CN213243387U - Electric power construction is with reason line frame - Google Patents
Electric power construction is with reason line frame Download PDFInfo
- Publication number
- CN213243387U CN213243387U CN202022389277.1U CN202022389277U CN213243387U CN 213243387 U CN213243387 U CN 213243387U CN 202022389277 U CN202022389277 U CN 202022389277U CN 213243387 U CN213243387 U CN 213243387U
- Authority
- CN
- China
- Prior art keywords
- electric power
- fixedly connected
- power construction
- seat
- screw thread
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 30
- 238000004804 winding Methods 0.000 claims description 25
- 230000000694 effects Effects 0.000 abstract description 4
- 230000009471 action Effects 0.000 abstract description 2
- 230000008859 change Effects 0.000 abstract description 2
- 230000006378 damage Effects 0.000 abstract description 2
- 230000002265 prevention Effects 0.000 abstract 1
- 230000005540 biological transmission Effects 0.000 description 9
- 230000001681 protective effect Effects 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 3
- 238000009826 distribution Methods 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 238000005304 joining Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 230000007480 spreading Effects 0.000 description 1
- 238000003892 spreading Methods 0.000 description 1
- 239000002887 superconductor Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Images
Landscapes
- Installation Of Indoor Wiring (AREA)
Abstract
The utility model discloses an electric power construction is with reason line frame, including backup pad, kinking board, linkage plate, bracing piece and balancing pole, the equal fixedly connected with protection network in both sides of balancing pole, the spacing platform of last fixed surface of kinking board is connected with, the surface of spacing platform is provided with the screw thread seat, the inside threaded connection of screw thread seat has a linking piece, the one end fixedly connected with of linking piece links up the seat. The utility model has the advantages of the utility model provides an electric power construction is with reason line frame, this equipment provides a reason line structure, when using, the setting of pivot, when dragging the circuit, can play the effect of spacing supplementary pulling, through the threaded connection mode between screw thread seat and the linking piece, consequently can dismantle between spool and the screw thread seat, be convenient for maintain, or change when the circuit is used up, the setting of protection network can play certain guard action to the device, the falling object landing that the prevention construction place appears, cause the destruction to the device.
Description
Technical Field
The utility model relates to an electric power construction equipment technical field specifically is an electric power construction is with reason line frame.
Background
Electric power engineering, i.e. engineering related to the production, transmission and distribution of electric energy, also broadly includes engineering of applying electricity as power and energy in various fields, the transmission and distribution of electric energy is mainly realized by high-voltage and low-voltage alternating current power networks, and also broadly includes engineering of applying electricity as power and energy in various fields, and at the same time, it can be understood as transmission and transformation engineering. In the last 30 years, the high-voltage direct-current transmission technology is rapidly improved and is more and more widely applied in some transmission fields. Therefore, as a direction of the development of the transmission engineering technology, the method is mainly used for researching the ultra-high voltage alternating current transmission and direct current transmission technology to form a larger power grid; meanwhile, the technical problem of superconductor electric energy transmission is also researched, in some indoor construction, three lines of zero fire ground are required to be arranged, before construction, constructors need to arrange the three lines, wiring needs to be carried out for multiple times when laying the lines aiming at different types of lines, the time of electric power construction is prolonged, and therefore the efficiency of electric power construction is reduced.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides an electric power construction is with reason line frame has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides an electric power construction is with reason line frame, includes the backup pad, the equal fixedly connected with kinking board in both sides of backup pad, one side fixedly connected with linkage plate of kinking board, the last fixed surface of backup pad is connected with the bracing piece, the one end fixedly connected with balancing pole of bracing piece, the equal fixedly connected with protection network in both sides of balancing pole, the spacing platform of last fixed surface of kinking board is connected with, the surface of spacing platform is provided with the screw thread seat, the inside threaded connection of screw thread seat has linkage block, the one end fixedly connected with linkage block links up the seat.
Optionally, the upper surface of the connecting plate is fixedly connected with a fixing table, and the upper surface of the fixing table is movably connected with a wire clamping frame.
Optionally, the upper surface of the connecting plate is movably connected with a binding rope.
Optionally, the upper surface of the joining seat is movably connected with a winding shaft, and the upper surface of the winding shaft is fixedly connected with a handle.
Optionally, the bottom of the connection plate is movably connected with a universal wheel.
Optionally, one side of the wire clamping frame is movably connected with a rotating shaft.
Optionally, the wire clamping frame is matched with the rotating shaft.
(III) advantageous effects
The utility model provides an electric power construction is with reason line frame possesses following beneficial effect:
the utility model has the advantages of the utility model provides an electric power construction is with reason line frame, this equipment provides a reason line structure, when using, through the setting of spool, can twine the heterogeneous circuit on the spool respectively, the spool can realize rotating on linking up the seat, penetrate corresponding card line frame with the one end of heterogeneous circuit on, setting through the pivot, thereby the one end of pulling circuit drives the spool and rotates, and then, can constantly lengthen the circuit, realize laying of circuit, the setting of pivot, when dragging the circuit, can play the effect of spacing supplementary pulling, different circuit corresponds different card line frames, consequently can not lead to the circuit winding together when spreading the line, and lay when can carrying out many circuits simultaneously, the engineering time is saved, the efficiency of construction is improved.
The utility model has the main advantages that the utility model provides a wire arrangement frame for electric power construction, the equipment provides a wire arrangement structure, when in use, through the threaded connection mode between the threaded seat and the linking block, therefore, the wire winding shaft and the threaded seat can be disassembled, the maintenance is convenient, or the circuit is replaced when the circuit is used up, through the setting of the handle, when the laid circuit is too long, the wire can be wound up through rotating the handle, thereby ensuring the matching between different circuits, the device is provided with the universal wheel, the maneuverability of the device is increased, when in use, the device can be moved through the rope-tying pulling device according to the actual requirement, when in special conditions, one end of the circuit is fixed, the device can be moved through the rope-tying pulling device, the wire laying work is carried out, time and labor are saved, the setting of the protective net can play a certain protective role to the device, the falling object in the construction place can be prevented, causing damage to the device.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure of the screw seat of the present invention;
fig. 3 is a schematic sectional view of the structure of the winding shaft of the present invention.
In the figure: 1. a support plate; 2. winding board; 3. a connector tile; 4. a support bar; 5. a balancing pole; 6. a protective net; 7. a limiting table; 8. a threaded seat; 9. a joining block; 10. a linking seat; 11. a fixed table; 12. a wire clamping frame; 13. tying a rope; 14. a winding shaft; 15. a handle; 16. a universal wheel; 17. a rotating shaft.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: a wire arranging frame for electric power construction comprises a supporting plate 1, wherein both sides of the supporting plate 1 are fixedly connected with wire winding plates 2, one side of each wire winding plate 2 is fixedly connected with a connecting plate 3, the upper surface of each connecting plate 3 is fixedly connected with a fixing table 11, the upper surface of each fixing table 11 is movably connected with a wire clamping frame 12, one side of each wire clamping frame 12 is movably connected with a rotating shaft 17, the wire clamping frames 12 and the rotating shafts 17 are matched with each other, 2 wires penetrate between the two rotating shafts 17, the rotating shafts 17 are driven to rotate when the wires are pulled, the upper surfaces of the connecting plates 3 are movably connected with binding ropes 13, the bottoms of the connecting plates 3 are movably connected with universal wheels 16, the upper surface of the supporting plate 1 is fixedly connected with a supporting rod 4, one end of the supporting rod 4 is fixedly connected with a balancing rod 5, both sides of the balancing rod 5 are fixedly connected with protective nets 6, the upper surface of the winding board 2 is fixedly connected with a limiting platform 7, the surface of the limiting platform is provided with a thread seat 8, the inner thread of the thread seat 8 is connected with a connecting block 9, one end of the connecting block 9 is fixedly connected with a connecting seat 10, the upper surface of the connecting seat 10 is movably connected with a winding shaft 14, the upper surface of the winding shaft 14 is fixedly connected with a handle 15, different types of circuits can be respectively wound on the winding shaft 14 through the arrangement of the winding shaft 14, the winding shaft 14 can rotate on the connecting seat 10, one ends of the different types of circuits penetrate into corresponding wire clamping frames 12, one end of the circuit is pulled through the arrangement of a rotating shaft 17 so as to drive the winding shaft 14 to rotate, thereby the circuit can be continuously lengthened, the laying of the circuit is realized, the rotating shaft 17 is arranged, when the circuit is pulled, the limiting auxiliary pulling effect can be played, the different circuits correspond to the different wire clamping frames, and therefore, the circuit can not be wound together when the circuit is laid, and can carry on laying while being multiple lines at the same time, has saved the construction time, has raised the construction efficiency, through the threaded connection way between engaging block 9 and the threaded seat 8, therefore can dismantle between bobbin 14 and the threaded seat 8, easy to maintain, or the line is changed when using up, through the arrangement of the handle 15, when the laying line is too long, can rotate the handle 15, take up the line work, thus guarantee to match each other between different lines, the apparatus is equipped with the universal wheel 16, has added the sex of the apparatus, while using, can according to the actual demand, can through tying up the rope 13 to pull the apparatus, move, to the special condition, after one end of the line is fixed, can pull the apparatus to move through tying up the rope 13, carry on laying work, labour saving and time saving, the setting up of the protective screen 6, can play certain protective action to the apparatus, prevent the falling object that the construction site appears from slipping off, the device is damaged, detailed descriptions of known functions and known components are omitted in the specific embodiment of the disclosure, and in order to ensure compatibility of the equipment, all adopted operation means are consistent with parameters of instruments on the market.
To sum up, when the wire arranging frame for electric power construction is used, different types of circuits can be respectively wound on the wire winding shaft 14 through the arrangement of the wire winding shaft 14, the wire winding shaft 14 can rotate on the connecting seat 10, one ends of the different types of circuits penetrate into the corresponding wire clamping frames 12, one end of the circuit is pulled through the arrangement of the rotating shaft 17 so as to drive the wire winding shaft 14 to rotate, and then the circuit can be continuously stretched to realize the laying of the circuit, the rotating shaft 17 can play a role of limiting and assisting the pulling when the circuit is pulled, and the wire can be wound by rotating the handle 15 through the threaded connection mode between the threaded seat 8 and the connecting block 9, so that the wire winding shaft 14 and the threaded seat 8 can be detached, the maintenance is convenient, or the circuit is replaced when the circuit is used up, through the arrangement of the handle 15, when the laid circuit is too long, the wire winding work can be carried out through the rotation of the handle 15, thereby ensuring the mutual matching between the different circuits, the device is equipped with universal wheel 16, has added the mobility of this device, when using, can remove through tying up 13 pulling devices of rope according to actual demand, and when special case, the one end of circuit is fixed well the back, and accessible is tied up 13 pulling devices and is removed, lays the line work, labour saving and time saving, and certain guard action can be played to the device to the setting of protection network 6.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (7)
1. The utility model provides a line arrangement frame for power construction, includes backup pad (1), its characterized in that: the utility model discloses a winding device, including the equal fixedly connected with kinking board in both sides of backup pad (1) (2), one side fixedly connected with linking board (3) of kinking board (2), the last fixed surface of backup pad (1) is connected with bracing piece (4), the one end fixedly connected with balancing pole (5) of bracing piece (4), the equal fixedly connected with protection network (6) in both sides of balancing pole (5), the spacing platform of last fixed surface of kinking board (2) is connected with (7), the surface of spacing platform is provided with screw thread seat (8), the internal thread of screw thread seat (8) is connected with links up piece (9), the one end fixedly connected with of linking up piece (9) links up seat (10).
2. The wire arranging frame for electric power construction according to claim 1, wherein: the upper surface of the connecting plate (3) is fixedly connected with a fixed table (11), and the upper surface of the fixed table (11) is movably connected with a wire clamping frame (12).
3. The wire arranging frame for electric power construction according to claim 1, wherein: the upper surface of the connecting plate (3) is movably connected with a binding rope (13).
4. The wire arranging frame for electric power construction according to claim 1, wherein: the upper surface of the connecting seat (10) is movably connected with a winding shaft (14), and the upper surface of the winding shaft (14) is fixedly connected with a handle (15).
5. The wire arranging frame for electric power construction according to claim 1, wherein: the bottom of the connection plate (3) is movably connected with a universal wheel (16).
6. The wire arranging frame for electric power construction according to claim 2, wherein: one side of the wire clamping frame (12) is movably connected with a rotating shaft (17).
7. The wire arranging frame for electric power construction according to claim 6, wherein: the wire clamping frame (12) is matched with the rotating shaft (17).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022389277.1U CN213243387U (en) | 2020-10-24 | 2020-10-24 | Electric power construction is with reason line frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022389277.1U CN213243387U (en) | 2020-10-24 | 2020-10-24 | Electric power construction is with reason line frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213243387U true CN213243387U (en) | 2021-05-18 |
Family
ID=75880192
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022389277.1U Expired - Fee Related CN213243387U (en) | 2020-10-24 | 2020-10-24 | Electric power construction is with reason line frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213243387U (en) |
-
2020
- 2020-10-24 CN CN202022389277.1U patent/CN213243387U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104993421B (en) | A kind of portable pay-off crossing frame | |
CN102290742B (en) | Tension stringing construction technology | |
CN108736377B (en) | Live crossing system for paying-off construction crossing power line and application method thereof | |
CN204316006U (en) | A kind of electric transmission line hot-line crosses over block device | |
CN205407205U (en) | Cable spool wire rack | |
CN213243387U (en) | Electric power construction is with reason line frame | |
CN204793847U (en) | Frame is strideed across to portable unwrapping wire | |
CN202359878U (en) | Buried type expandable insulating rail | |
CN209267015U (en) | A cable deployment device for the cable tray of the basement distribution station | |
CN207010097U (en) | A kind of wire installation of electric wire laying | |
CN206820364U (en) | Special tools for power distribution lines | |
CN102709849A (en) | Manual multifunctional wire tightening device and wire tightening method | |
CN106532557B (en) | Across 10KV line construction platform tools devices | |
CN209419109U (en) | A kind of bypass cable stringing special equipment | |
CN202602171U (en) | A tool for power-on replacing multi-loop double split conductor insulator of 220kV line | |
CN205051256U (en) | A pay -off for power distribution network | |
CN107859419A (en) | A kind of outdoor electric pole remove device | |
CN102403670B (en) | Quick wire picking device applied to 10 KV and below overhead power transmission lines | |
CN203233106U (en) | High-voltage transmission line wiring pull device | |
CN105439023A (en) | Transformer substation weight lifting device | |
CN205159920U (en) | Insulation plug-in plate for live replacement of multi-circuit transmission line jumper suspension insulator string on the same tower | |
CN205312753U (en) | Cable laying pay -off suitable for any cable drum | |
CN212518195U (en) | Hydraulic and hydroelectric engineering is with device of sunkening cord | |
CN213959563U (en) | Crossing structure for power transmission crossing construction | |
CN103430781B (en) | A kind of insulation trimmer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210518 |