CN220382715U - Wire clamping device for pile foundation positioning - Google Patents
Wire clamping device for pile foundation positioning Download PDFInfo
- Publication number
- CN220382715U CN220382715U CN202322012198.2U CN202322012198U CN220382715U CN 220382715 U CN220382715 U CN 220382715U CN 202322012198 U CN202322012198 U CN 202322012198U CN 220382715 U CN220382715 U CN 220382715U
- Authority
- CN
- China
- Prior art keywords
- pile foundation
- clamp body
- steel pile
- shaped steel
- penetrating rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 65
- 239000010959 steel Substances 0.000 claims abstract description 65
- 230000000149 penetrating effect Effects 0.000 claims abstract description 41
- 238000004804 winding Methods 0.000 claims description 6
- 238000010276 construction Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The application discloses card line ware of stake basis location usefulness includes: the penetrating rod penetrates through the through hole on the side edge of the C-shaped steel pile foundation; the first clamp body is fixed on one end of the penetrating rod; the second clamp body is slidably and rotatably sleeved at the other end of the penetrating rod, and a nut is screwed at the threaded end of the penetrating rod at the other end far away from the holding end to push the second clamp body to lean against the first clamp body. After the penetrating rod penetrates through the through hole on the side edge of the C-shaped steel pile foundation with the first clamp body, the positioning stay wire is wound on the penetrating rod close to the holding end, the nut is screwed on the penetrating rod to push the second clamp body to be clamped on the C-shaped steel pile foundation close to the first clamp body, the positioning stay wire is fixed on the C-shaped steel pile foundation, when the positioning stay wire is required to be dismounted, the second clamp body of the nut is screwed out to be far away from the first clamp body and is not clamped on the C-shaped steel pile foundation any more, and the positioning stay wire is dismounted from the C-shaped steel pile foundation and is lowered, so that the problem that the positioning ring is inconvenient to dismount, adjust and install on the C-shaped steel pile foundation to adapt to stay wire mounting is solved.
Description
Technical Field
The utility model relates to a line clamping device for pile foundation positioning, and belongs to the technical field of photovoltaic power station construction.
Background
When the photovoltaic power station is constructed in mountain environment construction, the C-shaped steel pile foundation is pre-buried in concrete poured into the pile hole, and then the mounting frame body is used for paving a plurality of photovoltaic panels at the later stage on the C-shaped steel pile foundation. In order to ensure that a plurality of C-shaped steel pile foundations are collinear in an inclined mountain area, the C-shaped steel pile foundations need to be positioned when being pre-buried so as to ensure that the C-shaped steel pile foundations in the middle and the C-shaped steel pile foundations at two ends are collinear.
The existing technology for collineation of a middle pile foundation and two-end pile foundations is like a photovoltaic power station concrete pile foundation embedded part positioning assembly with a Chinese patent publication number of CN215562767U, and the disclosed technology is as follows: two perpendicularity checking lines are respectively pulled at the top and the bottom of the positioning frames, namely, the embedded parts of the concrete pile foundation in the same direction, the same inclined plane or the same horizontal plane can be adjusted; the top and the bottom of one side of the rod body are respectively provided with a positioning ring which is convenient for a stay wire to pass through; although the locating stay wire can be installed with the rod body through the locating ring, the problem that the locating ring is inconvenient to detach, adjust and install on the C-shaped steel pile foundation to adapt to stay wire installation exists.
Disclosure of Invention
In order to solve the technical problems, the utility model provides a wire clamping device for positioning a pile foundation.
The utility model is realized by the following technical scheme.
The utility model provides a line clamping device for positioning a pile foundation, which comprises the following components:
the penetrating rod penetrates through the through hole on the side edge of the C-shaped steel pile foundation;
the first clamp body is fixed on one end of the penetrating rod;
the second clamp body is slidably and rotatably sleeved at the other end of the penetrating rod, and a nut is screwed at the threaded end of the penetrating rod at the other end far away from the holding end to push the second clamp body to lean against the first clamp body.
The penetrating rod is fixed with a holding end which is convenient to hold.
The penetrating rod close to the holding end is provided with a winding through hole for penetrating and winding the positioning stay wire.
The C-shaped steel pile foundation is characterized by further comprising a C-shaped steel pile foundation which is used for being clamped with the first clamp body and the second clamp body, wherein a plurality of through holes are formed in the side edges of the C-shaped steel pile foundation, and the penetrating rod penetrates through the through holes in the side edges of the C-shaped steel pile foundation.
The whole width of the first clamp body and the penetrating rod is smaller than the width of the through hole at the side edge of the foundation of the C-shaped steel pile.
The bottom of the C-shaped steel pile foundation is pre-buried and fixed in concrete, and the concrete is installed in pile holes of the mountain land.
The utility model has the beneficial effects that: after the penetrating rod penetrates through the through hole on the side edge of the C-shaped steel pile foundation with the first clamp body, the positioning stay wire is wound on the penetrating rod close to the holding end, the nut is screwed on the penetrating rod to push the second clamp body to be clamped on the C-shaped steel pile foundation close to the first clamp body, the positioning stay wire is fixed on the C-shaped steel pile foundation, when the positioning stay wire is required to be dismounted, the second clamp body of the nut is screwed out to be far away from the first clamp body and is not clamped on the C-shaped steel pile foundation any more, the positioning stay wire is dismounted from the C-shaped steel pile foundation, and the problem that the positioning ring is inconvenient to dismount, adjust and install on the C-shaped steel pile foundation to adapt to stay wire mounting is solved.
Drawings
FIG. 1 is a schematic diagram of a structure of a middle C-shaped steel pile foundation according to the utility model by means of positioning stay wires;
FIG. 2 is a schematic structural view of the positioning stay wire of the utility model mounted on a C-corrugated steel pile foundation through a wire clamping device;
FIG. 3 is a schematic diagram of the structure of the through hole of the line clamping device penetrating through the side edge of the C-shaped steel pile foundation;
FIG. 4 is a schematic diagram of the structure of the wire clip of the present utility model;
in the figure: 1-C corrugated steel pile foundation; 11-pile hole; 12-concrete; 3-mountain land; 2-positioning a stay wire; 3-mountain land; 41-a penetrating rod; 42-holding end; 43-winding through holes; 5-a first clamp body; 6-a second clamp; 7-nut.
Detailed Description
The technical solution of the present utility model is further described below, but the scope of the claimed utility model is not limited to the above.
As shown in fig. 1 to 4.
The pile foundation positioning construction method comprises the following steps:
the method comprises the steps that firstly, C-shaped steel pile foundations 1 at two tail ends are vertically pre-buried in pile holes 11 which are poured into concrete 12 through a level meter, and the C-shaped steel pile foundations 1 are vertically arranged in mountain areas 3 after the concrete 12 is solidified;
and secondly, mounting positioning stay wires 2 on the side edges of the C-shaped steel pile foundations 1 at the tail ends, detachably fixing the two ends of the positioning stay wires 2 on the side edges of the two C-shaped steel pile foundations 1, pre-embedding the C-shaped steel pile foundations 1 in the middle into pile holes 11 which are poured into concrete 12 by taking the positioning stay wires 2 as positioning references, and adjusting to be vertical by combining with a level meter to present a pile foundation positioning distribution system.
The two ends of the positioning stay wire 2 are detachably fixed on the two C-shaped steel pile foundations 1 at the tail ends, when the C-shaped steel pile foundations 1 in the middle are pre-buried into the pile holes 11 poured into the concrete 12 by taking the positioning stay wire 2 as a positioning reference, the positioning stay wire 2 does not occupy too much site construction space, and the problem that the positioning rods occupy construction environment space on the two ends of the pile foundations is solved.
The utility model provides a pile foundation location distribution system, includes:
a plurality of pile holes 11 which are collinear and distributed at intervals are excavated in the mountain land 3 for providing a construction stress foundation in an inclined state;
the pile hole 11 is poured with concrete 12, and a C-shaped steel pile foundation 1 is embedded in the concrete 12;
a positioning stay wire 2 is detachably fixed on the side edge between the two C-shaped steel pile foundations 1 at the tail end, and the C-shaped steel pile foundations 1 at the middle part are installed in the concrete 12 of the pile hole 11 by means of the positioning stay wire 2 as a positioning reference.
When the C-shaped steel pile foundation 1 in the middle is installed in the concrete 12 of the pile hole 11, the C-shaped steel pile foundation 1 in the middle is installed by taking the positioning stay wire 2 as a positioning reference, and the positioning stay wire 2 is installed on the side edge between the two C-shaped steel pile foundations 1 at the tail end, so that the positioning stay wire 2 does not occupy too much site construction space, and the problem that the positioning rods occupy construction environment space on the two ends of the pile foundation is solved.
The positioning stay wire 2 is detachably and fixedly arranged on the two C-shaped steel pile foundations 1 at the tail ends through a wire clamping device for pile foundation positioning.
The utility model provides a line ware is blocked to stake basis location usefulness, includes:
the penetrating rod 41 penetrates through the through hole on the side edge of the C-shaped steel pile foundation 1, and a holding end 42 is integrally fixed at one end of the penetrating rod 41 so as to be convenient to hold;
the penetrating rod 41 towards the holding end 42 is integrally and fixedly connected with the first clamp body 5;
the other end of the penetrating rod 41 far from the holding end 42 is slidably and rotatably sleeved with the second clamp body 6, and the other end of the penetrating rod 41 far from the holding end 42 is provided with a threaded end in a screwed manner to push the second clamp body 6 to lean against the first clamp body 5.
After the penetrating rod 41 is penetrated on the through hole on the side edge of the C-shaped steel pile foundation 1 with the first clamp body 5, the positioning stay wire 2 is wound and installed on the penetrating rod 41 close to the holding end 42, the nut 7 is screwed on the penetrating rod 41 to push the second clamp body 6 to be clamped on the C-shaped steel pile foundation 1 close to the first clamp body 5, the positioning stay wire 2 is fixed on the C-shaped steel pile foundation 1, when the positioning stay wire 2 is required to be disassembled, the second clamp body 6 of the nut 7 is far away from the first clamp body 5 and is not clamped on the C-shaped steel pile foundation 1 any more, the positioning stay wire 2 is disassembled from the C-shaped steel pile foundation 1, and the problem that the positioning ring is inconvenient to disassemble, adjust and install on the C-shaped steel pile foundation to adapt to stay wire installation is solved.
The penetrating rod 41, which is directed towards the holding end 42, is provided with a winding through hole 43 for the positioning wire 2 to be wound therethrough.
The C-shaped steel pile foundation comprises a first clamping body 5 and a second clamping body 6, and is characterized by further comprising a C-shaped steel pile foundation 1 which is clamped with the first clamping body 5 and the second clamping body 6, wherein a plurality of through holes are formed in the side edge of the C-shaped steel pile foundation 1, and a penetrating rod 41 penetrates through the through holes in the side edge of the C-shaped steel pile foundation 1.
The whole width of the first clamp body 5 added with the penetrating rod 41 is smaller than the width of the through hole on the side edge of the C-shaped steel pile foundation 1.
The bottom of the C-shaped steel pile foundation 1 is pre-buried and fixed in concrete 12, and the concrete 12 is installed in pile holes 11 of the mountain land 3.
Claims (6)
1. The wire clamping device for positioning the pile foundation is characterized by comprising a penetrating rod (41) which penetrates through a through hole on the side edge of the C-shaped steel pile foundation (1);
the first clamp body (5), the first clamp body (5) is fixed on one end of the penetrating rod (41);
the second clamp body (6) is sleeved at the other end of the penetrating rod (41) in a sliding and rotating mode, a nut (7) is screwed at the other end of the penetrating rod (41) far away from the holding end (42) for pushing the second clamp body (6) to lean against the first clamp body (5).
2. The pile foundation positioning wire clip of claim 1, wherein: the penetrating rod (41) is fixed with a holding end (42) which is convenient to hold.
3. The pile foundation positioning wire clip of claim 1, wherein: the penetrating rod (41) close to the holding end (42) is provided with a winding through hole (43) for penetrating and winding the positioning stay wire (2).
4. The pile foundation positioning wire clip of claim 1, wherein: the C-shaped corrugated steel pile foundation structure is characterized by further comprising a C-shaped corrugated steel pile foundation (1) which is used for being clamped with the first clamp body (5) and the second clamp body (6), wherein a plurality of through holes are formed in the side edges of the C-shaped corrugated steel pile foundation (1), and the penetrating rod (41) penetrates through the through holes in the side edges of the C-shaped corrugated steel pile foundation (1).
5. The pile foundation positioning wire clip of claim 1, wherein: the whole width of the first clamp body (5) plus the penetrating rod (41) is smaller than the width of the through hole at the side edge of the C-shaped steel pile foundation (1).
6. The pile foundation positioning wire clip of claim 4, wherein: the bottom of the C-shaped steel pile foundation (1) is pre-buried and fixed in concrete (12), and the concrete (12) is installed in pile holes (11) of the mountain land (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322012198.2U CN220382715U (en) | 2023-07-28 | 2023-07-28 | Wire clamping device for pile foundation positioning |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322012198.2U CN220382715U (en) | 2023-07-28 | 2023-07-28 | Wire clamping device for pile foundation positioning |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220382715U true CN220382715U (en) | 2024-01-23 |
Family
ID=89565837
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322012198.2U Active CN220382715U (en) | 2023-07-28 | 2023-07-28 | Wire clamping device for pile foundation positioning |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220382715U (en) |
-
2023
- 2023-07-28 CN CN202322012198.2U patent/CN220382715U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208039267U (en) | A kind of support connection structure of subway foundation pit steel purlin | |
CN220382715U (en) | Wire clamping device for pile foundation positioning | |
CN220266618U (en) | Pile foundation positioning and distributing system | |
CN116927231A (en) | Pile foundation positioning construction method | |
CN212336092U (en) | Underground pipe gallery | |
CN210563705U (en) | Suspended upright post installation auxiliary device | |
CN215802129U (en) | Slope cut-off and drainage groove fixing device | |
CN213450496U (en) | Novel special antidetonation support of shield tunnel embedded channel | |
CN213584606U (en) | Lightning protection mechanism for short wave signal transmitting tower in broadcast television station | |
CN215906818U (en) | Vegetation slope protection soil and water conservation device | |
CN220172582U (en) | Power equipment installs linkage | |
CN220927967U (en) | Anti-floating device of embedded power pipeline | |
CN213243425U (en) | Lateral anti-seismic support for cable bridge | |
CN218298085U (en) | Special support for vertically arranging double-split conductor unmanned aerial vehicle X-ray detection | |
CN221633392U (en) | Lightning rod installing support of electric power iron tower | |
CN219753265U (en) | Slope protection reinforcing structure | |
CN212927098U (en) | Supporting tool assembly for adjusting trench cover | |
CN218780083U (en) | Communication tower | |
CN213476896U (en) | Geotechnical engineering underground structure convenient to dismouting | |
CN212689651U (en) | Enclosure reinforcing device for ancient building | |
CN221646178U (en) | Integral tile hanging structure of sloping roof | |
CN220377305U (en) | Foundation pit collapse prevention fixing frame for subway building | |
CN219013833U (en) | River water level flow monitoring and early warning device | |
CN221823389U (en) | Construction device for reserved hole of building wall | |
CN216587379U (en) | Glazed tiles roof photovoltaic board mounting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |