CN213358677U - Pipe rack with pipe rack support - Google Patents

Pipe rack with pipe rack support Download PDF

Info

Publication number
CN213358677U
CN213358677U CN202021905397.6U CN202021905397U CN213358677U CN 213358677 U CN213358677 U CN 213358677U CN 202021905397 U CN202021905397 U CN 202021905397U CN 213358677 U CN213358677 U CN 213358677U
Authority
CN
China
Prior art keywords
pipe rack
support
piping lane
horizontal
mount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021905397.6U
Other languages
Chinese (zh)
Inventor
陈伟浩
王仟
赵琨杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Underground Pipeline Development Co ltd
Original Assignee
Hangzhou Underground Pipeline Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Underground Pipeline Development Co ltd filed Critical Hangzhou Underground Pipeline Development Co ltd
Priority to CN202021905397.6U priority Critical patent/CN213358677U/en
Application granted granted Critical
Publication of CN213358677U publication Critical patent/CN213358677U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a pipe gallery with pipe gallery supports, belonging to the technical field of pipe galleries and solving the problems of complex installation and difficult operation of the pipe gallery supports, the whole pipe gallery channel is formed by connecting a plurality of square pipe galleries, a plurality of pipe gallery supports are symmetrically arranged on the side wall of each square pipe gallery perpendicular to the ground, the upper surface of the side wall of each square pipe gallery close to the ground is provided with an installation groove, each pipe gallery support comprises a fixed frame, one end of each fixed frame is inserted into the corresponding installation groove, the pipe rack support is preassembled in the square pipe rack, the fixing frame is provided with an ear plate, the ear plate is provided with a threaded hole, a fixing piece is arranged in a gap between the mounting groove and the fixing frame on the pipe rack support, a limiting bolt is screwed on the ear plate, when the limiting bolt is screwed down, the limiting bolt moves towards the ground direction, and the fixing piece is abutted to the fixing piece to enable the fixing piece to move towards the ground direction, so that the fixing piece is firmly connected in the mounting hole groove.

Description

Pipe rack with pipe rack support
Technical Field
The utility model belongs to the technical field of underground pipe gallery's technique and specifically relates to a pipe gallery who installs pipe gallery support is related to.
Background
At present, along with the development of cities, high-capacity power pipelines are applied more and more, in order to keep road appearance complete and attractive, the power pipelines and other communication pipelines are buried underground, underground pipe galleries are produced as soon as possible, the power pipelines, the telecommunication pipelines, the communication pipelines and other pipelines are placed in the same concrete structure, other municipal pipelines such as electricity, cold, heat, fuel gas and communication pipelines are laid in the underground pipe galleries even except gravity flow rain and sewage pipelines, and the municipal pipelines are connected to all land blocks through branch pipe galleries.
In the prior art, in order to ensure that various pipelines can be distributed in a pipe gallery in a more orderly manner, a horizontal layer frame is arranged on the inner wall of the pipe gallery, and the method for arranging the horizontal layer frame on the inner wall of the pipe gallery is mainly to punch holes on the inner wall of a concrete pipe gallery and fix the horizontal layer frame by using expansion bolts.
The above prior art solutions have the following drawbacks: at least more than two expansion bolts are arranged on each horizontal layer frame, and when a large number of horizontal layer frames need to be arranged, the installation steps required by field construction are more, and the installation is complicated.
SUMMERY OF THE UTILITY MODEL
To the not enough that prior art exists, one of the purpose of this application is to provide a simple installation, easy operation's piping lane support and piping lane.
The above object of the present application is achieved by the following technical solutions: the utility model provides an install piping lane of piping lane support is formed by connecting a plurality of square piping lanes, its characterized in that: including the piping lane support, be equipped with the piping lane support in the square piping lane, the piping lane support includes two piece at least fixedly connected with horizontal connecting rods between two at least mounts, two mounts, rectangular frame is constituteed with horizontal connecting rod to the mount, mount fixed connection has horizontal layer frame, horizontal layer frame perpendicular to horizontal connecting rod and mount simultaneously, square piping lane is close to and is opened on the lateral wall upper surface on ground and has the mounting groove, during the mounting groove that corresponds was inserted to the mount, is equipped with at least a set of piping lane support in each square piping lane.
Through adopting above-mentioned technical scheme, assemble the piping lane support in advance, install whole piping lane passageway with every piping lane support one by one after assembling, the installation is simple, and convenient operation has improved the installation effectiveness greatly.
Preferably: the horizontal shelf is positioned on one side of the fixing frame far away from the side wall of the pipe rack support.
By adopting the technical scheme, the middle passageway can be reserved for workers to maintain and install equipment, and the space utilization rate is increased.
Preferably: and a fixing piece for compensating the clearance is embedded in the clearance between the mounting groove and the fixing frame, and the fixing piece is in a triangular prism shape.
Through adopting above-mentioned technical scheme, be interference fit between mounting groove and the mount, assembly back mounting groove and mount surface take place elastic pressure for fixed firm connection is in the mounting hole groove.
Preferably: the fixing frame is fixedly connected with an ear plate, the ear plate is provided with a threaded hole, the threaded hole is connected with a limiting bolt in a threaded mode, and the limiting bolt abuts against the fixing piece.
Through adopting above-mentioned technical scheme, through screwing up the bolt, make bolt top tight mounting, during the clearance of mounting embedding mount and mounting hole, avoided the mounting undersize, look for the problem of application of force point difficulty.
Preferably: the fixing frame is provided with a plurality of second avoiding holes, one end of the horizontal layer frame is provided with a first avoiding hole, a bolt penetrates through the first avoiding hole, the bolt penetrates through one second avoiding hole simultaneously, and a first nut is screwed on the bolt.
By adopting the technical scheme, the horizontal layer frame can be raised or lowered according to different requirements, and the construction flexibility is improved.
Preferably: at least two horizontal layer racks are arranged on the fixed frame.
Through adopting above-mentioned technical scheme, set up the multilayer horizontal layer and can place more spool, increased the inside space utilization of piping lane.
Preferably: the upper surface of the horizontal shelf is at least provided with two grooves.
Through adopting above-mentioned technical scheme, the spool is placed and is difficult for rolling on the horizontal layer frame.
Preferably, the horizontal shelf is provided with two or more second avoidance holes corresponding to the fixing frame.
Through adopting above-mentioned technical scheme, the installation of horizontal layer frame is more stable, avoids overweight pipeline to make horizontal layer frame drop.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the pipe gallery is installed in advance, and during construction, the pipe gallery support is only required to be inserted into the installation groove and embedded into the fixing piece, so that the installation is convenient and the operation is simple;
2. embedding mounting in the clearance between mounting groove and the mount, pipe gallery support mounting is more firm.
Drawings
FIG. 1 is a schematic diagram of the overall structure of a pipe rack with a pipe rack bracket according to the embodiment;
FIG. 2 is an assembly schematic of a pipe rack with pipe rack brackets installed;
figure 3 is an exploded view of a pipe rack.
In the figure, 1, a square pipe gallery; 11. mounting grooves; 2. a fixing member; 3. a pipe rack support; 4. a limit bolt; 31. horizontal shelves; 311. a first avoidance void; 32. a fixed mount; 321. a second avoidance hole; 322. an ear plate; 3221. a threaded hole; 33. A first nut; 34. a horizontal connecting rod; 341. an external thread; 35. bolt, 36, second nut.
Detailed Description
The present application is described in further detail below with reference to the attached drawings.
Referring to fig. 1 and 2, the whole underground pipe gallery channel is formed by connecting a plurality of square pipe galleries 1. The symmetry is equipped with a plurality of piping lane supports 3 on the lateral wall of square piping lane 1 perpendicular to bottom surface, and square piping lane 1 is opened on being close to the lateral wall upper surface on ground has mounting groove 11. The pipe rack support 3 comprises a fixing rack 32, one end of the fixing rack 32 is inserted into the corresponding mounting groove 11, and the pipe rack support 3 is preassembled into the square pipe rack 1.
Referring to fig. 1, fig. 3, the ear plate 322 is arranged on the fixing frame 32, a threaded hole 3221 is arranged on the ear plate 322, a fixing member 2 is placed in a gap between the mounting groove 11 and the fixing frame 32 on the pipe rack support 3, a limiting bolt 4 is screwed in the threaded hole 3221, the limiting bolt 4 is screwed, the limiting bolt 4 moves towards the ground direction, the fixing member 2 is abutted, at the moment, the mounting groove 11 and the fixing frame 32 are in interference fit with each other, and elastic pressure is generated among the fixing member 2, so that the fixing frame 32 is firmly connected in the mounting hole groove 11.
During the construction, pipe gallery support 3 assembles well in advance, installs whole pipe gallery passageway with every pipe gallery support 3 one by one after assembling well, and the installation is simple, and convenient operation has effectively improved the installation effectiveness.
Referring to fig. 2 and 3, the pipe gallery support 3 includes two fixing frames 32 arranged along the vertical direction and two horizontal connecting rods 34 arranged along the horizontal direction, the horizontal connecting rods 34 are located between the two fixing frames 32, a plurality of second avoiding holes 321 are formed in the fixing frames 32 along the vertical direction, and two ends of each horizontal connecting rod 34 penetrate through one second avoiding hole 321 in the two fixing frames 32 respectively, so that the two fixing frames 32 and the two horizontal connecting rods 34 are rectangular.
In order to fix the horizontal connecting rod 34 to the fixing frame 32 more stably, the two ends of the horizontal connecting rod 34 are both provided with external threads 341, the two ends of the horizontal connecting rod 34 are both connected with first nuts 33 through threads, and the first nuts 33 abut against the outward side of the fixing frame 32, so that the horizontal connecting rod 34 is stably installed between the two fixing frames 32.
Referring to fig. 2 and 3, one end of the horizontal layer frame 31 is provided with two first avoidance holes 312, a bolt 35 penetrates through the first avoidance holes 312, the bolt 35 simultaneously penetrates through the second avoidance holes 321, and the bolt 35 is screwed with a second nut 36, so that the horizontal layer frame 31 is fixedly mounted on the fixing frames 32, three horizontal layer frames 31 are mounted on each fixing frame 32, and the mounting heights of the horizontal layer frames 31 mounted on the two fixing frames 32 connected by the two horizontal connecting rods 34 are the same. The upper surface of the horizontal layer frame 31 is provided with three grooves 312, and the conduit is not easy to roll off when being placed on the horizontal layer frame 31.
The workman will install pipe gallery support 3 in advance and transport the construction site, insert pipe gallery support 3 in corresponding mounting groove 11, put into mounting 2 in mounting groove 11 and mount 32's clearance, mounting 2 is the triangular prism shape, screw up spacing bolt 4, in the mounting 2 embedding gap, the installation of pipe gallery support 3 is accomplished, with the same mode with the whole installation of all pipe gallery supports 3 in the pipe gallery passageway accomplish the back, according to the weight of different pipelines and the reasonable every layer of horizontal layer frame 31 of placing of characteristic, and simultaneously, if require horizontal layer frame 31 transform height, loosen bolt 35, pull down horizontal layer frame 31, reselect suitable high installation, the flexibility of construction has been increased.
The embodiments of the present invention are preferred embodiments of the present application, and the scope of protection of the present application is not limited by the embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides an install piping lane of piping lane support is formed by connecting a plurality of square piping lanes (1), its characterized in that: including piping lane support (3), be equipped with piping lane support (3) in square piping lane (1), rectangular frame is constituteed with horizontal connecting rod (34) in mount (32) two at least fixedly connected with horizontal connecting rod (34) between at least two mount (32), two mount (32) in piping lane support (3), mount (32) fixed connection has horizontal layer frame (31), horizontal layer frame (31) perpendicular to horizontal connecting rod (34) and mount (32) simultaneously, square piping lane (1) is close to and opens on the lateral wall upper surface on ground has mounting groove (11), during mount (32) inserted corresponding mounting groove (11), is equipped with at least a set of piping lane support (3) in each square piping lane.
2. The pipe rack of claim 1 with the installed pipe rack support, characterized in that: the horizontal shelf (31) is positioned on one side of the fixed frame (32) far away from the side wall of the pipe rack support (3).
3. The pipe rack of claim 1 with the installed pipe rack support, characterized in that: the mounting structure is characterized in that a fixing piece (2) used for compensating a gap is embedded in the gap between the mounting groove (11) and the fixing frame (32), and the fixing piece (2) is in a triangular prism shape.
4. A pipe rack having installed pipe rack brackets according to claim 3, characterized in that: the fixing frame (32) is fixedly connected with an ear plate (322), the ear plate (322) is provided with a threaded hole (3221), the threaded hole (3221) is connected with a limiting bolt (4) in a threaded mode, and the limiting bolt (4) abuts against the fixing piece (2).
5. The pipe rack of claim 1 with the installed pipe rack support, characterized in that: be equipped with a plurality of seconds on mount (32) and dodge hole (321), horizontal layer frame (31) one end is equipped with first dodge hole (311), wear to be equipped with bolt (35) in first dodge hole (311), bolt (35) pass a second simultaneously and dodge hole (321), the spiro union has first nut (33) on bolt (35).
6. The pipe rack of claim 2 with the installed pipe rack support, characterized in that: the fixed frame (32) is provided with at least two horizontal layer frames (31).
7. The pipe rack of claim 2 with the installed pipe rack support, characterized in that: the upper surface of the horizontal shelf (31) is at least provided with two grooves (312).
8. A pipe rack having pipe rack brackets installed according to claim 4, characterized in that: the horizontal shelf (31) is provided with two or more second avoidance holes (321) corresponding to the fixing frame (32).
CN202021905397.6U 2020-09-03 2020-09-03 Pipe rack with pipe rack support Active CN213358677U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021905397.6U CN213358677U (en) 2020-09-03 2020-09-03 Pipe rack with pipe rack support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021905397.6U CN213358677U (en) 2020-09-03 2020-09-03 Pipe rack with pipe rack support

Publications (1)

Publication Number Publication Date
CN213358677U true CN213358677U (en) 2021-06-04

Family

ID=76148963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021905397.6U Active CN213358677U (en) 2020-09-03 2020-09-03 Pipe rack with pipe rack support

Country Status (1)

Country Link
CN (1) CN213358677U (en)

Similar Documents

Publication Publication Date Title
CN102242575A (en) Noise-reducing dust-reducing partition system for construction site as well as assembling and use method thereof
CN112510610B (en) Assembled pipe gallery support and construction process thereof
CN204906277U (en) Photovoltaic module installing support suitable for foundation settlement ground place easily takes place
CN213358677U (en) Pipe rack with pipe rack support
CN202194159U (en) Square pipe gallery bracket and square pipe gallery
US20120216465A1 (en) Fastener free assembly system for solar panel arrays
CN205935331U (en) U type glass curtain wall installing the system
KR102398005B1 (en) Land weight type solar energy generating apparatus capable of facilitating installation and dismantlement
CN210684774U (en) Assembled concrete utility tunnel is connected to slot type
CN213982318U (en) Assembled piping lane support
CN108999318B (en) Unit curtain wall side buried single pendant structure, unit body with side buried single pendant and unit curtain wall mounting method
CN212871149U (en) Deep level displacement monitoring devices
CN110924431A (en) Comprehensive pipe gallery faces limit protector
CN206706828U (en) A kind of corrugated steel pipe gallery variable bit support connection structure
CN214466995U (en) Pipeline strutting arrangement is adopted in natural gas exploitation
CN221323544U (en) Pipeline bracket for building construction
CN213741458U (en) Fixing device is used in municipal works drainage pipe construction
CN220382715U (en) Wire clamping device for pile foundation positioning
CN217056629U (en) Stable water pipe seat
CN221167911U (en) Assembled utility tunnel
CN208237221U (en) A kind of interim pipeline suspension arrangement
CN220889677U (en) Utility tunnel
CN216952027U (en) Annular vibration isolation gallows for piping lane
CN214222229U (en) Assembled detachable pipe gallery support
CN210669429U (en) Positioning structure based on cable conductor and cable bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant