CN213359300U - Mobile combined construction platform - Google Patents
Mobile combined construction platform Download PDFInfo
- Publication number
- CN213359300U CN213359300U CN202021016272.8U CN202021016272U CN213359300U CN 213359300 U CN213359300 U CN 213359300U CN 202021016272 U CN202021016272 U CN 202021016272U CN 213359300 U CN213359300 U CN 213359300U
- Authority
- CN
- China
- Prior art keywords
- construction platform
- base
- stair
- low
- operation table
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 90
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 42
- 239000010959 steel Substances 0.000 claims abstract description 42
- 238000003466 welding Methods 0.000 claims description 13
- 238000009435 building construction Methods 0.000 abstract description 2
- 229910001335 Galvanized steel Inorganic materials 0.000 description 2
- 239000008397 galvanized steel Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- AZDRQVAHHNSJOQ-UHFFFAOYSA-N alumane Chemical group [AlH3] AZDRQVAHHNSJOQ-UHFFFAOYSA-N 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Images
Landscapes
- Handcart (AREA)
Abstract
The utility model belongs to the field of building construction, in particular to a mobile combined construction platform, which comprises a tractor, a low construction platform and a high construction platform which are connected in series in sequence through a cylindrical sleeve pair; the high construction platform comprises a base, a corner stair and an operation table board, wherein the base is of a stand column frame structure, four corners of the lower bottom surface of the base are respectively provided with a load-bearing travelling wheel, the corner stair comprises a right-angle stair lower section and a right-angle stair upper section, the right-angle stair lower section is connected with the base, and the right-angle stair upper section is connected with the top operation table board; the low construction platform comprises a base and an operation table board, the base of the low construction platform is the same as the base structure and the height of the high construction platform, anti-skid steel plates are respectively paved on the base of the low construction platform and the base of the high construction platform, and the anti-skid steel plate surface of the low construction platform is the operation table board. Construction platform is formed by the removable built-up connection of many parts, can satisfy conventional low floor height construction demand, also can satisfy the construction demand of great floor height.
Description
Technical Field
The utility model belongs to the building construction field, concretely relates to remove combination formula construction platform.
Background
When the floor height of a conventional underground garage is higher than 3.0, an aluminum scaffold is adopted for construction conventionally, and the problems of time consumption, labor consumption, inconvenience in movement, large potential safety hazard and low construction efficiency exist in building. Through retrieval, the field also adopts a lifting type construction platform for house building engineering as described in patent CN201820944810.6, and the platform structure has a lifting function, so that the construction requirement of layer height change is solved to a certain extent. But the device still involves components such as slide rail, pneumatic cylinder, connecting shaft spare, and the structure is complicated, and the volume is great, is unfavorable for quick turnover use.
Disclosure of Invention
The utility model provides a solve above-mentioned problem, provide a remove combination formula construction platform, specifically adopt following technical scheme:
a mobile combined construction platform comprises a tractor, a low construction platform and a high construction platform which are sequentially connected in series through a cylindrical sleeve pair;
the high construction platform comprises a base, a corner stair and an operation table board, wherein the base is of a stand column frame structure, four corners of the lower bottom surface of the base are respectively provided with a load-bearing travelling wheel, the corner stair comprises a right-angle stair lower section and a right-angle stair upper section, the right-angle stair lower section is connected with the base, and the right-angle stair upper section is connected with the top operation table board;
the low construction platform comprises a base and an operation table board, the base of the low construction platform is the same as the base structure and the height of the high construction platform, anti-skid steel plates are respectively paved on the base of the low construction platform and the base of the high construction platform, and the anti-skid steel plate surface of the low construction platform is the operation table board.
The height of the operation table top of the high construction platform is more than 2.5 m.
The periphery of the operating platform is welded with at least 12 sleeves I, and railings are detachably connected in the sleeves I in an inserting mode.
The height of the high construction platform base and the low construction platform base is 600-700 mm.
The height of the railing is 50 mm.
The corner stairs are formed by welding steel pipes and anti-skid steel plates; or is formed by erecting steel pipes and fasteners; or the steel plate is formed by welding channel steel and an anti-skid steel plate.
The construction platform of the utility model is formed by detachably combining and connecting a plurality of parts, which can meet the construction requirements of conventional low floor height and larger floor height; the combined construction platform can be combined and disassembled at will according to actual construction requirements, and is convenient to transfer and disassemble; meanwhile, the construction platform can be manufactured by common steel pipes, steel bars, angle steel and other components on the construction site, and is convenient to obtain materials and low in cost.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIGS. 2 and 3 are schematic structural views of the top of a high construction platform;
FIG. 4 is a view taken along line A of FIG. 3;
FIG. 5 is a view from the direction B of FIG. 3;
FIG. 6 is a schematic view of the connection of a high construction platform base and a low construction platform base;
in the figure: 1-a tractor, 2-a low construction platform and 3-a high construction platform;
31-right-angle stair lower section, 32-right-angle stair upper section, 33-sleeve I, 34-railing, 35-load-bearing walking wheel, 36-antiskid steel plate I, 37-base frame I, 38-reinforcing rod I, 39-base frame II, 40-reinforcing rod II, 41-antiskid steel plate II, 42-sleeve II and 43-operation table top.
Detailed Description
The movable combined type construction platform shown in fig. 1 is characterized by comprising a tractor, a low construction platform and a high construction platform which are sequentially connected in series through a cylindrical sleeve pair; the high construction platform comprises a base, a corner stair and an operation table board, wherein the base is of a stand column frame structure, four corners of the lower bottom surface of the base are respectively provided with a load-bearing travelling wheel, the corner stair comprises a right-angle stair lower section and a right-angle stair upper section, the right-angle stair lower section is connected with the base, and the right-angle stair upper section is connected with the top operation table board;
the low construction platform comprises a base and an operation table board, the base of the low construction platform is the same as the base structure and the height of the high construction platform, anti-skid steel plates are respectively paved on the base of the low construction platform and the base of the high construction platform, and the anti-skid steel plate surface of the low construction platform is the operation table board.
The specific manufacturing and using process of the present invention is further described below with reference to the accompanying drawings:
1) 3500mm × 1500mm of 5mm thick anti-skid steel plates are adopted and divided into A, B blocks, wherein A =1500mm × 2000mm is used as a high construction platform, and B =1500mm × 1000m is used as a low construction platform (the width and the length can be adjusted according to actual requirements).
2) Respectively adopting 50 multiplied by 5 galvanized equilateral angle steel, welding a circle along the periphery of 2 anti-skid steel plates, respectively welding 25 galvanized round steel with the length of 500mm at the four corners under the angle steel, and adding 4 scaffold bogie wheels with anti-skid devices at the bottom of the angle steel to form a high construction platform base and a low construction platform base; the galvanized angle steels are respectively used for welding during welding, and the welding is firm;
3) designing 10 galvanized steel pipe supports with the thickness of 25mm at the four corners and the middle of the bottom of the antiskid steel plate of the high construction platform base for reinforcement, and arranging 6 galvanized steel pipe supports at the corresponding positions of the low construction platform base;
4) 2 sleeve pipes of 25mm are designed on the upper portion of a high construction platform base, L =50mm sleeve pipes are designed on the middle portion of the left end of a low construction platform base, 2 sleeve pipes of 25mm are designed on the middle portion of the left end of the low construction platform base, and the sleeve pipes of 50mm are used as sleeve pipes in figure 6. The structure is adopted to connect between the tractor and the low construction platform.
The top operating platform of the high construction platform is more than 2.5m in height, and the operating platform of the low construction platform is less than 2.5m in height.
Wherein the operation space of high construction platform operation mesa is 1500mm 1000mm, is equipped with 500 mm's of width corner stair in the high construction platform, can be from the base face to top operation mesa.
The design welding has 12 sleeves of 25mm all around operation platform for connect and prevent the railing, prevent that railing height 50mm all adopts 20 galvanized round steel preparation. All railings are connected in an inserting mode through the sleeves and can be detached. The height of the base from the ground is 600mm-700mm, (the height of the bogie wheel is +500mm), and 4 protective railings can be arranged around the base by adopting the method.
The corner stair can be formed by welding steel pipes and anti-skid steel plates, can also be formed by erecting steel pipes and fasteners, and can also be formed by welding channel steel and anti-skid steel plates.
The design height between the construction platform base and the top operation platform is generally 2000mm, the construction platform is formed by welding 4 # channel steels or 50 multiplied by 5 galvanized angle steels, and the actual construction height is determined by the height of the construction platform and the height of an operator.
500mm half space can be designed to the wide right angle stair of 500mm in the middle of being 750mm high department promptly, guardrail height 500mm, and the protection railing sets up between two parties, and the footboard adopts anti-skidding steel sheet, footboard width 260 mm.
The front end of the movable operation platform can be pulled by an electric or diesel mechanical tractor.
Claims (6)
1. A movable combined construction platform is characterized by comprising a tractor, a low construction platform and a high construction platform which are sequentially connected in series through a cylindrical sleeve pair;
the high construction platform comprises a base, a corner stair and an operation table board, wherein the base is of a stand column frame structure, four corners of the lower bottom surface of the base are respectively provided with a load-bearing travelling wheel, the corner stair comprises a right-angle stair lower section and a right-angle stair upper section, the right-angle stair lower section is connected with the base, and the right-angle stair upper section is connected with the top operation table board;
the low construction platform comprises a base and an operation table board, the base of the low construction platform is the same as the base structure and the height of the high construction platform, anti-skid steel plates are respectively paved on the base of the low construction platform and the base of the high construction platform, and the anti-skid steel plate surface of the low construction platform is the operation table board.
2. A mobile modular construction platform according to claim 1, characterised in that the high construction platform has an operating deck height greater than 2.5 m.
3. The mobile combined type construction platform according to claim 1, wherein at least 12 sleeves I are welded around the operation platform, and railings are detachably connected in the sleeves I in an inserting mode.
4. The mobile modular construction platform of claim 1 wherein the height of the high and low construction platform bases is 600-700 mm.
5. A mobile modular construction platform according to claim 3, wherein the height of the balustrade is 50 mm.
6. The mobile combined construction platform according to claim 1, wherein the corner stairs are formed by welding steel pipes and anti-skid steel plates; or is formed by erecting steel pipes and fasteners; or the steel plate is formed by welding channel steel and an anti-skid steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021016272.8U CN213359300U (en) | 2020-06-05 | 2020-06-05 | Mobile combined construction platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021016272.8U CN213359300U (en) | 2020-06-05 | 2020-06-05 | Mobile combined construction platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213359300U true CN213359300U (en) | 2021-06-04 |
Family
ID=76125561
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021016272.8U Expired - Fee Related CN213359300U (en) | 2020-06-05 | 2020-06-05 | Mobile combined construction platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213359300U (en) |
-
2020
- 2020-06-05 CN CN202021016272.8U patent/CN213359300U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206092022U (en) | Be used for lining cutting rectangular -section or radiation gradual change rectangular -section formula operation car of crawling | |
CN202046430U (en) | Dock pier trailer | |
CN207536671U (en) | A kind of novel piping lane pallet | |
CN210289067U (en) | Robot lifting operation platform | |
CN213359300U (en) | Mobile combined construction platform | |
CN202705928U (en) | Walking structure for crossing turning construction of existing line bridge flat surface | |
CN212454414U (en) | Shield constructs station-crossing and falls platform and shield constructs station-crossing system with top | |
CN113152166A (en) | Straddle type monorail track beam sliding erection tool | |
CN206889001U (en) | A kind of tunnel arch processes transportation system | |
CN2131978Y (en) | Lining-building platform car for tunnel construction | |
CN207032058U (en) | A kind of scalable Bridge Beam bottom job platform of continuous self-propelled | |
CN104675094A (en) | Detachable type movable scaffold platform | |
CN212508044U (en) | Modularization ladder of ascending a height | |
CN210389626U (en) | Compound PC component production line | |
CN2296400Y (en) | Regulating platform building cart for mould building concrete | |
CN211498488U (en) | Highway and railway dual-purpose bridge movable railway hard protection platform | |
CN210507165U (en) | Scaffold device and bridge fitment operation structure for bridge fitment | |
CN210946709U (en) | Manual paving operation device for channel side slope prefabricated slab | |
CN217867971U (en) | Fence type manual hydraulic conveying device | |
CN219344587U (en) | Portable construction cat ladder | |
CN112796223A (en) | Movable bridge span device | |
CN219710905U (en) | Tunnel movable scaffold construction platform | |
CN212583182U (en) | Movable construction platform for construction site | |
CN206319262U (en) | Carry the Diamond-Shape Form Traveler of transport and Lift-on/Lift-off System | |
CN220225505U (en) | Backfill device for backfill soil at two sides of whole ballast bed of metro vehicle base |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210604 |