CN213320752U - Precast slab pouring device for building construction - Google Patents

Precast slab pouring device for building construction Download PDF

Info

Publication number
CN213320752U
CN213320752U CN202021746335.5U CN202021746335U CN213320752U CN 213320752 U CN213320752 U CN 213320752U CN 202021746335 U CN202021746335 U CN 202021746335U CN 213320752 U CN213320752 U CN 213320752U
Authority
CN
China
Prior art keywords
hole
rod
plate
pouring
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021746335.5U
Other languages
Chinese (zh)
Inventor
王霞
阚显福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021746335.5U priority Critical patent/CN213320752U/en
Application granted granted Critical
Publication of CN213320752U publication Critical patent/CN213320752U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to a construction technical field discloses a device is pour to prefabricated plate that construction used, including the pouring mould, the right side of pouring mould and swing joint board's left side fixed connection, swing joint board's right side has been seted up the hole and has been passed through the surface bottom swing joint of bearing with the threaded rod, the threaded rod surface sheathes the screw hole threaded connection who sets up with the internal thread, the surface left side of internal thread cover and the right side fixed connection of movable mounting board, the bottom of movable mounting board and the top fixed connection of fixed mounting pole, the bottom of fixed mounting pole and the top fixed connection of stripper plate, set up the hole on the stripper plate and through the surface top swing joint of hole and trompil pole. The utility model discloses played the volume of pouring of solving hard control concrete when pouring the prefabricated plate, leaded to the prefabricated plate highly too high or low excessively, leaded to unable service problem's effect.

Description

Precast slab pouring device for building construction
Technical Field
The utility model relates to a construction technical field specifically is a device is pour to prefabricated plate that construction used.
Background
The prefabricated slab is a template used for building construction, the prefabricated slab has a plurality of uses in the building, the prefabricated slab can be used for cover plates on a ditch and a heat insulation layer for the building, the existing prefabricated slab is usually manufactured through pouring, the height of the prefabricated slab can be controlled for different places, but the pouring amount of concrete is difficult to control when the prefabricated slab is poured, so that the height of the prefabricated slab is too high or too low, and the prefabricated slab cannot be used.
SUMMERY OF THE UTILITY MODEL
The utility model provides a device is pour to prefabricated plate that construction used, this device is pour to prefabricated plate that construction used has solved the volume of pouring of hard control concrete when pouring the prefabricated plate, leads to the prefabricated plate highly too high or low excessively, leads to the problem of unable use.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a precast slab pouring device for building construction comprises a pouring mold, the right side of the pouring mold is fixedly connected with the left side of a movable connecting plate, the right side of the movable connecting plate is provided with a hole and is movably connected with the bottom of the outer surface of the threaded rod through a bearing, the outer surface of the threaded rod is in threaded connection with a threaded hole formed in the internal thread sleeve, the left side of the outer surface of the internal thread sleeve is fixedly connected with the right side of the movable mounting plate, the bottom of the movable mounting plate is fixedly connected with the top of the fixed mounting rod, the bottom of the fixed mounting rod is fixedly connected with the top of the extrusion plate, the extrusion plate is provided with a hole and is movably connected with the top of the outer surface of the perforated rod through the hole, the left side of the pouring mold is provided with a notch and is fixedly connected with the outer surface of the visual window through a notch wall, and the left side of the visual window is fixedly connected with the right side of the scale plate.
Preferably, the bottom of the outer surface of the pouring mold is attached to the inner wall of the rubber pad, the outer surface of the rubber pad is attached to the inner wall of the bottom support cover, the bottom of the inner wall of the bottom support cover is fixedly connected with the bottom of the hole opening rod, and the hole opening rod is located in an inner cavity of the pouring mold.
Preferably, the right side of the bottom support cover is provided with a hole and is movably connected with the outer surface of the bolt rod through the hole, the left end of the bolt rod penetrates through the hole formed in the right side of the rubber pad and is movably connected with the rubber pad, the left end of the outer surface of the bolt rod is in threaded connection with a threaded groove hole formed in the bottom of the right side of the pouring mold, the number of the bolt rods is two, and the two bolt rods are symmetrically arranged by taking the bottom support cover as a central line.
Preferably, the top of the movable mounting plate is fixedly connected with the bottom of the shell of the rotating motor, an output shaft of the rotating motor penetrates through a hole formed in the movable mounting plate and is movably connected with the movable mounting plate, the bottom of the output shaft of the rotating motor is fixedly connected with the top of the connecting frame, and the bottom of the connecting frame is fixedly connected with the bottom of the stirring disc.
Preferably, the stirring disc is provided with an annular groove and a hole and is movably connected with the hole opening rod through the annular groove and the hole, and the stirring disc is positioned above the extrusion plate.
Preferably, the left side of the bottom of the movable mounting plate is fixedly connected with the top of the limiting rod, the bottom of the limiting rod penetrates through a hole formed in the left side of the movable connecting plate and is movably connected with the movable connecting plate, the left side of the pouring mold is fixedly connected with one end of a fixed connecting rod, and the other end of the fixed connecting rod is fixedly connected with the elevator.
Borrow by above-mentioned technical scheme, the utility model provides a device is pour to prefabricated plate that construction used. The method at least has the following beneficial effects:
(1) the precast slab pouring device for building construction comprises a pouring die, a movable mounting plate, a fixed mounting rod, a pressing plate, a scale plate, a precast slab, a threaded rod, a movable mounting plate, a fixed mounting plate, a hole and a grinding plate, wherein the precast slab is poured into the pouring die, the rough pouring height is observed through a visual window, after a proper amount of concrete is poured, the threaded rod is rotated, the threaded rod drives the inner threaded sleeve to move downwards through threaded transmission, the inner threaded sleeve drives the movable mounting plate and the fixed mounting rod to move downwards, the fixed mounting rod drives the pressing plate to move downwards, the pressing plate presses the concrete, the pressing plate is moved to a required height through observing the scale plate, when the pressing plate is contacted with the concrete, redundant concrete is discharged to the upper part of the pressing plate through the hole formed in the pressing plate, after the concrete below the pressing plate is solidified, the redundant, resulting in the effect of being unusable.
(2) This device is pour to precast slab of construction usefulness, after the rigidity with the stripper plate, start the rotating electrical machines, the output shaft of rotating electrical machines drives the link rotatory, the link drives the rotatory agitator disk of agitator and rotates and stir the concrete of stripper plate top, through the rotatory concrete setting time who prolongs the stripper plate top of agitator disk, played behind the concrete setting of stripper plate below, the concrete above the stripper plate still is in the liquid, can not influence the effect that the precast slab was dismantled.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application:
fig. 1 is a schematic structural view of the present invention;
fig. 2 is a top view of the stirring plate in the structure diagram 1 of the present invention.
In the figure: 1 pouring mold, 2 bottom support covers, 3 rubber pads, 4 bolt rods, 5 fixed connecting rods, 6 perforated rods, 7 movable connecting plates, 8 threaded rods, 9 internal thread sleeves, 10 movable mounting plates, 11 rotating motors, 12 connecting frames, 13 stirring discs, 14 fixed mounting rods, 15 extrusion plates, 16 visual windows, 17 scale plates and 18 limiting rods.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-2, the present invention provides a technical solution: a precast slab pouring device for building construction comprises a pouring mold 1, the right side of the pouring mold 1 is fixedly connected with the left side of a movable connecting plate 7, the right side of the movable connecting plate 7 is provided with a hole and is movably connected with the bottom of the outer surface of a threaded rod 8 through a bearing, the outer surface of the threaded rod 8 is in threaded connection with a threaded hole formed in an inner threaded sleeve 9, the left side of the outer surface of the inner threaded sleeve 9 is fixedly connected with the right side of a movable mounting plate 10, the bottom of the movable mounting plate 10 is fixedly connected with the top of a fixed mounting rod 14, the bottom of the fixed mounting rod 14 is fixedly connected with the top of an extrusion plate 15, the extrusion plate 15 is provided with a hole and is movably connected with the top of the outer surface of a hole-forming rod 6 through a hole, the left side of the pouring mold 1 is provided with a notch and is fixedly connected with the outer surface, pouring concrete into a pouring mold 1, observing the rough pouring height through a visible window 16, after pouring a proper amount of concrete, rotating a threaded rod 8, driving an internal thread sleeve 9 to move downwards through thread transmission by the threaded rod 8, driving a movable mounting plate 10 and a fixed mounting rod 14 to move downwards through the internal thread sleeve 9, driving an extrusion plate 15 to move downwards through the fixed mounting rod 14, extruding the concrete by the extrusion plate 15, moving the extrusion plate 15 to a required height through observing a scale plate 17, discharging redundant concrete to the upper side of the extrusion plate 15 through a hole formed in the extrusion plate 15 when the extrusion plate 15 is contacted with the concrete, breaking and polishing the redundant concrete after the concrete below the extrusion plate 15 is solidified, and solving the problem that the height of the precast slab is too high or too low due to the difficulty in controlling the pouring amount of the concrete when the precast slab is poured, the effect of causing the problem of being unable to use;
the bottom of the outer surface of the pouring mold 1 is attached to the inner wall of the rubber pad 3, the outer surface of the rubber pad 3 is attached to the inner wall of the bottom support cover 2, the rubber pad 3 is used for improving the connection tightness between the bottom support cover 2 and the pouring mold 1 and preventing concrete from leaking from gaps, the bottom of the inner wall of the bottom support cover 2 is fixedly connected with the bottom of the perforated rod 6, the perforated rod 6 is located in an inner cavity of the pouring mold 1, the perforated rod 6 is used for supposing that holes are formed in the existing prefabricated slab for saving cost, holes are formed in the poured concrete, holes are formed in the right side of the bottom support cover 2 and movably connected with the outer surface of the bolt rod 4 through the holes, the left end of the bolt rod 4 penetrates through the holes formed in the right side of the rubber pad 3 and is movably connected with the rubber pad 3, the left end of the outer surface of the bolt rod 4 is connected with the threaded groove hole formed in the bottom of the right side of the pouring mold 1 The bolt rod 4 is knocked firstly after the bolt rod 4 is removed to loosen the direct connection between the precast slab and the pouring mold, and the fixed connecting rod 5 and the pouring mold 1 are driven to ascend through the lifter to complete demolding, so that the existing plastic film is taken as a demolding technology, and the pouring mold is convenient to separate from the precast slab;
the top of the movable mounting plate 10 is fixedly connected with the bottom of the shell of the rotating motor 11, the output shaft of the rotating motor 11 passes through a hole formed in the movable mounting plate 10 and is movably connected with the movable mounting plate 10, the bottom of the output shaft of the rotating motor 11 is fixedly connected with the top of the connecting frame 12, the bottom of the connecting frame 12 is fixedly connected with the bottom of the stirring disc 13, the stirring disc 13 is provided with an annular groove and a hole and is movably connected with the perforated rod 6 through the annular groove and the hole, the stirring disc 13 is positioned above the extrusion plate 15, after the position of the extrusion plate 15 is fixed, the rotating motor 11 is started, the output shaft of the rotating motor 11 drives the connecting frame 12 to rotate, the connecting frame 12 drives the stirring disc 13 to rotate the stirring disc 13 and stir the concrete above the extrusion plate 15, the concrete solidification time above the extrusion plate 15 is prolonged through the rotation of the stirring disc 13, and after the concrete below the extrusion plate 15 is solidified, the concrete on the extrusion plate 15 is still in a liquid state, so that the disassembly effect of the precast slab cannot be influenced;
the left side of movable mounting panel 10 bottom and the top fixed connection of gag lever post 18, the bottom of gag lever post 18 pass the hole of seting up on the left of swing joint board 7 and with swing joint board 7 swing joint, the left side of pouring mould 1 and the one end fixed connection of fixed link 5, the other end and the lift fixed connection of fixed link 5, the effect of gag lever post 18 is to prevent that movable mounting panel 10 from rotatory, make movable mounting panel 10 and interior thread bush 9 only can reciprocate along with the rotation of threaded rod 8.
When the device is used, concrete is poured into a pouring mold 1, the rough pouring height is observed through a visual window 16, after a proper amount of concrete is poured, the threaded rod 8 is rotated, the threaded rod 8 drives the internal thread sleeve 9 to move downwards through thread transmission, the internal thread sleeve 9 drives the movable mounting plate 10 and the fixed mounting rod 14 to move downwards, the fixed mounting rod 14 drives the extrusion plate 15 to move downwards, the extrusion plate 15 extrudes the concrete, the extrusion plate 15 is moved to a required height through observing the scale plate 17, when the extrusion plate 15 is contacted with the concrete, redundant concrete is discharged to the upper side of the extrusion plate 15 through the holes formed in the extrusion plate 15, after the concrete below the extrusion plate 15 is solidified, the redundant concrete is smashed and polished, and the problem that the pouring amount of the concrete is difficult to control when the precast slab is poured is solved, so that the height of the precast slab is too high or too low is caused, the effect of causing the problem of being unable to use;
after the position of the extrusion plate 15 is fixed, the rotating motor 11 is started, the output shaft of the rotating motor 11 drives the connecting frame 12 to rotate, the connecting frame 12 drives the stirring disc 13 to rotate and stir the concrete above the extrusion plate 15, the concrete solidification time above the extrusion plate 15 is prolonged through the rotation of the stirring disc 13, and after the concrete below the extrusion plate 15 is solidified, the concrete above the extrusion plate 15 is still in a liquid state, so that the effect of disassembling the precast slab cannot be influenced.
It is right above the utility model provides a device is pour to prefabricated plate for construction has carried out detailed introduction. The utility model discloses it is right to have used specific individual example the utility model discloses a principle and implementation have been elucidated, and the explanation of above embodiment is only used for helping understanding the utility model discloses a method and core thought thereof. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.

Claims (6)

1. The utility model provides a device is pour to precast slab that construction used, is including pouring mould (1), its characterized in that: the right side of the pouring mold (1) is fixedly connected with the left side of the movable connecting plate (7), the right side of the movable connecting plate (7) is provided with a hole and is movably connected with the bottom of the outer surface of the threaded rod (8) through a bearing, the outer surface of the threaded rod (8) is in threaded connection with a threaded hole formed in the inner threaded sleeve (9), the left side of the outer surface of the inner threaded sleeve (9) is fixedly connected with the right side of the movable mounting plate (10), the bottom of the movable mounting plate (10) is fixedly connected with the top of the fixed mounting rod (14), the bottom of the fixed mounting rod (14) is fixedly connected with the top of the extrusion plate (15), the extrusion plate (15) is provided with a hole and is movably connected with the top of the outer surface of the perforated rod (6) through the hole, the left side of the pouring mold (1) is provided with a notch and is fixedly connected with the outer surface of, the left side of the visual window (16) is fixedly connected with the right side of the scale plate (17).
2. The precast slab casting device for building construction according to claim 1, wherein: the bottom of the outer surface of the pouring mold (1) is attached to the inner wall of the rubber pad (3), the outer surface of the rubber pad (3) is attached to the inner wall of the bottom support cover (2), the bottom of the inner wall of the bottom support cover (2) is fixedly connected with the bottom of the hole opening rod (6), and the hole opening rod (6) is located in the inner cavity of the pouring mold (1).
3. The precast slab casting device for building construction according to claim 2, wherein: the bottom support cover is characterized in that a hole is formed in the right side of the bottom support cover (2) and is movably connected with the outer surface of a bolt rod (4) through the hole, the left end of the bolt rod (4) penetrates through the hole formed in the right side of a rubber pad (3) and is movably connected with the rubber pad (3), the left end of the outer surface of the bolt rod (4) is in threaded connection with a threaded groove hole formed in the bottom of the right side of a pouring mold (1), the number of the bolt rods (4) is two, and the two bolt rods are symmetrically installed by taking the bottom support cover (2) as a central line.
4. The precast slab casting device for building construction according to claim 3, wherein: the top of movable mounting board (10) and the shell bottom fixed connection of rotating electrical machines (11), the output shaft of rotating electrical machines (11) pass the hole of seting up on movable mounting board (10) and with movable mounting board (10) swing joint, the output shaft bottom of rotating electrical machines (11) and the top fixed connection of link (12), the bottom fixed connection of the bottom of link (12) and agitator disk (13).
5. The precast slab casting device for building construction according to claim 4, wherein: the stirring disc (13) is provided with an annular groove and a hole and is movably connected with the perforated rod (6) through the annular groove and the hole, and the stirring disc (13) is positioned above the extrusion plate (15).
6. The precast slab casting device for building construction according to claim 1, wherein: the left side of movable mounting board (10) bottom and the top fixed connection of gag lever post (18), the bottom of gag lever post (18) pass the hole of seting up on swing joint board (7) left side and with swing joint board (7) swing joint, the left side of pouring mould (1) and the one end fixed connection of fixed link (5), the other end and the lift fixed connection of fixed link (5).
CN202021746335.5U 2020-08-19 2020-08-19 Precast slab pouring device for building construction Active CN213320752U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021746335.5U CN213320752U (en) 2020-08-19 2020-08-19 Precast slab pouring device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021746335.5U CN213320752U (en) 2020-08-19 2020-08-19 Precast slab pouring device for building construction

Publications (1)

Publication Number Publication Date
CN213320752U true CN213320752U (en) 2021-06-01

Family

ID=76098587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021746335.5U Active CN213320752U (en) 2020-08-19 2020-08-19 Precast slab pouring device for building construction

Country Status (1)

Country Link
CN (1) CN213320752U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113432910A (en) * 2021-06-25 2021-09-24 佛山市新利海混凝土有限公司 Sampling device and sampling method for concrete production detection

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113432910A (en) * 2021-06-25 2021-09-24 佛山市新利海混凝土有限公司 Sampling device and sampling method for concrete production detection

Similar Documents

Publication Publication Date Title
CN207983821U (en) A kind of casting casting device
CN213320752U (en) Precast slab pouring device for building construction
CN111185994A (en) Road construction barrier prefabricating device and method
CN211333725U (en) Concrete prefabricated component pouring device
CN117026826A (en) Bridge construction pouring device and application method thereof
CN215038734U (en) Concrete water pipe internal pouring device for water supply and drainage
CN110815496A (en) Pouring device and pouring method for preventing concrete test piece from being layered during pouring
CN215434154U (en) Pouring device is used in aerated concrete block production
CN112895074A (en) Gypsum model making devices for architectural design
CN220028612U (en) Detachable aluminum ingot casting die
CN216968153U (en) Automatic forming die for gypsum blocks
CN213732398U (en) Steel mould for prefabricated PC concrete member
CN220297418U (en) Mould for recycled concrete block
CN219705618U (en) Cement product pouring die
CN219255974U (en) Anti-blocking cement pipe pouring device
CN215906592U (en) Construction equipment for municipal elevated road and bridge anti-collision wall
CN217232723U (en) Template mounting structure for construction of fair-faced concrete column
CN220219002U (en) Continuous automatic pouring device of steady voltage
CN220994863U (en) Concrete solid brick blank mould
CN215697890U (en) Extrusion type casting die convenient to disassemble
CN211466800U (en) Cement component apparatus for producing
CN219381030U (en) Cement adjustment shaft mould
CN209903521U (en) Mould for prefabricated superimposed sheet
CN216801664U (en) Casting device of high-ductility aluminum alloy wafer capable of deep drawing
CN214321767U (en) Extrusion type casting die convenient to disassemble

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant