CN213265486U - Intelligent control vertical circular rail hoisting system for building assembled curtain wall - Google Patents

Intelligent control vertical circular rail hoisting system for building assembled curtain wall Download PDF

Info

Publication number
CN213265486U
CN213265486U CN202022005030.5U CN202022005030U CN213265486U CN 213265486 U CN213265486 U CN 213265486U CN 202022005030 U CN202022005030 U CN 202022005030U CN 213265486 U CN213265486 U CN 213265486U
Authority
CN
China
Prior art keywords
guide rail
vertical
curtain wall
rail
intelligent control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022005030.5U
Other languages
Chinese (zh)
Inventor
彭望佳
李伯基
冯智宁
严超磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Bole Intelligent Technology Co ltd
Guangzhou Jangho Curtain Wall System Engineering Co Ltd
Original Assignee
Guangzhou Bole Intelligent Technology Co ltd
Guangzhou Jangho Curtain Wall System Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Bole Intelligent Technology Co ltd, Guangzhou Jangho Curtain Wall System Engineering Co Ltd filed Critical Guangzhou Bole Intelligent Technology Co ltd
Priority to CN202022005030.5U priority Critical patent/CN213265486U/en
Application granted granted Critical
Publication of CN213265486U publication Critical patent/CN213265486U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an intelligent control vertical circular rail hoisting system for a building assembled curtain wall, which comprises a vertical conveying mechanism and a circular hoisting mechanism; the vertical conveying mechanism comprises a vertical guide rail, a longitudinal sliding plate and a winch, the longitudinal sliding plate is arranged on the vertical guide rail in a lifting manner, and the winch is positioned on the upper side of the vertical guide rail and is provided with a lifting rope for pulling the longitudinal sliding plate to ascend; the annular hoisting mechanism comprises an annular guide rail and a lifting appliance, the annular guide rail is arranged on the outer side of the upper end of the vertical guide rail, and the lifting appliance is installed on the annular guide rail and can move along the annular guide rail. The utility model provides a hoist and mount system transports the curtain through vertical guide rail and longitudinal sliding plate complex form, compares current soft cable hoist and mount mode safer, even also can guarantee not acutely to rock when articulating in strong wind weather, also can improve vertical migration speed simultaneously.

Description

Intelligent control vertical circular rail hoisting system for building assembled curtain wall
Technical Field
The utility model relates to a high-rise building curtain hoist and mount technical field especially relates to a perpendicular circular rail hoist and mount system of building assembled curtain intelligent control.
Background
As is well known, a building curtain wall is one of building structures commonly existing in the market at present, and is popular among people due to high aesthetic degree, and a high-rise building can be installed only after the building curtain wall to be installed is hoisted to a corresponding installation floor in the construction process. However, the existing hoisting scheme is a mode of vertically hoisting a soft cable by using a steel wire, when a curtain wall is delivered to a higher floor or is easy to shake violently in windy weather, the safety is low, and the hoisting speed is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a perpendicular circular rail hoist and mount system of building assembled curtain intelligent control does benefit to and promotes construction security and hoist and mount efficiency.
In order to achieve the above object, the utility model provides a following technical scheme:
an intelligent control vertical circular rail hoisting system for a building assembled curtain wall comprises a vertical conveying mechanism and a circular hoisting mechanism; the vertical conveying mechanism comprises a vertical guide rail, a longitudinal sliding plate and a winch, the longitudinal sliding plate is arranged on the vertical guide rail in a lifting manner, and the winch is positioned on the upper side of the vertical guide rail and is provided with a lifting rope for pulling the longitudinal sliding plate to ascend; the annular hoisting mechanism comprises an annular guide rail and a lifting appliance, the annular guide rail is arranged on the outer side of the upper end of the vertical guide rail, and the lifting appliance is installed on the annular guide rail and can move along the annular guide rail.
As a further preferred scheme, the annular hoisting mechanism further comprises a plurality of telescopic mechanisms which are annularly arranged at intervals; the telescopic mechanism comprises a telescopic guide rod and a telescopic guide sleeve, the telescopic guide rod is transversely arranged, and one end of the telescopic guide rod is fixedly connected with the annular guide rail; the telescopic guide sleeve is sleeved with a telescopic guide rod.
As a further preferable scheme, the telescopic mechanism further comprises a hydraulic cylinder, and the hydraulic cylinder is mounted on the telescopic guide sleeve and drives the telescopic guide rod to extend and retract.
As a further preferable mode, the longitudinal sliding plate includes a main bracket and a sliding connector installed at a rear side of the main bracket and slidably connected with the vertical guide rail.
As a further preferred aspect, the longitudinal sliding plate includes two sliding connectors fixed to the upper and lower ends of the back portion of the main bracket, respectively.
As a further preferred scheme, the sliding connection piece includes a fixed plate and two limiting pieces installed on the back of the fixed plate and arranged oppositely, and the vertical guide rail is located between the two limiting pieces.
As a further preferable scheme, the limiting member is provided with a pulley matched with the vertical guide rail.
As a further preferred scheme, the main support comprises a cross rod, and a pair of clamping pieces are arranged on the cross rod and used for clamping two sides of the curtain wall.
As a further preferred scheme, the vertical conveying mechanism further comprises a plurality of positioning frames arranged at intervals, and one end of each positioning frame is fixed with the vertical guide rail
As a further preferable scheme, the vertical guide rail and the annular guide rail are i-shaped steel.
Compared with the prior art, the utility model discloses the beneficial effect who reaches is:
the utility model provides a hoist and mount system transports the curtain through vertical guide rail and longitudinal sliding plate complex form, compares current soft cable hoist and mount mode safer, even also can guarantee not acutely to rock when articulating in strong wind weather, also can improve vertical migration speed simultaneously.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic structural view of the intelligent control vertical circular rail hoisting system for the assembled curtain wall of the building of the utility model;
FIG. 2 is an enlarged view of a portion of FIG. 1 at position A;
FIG. 3 is a schematic view of the curtain wall of the present invention mounted on a vertical rail;
FIG. 4 is a partial enlarged view of the location B in FIG. 3;
FIG. 5 is a schematic view of another perspective of FIG. 3;
in the figure: a vertical conveying mechanism 1; an annular hoisting mechanism 2; a hoist 11; a longitudinal slide 12; a positioning frame 13; a main support 131; a cross bar 1311; a clamp 1312; a slide connector 132; a fixing plate 1321; a limit piece 1322; a pulley 1323; a vertical guide rail 14; a first extension 141; a second extension 142; a connecting section 143; an endless guide rail 21; a telescoping mechanism 22; a telescopic guide rod 221; a telescoping guide 222; a hydraulic cylinder 223; a spreader 23; the curtain wall 100.
Detailed Description
In order to facilitate understanding of the present invention, the present invention will be described in more detail with reference to the accompanying drawings and embodiments. It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may be present. The terms "upper", "lower", "left", "right", "inner", "outer" and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Example 1
As shown in fig. 1 and fig. 2, the embodiment provides a building assembled curtain wall intelligent control vertical circular rail hoisting system, which comprises a vertical conveying mechanism 1 and a circular hoisting mechanism 2, which are respectively used for hoisting a curtain wall upwards and horizontally transporting the curtain wall. The vertical conveying mechanism comprises a vertical guide rail 14, a longitudinal sliding plate 12, positioning frames 13 and a winch 11, the longitudinal sliding plate is arranged on the vertical guide rail 14 in a lifting mode, the positioning frames are distributed on all floors and fixed with the vertical guide rail, and the winch is provided with a lifting rope for pulling the longitudinal sliding plate to ascend and is used for connecting the curtain wall 100 and the longitudinal sliding plate 12. The annular hoisting mechanism comprises an annular guide rail 21 and a lifting appliance 23, the annular guide rail is arranged on the outer side of the upper end of the vertical guide rail, and the lifting appliance is arranged on the annular guide rail and can move along the annular guide rail.
As shown in fig. 3 to 5, the longitudinal sliding plate includes a main bracket 131 and a sliding connector 132 installed at a rear side of the main bracket and slidably coupled with the vertical guide rail. In this embodiment, two sliding connectors are respectively fixed to the upper end and the lower end of the back of the main bracket 131.
The vertical guide rail 14 is made of i-shaped steel, and is provided with a first extending section 141, a second extending section 142 and a connecting section 143, the first extending section is located at one side close to the longitudinal sliding plate and is arranged in parallel with the second extending section, and two ends of the connecting section are respectively and vertically connected with the first extending section and the second extending section. The sliding connector includes a fixing plate 1321 and two limiting members 1322 installed on the back of the fixing plate and disposed oppositely, and the fixing plate is fixed to the back of the main bracket. The vertical guide rail is located between two locating parts, the end of the first extension section of locating part spacing, each locating part is equipped with two pulleys 1323 of the first extension section of butt, and two pulleys 1323 are located the both sides of first extension section respectively. The arrangement of the pulleys can reduce friction and facilitate the stable rising of the longitudinal sliding plate. In addition, the main support comprises a plurality of cross rods 1311, each cross rod is provided with a pair of clamping pieces 1312, and the clamping pieces 1312 are sleeved with the cross rods and used for clamping the side edges of the curtain wall to avoid shaking of the curtain wall.
As shown in figures 1-2, said annular hoisting means 2 further comprise a plurality of telescopic means 22 arranged annularly and at intervals. The telescopic mechanism comprises a telescopic guide rod 221 and a telescopic guide sleeve 222, the telescopic guide rod is transversely arranged, and one end of the telescopic guide rod is fixedly connected with the annular guide rail; the telescopic guide sleeve is sleeved with a telescopic guide rod. In this embodiment, the telescopic mechanism further includes a hydraulic cylinder 223, and the hydraulic cylinder is installed on the telescopic guide sleeve and drives the telescopic guide rod to extend and retract. The whole annular guide rail is arranged on the outer side of the telescopic mechanism in advance in the floor, the annular guide rail is locked with the floor, and then the annular guide rail is manually or synchronously moved out to the outer side of the floor by utilizing a hydraulic cylinder 223 and then locked in place. Need not artifical installation outside the building, do benefit to and improve construction security and installation dismantlement convenient. In this embodiment, the annular guide rail is an i-steel.
The operation flow of the hoisting system is as follows:
1. the curtain wall is transported to a transport trolley by a forklift;
2. the curtain wall is fixed well to hoist engine vertical lifting hook, and the safety hook hangs on vertical slide, and the hoist engine drive is mentioned the lifting hook through the lifting rope, and the curtain wall erects.
3. The clamping pieces are adjusted to clamp two sides of the curtain wall, so that the curtain wall is prevented from shaking;
4. the longitudinal lifting hook continues to rise upwards, and at the moment, the curtain wall drives the sliding plate to rise together to a specified floor;
5. the lifting appliance of the annular guide rail is transversely moved to the upper side of the curtain wall, the longitudinal lifting hook is separated from the curtain wall, and the longitudinal lifting hook is hung on the longitudinal sliding plate;
6. the curtain wall transversely moves to a specified position for installing the curtain wall, and the curtain wall is installed;
7. the longitudinal lifting hook drives the sliding plate to move down to continue the hoisting of the next curtain wall.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. An intelligent control vertical circular rail hoisting system for a building assembled curtain wall is characterized by comprising a vertical conveying mechanism and a circular hoisting mechanism; the vertical conveying mechanism comprises a vertical guide rail, a longitudinal sliding plate and a winch, the longitudinal sliding plate is arranged on the vertical guide rail in a lifting manner, and the winch is positioned on the upper side of the vertical guide rail and is provided with a lifting rope for pulling the longitudinal sliding plate to ascend; the annular hoisting mechanism comprises an annular guide rail and a lifting appliance, the annular guide rail is arranged on the outer side of the upper end of the vertical guide rail, and the lifting appliance is installed on the annular guide rail and can move along the annular guide rail.
2. The intelligent control vertical circular rail hoisting system for the building assembled curtain wall as claimed in claim 1, wherein the circular hoisting mechanism further comprises a plurality of telescopic mechanisms which are annularly arranged at intervals; the telescopic mechanism comprises a telescopic guide rod and a telescopic guide sleeve, the telescopic guide rod is transversely arranged, and one end of the telescopic guide rod is fixedly connected with the annular guide rail; the telescopic guide sleeve is sleeved with a telescopic guide rod.
3. The system for intelligently controlling the hoisting of the vertical ring rail of the building assembled curtain wall as claimed in claim 2, wherein the telescoping mechanism further comprises a hydraulic cylinder, and the hydraulic cylinder is mounted on the telescoping guide sleeve and drives the telescoping guide rod to telescope.
4. The intelligent control vertical ring rail hoisting system for the building assembled curtain wall as claimed in claim 1, wherein the longitudinal sliding plate comprises a main support and a sliding connector, and the sliding connector is installed at the rear side of the main support and is in sliding connection with the vertical guide rail.
5. The intelligent control vertical ring rail hoisting system for the building assembled curtain wall as claimed in claim 4, wherein the longitudinal sliding plate comprises two sliding connectors fixed at the upper end and the lower end of the back of the main bracket respectively.
6. The intelligent control vertical ring rail hoisting system for the building assembled curtain wall as claimed in claim 4, wherein the sliding connection member comprises a fixed plate and two limiting members installed on the back of the fixed plate and oppositely arranged, and the vertical guide rail is located between the two limiting members.
7. The intelligent control vertical ring rail hoisting system for the building assembled curtain wall as claimed in claim 6, wherein the limiting member is provided with a pulley matching the vertical guide rail.
8. The intelligent control vertical ring rail hoisting system for the building assembled curtain wall as claimed in claim 4, wherein the main support comprises a cross bar, and a pair of clamping members are arranged on the cross bar for clamping two sides of the curtain wall.
9. The intelligent control vertical circular rail hoisting system for the building assembled curtain wall as claimed in claim 1, wherein the vertical conveying mechanism further comprises a plurality of positioning frames arranged at intervals, and one end of each positioning frame is fixed with the vertical guide rail.
10. The intelligent control vertical ring rail hoisting system for the building assembled curtain wall as claimed in claim 1, wherein the vertical guide rail and the ring rail are i-steel.
CN202022005030.5U 2020-09-14 2020-09-14 Intelligent control vertical circular rail hoisting system for building assembled curtain wall Expired - Fee Related CN213265486U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022005030.5U CN213265486U (en) 2020-09-14 2020-09-14 Intelligent control vertical circular rail hoisting system for building assembled curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022005030.5U CN213265486U (en) 2020-09-14 2020-09-14 Intelligent control vertical circular rail hoisting system for building assembled curtain wall

Publications (1)

Publication Number Publication Date
CN213265486U true CN213265486U (en) 2021-05-25

Family

ID=75941337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022005030.5U Expired - Fee Related CN213265486U (en) 2020-09-14 2020-09-14 Intelligent control vertical circular rail hoisting system for building assembled curtain wall

Country Status (1)

Country Link
CN (1) CN213265486U (en)

Similar Documents

Publication Publication Date Title
CN214243605U (en) Novel partition plate installation device
CN207974504U (en) Climbing type hanging basket system for tilting decoration of exterior wall construction
CN109252733B (en) Attached self-climbing holding pole lifting system
CN213265486U (en) Intelligent control vertical circular rail hoisting system for building assembled curtain wall
CN210361337U (en) Multistage telescopic arm structure and leveling robot thereof
CN201411334Y (en) Simple traveling crane
CN201330506Y (en) Spreader climbing mechanism
CN216235734U (en) Vertical transportation hoisting structure for curtain wall unit plate
CN210117915U (en) Single-floor climbing frame and climbing system
CN211473441U (en) Assembled wallboard transportation equipment
CN213141328U (en) Hanging basket for mounting safety type outdoor high-rise building electrical appliances
CN212671145U (en) Small-size slide rail formula portable hanging flower basket
CN209957286U (en) Liftable simple and easy installation device of jib
CN204310700U (en) A kind of indoor hoisting crane
CN210685565U (en) Chimney is reformed transform and is used inner tube hoist device
CN113460855A (en) Auxiliary device for mounting and constructing assembly type laminated slab
CN209024026U (en) A kind of reinforcing bar cage hoisting machine
CN215673902U (en) Pipeline installation hoisting accessory
CN210635678U (en) Self-made advance support auxiliary elevator
CN216921292U (en) Mounting structure of outer wall construction lift platform
CN217177668U (en) Positioning bracket for water supply and drainage engineering pipeline
CN215439465U (en) Lifting device for combined aluminum alloy template
CN213771021U (en) Installation device of energy-saving window
CN112125120B (en) Auxiliary mobile butt-joint assembling equipment and method for hoisting steel truss
CN213927771U (en) Control pole setting convenient to hoist and mount

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210525

CF01 Termination of patent right due to non-payment of annual fee