CN213390717U - Ceramic curtain wall dry hanging structure - Google Patents

Ceramic curtain wall dry hanging structure Download PDF

Info

Publication number
CN213390717U
CN213390717U CN202020653035.6U CN202020653035U CN213390717U CN 213390717 U CN213390717 U CN 213390717U CN 202020653035 U CN202020653035 U CN 202020653035U CN 213390717 U CN213390717 U CN 213390717U
Authority
CN
China
Prior art keywords
ceramic
angle steel
frame
plate
wall body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020653035.6U
Other languages
Chinese (zh)
Inventor
蒙政强
杨仟厦
邓魏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Green Building Technology Engineering Co ltd
Monalisa Group Co Ltd
Original Assignee
Guangdong Green Building Technology Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Green Building Technology Engineering Co ltd filed Critical Guangdong Green Building Technology Engineering Co ltd
Priority to CN202020653035.6U priority Critical patent/CN213390717U/en
Application granted granted Critical
Publication of CN213390717U publication Critical patent/CN213390717U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

A ceramic curtain wall dry hanging piece structure comprises a ceramic plate and a wall body, wherein square tube stand columns are arranged on the wall body at intervals, angle steel cross beams in the horizontal direction are welded on the square tube stand columns to form angle steel keels, stable mounting frames are embedded in the wall body at intervals, one ends of the stable mounting frames are embedded in the wall body, and the other ends of the stable mounting frames are locked with the square tube stand columns; the angle steel crossbeam is provided with the metal and holds in the palm the sign indicating number, and the metal holds in the palm receiving of sign indicating number and is provided with bellied slider, and the ceramic plate back sets up the vice frame of installation, and the pendant is installed to the vice frame of installation, and the fine dried noodles that hold of pendant are provided with the spout, and the spout mutually supports with the slider and makes the vice frame cover of installation hang in the metal holds in the palm the sign indicating number, and the ceramic plate passes through the cooperation of spout and slider, can follow the. The utility model provides a structure and ceramic curtain dry-hanging method are hung futilely to ceramic curtain has solved when installing the ceramic plate, takes place the problem of colliding with easily between the ceramic plate.

Description

Ceramic curtain wall dry hanging structure
Technical Field
The utility model relates to an architectural decoration technical field especially relates to a structure is hung futilely to pottery curtain.
Background
The curtain wall is an outer wall method which utilizes various strong, light and beautiful building materials to replace the traditional masonry or window wall combination, and is an outer wall method which surrounds the periphery of a main structure to ensure that the building is beautiful and has sound and safe use function.
In recent years, with the continuous development of building materials, the variety of curtain wall panels is also continuously increased, various light panel materials can be used as the panel of the curtain wall, a colorful curtain wall form is provided for people, however, the new materials are mostly thin, the texture is crisp, the ceramic plates are just one of the materials, in the process of installing a plurality of ceramic plates, the situation of collision between the ceramic plates is easy to occur, the ceramic plates are damaged, and the process is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a ceramic curtain hangs structure futilely to the defect among the background art, when having solved the installation ceramic plate, takes place the problem of colliding with easily between the ceramic plate.
To achieve the purpose, the utility model adopts the following technical proposal:
a ceramic curtain wall dry hanging piece structure comprises a ceramic plate and a wall body, wherein square tube stand columns are arranged on the wall body at intervals, angle steel cross beams in the horizontal direction are welded on the square tube stand columns to form angle steel keels, stable mounting frames are embedded in the wall body at intervals, one ends of the stable mounting frames are embedded in the wall body, and the other ends of the stable mounting frames are locked on the square tube stand columns;
install the metal on the angle steel crossbeam and hold in the palm the sign indicating number, the metal asks receiving of sign indicating number to be provided with bellied slider, the ceramic plate back sets up the vice frame of installation, the pendant is installed to the vice frame of installation, the fine dried noodles that hold of pendant is provided with the spout, the spout with the slider is mutually supported and is made the vice frame cover of installation hang in the metal asks the sign indicating number, the ceramic plate passes through the spout with the cooperation of slider can be followed the horizontal direction of angle steel crossbeam slides.
Preferably, the metal bracket comprises a first fixing frame and a suspension bracket, the first fixing frame is provided with a first fixing plate and a first mounting plate, the first fixing plate is connected with the angle steel beam in a locking manner, and the cross section of the first mounting plate is a 7-shaped barb;
the cross section of the suspension bracket is a hook shaped like the Chinese character 'Jiong', the suspension bracket is buckled at the top of the first mounting plate, and the suspension bracket is provided with the sliding block.
Preferably, the metal bracket further comprises a second fixing frame, the second fixing frame is provided with a second fixing plate and a second mounting plate, the cross section of the second fixing frame is L-shaped, and the second fixing plate is connected with the angle steel cross beam in a locking manner;
the secondary mounting frame is further provided with a hanging code, the hanging code is provided with a fixing groove, the cross section of the hanging code is inverted U-shaped and is inversely hung at the top of the second mounting plate, so that the second mounting plate is embedded into the fixing groove.
Preferably, a notch is formed in the head of the stable mounting frame, and the square tube stand column is mounted in the notch and locked through a locking piece;
the bottom of the stable mounting frame is locked on the surface of the wall body through the locking piece, so that the stable mounting frame is vertically fixed on the wall body.
Preferably, the bottom of the angle steel keel is provided with a water retaining platform.
Preferably, a waterproof opening is reserved between the water retaining platform and the wall body.
Preferably, the water outlet is provided with a waterproof protective layer, a waterproof coiled material and a leveling layer which are sequentially paved from top to bottom.
Preferably, the suspension bracket and the first fixing bracket as well as the suspension bracket and the second fixing bracket are coaxially provided with threaded holes, and the threaded holes are connected with height-adjusting screws.
Preferably, the side edge of the ceramic plate is provided with a rubber protective strip.
Preferably, the decorative strip further comprises a decorative strip, and an inverted buckle clamping strip is arranged in the outward direction of an opening of the decorative strip;
the pendant is provided with a decoration strip installation groove, and a notch of the decoration strip installation groove is provided with a buckling part;
the inverted buckle clamping strip is embedded into the decoration strip mounting groove and is buckled with the abutting part, so that the decoration strip is attached to the side edge of the ceramic plate.
Has the advantages that:
the utility model discloses a set up the slider on the metal asks the sign indicating number, set up the spout at the pendant with hanging the sign indicating number, utilize slider and spout to mutually support, the problem that collides with takes place easily between the ceramic plate when the installation ceramic plate has been solved to the slidable mounting ceramic plate.
Drawings
FIG. 1 is a side view of the dry-hanging structure of the ceramic curtain wall of the present invention;
FIG. 2 is an enlarged structural view of A in FIG. 1;
FIG. 3 is an enlarged structural view of B in FIG. 1;
FIG. 4 is a top view of the dry-hanging structure of the ceramic curtain wall of the present invention (no decorative strip installed);
FIG. 5 is a top view of the ceramic curtain wall dry-hang structure of the present invention (with the decorative strip installed);
fig. 6 is an enlarged structural view of C in fig. 5.
Wherein: wall body 1, ceramic plate 2, square pipe stand 31, angle steel crossbeam 32, firm mounting bracket 4, metal holds in the palm sign indicating number 6, slider 61, first mount 62, first fixed plate 621, first mounting panel 622, second mount 63, second fixed plate 631, second mounting panel 632, mounted frame 64, heightening screw 641, installation subframe 7, pendant 71, trim mounting groove 710, string sign indicating number 72, manger board 8, waterproof port 9, waterproof layer 91, waterproofing membrane 92, screed-coat 93, ornamental strip 10, back-off trip 101.
Detailed Description
The technical solution of the present invention is further explained by the following embodiments with reference to the accompanying drawings.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are used merely for convenience of description and for simplicity of description, and do not indicate or imply that the device or element so referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
The utility model discloses a ceramic curtain wall dry hanging piece 71 structure, as shown in fig. 1 and 4, comprises a ceramic plate 2 and a wall body 1, the wall body 1 is provided with square tube columns 31 at intervals, the square tube columns 31 are welded with angle steel crossbeams 32 in the horizontal direction to form angle steel keels, the wall body 1 is embedded with a stable mounting frame 4 at intervals, one end of the stable mounting frame 4 is embedded into the wall body 1, and the other end locks the square tube columns 31;
as shown in fig. 2, be provided with a plurality of angle steel crossbeam 32 on the angle steel crossbeam 32, metal holds in the palm sign indicating number 6 is installed to angle steel crossbeam 32, the fine dried noodles that receive of metal hold in the palm sign indicating number 6 are provided with bellied slider 61, the ceramic plate 2 back sets up the vice frame 7 of installation, the pendant 71 is installed to the vice frame 7 of installation, the fine dried noodles that hold of pendant 71 are provided with the spout, the spout with slider 61 mutually supports and makes the vice frame 7 of installation overlap hang in metal holds in the palm sign indicating number 6, the ceramic plate 2 passes through the spout with the cooperation of slider 61 can be followed angle steel crossbeam 32's horizontal direction slides.
Among the prior art, when hanging dress ceramic plate 2, because the material of ceramic plate 2 is more fragile, the condition that takes place to collide with between the ceramic plate 2 appears easily, leads to ceramic plate 2 impaired, in order to solve above-mentioned problem, the utility model provides a structure is hung futilely to ceramic curtain.
The angle steel keel is formed by welding the square tube upright columns 31 and the angle steel cross beams 32 and is used for hanging the ceramic plate 2, in order to ensure the stability of the angle steel keel, the stabilizing mounting frame 4 is arranged between the wall body 1 and the angle steel keel, one end of the stabilizing mounting frame 4 is fixed on the wall body 1, and the other end of the stabilizing mounting frame is used for fixing the square tube upright columns 31, so that the angle steel keel keeps self stability by virtue of the wall body 1, the wall body 1 and the angle steel keel are parallel to each other, the stabilizing mounting frame 4 is respectively perpendicular to the wall body 1 and the angle steel keel, and in the embodiment, the angle steel keel is a rectangular frame formed by welding the square tube upright columns 31 and the angle steel cross;
the angle iron cross beam 32 is provided with a metal bracket 6, in the embodiment, the angle iron cross beam 32 is of an L-shaped structure, the dried surface of the metal bracket 6 is provided with a convex sliding block 61, the back surface of the ceramic plate 2 needing hanging is provided with an installation auxiliary frame 7, the installation auxiliary frame 7 is provided with a hanging piece 71, the dried surface of the hanging piece 71 is provided with a sliding groove, when hanging is carried out, the dried surface of the hanging piece 71 and the dried surface of the metal bracket 6 are hung with each other, so that the sliding block 61 is slidably installed in the sliding groove, the mutual fixation of the installation auxiliary frame 7 and the metal bracket 6 is realized, the ceramic plate 2 is hung on the angle iron keel, after one ceramic plate 2 is hung, the prior art often hangs a second ceramic plate 2 at a small distance at the side edge of the first ceramic plate 2, in order to guarantee that second ceramic plate 2 can closely piece together first ceramic plate 2, but in the work progress, because the material of ceramic plate 2 is more fragile, lead to first or second ceramic plate 2 impaired easily, in this application, then can hang dress second ceramic plate 2 in the great safe construction interval department apart from first ceramic plate 2, hang dress when second ceramic plate 2 arrives back on the angle steel fossil fragments, only need use the three-jaw sucking disc to hold second ceramic plate 2, with the help of slider 61 and the mutually supporting of spout, flat push second ceramic plate 2 slides to first ceramic plate 2, can closely piece together, guarantees simultaneously that first ceramic plate 2 can not collide with each other with second ceramic plate 2 and lead to both impaired.
Preferably, as shown in fig. 2, the metal bracket 6 includes a first fixing frame 62 and a suspension frame 64, the first fixing frame 62 is provided with a first fixing plate 621 and a first mounting plate 622, the first fixing plate 621 is connected with the angle steel beam 32 in a locking manner, and the cross section of the first mounting plate 622 is a barb shaped like "7";
the cross section of the hanging bracket 64 is a hook shaped like Jiong, the hanging bracket 64 is buckled on the top of the first mounting plate 622, and the sliding block 61 is arranged on the hanging bracket 64.
In this embodiment, the metal bracket 6 includes a first fixing frame 62 and a suspension frame 64, the first fixing frame 62 includes a first fixing plate 621 and a first mounting plate 622, the first fixing plate 621 is provided with a screw hole, and is locked to the angle steel beam 32 by a hexagon screw;
in the prior art, the cross section of the first mounting plate 622 is a steel plate with an "I" shaped structure, after the steel plate is inserted into the suspension bracket 64, holes need to be drilled from the side surface of the suspension bracket 64, and locking pieces are inserted to realize locking, so that the cross section of the suspension bracket 64 is adopted in the present application, and the cross section of the first mounting plate 622 is a "Jiong" shape, so that the suspension bracket 64 is buckled on the head of the first mounting plate 622 to complete the fixed mounting of the suspension bracket 64 and the first fixing frame 62, and the head of the first mounting plate 622 is just buckled in the suspension bracket 64, and no additional locking structure is needed for fixing.
Preferably, as shown in fig. 3, the metal bracket 6 further includes a second fixing frame 63, the second fixing frame 63 is provided with a second fixing plate 631 and a second mounting plate 632, the cross section of the second fixing frame 63 is L-shaped, and the second fixing plate 631 is in locking connection with the angle steel beam 32;
the mounting auxiliary frame 7 is further provided with a hanging code 72, the hanging code 72 is provided with a fixing groove, the cross section of the hanging code 72 is inverted U-shaped and is inversely hung on the top of the second mounting plate 632, so that the second mounting plate 632 is embedded into the fixing groove.
In this application, the metal bracket 6 further includes a second fixing frame 63, where the second fixing frame 63 includes a second fixing plate 631 and a second mounting plate 632, and the second fixing plate 631 is used to be locked with the angle beam 32;
the secondary frame 7 is further provided with the hanging bar 72, the hanging bar 72 is provided with a sliding installation groove, and the sliding installation groove is inserted into the head of the second installation plate 632, so that the hanging bar 72 can slide along the horizontal direction of the second installation plate 632.
Preferably, a notch is formed in the head of the stable mounting frame 4, and the square tube upright column 31 is mounted in the notch and locked by a locking piece;
the bottom of the stable mounting frame 4 is locked on the surface of the wall body 1 through the locking piece, so that the stable mounting frame 4 is vertically fixed on the wall body 1.
The head of firm mounting bracket 4 is seted up jaggedly, the breach is used for placing square tube column 31, just the screw has been seted up to the both sides of breach, will through the retaining member square tube column 31 locks, guarantees angle steel keel's stability.
Preferably, the bottom of the angle steel keel is provided with a water retaining platform 8.
Preferably, a waterproof opening 9 is reserved between the water retaining platform 8 and the wall body 1.
Preferably, the water outlet is provided with a waterproof protective layer 91, a waterproof coiled material 92 and a leveling layer 93 which are sequentially paved from top to bottom.
When carrying out dry-hang ceramic curtain, because fix through firm mounting bracket 4 between angle steel fossil fragments and the wall body 1, make wall body 1 with leave the clearance between the angle steel fossil fragments, when leaking or raining, water passes through wall body 1 and flows in the clearance, then passes ceramic curtain makes the water outflow easily, especially at the subway station, when leaking, and water easily flows in the track, leads to the track impaired, consequently angle steel fossil fragments's bottom sets up retaining platform 8, in this embodiment, retaining platform 8 constitutes for the concrete.
Simultaneously the water blocking platform 8 with waterproof mouth 9 has been retained to bottom between the wall body 1, and water can flow in waterproof mouth 9, waits for the clearance, but if do not clear up the water in waterproof mouth 9 for a long time, leads to easily preventing that mouth 9 from being rotten, consequently waterproof mouth 9 department from last to extremely down, lays waterproof protective layer 91, waterproofing membrane 92 and screed-coat 93 in proper order, wherein, screed-coat 93 constitutes for cement mortar, the surface calendering, waterproofing membrane 92 is double-deck polyethylene polypropylene fibre composite waterproof membrane 92, waterproof protective layer 91 constitutes for cement mortar.
Preferably, the suspension bracket 64 and the first fixing bracket 62, and the suspension bracket 64 and the second fixing bracket 63 are coaxially provided with threaded holes, and the threaded holes are connected with height-adjusting screws 641.
The height-adjusting screw 641 is used for adjusting the height of the angle iron keel, so that the height difference of the ceramic plate 2 can be adjusted when the ceramic plate 2 is hung conveniently.
Preferably, the side edge of the ceramic plate 2 is provided with a rubber protective strip.
When installing polylith ceramic plate 2, the easy emergence is collided with between ceramic plate 2 and the ceramic plate 2 when close piecing together, leads to ceramic plate 2 impaired, in order to avoid above-mentioned condition to take place, after installing a ceramic plate 2, need set up the rubber protective strip at the side of ceramic plate 2, prevent that it is impaired, demolish after the installation can.
Preferably, as shown in fig. 5 and 6, the decorative strip further comprises a decorative strip 10, and an inverted clip strip 101 is arranged at an opening of the decorative strip 10 in an outward direction;
the pendant 71 is provided with a decoration strip mounting groove 710, and a notch of the decoration strip mounting groove 710 is provided with a buckling part;
the reverse buckle clamping strip 101 is embedded into the decoration strip mounting groove 710 and is buckled with the buckling part, so that the decoration strip 10 is attached to the side edge of the ceramic plate 2.
When needs decorate ceramic plate 2, when closely piecing together two ceramic plates 2, reserve between two ceramic plates 2 and remain gapped and can supply to install ornamental strip 10, ornamental strip 10 when installing, only need stretch into ornamental strip 10's back-off card strip 101 in ornamental strip mounting groove 710, back-off card strip 101 can support automatically support the portion of detaining, accomplish the installation of ornamental strip 10.
The technical principle of the present invention is described above with reference to specific embodiments. The description is made for the purpose of illustrating the principles of the invention and should not be construed in any way as limiting the scope of the invention. Based on the explanations herein, those skilled in the art will be able to conceive of other embodiments of the present invention without any inventive effort, which would fall within the scope of the present invention.

Claims (10)

1. The utility model provides a structure is hung futilely to ceramic curtain wall, includes ceramic plate and wall body, the wall body interval is provided with square tubular column, the welding has the angle steel crossbeam of horizontal direction to form angle steel fossil fragments on the square tubular column, its characterized in that: the wall body is embedded with stable mounting frames at intervals, one end of each stable mounting frame is embedded into the wall body, and the other end of each stable mounting frame locks the square tube stand column;
install the metal on the angle steel crossbeam and hold in the palm the sign indicating number, the metal asks receiving of sign indicating number to be provided with bellied slider, the ceramic plate back sets up the vice frame of installation, the pendant is installed to the vice frame of installation, the fine dried noodles that hold of pendant is provided with the spout, the spout with the slider is mutually supported and is made the vice frame cover of installation hang in the metal asks the sign indicating number, the ceramic plate passes through the spout with the cooperation of slider can be followed the horizontal direction of angle steel crossbeam slides.
2. The ceramic curtain wall dry hanging structure according to claim 1, characterized in that:
the metal bracket comprises a first fixing frame and a suspension frame, wherein the first fixing frame is provided with a first fixing plate and a first mounting plate, the first fixing plate is connected with the angle steel beam in a locking manner, and the cross section of the first mounting plate is a 7-shaped barb;
the cross section of the suspension bracket is a hook shaped like the Chinese character 'Jiong', the suspension bracket is buckled at the top of the first mounting plate, and the suspension bracket is provided with the sliding block.
3. The ceramic curtain wall dry hanging structure according to claim 2, characterized in that:
the metal bracket also comprises a second fixing frame, the second fixing frame is provided with a second fixing plate and a second mounting plate, the cross section of the second fixing frame is L-shaped, and the second fixing plate is connected with the angle steel cross beam in a locking manner;
the secondary mounting frame is further provided with a hanging code, the hanging code is provided with a fixing groove, the cross section of the hanging code is inverted U-shaped and is inversely hung at the top of the second mounting plate, so that the second mounting plate is embedded into the fixing groove.
4. The ceramic curtain wall dry hanging structure according to claim 1, characterized in that:
a notch is formed in the head of the stable mounting frame, and the square tube stand column is mounted in the notch and locked through a locking piece;
the bottom of the stable mounting frame is locked on the surface of the wall body through the locking piece, so that the stable mounting frame is vertically fixed on the wall body.
5. The ceramic curtain wall dry hanging structure according to claim 1, characterized in that:
and a water retaining platform is arranged at the bottom of the angle steel keel.
6. The ceramic curtain wall dry hanging structure according to claim 5, wherein:
and a waterproof port is reserved between the water retaining platform and the wall body.
7. The ceramic curtain wall dry hanging structure according to claim 6, wherein:
waterproof mouthful is provided with and has laid waterproof layer, waterproofing membrane and screed-coat from top to bottom in proper order.
8. The ceramic curtain wall dry hanging structure according to claim 3, characterized in that:
the suspension bracket and the first fixing bracket as well as the suspension bracket and the second fixing bracket are coaxially provided with threaded holes, and the threaded holes are connected with height-adjusting screws.
9. The ceramic curtain wall dry hanging structure according to claim 1, characterized in that:
the side of the ceramic plate is provided with a rubber protective strip.
10. The ceramic curtain wall dry hanging structure according to claim 1, characterized in that:
the decorative strip is characterized by also comprising a decorative strip, wherein an opening of the decorative strip is provided with an inverted buckle clamping strip in an outward direction;
the pendant is provided with a decoration strip installation groove, and a notch of the decoration strip installation groove is provided with a buckling part;
the inverted buckle clamping strip is embedded into the decoration strip mounting groove and is buckled with the abutting part, so that the decoration strip is attached to the side edge of the ceramic plate.
CN202020653035.6U 2020-04-26 2020-04-26 Ceramic curtain wall dry hanging structure Active CN213390717U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020653035.6U CN213390717U (en) 2020-04-26 2020-04-26 Ceramic curtain wall dry hanging structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020653035.6U CN213390717U (en) 2020-04-26 2020-04-26 Ceramic curtain wall dry hanging structure

Publications (1)

Publication Number Publication Date
CN213390717U true CN213390717U (en) 2021-06-08

Family

ID=76178810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020653035.6U Active CN213390717U (en) 2020-04-26 2020-04-26 Ceramic curtain wall dry hanging structure

Country Status (1)

Country Link
CN (1) CN213390717U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113931401A (en) * 2021-10-25 2022-01-14 河北建工集团装饰工程有限公司 Thin ceramic large plate adhesive frame hanging structure and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113931401A (en) * 2021-10-25 2022-01-14 河北建工集团装饰工程有限公司 Thin ceramic large plate adhesive frame hanging structure and construction method

Similar Documents

Publication Publication Date Title
CN111441515A (en) Ceramic curtain wall dry-hanging structure and ceramic curtain wall dry-hanging method
CN209066791U (en) A kind of wall surface dry-hang device
CN213390717U (en) Ceramic curtain wall dry hanging structure
CN207405853U (en) Kitchen and toilet ceiling structure
CN105133772B (en) A kind of duplex integrated ceiling and its installation method
CN107304598A (en) A kind of dark frame ceiling system and its installation method
CN207934376U (en) A kind of decoration material dried hanging hang structure
CN207846817U (en) A kind of ceiling structure
CN216340293U (en) Double-layer curtain wall system with outer curtain wall made of UHPC material
CN205617685U (en) Outer sunshade system of decorating of glass curtain wall
CN213204597U (en) Stone curtain wall at cornice closing-in opening of inclined roof
CN103321329A (en) Finished-product partition ground rail system and construction method thereof
CN207846788U (en) A kind of fixing device of aluminum veneer
CN208594714U (en) A kind of installation system that ceramic wafer is shared with ceramic thin plate
CN210976284U (en) Adjustable ceiling supporting structure
CN215330839U (en) Suspended ceiling structure
CN208533816U (en) A kind of back-bolt type stone curtain wall
CN209040479U (en) A kind of dried hanging stone plate material structure
CN214090552U (en) Clamping frame for mounting modeling component and modeling component mounting structure
CN219261593U (en) Horizontal hanging keel system capable of leveling front
CN214144350U (en) Mineral wool board ceiling construction system
CN204920093U (en) Back of body bolt formula interior wall decorative board
CN205444592U (en) Ceramic tile curtain installing the system
CN217232359U (en) Assembled ceiling system with reverse drop level
CN217326241U (en) Novel wallboard keel system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221223

Address after: 528211 Xiqiao Textile City Industrial Park, Nanhai District, Foshan City, Guangdong Province

Patentee after: Monalisa Group Co.,Ltd.

Patentee after: GUANGDONG GREEN BUILDING TECHNOLOGY ENGINEERING Co.,Ltd.

Address before: 528000 No.6, 3rd floor, Taiping Industrial Zone (office complex), Xiqiao Town, Nanhai District, Foshan City, Guangdong Province

Patentee before: GUANGDONG GREEN BUILDING TECHNOLOGY ENGINEERING Co.,Ltd.