CN206889001U - A kind of tunnel arch processes transportation system - Google Patents

A kind of tunnel arch processes transportation system Download PDF

Info

Publication number
CN206889001U
CN206889001U CN201720879370.6U CN201720879370U CN206889001U CN 206889001 U CN206889001 U CN 206889001U CN 201720879370 U CN201720879370 U CN 201720879370U CN 206889001 U CN206889001 U CN 206889001U
Authority
CN
China
Prior art keywords
bow member
railcar
motor
control device
walker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720879370.6U
Other languages
Chinese (zh)
Inventor
陈学军
李建军
杨宇祥
王双卯
郭宝库
邓旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway No 12 Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway No 12 Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, First Engineering Co Ltd of China Railway No 12 Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201720879370.6U priority Critical patent/CN206889001U/en
Application granted granted Critical
Publication of CN206889001U publication Critical patent/CN206889001U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

It the utility model is related to tunnel shaped steel arch manufacture field, specially a kind of tunnel arch processing transportation system, it is big to solve operating personnel's labor intensity in tunnel arch processing, the problem of processing efficiency is low, including conveying track and No. 1 motor railcar and No. 2 motor railcars that are arranged on conveying track, conveying track runs through bow member clod wash area, bow member weld zone and bow member examination are spelled and storage area is set, bow member weld zone is symmetrically arranged with welding support in the both sides of conveying track, the side of conveying track is provided with railcar power slip and slide wire bracket, bow member clod wash area and bow member welding section are provided with No. 1 motor railcar, spelled in bow member weld zone and bow member examination and storage section is provided with No. 2 motor railcars, No. 1 motor railcar and No. 2 motor railcars contact connection with slip by current-collector.The utility model reduces the risk in transit that straddle truck is brought in hoisting process, and especially making processing to a fairly large number of bow member has positive meaning.

Description

A kind of tunnel arch processes transportation system
Technical field
Tunnel shaped steel arch manufacture field is the utility model is related to, specially a kind of tunnel arch processing transportation system.
Background technology
The country rock of various geology is frequently encountered in constructing tunnel, in order to ensure construction safety, steel arch-shelf is as initial stage A kind of most common support pattern, specific work progress are:Steel arch-shelf is entered according to the size of country rock residing for tunnel Merogenesis processing in row design and the processing factory outside tunnel.During construction, tunnel tunnel face excavation site is transported to, with excavation face After anchor pole welding positioning, further longitudinally connected reinforcing bar and reinforced mesh between steel arch-shelf, finally encircle to reinforced mesh and shaped steel Frame carries out gunite concrete and completes preliminary support reinforcement.
And during constructing tunnel, the processing of bow member is one essential of critical process, and for wall scroll Tunnel, bow member are in great demand, and improve bow member production capacity, play the role of for tunnel overall progress very important.
And it is always after cold roll forming is cut, i.e., to be folded into shaped steel required by design by bending machine that tunnel arch, which is processed, Radian.According to different Tunnel Design demands, steel arch-shelf is also not quite similar using specification, the length of shaped steel, and process needs Want artificial assistance to be sent into shaped steel former material from bending machine one end, and lifted from the other end by the bow member after bending, further Utilization manually rely on " split heads " and transport and to weld zone be attached plate weld, the bow member of welding fabrication uses hand fit gantry Bow member finished product memory block is hoisted to be stored.There is operating personnel's labor intensity height in this pattern, physical demands is big, easily Operating personnel is caused to construct tired, and straddle truck transportation range is grown, low construction efficiency, security risk is big.To mitigate operating personnel Labor intensity, improve bow member processing efficiency, reduce the security risk of straddle truck lifting transport bow member, study a kind of bow member it is special plus Work transportation system just seems very necessary.
The content of the invention
Operating personnel's labor intensity is big in the processing of existing tunnel arch in order to solve for the utility model, bow member processing efficiency Lowly, using straddle truck hang movement it is defeated when the problem of larger security risk be present, there is provided a kind of tunnel arch processing transport system System.
The utility model is achieved by the following technical solution:A kind of tunnel arch processes transportation system, including transport Track and No. 1 motor railcar and No. 2 motor railcars that can be moved along conveying track, conveying track run through bow member clod wash Area, bow member weld zone and bow member examination are spelled and storage area is set, and bow member weld zone is symmetrically arranged with welding in the both sides of conveying track Support, the side of conveying track are provided with railcar power slip and slide wire bracket, bow member clod wash area and bow member weld zone it Between be provided with No. 1 motor railcar, spelled in bow member weld zone and bow member examination and storage area between be provided with No. 2 motor railcars, 1 Number motor railcar and No. 2 motor railcars contact connection with slip by current-collector, and current-collector is current collection in slick line system The main device of electric energy is picked up in side, and electric energy is directly conducted to electrical appliance by the sliding contact of collecting brush and guide rail by it, so as to The mobile power supply of system is realized, current-collector sets and is separately positioned on No. 1 motor railcar and No. 2 motor railcars, can be by electricity Motor and control device can be directly passed to.
No. 1 motor railcar includes railcar walker, and railcar walker bottom symmetrical is provided with road wheel, wherein one Motor is connected with to road wheel, corner location is respectively arranged with jack at the top of railcar walker, and jacking is very heavy Top top is connected with railcar platform, and railcar walker rear end is connected with track truck control device bottom girder, railcar control dress Bottom set Liang Sijiaochu is respectively fixed with control device column, is provided with protective cover at the top of control device column, is stood in control device The inside cavity that post, track truck control device bottom girder and protective cover are formed is provided with track truck control device and hydraulic power unit.
No. 2 motor railcars include railcar walker, and railcar walker bottom symmetrical is provided with road wheel, wherein one Motor is connected with to road wheel, corner location is respectively arranged with jack at the top of railcar walker, and jacking is very heavy Top top, which is connected with, strengthens steel box, and two longitudinally reinforced channel-section steels are symmetrically arranged with along the railcar direction of motion between reinforcement steel box, Bow member storage longitudinal bracing is respectively fixed with the outside of longitudinally reinforced channel-section steel, strengthens steel box and longitudinally reinforced channel-section steel termination is fixed respectively There is bow member to store cross-brace, railcar walker front end is connected with track truck control device bottom girder, track truck control device bottom Liang Sijiaochu is respectively fixed with control device column, protective cover is provided with the top of control device column, in control device column, rail The inside cavity that road truck control device bottom girder and protective cover are formed is provided with track truck control device and hydraulic power unit.
Railcar power slip and slide wire bracket are arranged on away from the position that ground level is 30cm ~ 40cm, and slide wire bracket Interval 250cm ~ 350cm is uniformly arranged.
Conveying track is set using channel-section steel back-off, and channel-section steel is welded and fixed with ground built-in fitting.Using channel-section steel back-off and weld The fixed form of built-in fitting, manual operation is simple, and the contact area of channel-section steel and built-in fitting is big, and fixed effect is good, cost performance It is high.
Bow member stores cross-brace and bow member storage longitudinal bracing uses work steel, and bow member storage cross-brace is arc Frame.
Possessed advantage and caused effect are the utility model compared with prior art:
It can effectively mitigate operating personnel's labor intensity using the utility model, improve bow member processing efficiency, while The risk in transit that straddle truck is brought in hoisting process is reduced, processing is especially manufactured to a fairly large number of bow member to be had actively Meaning, it is easy to promote the use of.
Brief description of the drawings
Fig. 1 is that bow member processes transportation system's floor map;
Fig. 2 is No. 1 motor railcar structural representation;
Fig. 3 is No. 1 motor railcar top view;
Fig. 4 is bow member weld zone schematic cross-sectional view;
Fig. 5 is No. 2 motor railcar top views;
Fig. 6 is finished product bow member traffic zone schematic cross-sectional view.
In figure:1- conveying tracks, 2- welding supports, 3- railcar power slips and slide wire bracket, 4-1 power rails Car, 5-2 motor railcars, 6- motors, 7- railcar walkers, 8- jacks, 9- road wheels, 10- railcars Platform, 11- track truck control device bottom girders, 12- track truck control devices, 13- control device columns, 14- protective covers, 15- add Strong steel box, the longitudinally reinforced channel-section steels of 16-, 17- bow members storage cross-brace, 18- bow members storage longitudinal bracing, A- bow member clod washes area, B- bow members weld zone, the examination of C- bow members is spelled and storage area.
Embodiment
The utility model is described further with reference to Fig. 1-Fig. 6, a kind of tunnel arch processes transportation system, including fortune Defeated track 1 and No. 1 motor railcar 4 and No. 2 motor railcars 5 being arranged on conveying track 1, conveying track 1 is through arch Frame clod wash area A, bow member weld zone B and bow member examination are spelled and storage area C is set, and bow member weld zone B is symmetrical in the both sides of conveying track 1 Welding support 2 is provided with, the side of conveying track 1 is provided with railcar power slip and slide wire bracket 3, in bow member clod wash area A Bow member welding interval B is provided with No. 1 motor railcar 4,2 are provided between bow member weld zone B and bow member examination spelling and storage area C Number 5, No. 1 motor railcar 4 of motor railcar and No. 2 motor railcars 5 contact connection with slip by current-collector.
No. 1 motor railcar 4 includes railcar walker 7, and the bottom symmetrical of railcar walker 7 is provided with road wheel 9, its In a pair of road wheels 9 be connected with motor 6, the top of railcar walker 7 is symmetrically arranged with 4 jacks 8, jacking thousand The top of jin top 8 is connected with railcar platform 10, and the rear end of railcar walker 7 is connected with track truck control device bottom girder 11, track Control device column 13 is connected with truck control device bottom girder 11, the top of control device column 13 is provided with protective cover 14, controlled The inside cavity that device column 13, track truck control device bottom girder 11 and protective cover 14 processed are formed is provided with track truck control device 12 and hydraulic power unit.
No. 2 motor railcars 5 include railcar walker 7, and the bottom symmetrical of railcar walker 7 is provided with road wheel 9, its In a pair of road wheels 9 be connected with motor 6, the top of railcar walker 7 is symmetrically arranged with 4 jacks 8, jacking thousand The top of jin top 8, which is connected with, strengthens steel box 15, and make-up two-by-two is respectively symmetrically provided with along the railcar direction of motion between reinforcement steel box 15 Longitudinally reinforced channel-section steel 16, the outside of longitudinally reinforced channel-section steel 16 is respectively fixed with bow member storage longitudinal bracing 18, strengthens the He of steel box 15 The longitudinally reinforced termination of channel-section steel 16 is respectively fixed with bow member storage cross-brace 17, and the front end of railcar walker 7 is connected with railcar Control device bottom girder 11, control device column 13, the top of control device column 13 are connected with track truck control device bottom girder 11 Protective cover 14 is provided with, in the inside cavity that control device column 13, track truck control device bottom girder 11 and protective cover 14 are formed It is provided with track truck control device 12 and hydraulic power unit.
Railcar power slip and slide wire bracket 3 are arranged on the position away from ground 30cm ~ 40cm, and slide wire bracket interval 250cm ~ 350cm is uniformly arranged.Conveying track 1 is set using channel-section steel back-off, and channel-section steel is welded and fixed with ground built-in fitting.Bow member Storage cross-brace 17 and bow member storage longitudinal bracing 18 use work steel, and bow member storage cross-brace 17 is row's arc bow members.
Embodiment:
Tunnel arch processes transportation system, mainly by 2 self-control motor railcars, welding support 2, conveying track 1, tracks Car power slip and the part of slide wire bracket 3 four are formed.
No. 1 motor railcar 4:It is mainly used in transporting the bow member of bow member forming mill cold roll forming to bow member weld zone B, i.e., Bow member welding processing is carried out on transport to welding support 2.Small rail car is made by oneself by running gear, hoisting system and control system three Part forms.Running gear includes motor 6, road wheel 9 and railcar walker 7, and the 7 four jiaos of installations of railcar walker are solid Fixed four 5t hydraulic jacks are as dolly climbing structure, and jack upper weld 1.5m × 1.2m × 10mm steel plates are as cold Roll forming bow member conveyance rail platform 10.Railcar afterbody is using 16# channel-section steels, 70 angle steel and 10mm steel plates welding control system System mounting platform, the main attachment rail truck control device 12 of control system mounting platform and hydraulic power unit.
No. 2 motor railcars:It is mainly used in transporting the finished product bow member of weld zone welding fabrication to area to be checked and bow member examination Spell and storage area C is carried out trying spelling and stored.Its construction of No. 2 motor railcars 5 of self-control is with making No. 14 basic phase of motor railcar by oneself Together, the main distinction is that the finished product bow member storage platform of four 5t hydraulic jack upper welds is welded using 4 18# I-steel Connect.2 I-steel wherein perpendicular to supply line orbital direction are processed according to finished product bow member pre-bending radian, parallel with transporting 2 I-steel in trajectory direction need not carry out pre-bending.
Conveying track 1 is laid:Conveying track 1 is mainly used in connecting bow member clod wash area A, bow member weld zone B, bow member area to be checked Spelling and storage area C are tried with bow member.Conveying track 1 length 70m, center spacing 1.1m, main be welded to connect using 2 8# channel-section steels and Into back buckle on the ground, is welded and fixed using ground embedded bar.
Welding support 2:The region welded mainly as the semi-finished product I-steel of pre-bending shaping with bow member connecting plate, is adopted It is molded with 20# I-steel welding processing, includes column and longeron two parts.Column longitudinal pitch 1.5m, column bottom is using length The I-steel transverse weld for spending 40cm lays the stability for ensureing welding support 2 on the ground, is not easy to mainly with ground consolidation The horizontal spacing of welding support 2 adjusts at any time, meets the bow member storage and welding of different length, longeron length 10m, with column top surface It is welded to connect.The shaped steel handled through bow member clod wash area A being placed on No. 1 platform of motor railcar 4, with No. 1 power Railcar 4 is transported to bow member weld zone B, is declined by operating the jack 8 on No. 1 motor railcar 4, by direct type to be welded Steel is placed on welding support 2, and keeps firm;Further, the steel members handled through clod wash are carried out in bow member weld zone B Soldering;After the completion of bow member welding, run using No. 2 motor railcars 5 to the bottom of welding support 2 for being supported by bow member, Bow member is raised by operating jack 8 and depart from welding support 2, welding bow member is further passed through into No. 2 power rails Car 5 is transported.
Railcar power slip and slide wire bracket 3:Principally serve as No. 1 motor railcar 4 and No. 2 motor railcars 5 carry For power.Slip height highly determines according to cart slideway, apart from rail top face 30cm.Slip is fixed on slide wire bracket, sliding Line bracket uses 40 × 60mm of ∠ unequal angle welding processing and formed, and slide wire bracket includes column and longitudinal rod two Point, column spacing is arranged to 3m.
The utility model is simple in construction, reasonable in design, easy for construction, compared with traditional bow member machining production line, mainly Add 2 self-control motor railcars, power slip and conveying track 1, about 25000 yuan of input increase, the processing efficiency of bow member Lifting at double is obtained, operating personnel's labor intensity substantially reduces, and the security risk of straddle truck lifting transport bow member significantly drops It is low, there is good application value.

Claims (6)

1. a kind of tunnel arch processes transportation system, including conveying track(1)And can be along conveying track(1)No. 1 of motion is dynamic Power railcar(4)With No. 2 motor railcars(5), it is characterised in that:Conveying track(1)Through bow member clod wash area(A), bow member weldering Meet area(B)Spelling and storage area are tried with bow member(C)Set, bow member weld zone(B)In conveying track(1)Both sides be symmetrically arranged with weldering Connect support(2), conveying track(1)Side be provided with railcar power slip and slide wire bracket(3), in bow member clod wash area(A) Between bow member weld zone(B)It is provided with No. 1 motor railcar(4), in bow member weld zone(B)Spelling and storage area are tried with bow member (C)Between be provided with No. 2 motor railcars(5), No. 1 motor railcar(4)With No. 2 motor railcars(5)Pass through current-collector Connection is contacted with slip.
A kind of 2. tunnel arch processing transportation system according to claim 1, it is characterised in that:No. 1 motor railcar(4) Including railcar walker(7), railcar walker(7)Bottom symmetrical is provided with road wheel(9), one pair of which road wheel(9) It is connected with motor(6), railcar walker(7)Top corner location is respectively arranged with jack(8), jack very heavy Top(8)Top is connected with railcar platform(10), railcar walker(7)Rear end is connected with track truck control device bottom girder (11), track truck control device bottom girder(11)Control device column is respectively fixed with corner(13), control device column(13) Top is provided with protective cover(14), in control device column(13), track truck control device bottom girder(11)And protective cover(14)Shape Into inside cavity be provided with track truck control device(12)And hydraulic power unit.
A kind of 3. tunnel arch processing transportation system according to claim 1, it is characterised in that:No. 2 motor railcars(5) Including railcar walker(7), railcar walker(7)Bottom symmetrical is provided with road wheel(9), one pair of which road wheel(9) It is connected with motor(6), railcar walker(7)Top corner location is respectively arranged with jack(8), jack very heavy Top(8)Top, which is connected with, strengthens steel box(15), strengthen steel box(15)Between along the railcar direction of motion be symmetrically arranged with two it is vertical To reinforcement channel-section steel(16), longitudinally reinforced channel-section steel(16)Outside is respectively fixed with bow member storage longitudinal bracing(18), strengthen steel box (15)With longitudinally reinforced channel-section steel(16)Termination is respectively fixed with bow member storage cross-brace(17), railcar walker(7)Front end It is connected with track truck control device bottom girder(11), track truck control device bottom girder(11)Control device is respectively fixed with corner to stand Post(13), control device column(13)Top is provided with protective cover(14), in control device column(13), track truck control device Bottom girder(11)And protective cover(14)The inside cavity of formation is provided with track truck control device(12)And hydraulic power unit.
A kind of 4. tunnel arch processing transportation system according to claim 1, it is characterised in that:Railcar power slip and Slide wire bracket(3)It is arranged on away from the position that ground level is 30cm ~ 40cm, and slide wire bracket interval 250cm ~ 350cm is uniformly set Put.
A kind of 5. tunnel arch processing transportation system according to claim 1, it is characterised in that:Conveying track(1)Using Channel-section steel back-off is set, and channel-section steel is welded and fixed with ground built-in fitting.
A kind of 6. tunnel arch processing transportation system according to claim 3, it is characterised in that:Bow member stores cross-brace (17)Longitudinal bracing is stored with bow member(18)Use work steel, bow member storage cross-brace(17)For row's arc bow members.
CN201720879370.6U 2017-07-19 2017-07-19 A kind of tunnel arch processes transportation system Active CN206889001U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720879370.6U CN206889001U (en) 2017-07-19 2017-07-19 A kind of tunnel arch processes transportation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720879370.6U CN206889001U (en) 2017-07-19 2017-07-19 A kind of tunnel arch processes transportation system

Publications (1)

Publication Number Publication Date
CN206889001U true CN206889001U (en) 2018-01-16

Family

ID=61297030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720879370.6U Active CN206889001U (en) 2017-07-19 2017-07-19 A kind of tunnel arch processes transportation system

Country Status (1)

Country Link
CN (1) CN206889001U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108480987A (en) * 2018-06-04 2018-09-04 中机自动化装备股份有限公司 A kind of tunnel steel arch frame mechanized production system
CN109702486A (en) * 2018-11-16 2019-05-03 中铁三局集团有限公司 A kind of processing unit (plant) improving tunnel steel arch frame connecting plate splicing accuracy

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108480987A (en) * 2018-06-04 2018-09-04 中机自动化装备股份有限公司 A kind of tunnel steel arch frame mechanized production system
CN109702486A (en) * 2018-11-16 2019-05-03 中铁三局集团有限公司 A kind of processing unit (plant) improving tunnel steel arch frame connecting plate splicing accuracy
CN109702486B (en) * 2018-11-16 2020-07-10 中铁三局集团有限公司 Machining device for improving assembling precision of tunnel steel arch frame connecting plate

Similar Documents

Publication Publication Date Title
CN105649654B (en) Automatic hydraulic inverted arch trestle chassis and its construction method
CN101736696B (en) Highway-railway dual-purpose box-shaped double-beam T-shaped beam bridge girder erection machine
CN106968179B (en) A kind of constructing device that Cast-in-situ Beam is carried out using self-propelled entirety falsework method
CN104775825B (en) Single-well integral starting construction method of shield tunneling machine
CN201610524U (en) Box double girder type bridge machine for erection of both railway and highway T-beams
CN205638490U (en) A portable platform truck that is used for subway station tread wind channel to pour
CN206889001U (en) A kind of tunnel arch processes transportation system
CN102373670A (en) Mobile platform carrying and erecting integrated machine and bridge erecting method
CN101943004B (en) Hydraulic self-running inclined-hole ordinary-state concrete casting trolley
CN202016492U (en) Cabinet body transporting vehicle
CN103527218A (en) Multifunctional combined type concrete lining trolley
CN203419675U (en) Traveling track for girder crane
CN109505251B (en) Method for erecting arched steel structure truss bridge
CN108004930A (en) The construction method of vertical shift bowstring arch bridge
CN107858935A (en) Two straddle type Bridge Erectors
CN208633840U (en) A kind of tunnel double-lining trolley of reserved ventilation shaft fixed structure
CN107604828A (en) The Bridge Erector of double-T shaped beam bridge
CN210884988U (en) Transverse moving mechanism of gantry crane
CN102431907B (en) Walking type tunnel carriageway plate crane
CN107401124A (en) The Bridge Erector of T-shaped beam bridge
CN207499886U (en) A kind of large cross-section tunnel moves adjustable waterproof construction trolley
CN210193245U (en) Lifting hook portal type casting crane
CN210389626U (en) Compound PC component production line
CN210239676U (en) Liftable formula reinforcement platform truck
JP2808179B2 (en) Mobile bogie device such as arched mobile form device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant