A kind of interim pipeline suspension arrangement Download PDFInfo
- Publication number
- CN208237221U CN208237221U CN201820797388.6U CN201820797388U CN208237221U CN 208237221 U CN208237221 U CN 208237221U CN 201820797388 U CN201820797388 U CN 201820797388U CN 208237221 U CN208237221 U CN 208237221U
- Authority
- CN
- China
- Prior art keywords
- temporary construction
- construction fence
- connecting plate
- suspension arrangement
- interim pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model relates to building machinery fields, specifically disclose a kind of interim pipeline suspension arrangement, including temporary construction fence, and at least two be hung on the temporary construction fence and along the suspension assembly of the length direction of temporary construction fence distribution, each suspension assembly includes the frame that hangs being hung on the temporary construction fence, and is connected to several suspension grooves for being used to place interim pipeline for hanging frame.When installing suspension arrangement described in the utility model, only need to will hang frame hang on the temporary construction fence i.e. shell, and mounting means is simple, saves human and material resources;And when installing interim pipeline, every interim pipeline need to be only placed in the suspension groove that two are correspondingly arranged, be dismounted efficient and convenient;And a suspension arrangement can install several interim pipelines, save installation space and installation cost.
Description
Technical field
The utility model relates to building machinery field more particularly to a kind of interim pipeline suspension arrangements.
Background technique
In construction site construction period, need to use more interim pipeline such as cable, water pipe etc., in the prior art to facing
The installation of electrical cables, interim water pipe generallys use following two mode and is installed.The first is built-in type, specifically uses ditch
Machine digging groove is buried, and is excavated again by hook machine after use, and the construction time is long, expensive, and applies in the engineering earthwork
If label is improper during work, it is easy digging power-off cable and causes safety accident.Second is overhead type, specifically uses scaffold
Set up mounting rack, but this kind of mode waste of manpower, material resources, it is at high cost, and it is only used for a kind of installation of pipeline.
Utility model content
The purpose of this utility model is to provide a kind of interim pipeline suspension arrangements, can be improved speed of application, reduce and apply
Security performance when work cost, raising dismounting.
For this purpose, the utility model uses following technical scheme:
A kind of interim pipeline suspension arrangement, including temporary construction fence and at least two be hung on the temporary construction fence and edge
The suspension assembly of the length direction distribution of the temporary construction fence, each suspension assembly includes the extension being hung on the temporary construction fence
If frame, and be connected to and described hang the several for placing the suspension groove for facing pipeline of frame.
Further, the side of the temporary construction fence is equipped with connector, one end of the connector be connected to be placed in it is described
The described of temporary construction fence side hangs frame and hangs the side that frame presses on the temporary construction fence across described, makes to be placed in described face
When the described of the enclosing other side hang the other side that frame presses on the temporary construction fence.
Further, the frame that hangs includes the first connecting plate for being sequentially connected and being formed inverted U-shaped structure, third connecting plate
With the second connecting plate, the length of first connecting plate is less than the length of second connecting plate.
Further, the inverted U-shaped structure is hung on the temporary construction fence, and first connecting plate and the connection
Part is threadedly coupled.
Further, second connecting plate is provided along its length several hanger brackets, on each hanger bracket
Equipped with a suspension groove.
Further, the second connecting plate is located between the hanger bracket and the temporary construction fence, the hanger bracket and institute
The second connecting plate is stated to connect by fastener.
Further, the fastener is bolt, and each hanger bracket is fixed on by least described two fasteners
Second connecting plate.
Further, the temporary construction fence includes pedestal and the baffle set on the side of the pedestal.
Further, the suspension groove is U-type groove.
The utility model has the beneficial effects that only need to will hang frame when installing suspension arrangement described in the utility model and hang
In being shell on the temporary construction fence, mounting means is simple, saves human and material resources;And when installing interim pipeline, only needing will be every
The interim pipeline of root is placed in the suspension groove that two are correspondingly arranged, and is dismounted efficient and convenient;And a suspension arrangement can pacify
Several interim pipelines are filled, installation space and installation cost are saved.
Detailed description of the invention
Fig. 1 is the main view of interim pipeline suspension arrangement described in the utility model;
Fig. 2 is the side view of Fig. 1;
Fig. 3 is the partial enlargement diagram in Fig. 1 at I.
In figure:
1, temporary construction fence;11, pedestal;12, baffle;
2, suspension assembly;21, frame is hung;211, the first connecting plate;212, the second connecting plate;213, third connecting plate;22,
Hanger bracket;221, suspension groove;23, connector;
10, interim pipeline.
Specific embodiment
The technical issues of to solve the utility model, the technical solution of use and the technical effect that reaches are clearer,
Further illustrate the technical solution of the utility model below with reference to the accompanying drawings and specific embodiments.It is understood that
Specific embodiment described herein is used only for explaining the utility model, rather than the restriction to the utility model.In addition it also needs
It is noted that illustrating only part relevant to the utility model for ease of description, in attached drawing and not all.
As depicted in figs. 1 and 2, a kind of interim pipeline suspension arrangement, including temporary construction fence 1 are present embodiments provided, and extremely
Few two are hung on the temporary construction fence 1 and along the suspension assembly 2 of the length direction of the temporary construction fence 1 distribution, each outstanding
Hanging component 2 includes being hung on the temporary construction fence 1 and hanging frame 21, and be connected to and described hang the several for placing of frame 21
The suspension groove 221 of interim pipeline 10.The length and weight phase of the distance between two neighboring suspension assembly 2 and interim pipeline 10
It closes, the number of suspension assembly 2 and two neighboring outstanding can be determined according to the length and weight of the interim pipeline 10 actually used
The distance between hanging component 2.Above-mentioned interim pipeline 10 refers to temporary cable, water pipe etc..
When installing suspension arrangement described in the present embodiment, it only need to will hang frame 21 and hang on the temporary construction fence 1,
Mounting means is simple, saves human and material resources;And when installing interim pipeline 10, only need every interim pipeline 10 being placed in two
In a suspension groove 221 being correspondingly arranged, dismount efficient and convenient;And a suspension arrangement can install several interim pipes
Line 10 saves installation space and installation cost.
In the present embodiment, the temporary construction fence 1 includes pedestal 11 and the baffle 12 set on the side of the pedestal 11, is passed through
Pedestal 11 is that baffle 12 provides a supporting role.It is in actual use usually that pedestal 11 is placed directly on ground, baffle
12 are vertically arranged with pedestal 11, and suspension assembly 2 is hung directly from baffle 12.
The frame 21 that hangs includes the first connecting plate 211, the third connecting plate 213 for being sequentially connected and being formed inverted U-shaped structure
With the second connecting plate 212, the length of first connecting plate 211 is less than the length of second connecting plate 212, actually hangs
Frame 21 is in be similar toThe inverted U-shaped structure of type.The inverted U-shaped structure hang on the top of the baffle 12, so that first connects
Fishplate bar 211 and the second connecting plate 212 are respectively placed in the two sides of baffle 12;First connecting plate 211 and 23 spiral shell of connector
Line connection, specifically, the side of baffle 12 is equipped with connector 23, which is stay bolt bar, is set on the first connecting plate 211
Have a through-hole, the two sides of the through-hole are equipped with nut, one end of stay bolt bar sequentially pass through the nut of the through-hole side, through-hole with
And the nut of the through-hole other side, the side of baffle 12 is then pressed on, so that the second connecting plate 212 presses on the another of baffle 12
Side;By the way that connector 23 is arranged, it can be adjusted and be located between baffle 12 and the first connecting plate 211 according to the thickness of baffle 12
The length of stay bolt improves the stability of above-mentioned suspension arrangement so that one end of stay bolt bar presses on the one side of baffle 12
And safety.
In practical application, when the thickness of baffle 12 is less than 300mm, it can be adjusted by stay bolt bar as connector 23
Section is located in the length of the stay bolt between baffle 12 and the first connecting plate 211, so that one end of stay bolt bar presses on baffle
12 one side will hang stability and safety after frame 21 is hung on temporary construction fence 1 to improve.
As shown in figures 1 and 3, the side of the second connecting plate 212 is provided along its length several hanger brackets 22, each outstanding
The suspension groove 221 is equipped on hanger 22, above-mentioned suspension groove 221 is U-type groove, convenient for placing interim pipeline 10, preferably
, the depth of the U-type groove is more than or equal to the half of cable or water pipe diameter, to avoid cable or water pipe in microvibration
In the case where be detached from U-type groove, improve security performance when placing cable or water pipe using suspension arrangement described in the present embodiment;It is U-shaped
The distance between slot opposite sides face is more than or equal to the diameter of cable or water pipe, so that water pipe or cable can be placed at U-type groove
It is interior.There are three suspension assembly 2 described in the present embodiment is set, that is to say, that along the length direction of baffle 12, sustained height is distributed with
Three U-type grooves support same interim pipeline 10 by three U-type grooves, and stability is good, not easily to fall off.Of above-mentioned hanger bracket 22
The number for the interim pipeline 10 that number can be fixed according to actual needs determines, can suitably increase and decrease according to actual needs,
It is no longer specific herein to limit.
In the present embodiment, the second connecting plate 212 is located between the hanger bracket 22 and the baffle 12, the hanger bracket
22 are connected with second connecting plate 212 by fastener.In the present embodiment, above-mentioned fastener is bolt, each hanger bracket 22
The connection that itself and baffle 12 are realized by two bolts, ensure that the stability of hanger bracket 22.
The number of above-mentioned fastener is not limited in two, can also use other quantity, true with specific reference to actual demand
It is fixed.In the present embodiment, the hanger bracket 22 uses the steel plate bending of identical material to be made with frame 21 is hung, and the material of steel plate is herein
It is no longer specific to limit.
Obviously, the above embodiments of the present invention is used for the purpose of clearly illustrating examples for clearly illustrating the present invention, and
It is not limitations of the embodiments of the present invention.For those of ordinary skill in the art, in above description
On the basis of can also make other variations or changes in different ways.There is no need and unable to give all embodiments
Exhaustion.Any modifications, equivalent replacements, and improvements made within the spirit and principle of the present invention etc., should be included in
Within the protection scope of the utility model claims.
Claims (9)
1. a kind of interim pipeline suspension arrangement, which is characterized in that be hung on described face including temporary construction fence (1) and at least two
When enclosing (1) on and along the suspension assembly (2) of the length direction of the temporary construction fence (1) distribution, each suspension assembly (2) includes
It is hung on the temporary construction fence (1) and hangs frame (21), and be connected to and described hang the several interim for placing of frame (21)
The suspension groove (221) of pipeline (10).
2. interim pipeline suspension arrangement according to claim 1, which is characterized in that the side of the temporary construction fence (1) is set
Have connector (23), one end of the connector (23), which is connected to, to be placed in the described of the temporary construction fence (1) side and hang frame
(21) and pass through it is described hang the side that frame (21) presses on the temporary construction fence (1), make to be placed in the temporary construction fence (1) another
The described of side hangs the other side that frame (21) presses on the temporary construction fence (1).
3. interim pipeline suspension arrangement according to claim 2, which is characterized in that described hang frame (21) include successively connecting
Connect and formed the first connecting plate (211), third connecting plate (213) and the second connecting plate (212) of inverted U-shaped structure, described first
The length of connecting plate (211) is less than the length of second connecting plate (212).
4. interim pipeline suspension arrangement according to claim 3, which is characterized in that the inverted U-shaped structure hang on described
On temporary construction fence (1), and first connecting plate (211) is threadedly coupled with the connector (23).
5. interim pipeline suspension arrangement according to claim 3, which is characterized in that second connecting plate (212) is along it
Length direction is equipped with several hanger brackets (22), is equipped with the suspension groove (221) on each hanger bracket (22).
6. interim pipeline suspension arrangement according to claim 5, which is characterized in that the second connecting plate (212) is located in institute
It states between hanger bracket (22) and the temporary construction fence (1), the hanger bracket (22) and second connecting plate (212) pass through fastening
Part connection.
7. interim pipeline suspension arrangement according to claim 6, which is characterized in that the fastener is bolt, Mei Gesuo
It states hanger bracket (22) and is fixed on second connecting plate (212) by least two fasteners.
8. interim pipeline suspension arrangement according to claim 1, which is characterized in that the temporary construction fence (1) includes pedestal
(11) baffle (12) of the side and set on the pedestal (11).
9. interim pipeline suspension arrangement according to claim 1, which is characterized in that the suspension groove (221) is U-type groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820797388.6U CN208237221U (en) | 2018-05-28 | 2018-05-28 | A kind of interim pipeline suspension arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820797388.6U CN208237221U (en) | 2018-05-28 | 2018-05-28 | A kind of interim pipeline suspension arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208237221U true CN208237221U (en) | 2018-12-14 |
Family
ID=64575014
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820797388.6U Expired - Fee Related CN208237221U (en) | 2018-05-28 | 2018-05-28 | A kind of interim pipeline suspension arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208237221U (en) |
-
2018
- 2018-05-28 CN CN201820797388.6U patent/CN208237221U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208237221U (en) | A kind of interim pipeline suspension arrangement | |
CN208982781U (en) | Air hose mounting bracket in truss | |
CN215981218U (en) | Pipeline installation gallows under L shaped steel roof beam | |
CN102425254A (en) | Keel connecting device based on suspended curtain wall | |
CN202767547U (en) | Nuclear plant construction safety rope fixing clamping rod | |
CN209169914U (en) | It broadens the cable suspension and support of section for pipe gallery | |
CN203240109U (en) | Combined type cable hanging rack | |
CN202840313U (en) | Outdoor box body installation structure | |
CN202273337U (en) | Keel connecting device based on suspension type curtain wall | |
CN219499261U (en) | Photovoltaic module railing couple | |
CN212486062U (en) | Cable bridge hanger with insulation protection function | |
CN219712545U (en) | Combined supporting and lifting device for multi-layer water pipeline of power plant | |
CN211449863U (en) | Pay-off rack for pipeline repair | |
CN211287477U (en) | But reuse's a string ladder that is used for steel construction installation | |
CN210669429U (en) | Positioning structure based on cable conductor and cable bridge | |
CN217508203U (en) | Temporary electric wire suspension device for main building decoration stage | |
CN218992563U (en) | A simple and easy support for bearing pipeline | |
CN218216477U (en) | Communication room wiring rack easy to assemble and disassemble | |
CN221328514U (en) | Electromechanical pipeline support hanger bridge | |
CN220168779U (en) | Underground pipeline suspension protection structure | |
CN204947971U (en) | modular photovoltaic bracket | |
CN214379858U (en) | Anti-seismic support convenient to install in photovoltaic module workshop | |
CN207795302U (en) | Mining pipeline hook and mining pipeline hanging hook assembly | |
CN213717499U (en) | Cable support and bridge | |
CN212297944U (en) | Anti-seismic support device based on steel structure factory building looped network pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181214 Termination date: 20210528 |
|