CN213326549U - Fire hose for construction - Google Patents

Fire hose for construction Download PDF

Info

Publication number
CN213326549U
CN213326549U CN202022266294.6U CN202022266294U CN213326549U CN 213326549 U CN213326549 U CN 213326549U CN 202022266294 U CN202022266294 U CN 202022266294U CN 213326549 U CN213326549 U CN 213326549U
Authority
CN
China
Prior art keywords
box
sets
mounting panel
screw rod
symmetric distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022266294.6U
Other languages
Chinese (zh)
Inventor
邵健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuancheng Lutong Construction Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022266294.6U priority Critical patent/CN213326549U/en
Application granted granted Critical
Publication of CN213326549U publication Critical patent/CN213326549U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Handcart (AREA)

Abstract

The utility model discloses a fire hose for construction, the power distribution box comprises a box body, the rear side of box is equipped with the mounting panel, two sets of driving motor that are the symmetric distribution are installed to the upper end of mounting panel, the inside of mounting panel is rotated and is connected with two sets of screw rods that are the symmetric distribution, and the screw rod is connected with the driving motor transmission, the outside that the inside of mounting panel is located the screw rod is rotated and is connected with two sets of gears, and the gear is connected with the screw rod meshing, the front end of gear is located the rear side of box and installs the hoisting wheel, the supplementary lift column that is horizontal symmetric distribution is installed to the rear end of box, and assists the lift column and be connected with the hoisting wheel transmission. The utility model discloses in, adopt gear train hoist mechanism, realized the device can control the lift of box, change putting of box height to reduce the area of device when the building construction, make things convenient for constructor's building operation.

Description

Fire hose for construction
Technical Field
The utility model relates to a construction technical field especially relates to a fire hose for construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like.
Various safety protection need make during the construction to needs when danger takes place, the fire hose is one of the indispensable equipment in construction place, and the fire hose for the construction that has now often is difficult to go up and down according to user demand, and constructor often receives the place of fire hose to occupy the restriction, and is difficult to various construction operations of smooth going on.
Disclosure of Invention
The utility model aims to provide a: in order to solve the problem that the existing fire box for building construction is difficult to lift according to the use requirement, the fire box for building construction is provided.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a fire hose for construction, includes the box, the rear side of box is equipped with the mounting panel, two sets of driving motor that are the symmetric distribution are installed to the upper end of mounting panel, the inside of mounting panel is rotated and is connected with two sets of screw rods that are the symmetric distribution, and the screw rod is connected with the driving motor transmission, the outside that the inside of mounting panel is located the screw rod is rotated and is connected with two sets of gears, and the gear is connected with the screw rod meshing, the front end of gear is located the rear side of box and installs the hoisting wheel, the back end of box is installed and is assisted the lift column that is horizontal symmetric distribution, and assists the lift column and is connected with the hoisting wheel transmission.
As a further description of the above technical solution:
the inside of mounting panel is located the upper and lower both sides of two sets of screw rods and installs the axle sleeve, and the axle sleeve cover is established in the outside of screw rod.
As a further description of the above technical solution:
the outside of lifting wheel is installed and is the bearing bar of annular distribution.
As a further description of the above technical solution:
the inside of mounting panel has two sets of slide rails that are the symmetric distribution.
As a further description of the above technical solution:
the clamping plates are installed on two sides of the rear end of the box body and are in sliding connection with the sliding rails.
As a further description of the above technical solution:
four groups of mounting holes are formed in the diagonal positions of the mounting plate.
To sum up, owing to adopted above-mentioned technical scheme, the beneficial effects of the utility model are that:
1. the utility model discloses in, adopt gear train hoist mechanism, be equipped with driving motor on the mounting panel, screw rod and gear, be equipped with the hoisting wheel on the gear, be equipped with the bearing bar on the hoisting wheel, be equipped with on the box and assist the lift column, it rotates to drive the screw rod through driving motor, and then drive the hoisting wheel and rotate, install the bearing column in the hoisting wheel outside and carry out the transmission to assisting the lift column this moment, and then drive the box and remove along vertical direction, the lift that the device can control the box has been realized, change putting of box height, thereby reduce the area of device when the construction, make things convenient for constructor construction operation's effect.
2. The utility model discloses in, be equipped with the cardboard on the box, be equipped with the slide rail on the mounting panel, when the transmission drove the box and moved in vertical direction between the gear train, the cardboard of box rear end both sides can slide along the slide rail on the mounting panel, and the setting of cardboard and slide rail prevents that the box from empting to the mounting panel front side when sliding, has realized that the device can be when control box goes up and down, and the gliding stability of guarantee box on the mounting panel has improved the effect of device safety protection nature.
Drawings
Fig. 1 shows a front view provided in accordance with an embodiment of the present invention;
fig. 2 shows a side view provided in accordance with an embodiment of the present invention;
fig. 3 illustrates a partial cross-sectional view provided in accordance with an embodiment of the present invention;
fig. 4 shows a partial top view provided according to an embodiment of the present invention.
Illustration of the drawings:
1. a box body; 2. mounting a plate; 3. a drive motor; 4. a screw; 5. a gear; 6. a lifting wheel; 7. a load-bearing bar; 8. auxiliary lifting columns; 9. clamping a plate; 10. a slide rail; 11. a shaft sleeve; 12. and (7) installing holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a fire hose for construction, the power distribution box comprises a box body 1, the rear side of box 1 is equipped with mounting panel 2, two sets of driving motor 3 that are the symmetric distribution are installed to the upper end of mounting panel 2, the inside of mounting panel 2 is rotated and is connected with two sets of screw rods 4 that are the symmetric distribution, and screw rod 4 is connected with the transmission of driving motor 3, the inside outside that is located screw rod 4 of mounting panel 2 is rotated and is connected with two sets of gears 5, and gear 5 is connected with the meshing of screw rod 4, hoisting wheel 6 is installed to the front end that is located box 1's rear side of gear 5, the supplementary lift column 8 that is horizontal symmetric distribution is installed to the rear end of box 1, and assist lift column 8 and 6 transmission of hoisting wheel and be connected, adopt the lift of box 1 is realized to the driven mode of screw rod 4, this.
Specifically, as shown in fig. 1 to 3, shaft sleeves 11 are installed inside the mounting plate 2 on the upper and lower sides of the two sets of screws 4, the shaft sleeves 11 are sleeved outside the screws 4, the bearing rods 7 are installed outside the lifting wheels 6 and distributed annularly, the shaft sleeves 11 are beneficial to the rotation of the screws 4 in the mounting plate 2, and the size of the gap between the auxiliary lifting columns 8 is matched with the diameter of the bearing rods 7, so that the transmission between the bearing rods 7 and the auxiliary lifting columns 8 is facilitated.
Specifically, as shown in fig. 1-4, two sets of slide rails 10 are symmetrically arranged inside the mounting plate 2, two sides of the rear end of the box 1 are provided with the clamping plates 9, the clamping plates 9 are slidably connected with the slide rails 10, and the slide rails 10 and the clamping plates 9 are in clearance fit with each other, so that the safety and stability of the box 1 when sliding along the mounting plate 2 are improved.
Specifically, as shown in fig. 1, four sets of mounting holes 12 are formed at opposite corners of the mounting plate 2, and the mounting holes 12 are arranged to facilitate the assembly of the mounting plate 2 by a user.
The working principle is as follows: when the device is used, firstly, a user needs to install the mounting plate 2 through the mounting hole 12 on the mounting plate 2, then the driving motor 3 arranged on the mounting plate 2 is controlled to drive the screw rod 4 to rotate, and further drive the gear 5 connected with the screw rod 4 in a meshed manner to rotate, so that the lifting wheel 6 arranged at the front end of the gear 5 rotates, at the moment, the bearing rod 7 arranged at the outer side of the lifting wheel 6 drives the auxiliary lifting column 8 at the rear end of the box body 1 to move, and further the box body 1 is driven to move along the vertical direction, the device can control the lifting of the box body 1, the placement height of the box body 1 is changed, the floor area of the device during building construction is reduced, the effect of construction operation of constructors is facilitated, secondly, when the box body 1 is driven to move along the vertical direction by the transmission between the gear 5 groups, the clamping plates 9 at two sides of the rear, cardboard 9 and slide rail 10's setting are placed box 1 and can be emptyd to mounting panel 2 front side when sliding to realized that the device can be when control box 1 goes up and down, guarantee box 1 gliding stability on mounting panel 2 has improved device safety protection's effect.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a fire hose for construction, includes box (1), its characterized in that, the rear side of box (1) is equipped with mounting panel (2), two sets of driving motor (3) that are the symmetric distribution are installed to the upper end of mounting panel (2), the inside of mounting panel (2) is rotated and is connected with two sets of screw rods (4) that are the symmetric distribution, and screw rod (4) are connected with driving motor (3) transmission, the outside that the inside of mounting panel (2) is located screw rod (4) is rotated and is connected with two sets of gears (5), and gear (5) are connected with screw rod (4) meshing, lifting pulley (6) are installed to the rear side that the front end of gear (5) is located box (1), the rear end of box (1) is installed and is assisted lift column (8) that horizontal symmetric distribution, and assists lift column (8) and lifting pulley (6) transmission to be connected.
2. The fire box for building construction according to claim 1, wherein the inside of the mounting plate (2) is provided with shaft sleeves (11) at the upper and lower sides of the two sets of screws (4), and the shaft sleeves (11) are sleeved outside the screws (4).
3. A fire fighting box for building construction according to claim 1, characterized in that the lifting wheels (6) are mounted on their outer sides with load-bearing bars (7) distributed in a ring.
4. A fire box for building construction according to claim 1, characterised in that the mounting plate (2) has two sets of slide rails (10) inside it, distributed symmetrically.
5. The fire box for building construction as claimed in claim 4, wherein the clamping plates (9) are mounted on two sides of the rear end of the box body (1), and the clamping plates (9) are slidably connected with the sliding rails (10).
6. The fire box for building construction as claimed in claim 1, wherein four sets of mounting holes (12) are formed at the diagonal positions of the mounting plate (2).
CN202022266294.6U 2020-10-13 2020-10-13 Fire hose for construction Expired - Fee Related CN213326549U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022266294.6U CN213326549U (en) 2020-10-13 2020-10-13 Fire hose for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022266294.6U CN213326549U (en) 2020-10-13 2020-10-13 Fire hose for construction

Publications (1)

Publication Number Publication Date
CN213326549U true CN213326549U (en) 2021-06-01

Family

ID=76071314

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022266294.6U Expired - Fee Related CN213326549U (en) 2020-10-13 2020-10-13 Fire hose for construction

Country Status (1)

Country Link
CN (1) CN213326549U (en)

Similar Documents

Publication Publication Date Title
WO2017020539A1 (en) Tower crane with a traveling mechanism
CN206088920U (en) Construction scaffold
CN213326549U (en) Fire hose for construction
CN207377501U (en) A kind of adjustable preliminary bracing drilling jumbo
CN212105028U (en) Safe type scaffold frame for construction
CN206397172U (en) A kind of architectural engineering lowering or hoisting gear
CN110700624B (en) Building displacement system and method
CN111959590A (en) Material transportation device for constructional engineering
CN111706052A (en) Synchronous lifting device for building
CN211647222U (en) Novel plastering unit that building decoration used
CN207526058U (en) A kind of control device of electric tool
CN2931753Y (en) Minisize well borer
CN215858940U (en) Novel detachable combined type steel structure aerial work moving operation platform
CN212642054U (en) Building installation platform based on BIM technology
CN210082116U (en) Drilling equipment for construction
CN220928657U (en) Attached construction platform for building
CN106629470A (en) Lifting type level gage overhaul device
CN217054270U (en) Automatic elevator shaft construction platform that climbs
CN218438124U (en) Scaffold frame for building engineering that security performance is high
CN214780391U (en) Lifting device for constructional engineering
CN216038400U (en) Automatic lifting device that basement waterproofing used
CN216157105U (en) Mounting bracket is used in civil engineering construction
CN210559113U (en) Auxiliary hoisting tool for mounting power equipment
CN221053239U (en) Glass curtain wall mounting and positioning structure
CN211813309U (en) Multi-functional lifting device of architectural equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210928

Address after: 242000 No. 1, leyigang Road, high tech Industrial Development Zone, Xuancheng City, Anhui Province

Patentee after: Xuancheng Lutong Construction Co.,Ltd.

Address before: 225700 No.498, group 8, Tiane village, qianduo Town, Xinghua City, Taizhou City, Jiangsu Province

Patentee before: Shao Jian

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210601