CN213329430U - Large-span can pin-connected panel pile foundation reinforcing bar processing canopy - Google Patents

Large-span can pin-connected panel pile foundation reinforcing bar processing canopy Download PDF

Info

Publication number
CN213329430U
CN213329430U CN202022076084.0U CN202022076084U CN213329430U CN 213329430 U CN213329430 U CN 213329430U CN 202022076084 U CN202022076084 U CN 202022076084U CN 213329430 U CN213329430 U CN 213329430U
Authority
CN
China
Prior art keywords
steel
bolts
steel beam
pile foundation
multiplied
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022076084.0U
Other languages
Chinese (zh)
Inventor
张家和
陈晨
张艳超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Nanjing Construction Co Ltd
Original Assignee
Shanghai Baoye Group Nanjing Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Nanjing Construction Co Ltd filed Critical Shanghai Baoye Group Nanjing Construction Co Ltd
Priority to CN202022076084.0U priority Critical patent/CN213329430U/en
Application granted granted Critical
Publication of CN213329430U publication Critical patent/CN213329430U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model provides a pair of large-span pin-connected panel pile foundation steel reinforcement processing canopy has comprehensively considered reuse rate, loading and unloading structure, a plurality of factors such as construction cost, this kind of large-span pin-connected panel pile foundation steel reinforcement cage processing canopy has been designed, the needs of job site pile foundation steel reinforcement processing have been satisfied, the efficiency of field processing preparation and transportation has been improved greatly, the needs of the whole processing of pile foundation steel reinforcement cage have both been satisfied, can regard as the interim point of depositing of reinforcing bar again, a structure is simple, it is all very convenient to assemble the dismantlement.

Description

Large-span can pin-connected panel pile foundation reinforcing bar processing canopy
Technical Field
The utility model relates to a steel bar processing canopy technical field, especially a large-span pin-connected panel pile foundation steel bar processing canopy.
Background
The steel bar processing shed is used for processing steel bars and temporarily storing semi-finished products, and ensures that materials such as the steel bars, steel pipes, steel plates and the like are not easy to damp. In the construction of the constructional engineering project, the construction site is provided with a steel bar processing shed for storing and processing steel bars. Present steel reinforcement processing canopy is mostly steel pipe fastener formula and steel construction welded type, poor stability, be difficult for removing, the installation is loaded down with trivial details, reuse rate is low, need be with the help of lifting device during the removal, it is very inconvenient to remove, waste time and energy, and steel reinforcement cage processing needs the flat play of advancing of whole root reinforcing bar, and the steel reinforcement cage after the processing is accomplished can be convenient roll-out, it is very obvious, many stands in the middle of the current conventional steel reinforcement processing canopy, the limited demand that can not satisfy pile foundation overlength steel reinforcement cage (length 14 m) processing preparation has been satisfied to specification and size.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides a but large-span pin-connected panel pile foundation steel reinforcement processing canopy, its simple structure, convenient operation both can satisfy the whole needs of processing of pile foundation steel reinforcement cage, can regard as the interim point of depositing of reinforcing bar again, and is convenient, safe to it is practical.
The utility model relates to a large-span splicing pile foundation reinforcement processing shed, which comprises a circular upright post, expansion bolts, a concrete foundation, equilateral angle steel, M bolts, a first boundary node plate, a second boundary node plate, a transverse circular pipe, a steel beam, I-shaped steel, purlins and a waterproof roof,
the four round upright posts are fixed on a concrete foundation of 800mm multiplied by 800mm through expansion bolts which are arranged around the four corners of the round upright posts,
the upper and lower ends of the round upright posts are provided with first boundary node plates, the upper ends of the round upright posts are also provided with second boundary node plates, two adjacent round upright posts are fixed by equilateral angle steels of 50mm multiplied by 5mm in a crossed way, the two ends of the equilateral angle steels are fixed on the first boundary node plates arranged at the upper and lower ends of the round upright posts by M18 bolts, and the second boundary node plates between two adjacent round upright posts are connected by transverse round tubes, thereby carrying out secondary reinforcement,
the processing shed adopts H-shaped steel with the length of 350mm multiplied by 9mm as a steel beam, the total length of the steel beam is 16000mm, the steel beam is divided into a left steel beam and a right steel beam, one end of the left steel beam and one end of the right steel beam are fixedly connected through four double-row M18 bolts, the other end of the left steel beam and the other end of the right steel beam are respectively fixedly connected to the top end of the round upright post through eight symmetrically arranged double-row M18 bolts,
the purline adopts C-shaped steel of 100 multiplied by 50 multiplied by 10 multiplied by 2.4, and comprises a purline back, an upper purline bending part and a lower purline bending part, L-shaped fixing pieces are welded on the steel beam at intervals of 900mm, the purline back is connected with the L-shaped fixing pieces through M12 bolts, so that the lower purline bending part is tightly attached to the steel beam,
and a waterproof roof is arranged on the purline of the steel bar processing shed, and the roof is fixed on the bent part on the purline through a bolt.
As the utility model discloses further improve, waterproof roof is the various steel tile of 0.45mm, and expansion bolts is M12 bolt, and the round column size is phi 165mm 10mm, and horizontal pipe is phi 100 mm.
The utility model has the advantages that:
1. the pile foundation reinforcement cage processing shed structure is reasonable in stress and good in stability;
2. the pile foundation reinforcement cage processing shed is simple in structure, convenient to assemble and disassemble and capable of being repeatedly used, and construction cost is effectively reduced;
3. the pile foundation reinforcement cage processing shed is provided with a waterproof roof, so that the requirement of operation in rainy days is met, and the pile foundation reinforcement cage processing shed can be used as a temporary storage point for reinforcements;
4. this pile foundation steel reinforcement cage processing canopy is the large-span, satisfies the whole demand of processing of pile foundation reinforcing bar.
The utility model discloses a plurality of factors such as reuse rate, handling structure, construction cost have been considered comprehensively, but this kind of large-span pin-connected panel pile foundation steel reinforcement cage processing canopy has been designed, has satisfied the needs of job site pile foundation steel reinforcement processing, has improved the efficiency of on-the-spot processing preparation and transportation greatly, has both satisfied the needs of pile foundation steel reinforcement cage whole processing, can regard as the interim point of depositing of reinforcing bar again, and its simple structure, the pin-connected panel dismantlement is all very convenient.
Drawings
Fig. 1 is a schematic view of the overall structure of the pile foundation reinforcement processing shed of the utility model;
FIG. 2 is a schematic view of the structure of FIG. 1 with the water roof removed;
FIG. 3 is a side view of FIG. 1;
FIG. 4 is a top view of FIG. 1;
FIG. 5 is a side view of FIG. 2;
FIG. 6 is a schematic view of the joint between the left and right steel beams of FIG. 2;
FIG. 7 is a schematic view of the connection of the purlins and steel beams of FIG. 2;
FIG. 8 is a schematic view of the connection between the I-steel and the round column in FIG. 4;
FIG. 9 is a schematic view of the structure of the round pillar in FIG. 4;
in the figure: 1. the steel plate comprises, by weight, round columns, 2 expansion bolts, 3 concrete foundations, 4 equal-edge angle steels, 5M 18 bolts, 6 first boundary node plates, 7 second boundary node plates, 8 transverse round pipes, 9 steel beams, 9-1 left steel beams, 9-2 right steel beams, 9-3 steel beam joints, 9-4L-shaped fixing pieces, 10I-shaped steel, 11 purlins, 11-1 purlin backs, 11-2 purlin upper bending portions, 11-3 purlin lower bending portions, 12 waterproof roofs and 12-1 color steel tiles.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
As shown in fig. 1-9, the large-span assembly type pile foundation reinforcement processing shed of the utility model comprises a round upright post 1, an expansion bolt 2, a concrete foundation 3, an equilateral angle steel 4, an M18 bolt 5, a first boundary node plate 6, a second boundary node plate 7, a transverse round pipe 8, a steel beam, an I-shaped steel 10, a purlin and a waterproof roof 12,
four round upright posts 1 are arranged, the four round upright posts 1 are fixed on a concrete foundation 3 with the size of 800mm multiplied by 800mm through expansion bolts 2, the expansion bolts 2 are arranged around four corners of the round upright posts 1,
the upper end and the lower end of each circular upright post 1 are provided with first boundary node plates 6, the upper end of each circular upright post 1 is also provided with a second boundary node plate 7, two adjacent circular upright posts 1 are fixed by equal-edge angle steel 4 with the diameter of 50mm multiplied by 5mm in a crossed way, the two ends of the equal-edge angle steel 4 are fixed on the first boundary node plates 6 arranged at the upper end and the lower end of each circular upright post 1 by using M18 bolts 5, and the second boundary node plates 7 between the two adjacent circular upright posts 1 are connected by using transverse circular tubes 8 so as to carry out secondary reinforcement,
the processing shed adopts 350mm 9mm H-shaped steel as a steel beam 9, the total length of the steel beam 9 is 16000mm, the steel beam 9 is divided into a left steel beam 9-1 and a right steel beam 9-2, one end of the left steel beam 9-1 and one end of the right steel beam 9-2 are fixedly connected through four double-row M18 bolts 5, the other end of the left steel beam 9-1 and the other end of the right steel beam 9-2 are respectively fixedly connected to the top end of the round upright post 1 through two I-shaped steel 10 through eight symmetrically arranged double-row M18 bolts 5,
the purline 11 is made of 100 multiplied by 50 multiplied by 10 multiplied by 2.4C-shaped steel and comprises a purline back 11-1, purline upper bending parts 11-2 and purline lower bending parts 11-3, L-shaped fixing pieces 9-4 are welded on the steel beam at intervals of 900mm, the purline back 11-1 and the L-shaped fixing pieces 9-4 are connected through M12 bolts, so that the purline lower bending parts 11-3 are tightly attached to the steel beam,
and a waterproof roof 12 is arranged on a purline of the steel bar processing shed, and the roof is fixed on the bent part 11-2 on the purline through a bolt.
As the further improvement of the utility model, the waterproof roof 12 is 0.45mm color steel tile 12-1, the expansion bolt 2 is M12 bolt, the size of the round upright post 1 is phi 165mm multiplied by 10mm, and the transverse round pipe 8 is phi 100 mm.
The utility model has the advantages that:
1. the pile foundation reinforcement cage processing shed structure is reasonable in stress and good in stability;
2. the pile foundation reinforcement cage processing shed is simple in structure, convenient to assemble and disassemble and capable of being repeatedly used, and construction cost is effectively reduced;
3. the pile foundation reinforcement cage processing shed is provided with a waterproof roof, so that the requirement of operation in rainy days is met, and the pile foundation reinforcement cage processing shed can be used as a temporary storage point for reinforcements;
4. this pile foundation steel reinforcement cage processing canopy is the large-span, satisfies the whole demand of processing of pile foundation reinforcing bar.
The utility model discloses a plurality of factors such as reuse rate, handling structure, construction cost have been considered comprehensively, but this kind of large-span pin-connected panel pile foundation steel reinforcement cage processing canopy has been designed, has satisfied the needs of job site pile foundation steel reinforcement processing, has improved the efficiency of on-the-spot processing preparation and transportation greatly, has both satisfied the needs of pile foundation steel reinforcement cage whole processing, can regard as the interim point of depositing of reinforcing bar again, and its simple structure, the pin-connected panel dismantlement is all very convenient. .
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in any way, but also to cover any modifications or equivalent changes made in the technical spirit of the present invention, which fall within the scope of the present invention.

Claims (2)

1. A large-span spliced pile foundation reinforcement processing shed is characterized by comprising four circular upright columns (1), expansion bolts (2), concrete foundations (3), equilateral angle steel (4), M18 bolts (5), first boundary node plates (6), second boundary node plates (7), transverse circular pipes (8), steel beams, I-shaped steel (10), purlines and waterproof roofs (12), wherein the four circular upright columns (1) are fixed on the concrete foundations (3) with the thickness of 800mm multiplied by 800mm through the expansion bolts (2), the expansion bolts (2) are arranged around the four corners of the circular upright columns (1), the first boundary node plates (6) are arranged at the upper ends and the lower ends of the circular upright columns (1), the second boundary node plates (7) are further arranged at the upper ends of the circular upright columns (1), and the equilateral angle steel (4) with the thickness of 50mm multiplied by 5mm are used for crossed fixation between every two adjacent circular upright columns (1), the two ends of the equilateral angle steel (4) are fixed on first boundary node plates (6) arranged at the upper end and the lower end of the circular upright posts (1) by using M18 bolts (5), and second boundary node plates (7) between two adjacent circular upright posts (1) are connected by using transverse circular tubes (8) so as to perform secondary reinforcement,
the processing shed adopts H-shaped steel with the length of 350mm multiplied by 9mm as a steel beam (9), the total length of the steel beam (9) is 16000mm, the steel beam (9) is divided into a left steel beam (9-1) and a right steel beam (9-2), one end of the left steel beam (9-1) and one end of the right steel beam (9-2) are fixedly connected through four double rows of M18 bolts (5), the other end of the left steel beam is respectively and fixedly connected to the top end of a circular upright post (1) through two I-shaped steel (10) which are symmetrically arranged and eight double rows of M18 bolts (5), purlins (11) adopt C-shaped steel with the length of 100 multiplied by 50 multiplied by 10 multiplied by 2.4 and comprise purlin back parts (11-1), purlin upper bending parts (11-2) and purlin lower bending parts (11-3) which are symmetrically arranged, purlin fixing parts (9-4) are welded on the steel beam at intervals of 900mm, and the purlin back parts (11-1) and the L, and the lower bent part (11-3) of the purline is tightly attached to the steel beam, a waterproof roof (12) is arranged on the purline of the steel bar processing shed, and the roof is fixed on the upper bent part (11-2) of the purline through bolts.
2. The large-span assembly-type pile foundation reinforcement processing shed as claimed in claim 1, wherein the waterproof roof (12) is a 0.45mm color steel tile (12-1), the expansion bolts (2) are M12 bolts, the circular upright posts (1) have the size of phi 165mm x 10mm, and the transverse circular tubes (8) have the size of phi 100 mm.
CN202022076084.0U 2020-09-21 2020-09-21 Large-span can pin-connected panel pile foundation reinforcing bar processing canopy Active CN213329430U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022076084.0U CN213329430U (en) 2020-09-21 2020-09-21 Large-span can pin-connected panel pile foundation reinforcing bar processing canopy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022076084.0U CN213329430U (en) 2020-09-21 2020-09-21 Large-span can pin-connected panel pile foundation reinforcing bar processing canopy

Publications (1)

Publication Number Publication Date
CN213329430U true CN213329430U (en) 2021-06-01

Family

ID=76065155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022076084.0U Active CN213329430U (en) 2020-09-21 2020-09-21 Large-span can pin-connected panel pile foundation reinforcing bar processing canopy

Country Status (1)

Country Link
CN (1) CN213329430U (en)

Similar Documents

Publication Publication Date Title
US9388561B2 (en) Modular construction mold apparatus and method for constructing concrete buildings and structures
CN110067186B (en) Steel pipe stiffening web steel-concrete combined box girder
CN213329430U (en) Large-span can pin-connected panel pile foundation reinforcing bar processing canopy
CN210216122U (en) Steel pipe stiffening web steel-concrete combined box girder
CN212613728U (en) Support frame for supporting frame beam and high and large formwork support system
CN110725402A (en) Multi-cavity combined shear wall and H-shaped steel beam assembled node and construction method thereof
CN210857512U (en) Steel pipe combined type large-span protective shed
CN213268892U (en) Post-cast strip connection structure is supported to casing string
CN212270687U (en) Steel pipe support temporary pier for inclined main and auxiliary arch cross section
CN210396277U (en) Steel structure factory building with cross transition channel
CN107740598B (en) Tower type cast-in-situ structure formwork support system and construction process thereof
CN220620187U (en) Can have enough to meet need steel construction mortar jar basis
CN213509708U (en) Ring beam underpinning and reinforcing structure of brick-concrete structure building
CN215715337U (en) Integrated lattice column structure suitable for underground single structure and foundation pit support structure
CN213567673U (en) Reinforcing steel bar stacking device
CN220058063U (en) Tower crane foundation device
CN220621216U (en) Beehive support system for construction of large-diameter silo roof
CN217924416U (en) Nondestructive combination device for I-shaped steel
CN215037381U (en) Reinforcing steel bar storage device
CN216948714U (en) Warehouse and frame integrated reinforced concrete combined structure
CN213868833U (en) Large-tonnage bearing operation platform for elevator shaft building
CN211447782U (en) Turnover supporting tool for concrete oblique member template
CN215406099U (en) Steel support supporting structure of foundation pit with ultra-large area
CN220266283U (en) Combined structure of trestle and power transmission framework of power plant
CN212613190U (en) Aggregate sun-proof greenhouse assembled construction partition wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant