CN213320740U - Section bar die block dolly that bridge intelligence production system used - Google Patents
Section bar die block dolly that bridge intelligence production system used Download PDFInfo
- Publication number
- CN213320740U CN213320740U CN202021839710.0U CN202021839710U CN213320740U CN 213320740 U CN213320740 U CN 213320740U CN 202021839710 U CN202021839710 U CN 202021839710U CN 213320740 U CN213320740 U CN 213320740U
- Authority
- CN
- China
- Prior art keywords
- driving
- section bar
- walking
- production system
- die block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides a section bar die block dolly that bridge intelligence production system used relates to the prefabricated technical field of small box girder, has solved that conventional die block dolly welding volume is big, the processing degree of difficulty is big, the processing cost is on the high side, the girder straightness accuracy is difficult to guarantee and the technical problem that positioning accuracy is low. The section bar bottom die trolley used by the intelligent bridge production system comprises a main beam (1), a driving system (2) and a driven device (3). The utility model discloses a driving system (2) that set up drive the die block dolly and walk on the track, guarantee positioning accuracy when the location is convenient, make girder (1) through adopting the whole processing of section bar, reduce the processing cost, reduce the welding volume, guarantee the girder straightness accuracy, processing is simple.
Description
Technical Field
The utility model relates to a prefabricated technical field of small box girder, concretely relates to section bar die block dolly that bridge intelligence production system used.
Background
The bottom die trolley for prefabricating the small box girder is used for carrying the bottom die and the girder body to travel on a production line track, the main body structure of the existing bottom die trolley is usually welded by taking a plate as a main material, and the traveling power is usually provided by a winch. The bearing beam is welded by the plate, so that the problems of huge welding amount, large deformation of the main beam, difficulty in ensuring the straightness of the main beam, high processing cost, inconvenience for quick and convenient accurate positioning due to the adoption of a winch in a power system and the like can be caused.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a section bar die block dolly that bridge intelligence production system used, drive the die block dolly through the drive arrangement who sets up and walk on the track, guarantee positioning accuracy when the location is convenient, make the girder through adopting the whole processing of section bar, reduce the processing cost, reduce the welding volume, guarantee the girder straightness accuracy. The technical problems that a conventional bottom die trolley is large in welding amount, large in machining difficulty, high in machining cost, difficult to guarantee the straightness of a main beam and low in positioning precision are solved. The utility model provides a plurality of technical effects that preferred technical scheme among a great deal of technical scheme can produce see the explanation below in detail.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a section bar bottom die trolley used in a bridge intelligent production system is arranged on a track and used for carrying a bottom die and a beam body, and comprises a main beam, a driving system and a driven device; wherein:
the driving system and the driven device are both arranged on the main beam;
the main beam is arranged at the bottom of the bottom die;
the main beam comprises main section steel and a connecting beam;
one end of the main section steel is connected with the connecting beam;
an inclined strut is further arranged between the main section steel and the connecting beam;
and the main section steel is also provided with a walking box.
Optionally or preferably, the driving system comprises a driving device, a driving gear, a walking gear, a driving walking shaft and a driving walking wheel;
the driving gear is arranged on the driving device;
the driving walking shaft is arranged on the walking box;
the driving travelling wheel is arranged on the driving travelling shaft through a bearing;
the traveling gear is arranged on the driving traveling wheel;
the driving gear is meshed with the walking gear.
Alternatively or preferably, the driven means comprises a driven shaft and a driven wheel;
the driven shaft is arranged on the walking box;
the driven wheel is mounted on the driven shaft through a bearing.
Alternatively or preferably, the main beam is made of a profile.
Based on the technical scheme, the following technical effects can be generated:
the utility model provides a pair of section bar die block dolly that bridge intelligence production system used is applicable to and shiies die block and roof beam body. The utility model discloses a drive arrangement who sets up drives the die block dolly and walks on the track, guarantees positioning accuracy when the location is convenient, makes the girder through adopting the whole processing of section bar, reduces the processing cost, reduces the welding volume, guarantees the girder straightness accuracy. The technical problems that a conventional bottom die trolley is large in welding amount, large in machining difficulty, high in machining cost, difficult to guarantee the straightness of a main beam and low in positioning precision are solved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the main beam;
FIG. 3 is a schematic diagram of a drive system;
FIG. 4 is a cross-sectional schematic view of a road wheel;
in the figure: 1. a main beam; 2. a drive system; 3. a driven device; 4. a track; 5. bottom die; 6. a beam body; 7. a walking box; 101. main section steel; 102. bracing; 103. a tie-beam; 201. a drive device; 202. a drive gear; 203. a traveling gear; 204. a driving walking shaft; 205. driving travelling wheels; 301. a driven shaft; 302. a driven wheel.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the technical solutions of the present invention will be described in detail below. It is to be understood that the embodiments described are only some embodiments of the invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
The invention will be further described with reference to the accompanying drawings, but the scope of the invention is not limited to the following description.
As shown in fig. 1-4:
the utility model provides a section bar die block dolly that bridge intelligence production system used installs on track 4 for shiies die block 5 and roof beam body 6, including girder 1, actuating system 2 and slave unit 3, wherein:
the driving system 2 and the driven device 3 are both arranged on the main beam 1;
the main beam 1 is arranged at the bottom of the bottom die 5;
the main beam 1 comprises main section steel 101 and a connecting beam 103;
one end of the main section steel 101 is connected with a connecting beam 103;
an inclined strut 102 is further arranged between the main section steel 101 and the connecting beam 103;
the main section steel 101 is also provided with a walking box 7.
As an alternative embodiment, the driving system comprises a driving device 201, a driving gear 202,
A traveling gear 203, a driving traveling shaft 204 and a driving traveling wheel 205;
the driving gear 202 is installed on the driving device 201;
the driving walking shaft 204 is arranged on the walking box 7;
the driving travelling wheel 205 is mounted on the driving travelling shaft 204 through a bearing;
the walking gear 203 is arranged on the driving walking wheel 205;
the driving gear 202 and the traveling gear 203 are engaged with each other.
As an alternative embodiment, the driven device 3 comprises a driven shaft 301 and a driven wheel 302;
the driven shaft 301 is arranged on the walking box 7;
the driven wheel 302 is mounted on a driven shaft 301.
As an alternative embodiment, the main beam 1 is made of a profile.
As an optional embodiment, the length of the main beam 1 can be adjusted according to the length of the bottom die 5, and the main beam can be adapted to beam bodies 6 with different lengths in different combination modes, so that the applicability is improved.
As an optional implementation manner, a remote control device such as a PLC controller may be disposed on the driving device 201, so as to realize manual or automatic walking, and the operation is convenient and the positioning accuracy is high.
As an alternative embodiment, the driving system 2 and the driven device 3 are arranged asymmetrically, and a diagonal arrangement is adopted, so that unstable transmission phenomena such as slipping of the driving wheels and the like caused by height difference of the tracks 4 can be overcome to a certain extent.
Claims (4)
1. The utility model provides a section bar die block dolly that bridge intelligence production system used, installs on track (4) for carry die block (5) and roof beam body (6), its characterized in that: comprises a main beam (1), a driving system (2) and a driven device (3); wherein:
the driving system (2) and the driven device (3) are both arranged on the main beam (1);
the main beam (1) is arranged at the bottom of the bottom die (5);
the main beam (1) comprises main section steel (101) and a connecting beam (103);
one end of the main section steel (101) is connected with a connecting beam (103);
an inclined strut (102) is arranged between the main section steel (101) and the connecting beam (103);
the main section steel (101) is also provided with a traveling box (7).
2. The section bar bottom die trolley for the intelligent bridge production system according to claim 1, wherein the section bar bottom die trolley comprises: the driving system comprises a driving device (201), a driving gear (202), a walking gear (203), a driving walking shaft (204) and a driving walking wheel (205);
the driving gear (202) is arranged on a driving device (201);
the driving walking shaft (204) is arranged on the walking box (7);
the driving travelling wheel (205) is arranged on the driving travelling shaft (204) through a bearing;
the walking gear (203) is arranged on the driving walking wheel (205);
the driving gear (202) is meshed with the walking gear (203).
3. The section bar bottom die trolley for the intelligent bridge production system according to claim 1, wherein the section bar bottom die trolley comprises: the driven device (3) comprises a driven shaft (301) and a driven wheel (302);
the driven shaft (301) is arranged on the walking box (7);
the driven wheel (302) is mounted on the driven shaft (301) through a bearing.
4. The section bar bottom die trolley for the intelligent bridge production system according to claim 1, wherein the section bar bottom die trolley comprises: the main beam (1) is made of a section bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021839710.0U CN213320740U (en) | 2020-08-28 | 2020-08-28 | Section bar die block dolly that bridge intelligence production system used |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021839710.0U CN213320740U (en) | 2020-08-28 | 2020-08-28 | Section bar die block dolly that bridge intelligence production system used |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213320740U true CN213320740U (en) | 2021-06-01 |
Family
ID=76100601
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021839710.0U Active CN213320740U (en) | 2020-08-28 | 2020-08-28 | Section bar die block dolly that bridge intelligence production system used |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213320740U (en) |
-
2020
- 2020-08-28 CN CN202021839710.0U patent/CN213320740U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204640450U (en) | A kind of assembling-type precast box girder integral moving die plate | |
CN109914166B (en) | Urban rail scattered paving method mechanized construction equipment and construction method thereof | |
CN210483756U (en) | Trackless major diameter steel pipe transportation installation platform truck in tunnel | |
CN108313067A (en) | A kind of suspension monorail double mode driving bogie being suitable for very big ramp | |
CN203530847U (en) | Bridge erecting machine capable of erecting narrow small-curvature-radius highway ramp bridges | |
CN201284462Y (en) | Bridging machine for both highway and railway | |
CN110541347A (en) | large-span full-hydraulic tire walking type tunnel inverted arch trestle and construction method | |
CN201634223U (en) | Kettle entering ferry vehicle | |
CN213320740U (en) | Section bar die block dolly that bridge intelligence production system used | |
CN214644551U (en) | Side form device for precast beam | |
CN213320743U (en) | Board bottom die trolley used for intelligent bridge production system | |
CN201695345U (en) | Striding pierced type bridge erector | |
CN108130864B (en) | Integrally-assembled bridge whole-span beam transportation and erection equipment | |
CN2418156Y (en) | Double guiding-beam bridge-laying machine | |
CN205205674U (en) | Top of tower hoist and mount system | |
CN210738584U (en) | Space rigid frame trolley suitable for existing line crossing construction | |
CN210066384U (en) | Urban rail scattered paving method mechanical construction equipment | |
CN213320741U (en) | Cross-rail transverse moving ferry trolley used for intelligent bridge production system | |
CN207108292U (en) | Novel U-shaped erection equipment | |
CN220132754U (en) | Single-rope-surface traction rope hanging basket sliding beam walking device | |
CN215322203U (en) | Special flat car for transporting non-tensioned prefabricated box girder | |
CN201284463Y (en) | Hoisting overhead travelling crane of bridging machine for both highway and railway | |
CN114873177B (en) | Construction method of electric beam transporting vehicle for vertically and horizontally moving steel rail lithium battery | |
CN220598196U (en) | Auxiliary lifting device for diamond hanging basket construction | |
CN216104410U (en) | Bidirectional walking trolley |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220816 Address after: 418000 Xiangshang culture and Technology Industrial Park in Zhongfang County, Huaihua City, Hunan Province (east of Huaiqian Road, west of Ziyang Road, south of Wuxi East Road, north of Fengxiang Road) Patentee after: Hunan Wuxin Intelligent Technology Co., Ltd. Address before: No.1399, airport 2nd Road, xihanggang, Shuangliu District, Chengdu, Sichuan 610200 Patentee before: SICHUAN WUXIN INTELLIGENT EQUIPMENT Co.,Ltd. |
|