.
Preferably, the vertical plate is provided with a second connecting hole used for being connected with a second screw rod, and an internal thread matched with the second screw rod is arranged in the second connecting hole.
Compared with the prior art, the beneficial effects of the utility model are that:
in the utility model, the upper side and the lower side of the secondary steel beam are respectively provided with the fixed block, the fixed plate on the main steel beam runs through the through groove on the fixed block to be arranged, and then the first lead screw is inserted into the through groove through the first rotary button and is in threaded connection with the first connecting hole on the fixed plate, so that the fixed plate can be fixed, and the secondary steel beam can be arranged on the main steel beam; later, establish the groove cover with the cover in the backup pad on the fixed plate, remove the backup pad and make tray and steel part secondary beam closely laminate, drive the second lead screw through the second knob and rotate to make second lead screw and second connecting hole threaded connection, can realize the fixed to the backup pad, and the tray can carry out the centre gripping to steel part secondary beam fixedly, can strengthen the stability of steel part secondary beam, and then can effectively avoid the not firm problem of rigid structure locking.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is an enlarged schematic structural diagram of a position a of the present invention.
In the figure: 1. a steel main beam; 2. a steel secondary beam; 3. a fixed block; 4. a through groove; 5. a fixing plate; 6. a transverse plate; 7. a first lead screw; 8. a first rotary knob; 9. a vertical plate; 10. a support plate; 11. a tray; 12. a second lead screw; 13. a second rotary knob; 14. a slot; 15. a first connection hole; 16. sleeving a groove; 17. and a second connection hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "vertical", "upper", "lower", "horizontal", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Referring to fig. 1-2, the present invention provides a technical solution: a construction locking device for a building steel structure comprises a steel part main beam 1 and a steel part secondary beam 2, wherein the steel part secondary beam 2 is arranged on one side of the steel part main beam 1, the upper side and the lower side of the steel part secondary beam 2 are fixedly connected with fixing blocks 3, the fixing blocks 3 are attached to the steel part main beam 1, through grooves 4 which are mutually communicated are formed in two sides of each fixing block 3, fixing plates 5 are fixedly connected to positions, corresponding to the through grooves 4, on the steel part main beam 1, and the fixing plates 5 penetrate through the through grooves 4; the fixing mechanism is characterized in that the steel part main beam 1 is symmetrically provided with fixing mechanisms for fixing the fixing plate 5, the fixing mechanism comprises a transverse plate 6 fixedly connected with the steel part main beam 1, a first screw rod 7 movably penetrates through the transverse plate 6, one end of the first screw rod 7 is fixedly connected with a first rotating button 8, and the other end of the first screw rod is inserted into the through groove 4 and connected with the fixing plate 5; the one end rigid coupling that steel main beam 1 was kept away from to diaphragm 6 has riser 9, and the one side activity that diaphragm 6 was kept away from to riser 9 is equipped with backup pad 10, and backup pad 10 movable sleeve establishes the outside at fixed plate 5, and the top rigid coupling of backup pad 10 has tray 11, and the activity runs through in backup pad 10 has second lead screw 12, and the one end rigid coupling of second lead screw 12 has second knob 13, and the other end is connected with riser 9.
Furthermore, a slot 14 is formed in one side of the steel main beam 1, and one end of the steel secondary beam 2 is embedded in the slot 14.
Furthermore, the fixing plate 5 is connected with the through groove 4 in an embedded manner, a first connecting hole 15 used for being connected with the first lead screw 7 is formed in the fixing plate 5, and an internal thread matched with the first lead screw 7 in thread is formed in the first connecting hole 15.
Further, a sleeving groove 16 for sleeving the fixing plate 5 is formed in the supporting plate 10, the width of the sleeving groove 16 is consistent with that of the fixing plate 5, and the height of the sleeving groove 16 is greater than the thickness of the fixing plate 5.
Furthermore, a second connecting hole 17 used for being connected with a second screw rod 12 is formed in the vertical plate 9, and an internal thread matched with the second screw rod 12 is arranged in the second connecting hole 17.
The working principle is as follows: when the fixing device is used, one end of the steel secondary beam 2 is inserted into the slot 14, meanwhile, the fixing plate 5 penetrates through the through groove 4 in the fixing block 3 until the fixing block 3 is tightly attached to the steel main beam 1, then, the first screw rod 7 is inserted into the through groove 4 through the first rotating button 8 and is in threaded connection with the first connecting hole 15 in the fixing plate 5, the fixing of the fixing plate 5 can be achieved, and the steel secondary beam 2 can be further installed on the steel main beam 1; afterwards, establish the groove 16 cover on the fixed plate 5 with the cover on the backup pad 10, afterwards, remove backup pad 10 and make tray 11 closely laminate with steel secondary beam 2, drive second lead screw 12 through second knob 13 and rotate, and make second lead screw 12 and second connecting hole 17 threaded connection, can realize the fixed to backup pad 10, and tray 11 can carry out the centre gripping to steel secondary beam 2 and fix, can strengthen the stability of steel secondary beam 2, and then can effectively avoid the not firm problem of rigid structure locking.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The locking device for construction of the steel structure of the building is characterized by comprising a steel part main beam (1) and a steel part secondary beam (2), wherein the steel part secondary beam (2) is arranged on one side of the steel part main beam (1), the upper side and the lower side of the steel part secondary beam (2) are fixedly connected with fixing blocks (3), the fixing blocks (3) are attached to the steel part main beam (1), through grooves (4) which are mutually communicated are formed in two sides of each fixing block (3), a fixing plate (5) is fixedly connected to the corresponding position of the steel part main beam (1) and the through grooves (4), and the fixing plate (5) penetrates through the through grooves (4) to be arranged; the fixing mechanism for fixing the fixing plate (5) is symmetrically arranged on the steel part girder (1), the fixing mechanism comprises a transverse plate (6) fixedly connected with the steel part girder (1), a first screw rod (7) movably penetrates through the transverse plate (6), one end of the first screw rod (7) is fixedly connected with a first rotating button (8), and the other end of the first screw rod is inserted into the through groove (4) and connected with the fixing plate (5); one end rigid coupling that steel main beam (1) was kept away from in diaphragm (6) has riser (9), and the activity of one side that diaphragm (6) were kept away from in riser (9) is equipped with backup pad (10), and backup pad (10) activity cover is established in the outside of fixed plate (5), and the top rigid coupling of backup pad (10) has tray (11), and the activity runs through in backup pad (10) has second lead screw (12), and the one end rigid coupling of second lead screw (12) has second knob (13), and the other end is connected with riser (9).
2. The locking device for construction of the building steel structure according to claim 1, wherein: one side of the steel part main beam (1) is provided with a slot (14), and one end of the steel part secondary beam (2) is embedded in the slot (14).
3. The locking device for construction of the building steel structure according to claim 1, wherein: the fixing plate (5) is connected with the through groove (4) in an embedded mode, a first connecting hole (15) used for being connected with the first screw rod (7) is formed in the fixing plate (5), and an internal thread matched with the first screw rod (7) in a threaded mode is arranged in the first connecting hole (15).
4. The locking device for construction of the building steel structure according to claim 1, wherein: the supporting plate (10) is provided with a sleeving groove (16) for sleeving the fixing plate (5), the width of the sleeving groove (16) is consistent with that of the fixing plate (5), and the height of the sleeving groove (16) is larger than the thickness of the fixing plate (5).
5. The locking device for construction of the building steel structure according to claim 1, wherein: and a second connecting hole (17) used for being connected with a second screw rod (12) is formed in the vertical plate (9), and an internal thread matched with the second screw rod (12) is arranged in the second connecting hole (17).
CN202022439409.7U 2020-10-28 2020-10-28 Construction locking device for building steel structure Active CN213626041U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022439409.7U CN213626041U (en) 2020-10-28 2020-10-28 Construction locking device for building steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022439409.7U CN213626041U (en) 2020-10-28 2020-10-28 Construction locking device for building steel structure

Publications (1)

Publication Number Publication Date
CN213626041U true CN213626041U (en) 2021-07-06

Family

ID=76625586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022439409.7U Active CN213626041U (en) 2020-10-28 2020-10-28 Construction locking device for building steel structure

Country Status (1)

Country Link
CN (1) CN213626041U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152665A (en) * 2021-04-21 2021-07-23 吉林建筑大学 Assembly type building connection structure
CN114482285A (en) * 2022-03-17 2022-05-13 崔晓丽 Integrated assembled steel construction building

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152665A (en) * 2021-04-21 2021-07-23 吉林建筑大学 Assembly type building connection structure
CN114482285A (en) * 2022-03-17 2022-05-13 崔晓丽 Integrated assembled steel construction building
CN114482285B (en) * 2022-03-17 2023-07-14 崔晓丽 Integrated assembly type steel structure building

Similar Documents

Publication Publication Date Title
CN213626041U (en) Construction locking device for building steel structure
CN211816932U (en) Detachable assembly type building steel structure
CN209742119U (en) energy-conserving fire prevention steel construction of green building
CN210549097U (en) Stainless steel welded fastening support frame
CN214941017U (en) Steel structure supporting beam convenient to mount
CN215671203U (en) Steel construction installation positioner based on construction
CN210917759U (en) Construction locking device for building steel structure
CN210342237U (en) Steel construction post roof beam connecting elements convenient to installation
CN217419991U (en) Temporary fixing device for steel structure installation
CN209799003U (en) house steel structure supporting structure
CN111576625A (en) Building steel structure connecting structure
CN207512914U (en) A kind of mortise and tenon type hub node closes up connection structure
CN217204633U (en) Reinforced steel structure mounted in multiple ways
CN220868581U (en) I-steel beam side filling structure
CN212715346U (en) Connecting structure of house building steel structure keel
CN209874462U (en) Environment-friendly high-strength building template
CN218346820U (en) Novel building engineering frame post template reinforced structure
CN217711376U (en) Steel structure concrete supporting beam
CN220318798U (en) Assembled steel frame beam column connected node
CN214941275U (en) Steel construction wall structure based on energy-conserving assembled
CN211102497U (en) Tool for preventing welding deformation of foundation ring splicing flange of wind power generation tower cylinder
CN211257908U (en) Be applied to reinforced (rfd) C shaped steel structure on layer top
CN211775092U (en) Assembled building reinforced concrete member
CN216075528U (en) Energy-conserving building steel construction of antidetonation
CN211395985U (en) Connection structure in steel structure building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant