CN206820364U - Special tools for power distribution lines - Google Patents

Special tools for power distribution lines Download PDF

Info

Publication number
CN206820364U
CN206820364U CN201720644123.8U CN201720644123U CN206820364U CN 206820364 U CN206820364 U CN 206820364U CN 201720644123 U CN201720644123 U CN 201720644123U CN 206820364 U CN206820364 U CN 206820364U
Authority
CN
China
Prior art keywords
cable
support
distribution line
laying tool
tool according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720644123.8U
Other languages
Chinese (zh)
Inventor
刘峰
王灿伟
张莹
李广雨
刘佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongping Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Dongping Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongping Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Dongping Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN201720644123.8U priority Critical patent/CN206820364U/en
Application granted granted Critical
Publication of CN206820364U publication Critical patent/CN206820364U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model provides a kind of distribution line Special line laying tool, is related to distribution line stringing technical field of tools, solve can only once lay single line during stringing and caused by the technical problem that wastes time and energy.The distribution line Special line laying tool includes support oriented device and draw-gear, support oriented device is used for supporting cable and limits the trend of cable, support oriented device is arranged on the head of the mast, there is the position of multiple placement cables on support oriented device, draw-gear is connected with more cables being placed on support oriented device, and more cables are pulled to and treat decorating position.The utility model can lay multi-cable simultaneously, greatly shorten the stringing time, improve efficiency of construction.

Description

配电线路放线专用工具Special tools for power distribution lines

技术领域technical field

本实用新型涉及配电线路架线工具技术领域,尤其是涉及一种能够同时铺设多条配电线路的放线专用工具。The utility model relates to the technical field of power distribution line stringing tools, in particular to a special wire-laying tool capable of simultaneously laying a plurality of power distribution lines.

背景技术Background technique

配电线路新建及扩增施工中,常需要架设3根或4根平行的配电线路,施工包括前期准备、横担装设和电缆架设等过程,在实际作业过程中,目前均是采用单根放、紧线作业模式,即采用一次架设单根电缆,待架设完一根电缆后再架设下一根电缆的工作模式,所以需要耗费大量人力、物力及时间进行配电线路的电缆架设工作,基本上电缆架设工作占据了整个配电线路施工总时间的50.18%,如何能同时架设全部的电缆,减少电缆架设时间,提高配电线路施工工作效率是急需解决的问题。During the new construction and expansion of distribution lines, it is often necessary to erect 3 or 4 parallel distribution lines. The construction includes preliminary preparations, cross-arm installation, and cable erection. In the actual operation process, a single The operation mode of root laying and tightening, that is, the working mode of erecting a single cable at a time, and then erecting the next cable after erecting one cable, so it needs a lot of manpower, material resources and time for cable erection work of distribution lines , Basically, the cable erection work occupies 50.18% of the total construction time of the entire distribution line. How to erect all the cables at the same time, reduce the cable erection time, and improve the construction efficiency of the distribution line is an urgent problem to be solved.

实用新型内容Utility model content

本实用新型的目的在于提供一种能够同时铺设多条配电线路的放线专用工具,以解决现有技术中存在的线路架设耗时费力的技术问题。The purpose of the utility model is to provide a special tool for laying out multiple power distribution lines at the same time, so as to solve the technical problem of time-consuming and labor-intensive line erection in the prior art.

为实现上述目的,本实用新型提供了以下技术方案:In order to achieve the above object, the utility model provides the following technical solutions:

本实用新型提供的配电线路放线专用工具,包括支撑导向装置和牵引装置,所述支撑导向装置用于支撑线缆并限制所述线缆的走向,所述支撑导向装置安装在电杆顶部,所述支撑导向装置上具有多个放置所述线缆的位置,所述牵引装置与放置在所述支撑导向装置上的多根所述线缆连接,将多根所述线缆牵拉到待架设位置。The special tool for unwinding power distribution lines provided by the utility model includes a support and guide device and a traction device. The support and guide device is used to support the cable and limit the direction of the cable. The support and guide device is installed on the top of the pole , there are multiple positions for placing the cables on the support and guide device, the pulling device is connected to the multiple cables placed on the support and guide device, and pulls the multiple cables to The location to be erected.

通过采用在电杆顶部设置具有放置多根线缆位置的支撑导向装置,通过牵引装置将放置在支撑导向装置上的多根线缆全部牵拉,并同时定向移动到下一个待架设的电杆顶部,从而实现同时铺设三到四根电缆。具体使用时,首先将多根线缆分别并排放置到支撑导向装置上,然后将多根线缆固定到牵引装置上,通过驱动装置拉动牵引装置,牵引装置带动多根线缆同时并行向下一根电杆处移动,待移动到下一根电杆处将线缆放置到下一根电杆上的支撑导向装置上,然后继续拖动线缆进行架设。由于采用配电线路作业专用轻便型组合工具,电缆架设时间缩短,以前三相电缆需要三次(或四次)放线拉线,改进后一次即可完成,从而压缩电缆架设的时间量,减少安装时间,有效降低总体工作时间,工作流程更加高效、流畅。By adopting a support and guide device with a position for placing multiple cables on the top of the pole, all the multiple cables placed on the support and guide device are pulled by the traction device, and at the same time, they are oriented and moved to the next pole to be erected top, so that three to four cables can be laid at the same time. In specific use, first place a plurality of cables side by side on the supporting guide device, then fix the plurality of cables to the traction device, pull the traction device through the driving device, and the traction device drives multiple cables in parallel to the next After moving to the next pole, place the cable on the support and guide device on the next pole, and then continue to drag the cable for erection. Due to the use of a special portable combination tool for power distribution lines, the cable erection time is shortened. In the past, the three-phase cables required three (or four) laying and pulling wires. After the improvement, it can be completed in one time, thereby reducing the amount of time for cable erection and reducing installation time. , effectively reducing the overall working time, and the workflow is more efficient and smooth.

作为本实用新型的进一步改进,所述支撑导向装置包括平台支撑架和电缆导向机构,所述电缆导向机构的数量为至少两个,所有的所述电缆导向机构并排安装在所述平台支撑架顶部,所述平台支撑架通过设置在其上的固定杆与电杆顶部的抱箍连接。所述平台支撑架用于支撑固定所述电缆导向机构,所述电缆导向机构用于支撑线缆并将线缆导向下一个线缆架设位置,所述牵引装置用于拉动铺设的线缆并行移动。As a further improvement of the utility model, the support and guide device includes a platform support frame and a cable guide mechanism, the number of the cable guide mechanisms is at least two, and all the cable guide mechanisms are installed side by side on the top of the platform support frame , the platform support frame is connected with the hoop on the top of the pole through the fixed pole arranged on it. The platform support frame is used to support and fix the cable guide mechanism, the cable guide mechanism is used to support the cable and guide the cable to the next cable erection position, and the traction device is used to pull the laid cable to move in parallel .

作为本实用新型的进一步改进,所述电缆导向机构为朝天滑车,所述朝天滑车包括滚轮、两个平行设置的支撑件和一U形连接件,所述线缆放在在所述滚轮上,所述滚轮转动连接在两个所述支撑件之间,所述U形连接件设置在所述支撑件底部,所述平台支撑架插入到所述U形连接件的U形凹腔内通过螺栓连接。所述U形连接件的凹腔开口规格与所述平台支撑架的厚度相适配,所述U形连接件开口朝向所述滚轮转动方向,螺栓依次从所述U形连接件的下连接板和所述平台支撑架上穿过,螺栓末端压在所述U形连接件的上连接板上。通过所述滚轮减少线缆移动过程中的阻力,能够更方便快捷的进行线缆架设工作,通过可拆卸设置在平台支撑架上,便于维修更换所述朝天滑车。As a further improvement of the utility model, the cable guiding mechanism is an overhead block, and the overhead block includes rollers, two parallel supports and a U-shaped connector, the cables are placed on the rollers, The rollers are rotatably connected between the two supports, the U-shaped connectors are arranged at the bottom of the supports, and the platform support frame is inserted into the U-shaped cavity of the U-shaped connectors through bolts. connect. The cavity opening specification of the U-shaped connector is adapted to the thickness of the platform support frame, the opening of the U-shaped connector faces the direction of rotation of the roller, and the bolts are sequentially connected from the lower connecting plate of the U-shaped connector. and the platform support frame, and the bolt ends are pressed on the upper connecting plate of the U-shaped connecting piece. The resistance in the moving process of the cable is reduced by the roller, and the cable erection work can be performed more conveniently and quickly, and the detachable setting on the platform support frame is convenient for maintenance and replacement of the upward tackle.

作为本实用新型的进一步改进,所述支撑件顶部设置有电缆卡具,所述电缆卡具一端与其中一个所述支撑件铰接,所述电缆卡具另一端距离另一个所述支撑件留有间隙。所述电缆卡具为L型结构,包括第一直杆和第二直杆,所述铰接处设置在所述第一直杆和所述第二直杆连接处,所述第一直杆平行贴合在所述支撑件外侧,所述第二直杆可通过所述铰接处向下倾斜。通过在支撑件顶部设置电缆卡具,防止线缆从支撑件顶部脱出,进一步提高施工的准确性,并保证施工安全。As a further improvement of the present utility model, a cable clamp is provided on the top of the support, one end of the cable clamp is hinged to one of the supports, and the other end of the cable clamp is left a distance from the other support. gap. The cable clamp is an L-shaped structure, including a first straight rod and a second straight rod, the hinge is arranged at the connection between the first straight rod and the second straight rod, and the first straight rod is parallel to Attached to the outside of the support, the second straight rod can be inclined downward through the hinge. By setting the cable clamp on the top of the support, the cable is prevented from protruding from the top of the support, further improving the accuracy of construction and ensuring construction safety.

作为本实用新型的进一步改进,所述电缆卡具与所述支撑件之间通过扭簧连接,所述电缆卡具常态时平行于所述平台支撑架设置。通过在所述朝天滑车顶部焊接电缆卡具,达到固定导线、防止脱落的目的。按压电缆卡具放置线缆,线缆入位到滚轮上后,电缆卡具自动复归,操作简单省时。通过采用扭簧连接,从而所述电缆卡具为具有自动复位功能的电缆卡具,当线缆从两个所述支撑件顶部向下放置时,线缆压在所述电缆卡具上,由于扭簧的作用,电缆卡具被压向下旋转,从而所述电缆卡具末端距离所述支撑件距离拉大,线缆从电缆卡具与支撑件之间的缝隙处进入到滚轮上,电缆卡具由于没有压力作用从而恢复到原始的平衡状态对线缆起到防止脱出的作用。As a further improvement of the utility model, the cable clamp is connected to the support member through a torsion spring, and the cable clamp is normally arranged parallel to the platform support frame. By welding the cable clamp on the top of the upside-down block, the purpose of fixing the wires and preventing them from falling off is achieved. Press the cable clamp to place the cable. After the cable is placed on the roller, the cable clamp will automatically return. The operation is simple and time-saving. By adopting torsion spring connection, the cable clamp is a cable clamp with automatic reset function. When the cable is placed downward from the top of the two supports, the cable is pressed on the cable clamp, because Under the action of the torsion spring, the cable clamp is pressed down and rotated, so that the distance between the end of the cable clamp and the support is enlarged, and the cable enters the roller from the gap between the cable clamp and the support. Since the fixture has no pressure effect, it returns to the original balance state and prevents the cable from coming out.

作为本实用新型的进一步改进,所述平台支撑架采用角钢制成,所述电缆导向机构固定连接在角钢的一侧边上,所述平台支撑架中部设置有平面支撑架,所述平面支撑架也由角钢制成,所述平面支撑架与所述平台支撑架形成矩形空腔,所述固定杆依次穿过所述平台支撑架和所述平面支撑架与所述电杆顶部的所述抱箍连接。通过在平台支撑架上加装平面支撑架,增大平台支撑架与抱箍接触面积,固定方便,适用多种尺寸抱箍。As a further improvement of the utility model, the platform support frame is made of angle steel, the cable guiding mechanism is fixedly connected to one side of the angle steel, a plane support frame is arranged in the middle of the platform support frame, and the plane support frame Also made of angle steel, the plane support frame and the platform support frame form a rectangular cavity, and the fixed rod passes through the platform support frame and the plane support frame and the embrace at the top of the pole in turn. Hoop connection. By installing a plane support frame on the platform support frame, the contact area between the platform support frame and the hoop is increased, the fixing is convenient, and it is suitable for hoops of various sizes.

作为本实用新型的进一步改进,所述牵引装置上设置有与所述电缆导向机构数量相同的固定孔,所述固定孔用于固定所述线缆。相邻两个所述固定孔间距与相邻两个所述电缆导向机构间距相同,所述牵引装置与驱动装置连接。As a further improvement of the utility model, the pulling device is provided with the same number of fixing holes as the cable guiding mechanism, and the fixing holes are used for fixing the cables. The distance between two adjacent fixing holes is the same as the distance between two adjacent cable guide mechanisms, and the pulling device is connected to the driving device.

作为本实用新型的进一步改进,所述牵引装置包括固定部和牵拉部,所述固定部采用角钢材料制成,所述固定孔设置在所述固定部上,所述牵拉部为一三角形平板,所述三角形平板角部设置有用于与驱动装置连接通孔,所述三角形平板远离所述通孔侧与所述固定部固定连接。设计一体式牵引装置,将所有线缆集中在一块牵引装置上牵引,受力均衡,提高工作效率。As a further improvement of the utility model, the pulling device includes a fixing part and a pulling part, the fixing part is made of angle steel material, the fixing hole is set on the fixing part, and the pulling part is a triangular shape As for the flat plate, the corner of the triangular flat plate is provided with a through hole for connecting with the driving device, and the side of the triangular flat plate away from the through hole is fixedly connected with the fixing part. An integrated traction device is designed, all the cables are concentrated on one traction device for traction, the force is balanced, and the work efficiency is improved.

作为本实用新型的进一步改进,所述牵拉部位于所述固定部中间。As a further improvement of the utility model, the pulling part is located in the middle of the fixing part.

作为本实用新型的进一步改进,所述抱箍包括竖连杆和抱卡,所述竖连杆垂直连接在所述抱卡侧壁上,所述固定杆与所述竖连杆连接,所述抱卡为半圆弧形结构,包括左抱卡和右抱卡,所述左抱卡和所述右抱卡相对设置连接在一起形成与电杆直径相同的圆形紧固部。As a further improvement of the utility model, the hoop includes a vertical connecting rod and a holding card, the vertical connecting rod is vertically connected to the side wall of the holding card, the fixed rod is connected to the vertical connecting rod, the The holding card is a semi-circular arc structure, including a left holding card and a right holding card. The left holding card and the right holding card are arranged oppositely and connected together to form a circular fastening part with the same diameter as the pole.

作为本实用新型的进一步改进,所述竖连杆采用角钢材料制成,所述竖连杆顶部的直角开口处设置有挡板,所述固定杆穿设在所述挡板上实现所述平台支撑架与所述电杆的连接。As a further improvement of the present utility model, the vertical connecting rod is made of angle steel material, a baffle is provided at the right-angle opening on the top of the vertical connecting rod, and the fixed rod is installed on the baffle to realize the platform The connection between the support frame and the pole.

作为本实用新型的进一步改进,所述固定杆为螺纹杆。所述固定杆穿过所述挡板后用螺母拧紧实现固定。As a further improvement of the utility model, the fixing rod is a threaded rod. After the fixing rod passes through the baffle plate, it is fixed by tightening with a nut.

本实用新型配电线路放线专用工具,通过设置具有多个放置线缆位置的支撑导向装置,和同时可牵拉多根线缆的牵引装置,解决了线路、台区改造时线路铺设只能一次放单根电缆的问题,大大缩短了电缆架设时间,提升了线路改造效率,缩短了停电时间,电缆架设环节所占时间比例由最初的50.18%降低到20.84%,整体流程得到压缩,线路施工时间大大降低。The special tool for unwinding the power distribution line of the utility model solves the problem that the line laying can only be done when the line and the station area are reconstructed by providing a support guide device with multiple cable placement positions and a traction device that can pull multiple cables at the same time. The problem of placing a single cable at a time greatly shortens the cable erection time, improves the efficiency of line transformation, shortens the power outage time, and reduces the proportion of cable erection time from the initial 50.18% to 20.84%. The overall process is compressed and the line construction The time is greatly reduced.

本实用新型提供的诸多技术方案中的优选技术方案所能产生的诸多技术效果详见下文阐述:The many technical effects that can be produced by the preferred technical solution in the many technical solutions provided by the utility model are detailed below:

1、本实用新型通过将朝天滑车设置在平台支撑架顶部,线缆在上方,作业时不易受干扰。1. In the utility model, the overhead block is arranged on the top of the platform support frame, and the cables are above, so that it is not easy to be disturbed during operation.

2、本实用新型通过在电杆顶部设置抱箍,抱箍与电杆可拆卸连接,平台支撑架连接在抱箍上,具有安装方便快捷牢固的特点。2. The utility model is provided with a hoop on the top of the pole, the hoop is detachably connected to the pole, and the platform support frame is connected to the hoop, which has the characteristics of convenient, fast and firm installation.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are only some embodiments of the utility model, and those skilled in the art can also obtain other drawings based on these drawings without creative work.

图1是本实用新型配电线路放线专用工具设置在电杆上后使用时的结构示意图;Fig. 1 is a structural schematic diagram of the utility model when the utility model distribution line unwinding special tool is set on the electric pole and used;

图2是本实用新型配电线路放线专用工具的主视结构示意图;Fig. 2 is a schematic structural diagram of the main view of the special tool for unwinding distribution lines of the utility model;

图3是图2的右视结构示意图;Fig. 3 is a schematic diagram of the right view structure of Fig. 2;

图4是本实用新型牵引装置的结构示意图。Fig. 4 is a schematic structural view of the traction device of the present invention.

图中1-平台支撑架;11-固定杆;12-平面支撑架;2-电缆导向机构;21-滚轮;22-支撑件;23-扭簧;24-电缆卡具;25-U形连接件;3-牵引装置;31-固定部;311-固定孔;312-定位孔;32-牵拉部;321-通孔;4-线缆;5-电杆;6-抱箍;61-竖连杆;62-抱卡。In the figure 1-platform support frame; 11-fixed rod; 12-plane support frame; 2-cable guide mechanism; 21-roller; 22-support; 23-torsion spring; 24-cable clamp; 3-traction device; 31-fixed part; 311-fixed hole; 312-positioning hole; 32-pull part; 321-through hole; 4-cable; Vertical connecting rod; 62-hold card.

具体实施方式detailed description

为使本实用新型的目的、技术方案和优点更加清楚,下面将对本实用新型的技术方案进行详细的描述。显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动的前提下所得到的所有其它实施方式,都属于本实用新型所保护的范围。In order to make the purpose, technical solution and advantages of the utility model clearer, the technical solution of the utility model will be described in detail below. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present utility model, all other implementations obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present utility model.

图1为本实用新型配电线路放线专用工具设置在电杆上后使用时的结构示意图;如图1所示,本实用新型提供了一种配电线路放线专用工具,包括支撑导向装置和牵引装置3,支撑导向装置用于支撑线缆4并限制线缆4的走向,支撑导向装置安装在电杆5顶部,支撑导向装置上具有多个放置线缆4的位置,牵引装置3与放置在支撑导向装置上的多根线缆4连接,将多根线缆4牵拉到待架设位置。通过采用在电杆5顶部设置具有放置多根线缆4位置的支撑导向装置,通过牵引装置3将放置在支撑导向装置上的多根线缆4全部牵拉,并同时定向移动到下一个待架设的电杆5顶部,从而实现同时铺设三到四根电缆。具体使用时,首先将多根线缆5分别并排放置到支撑导向装置上,然后将多根线缆4固定到牵引装置3上,通过驱动装置拉动牵引装置3,牵引装置3带动多根线缆4同时并行向下一根电杆5处移动,待移动到下一根电杆5处将线缆4放置到下一根电杆5上的支撑导向装置上,然后继续拖动线缆4进行架设。由于采用配电线路作业专用轻便型组合工具,电缆架设时间缩短,以前三相电缆需要三次(或四次)放线拉线,改进后一次即可完成,从而压缩电缆架设的时间量,减少安装时间,有效降低总体工作时间,工作流程更加高效、流畅。Figure 1 is a schematic structural view of the utility model when the special tool for unwinding power distribution lines is set on the pole and used; as shown in Figure 1, the utility model provides a special tool for unwinding power distribution lines, including a supporting guide device And the traction device 3, the support guide device is used to support the cable 4 and limit the direction of the cable 4, the support guide device is installed on the top of the pole 5, there are multiple positions for placing the cable 4 on the support guide device, the traction device 3 and the A plurality of cables 4 placed on the supporting guide device are connected, and the plurality of cables 4 are pulled to a position to be erected. By adopting a support guide device with a position for placing a plurality of cables 4 on the top of the pole 5, the plurality of cables 4 placed on the support guide device are all pulled by the traction device 3, and at the same time, they are oriented and moved to the next one to be placed. The pole 5 top that erects, thereby realizes laying three to four cables simultaneously. In specific use, first place a plurality of cables 5 side by side on the supporting guide device, then fix the plurality of cables 4 to the traction device 3, pull the traction device 3 through the driving device, and the traction device 3 drives the plurality of cables 4. At the same time, move to the next pole 5 in parallel. After moving to the next pole 5, place the cable 4 on the support and guide device on the next pole 5, and then continue to drag the cable 4 Erection. Due to the use of a special portable combination tool for power distribution lines, the cable erection time is shortened. In the past, the three-phase cables required three (or four) laying and pulling wires. After the improvement, it can be completed in one time, thereby reducing the amount of time for cable erection and reducing installation time. , effectively reducing the overall working time, and the workflow is more efficient and smooth.

图2是本实用新型配电线路放线专用工具的主视结构示意图,图3是图2的右视结构示意图;如图2和图3所示,支撑导向装置包括平台支撑架1和电缆导向机构2,电缆导向机构2的数量为至少两个,所有的电缆导向机构2并排安装在平台支撑架1顶部,平台支撑架1通过设置在其上的固定杆11与电杆5顶部的抱箍6连接。平台支撑架1用于支撑固定电缆导向机构2,电缆导向机构2用于支撑线缆4并将线缆4导向下一个线缆4架设位置,牵引装置3用于拉动铺设的线缆4并行移动。电缆导向机构2为朝天滑车,朝天滑车包括滚轮21、两个平行设置的支撑件22和一U形连接件25,线缆4放在在滚轮21上,滚轮21转动连接在两个支撑件22之间,U形连接件25设置在支撑件22底部,平台支撑架1插入到U形连接件25的U形凹腔内通过螺栓连接。U形连接件25的凹腔开口规格与平台支撑架1的厚度相适配,U形连接件25开口朝向滚轮21转动方向,螺栓依次从U形连接件25的下连接板和平台支撑架1上穿过,螺栓末端压在U形连接件25的上连接板上。通过滚轮21减少线缆4移动过程中的阻力,能够更方便快捷的进行线缆4架设工作,通过可拆卸设置在平台支撑架1上,便于维修更换朝天滑车。支撑件22顶部设置有电缆卡具24,电缆卡具24一端与其中一个支撑件22铰接,电缆卡具24另一端距离另一个支撑件22留有间隙。电缆卡具24为L型结构,包括第一直杆和第二直杆,铰接处设置在第一直杆和第二直杆连接处,第一直杆平行贴合在支撑件22外侧,第二直杆可通过铰接处向下倾斜。通过在支撑件22顶部设置电缆卡具24,防止线缆4从支撑件22顶部脱出,进一步提高施工的准确性,并保证施工安全。电缆卡具24与支撑件22之间通过扭簧23连接,电缆卡具24常态时平行于平台支撑架1设置。通过在朝天滑车顶部焊接电缆卡具24,达到固定导线、防止脱落的目的。按压电缆卡具24放置线缆4,线缆4入位到滚轮21上后,电缆卡具24自动复归,操作简单省时。通过采用扭簧23连接,从而电缆卡具24为具有自动复位功能的电缆卡具24,当线缆4从两个支撑件22顶部向下放置时,线缆4压在电缆卡具24上,由于扭簧23的作用,电缆卡具24被压向下旋转,从而电缆卡具24末端距离支撑件22距离拉大,线缆4从电缆卡具24与支撑件22之间的缝隙处进入到滚轮21上,电缆卡具24由于没有压力作用从而恢复到原始的平衡状态对线缆4起到防止脱出的作用。平台支撑架1采用角钢制成,电缆导向机构2固定连接在角钢的一侧边上,平台支撑架1中部设置有平面支撑架12,平面支撑架12也由角钢制成,平面支撑架12与平台支撑架1形成矩形空腔,固定杆11依次穿过平台支撑架1和平面支撑架12与电杆5顶部的抱箍6连接。通过在平台支撑架1上加装平面支撑架12,增大平台支撑架1与抱箍6接触面积,固定方便,适用多种尺寸抱箍6。Fig. 2 is a schematic diagram of the front view of the special tool for unwinding distribution lines of the utility model, and Fig. 3 is a schematic diagram of the structure of the right side of Fig. 2; as shown in Fig. 2 and Fig. 3, the supporting guide device includes a platform support frame 1 and a cable guide Mechanism 2, the number of cable guide mechanisms 2 is at least two, and all cable guide mechanisms 2 are installed side by side on the top of the platform support frame 1, and the platform support frame 1 passes through the fixed pole 11 arranged on it and the hoop on the top of the electric pole 5 6 connections. The platform support frame 1 is used to support and fix the cable guide mechanism 2, the cable guide mechanism 2 is used to support the cable 4 and guide the cable 4 to the erection position of the next cable 4, and the traction device 3 is used to pull the laid cable 4 to move in parallel . The cable guiding mechanism 2 is an overhead block, which includes a roller 21, two parallel supports 22 and a U-shaped connector 25, the cable 4 is placed on the roller 21, and the roller 21 is rotatably connected to the two supports 22 Between them, the U-shaped connector 25 is arranged at the bottom of the support 22, and the platform support frame 1 is inserted into the U-shaped cavity of the U-shaped connector 25 and connected by bolts. The cavity opening specification of the U-shaped connector 25 is compatible with the thickness of the platform support frame 1. The opening of the U-shaped connector 25 faces the direction of rotation of the roller 21. Pass through, and the bolt end is pressed on the upper connection plate of the U-shaped connector 25. The resistance during the moving process of the cable 4 is reduced by the roller 21, and the erection of the cable 4 can be performed more conveniently and quickly, and it can be detachably arranged on the platform support frame 1, which is convenient for maintenance and replacement of the overhead block. A cable clamp 24 is disposed on the top of the support 22 , one end of the cable clamp 24 is hinged to one of the supports 22 , and the other end of the cable clamp 24 leaves a gap from the other support 22 . The cable clamp 24 is an L-shaped structure, including a first straight rod and a second straight rod. The hinge is arranged at the joint between the first straight rod and the second straight rod. The two straight rods can be inclined downward through the hinge. By arranging the cable clamp 24 on the top of the support 22, the cable 4 is prevented from protruding from the top of the support 22, further improving the accuracy of construction and ensuring construction safety. The cable clamp 24 is connected to the support member 22 through a torsion spring 23 , and the cable clamp 24 is normally arranged parallel to the platform support frame 1 . By welding the cable clamp 24 on the top of the sky block, the purpose of fixing the wires and preventing falling off is achieved. Press the cable clamp 24 to place the cable 4, and after the cable 4 is placed on the roller 21, the cable clamp 24 automatically resets, and the operation is simple and time-saving. By using the torsion spring 23 to connect, the cable clamp 24 is a cable clamp 24 with an automatic reset function. When the cable 4 is placed downward from the top of the two supports 22, the cable 4 is pressed on the cable clamp 24, Due to the effect of the torsion spring 23, the cable clamp 24 is pressed down and rotated, so that the distance between the end of the cable clamp 24 and the support member 22 is enlarged, and the cable 4 enters from the gap between the cable clamp 24 and the support member 22. On the roller 21 , the cable clamp 24 returns to the original balance state due to no pressure effect, and prevents the cable 4 from coming out. The platform support frame 1 is made of angle steel, and the cable guide mechanism 2 is fixedly connected to one side of the angle steel. The middle part of the platform support frame 1 is provided with a plane support frame 12, and the plane support frame 12 is also made of angle steel. The platform support frame 1 forms a rectangular cavity, and the fixed rod 11 passes through the platform support frame 1 and the plane support frame 12 in turn to connect with the hoop 6 on the top of the electric pole 5 . By installing a plane support frame 12 on the platform support frame 1, the contact area between the platform support frame 1 and the hoop 6 is increased, the fixing is convenient, and the hoop 6 is applicable to various sizes.

图4是本实用新型牵引装置的结构示意图;如图4所示,牵引装置3上设置有与电缆导向机构2数量相同的固定孔311,固定孔311用于固定线缆4。相邻两个固定孔311间距与相邻两个电缆导向机构2间距相同,牵引装置3与驱动装置连接。牵引装置3包括固定部31和牵拉部32,固定部31采用角钢材料制成,固定孔311设置在固定部31上,牵拉部32为一三角形平板,三角形平板角部设置有用于与驱动装置连接通孔321,三角形平板远离通孔321侧与固定部31固定连接。设计一体式牵引装置,将所有线缆4集中在一块牵引装置3上牵引,受力均衡,提高工作效率。牵拉部32位于固定部31中间。抱箍6包括竖连杆61和抱卡62,竖连杆61垂直连接在抱卡62侧壁上,固定杆11与竖连杆61连接,抱卡62为半圆弧形结构,包括左抱卡和右抱卡,左抱卡和右抱卡相对设置连接在一起形成与电杆5直径相同的圆形紧固部。竖连杆61采用角钢材料制成,竖连杆61顶部的直角开口处设置有挡板,固定杆11穿设在挡板上实现平台支撑架1与电杆5的连接。固定杆11为螺纹杆。固定杆11穿过挡板后用螺母拧紧实现固定。FIG. 4 is a schematic structural view of the traction device of the present invention; as shown in FIG. 4 , the traction device 3 is provided with the same number of fixing holes 311 as the cable guide mechanism 2 , and the fixing holes 311 are used for fixing the cables 4 . The distance between two adjacent fixing holes 311 is the same as the distance between two adjacent cable guide mechanisms 2 , and the traction device 3 is connected to the driving device. The traction device 3 comprises a fixed part 31 and a pulling part 32. The fixing part 31 is made of an angle steel material. The fixing hole 311 is arranged on the fixing part 31. The pulling part 32 is a triangular flat plate. The device is connected to the through hole 321 , and the side of the triangular plate away from the through hole 321 is fixedly connected to the fixing part 31 . An integrated traction device is designed, and all the cables 4 are concentrated on one traction device 3 for traction, so that the force is balanced and the work efficiency is improved. The pulling part 32 is located in the middle of the fixing part 31 . The hoop 6 includes a vertical connecting rod 61 and a holding card 62, the vertical connecting rod 61 is vertically connected to the side wall of the holding card 62, the fixed rod 11 is connected with the vertical connecting rod 61, and the holding card 62 is a semicircular arc structure, including a left holding card With the right holding card, the left holding card and the right holding card are relatively arranged and connected together to form a circular fastening part with the same diameter as the pole 5. Vertical connecting rod 61 adopts angle steel material to make, and the right-angled opening of vertical connecting rod 61 top is provided with baffle plate, and fixed rod 11 is set on the baffle plate and realizes the connection of platform support frame 1 and pole 5. The fixed rod 11 is a threaded rod. After the fixed rod 11 passes through the baffle plate, it is tightened with a nut to realize fixing.

本实用新型配电线路放线专用工具,通过设置具有多个放置线缆位置的支撑导向装置,和同时可牵拉多根线缆的牵引装置,解决了线路、台区改造时线路铺设只能一次放单根电缆的问题,大大缩短了电缆架设时间,提升了线路改造效率,缩短了停电时间,电缆架设环节所占时间比例由最初的50.18%降低到20.84%,整体流程得到压缩,线路施工时间大大降低。The special tool for unwinding the power distribution line of the utility model solves the problem that the line laying can only be done when the line and the station area are reconstructed by providing a support guide device with multiple cable placement positions and a traction device that can pull multiple cables at the same time. The problem of placing a single cable at a time greatly shortens the cable erection time, improves the efficiency of line transformation, shortens the power outage time, and reduces the proportion of cable erection time from the initial 50.18% to 20.84%. The overall process is compressed and the line construction The time is greatly reduced.

以上所述,仅为本实用新型的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,可轻易想到变化或替换,都应涵盖在本实用新型的保护范围之内。因此,本实用新型的保护范围应以所述权利要求的保护范围为准。The above is only a specific embodiment of the present utility model, but the scope of protection of the present utility model is not limited thereto. Anyone familiar with the technical field can easily think of changes or changes within the technical scope disclosed by the utility model Replacement should be covered within the protection scope of the present utility model. Therefore, the protection scope of the present utility model should be based on the protection scope of the claims.

Claims (10)

  1. A kind of 1. distribution line Special line laying tool, it is characterised in that:It is described including support oriented device and draw-gear (3) Support oriented device is used for supporting cable (4) and limits the trend of the cable (4), and the support oriented device is arranged on electric pole (5) there are multiple positions for placing the cables (4), the draw-gear (3) is with placing at the top of, on the support oriented device More cable (4) connections on the support oriented device, the more cables (4) are pulled to and treat decorating position.
  2. 2. distribution line Special line laying tool according to claim 1, it is characterised in that:The support oriented device includes Platform frame (1) and cable guiding mechanism (2), the quantity of the cable guiding mechanism (2) is at least two, and all is described Cable guiding mechanism (2) is mounted side by side at the top of the platform frame (1), and the platform frame (1) is by being arranged on it On fix bar (11) be connected with the anchor ear (6) at the top of the electric pole (5).
  3. 3. distribution line Special line laying tool according to claim 2, it is characterised in that:The cable guiding mechanism (2) For upturned tackle, the upturned tackle includes roller (21), two support members (22) and a U-shaped connector be arrangeding in parallel (25), the cable (4) is placed on the roller (21) on the roller (21) and is rotatably connected on two support members (22) Between, the U-shaped connector (25) is arranged on the support member (22) bottom, and the platform frame (1) is inserted into the U-shaped It is bolted in the U-shaped cavity of connector (25).
  4. 4. distribution line Special line laying tool according to claim 3, it is characterised in that:Set at the top of the support member (22) Cable fixture (24) is equipped with, described cable fixture (24) one end is be hinged with one of them described support member (22), the strain relief clamp Tool (24) other end leaves gap apart from support member another described (22).
  5. 5. distribution line Special line laying tool according to claim 4, it is characterised in that:The cable fixture (24) and institute State and connected by torsion spring (23) between support member (22), parallel to the platform frame during cable fixture (24) normality (1) set.
  6. 6. distribution line Special line laying tool according to claim 2, it is characterised in that:The platform frame (1) is adopted It is made of angle steel, the cable guiding mechanism (2) is fixedly connected on a side of angle steel, in the middle part of the platform frame (1) Be provided with planar support frame (12), the planar support frame (12) is also made up of angle steel, the planar support frame (12) with it is described Platform frame (1) forms rectangular enclosure, and the fix bar (11) sequentially passes through the platform frame (1) and the plane branch Support (12) is connected with the anchor ear (6) at the top of the electric pole (5).
  7. 7. distribution line Special line laying tool according to claim 2, it is characterised in that:Set on the draw-gear (3) It is equipped with and is used to fix the cable (4) with the cable guiding mechanism (2) quantity identical fixing hole (311), the fixing hole.
  8. 8. distribution line Special line laying tool according to claim 7, it is characterised in that:The draw-gear (3) includes Fixed part (31) and pulling portion (32), the fixed part (31) are made of angle steel material, and the fixing hole (311) is arranged on institute State on fixed part (31), the pulling portion (32) is a triangle flat plate, and the triangle flat plate corner, which is provided with, to be used for and drive The through hole (321) of dynamic device connection, the triangle flat plate is away from the through hole (321) side and the fixed company of the fixed part (31) Connect.
  9. 9. distribution line Special line laying tool according to claim 2, it is characterised in that:The anchor ear (6) includes perpendicular connect Bar (61) and holding card (62), the vertical connecting rod (61) are vertically connected in the holding card (62) side wall, the fix bar (11) with The vertical connecting rod (61) connection, the holding card (62) be semicircular arc structure, including left holding card and right holding card, the left holding card with The right holding card, which is oppositely arranged, to be joined together to form and the electric pole (5) diameter identical circle fastening part.
  10. 10. distribution line Special line laying tool according to claim 9, it is characterised in that:The vertical connecting rod (61) uses Angle steel material is made, and the always open place at the top of the vertical connecting rod (61) is provided with baffle plate, and the fix bar (11) is located in institute State the connection that the platform frame (1) and the electric pole (5) are realized on baffle plate.
CN201720644123.8U 2017-06-05 2017-06-05 Special tools for power distribution lines Expired - Fee Related CN206820364U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720644123.8U CN206820364U (en) 2017-06-05 2017-06-05 Special tools for power distribution lines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720644123.8U CN206820364U (en) 2017-06-05 2017-06-05 Special tools for power distribution lines

Publications (1)

Publication Number Publication Date
CN206820364U true CN206820364U (en) 2017-12-29

Family

ID=60759126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720644123.8U Expired - Fee Related CN206820364U (en) 2017-06-05 2017-06-05 Special tools for power distribution lines

Country Status (1)

Country Link
CN (1) CN206820364U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108512129A (en) * 2018-06-25 2018-09-07 国网江苏省电力公司太仓市供电公司 A kind of cable wiring device
CN110697491A (en) * 2018-07-09 2020-01-17 宁夏农林科学院农作物研究所 Planning paying-off device for field test
CN113451938A (en) * 2021-06-09 2021-09-28 衢州学院 Auxiliary traction device for electric power cable installation

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108512129A (en) * 2018-06-25 2018-09-07 国网江苏省电力公司太仓市供电公司 A kind of cable wiring device
CN108512129B (en) * 2018-06-25 2024-08-16 国网江苏省电力有限公司太仓市供电分公司 Cable wiring device
CN110697491A (en) * 2018-07-09 2020-01-17 宁夏农林科学院农作物研究所 Planning paying-off device for field test
CN110697491B (en) * 2018-07-09 2024-06-14 宁夏农林科学院农作物研究所 Field test planning paying-off device
CN113451938A (en) * 2021-06-09 2021-09-28 衢州学院 Auxiliary traction device for electric power cable installation
CN113451938B (en) * 2021-06-09 2022-05-27 衢州学院 Auxiliary traction device for power cable installation

Similar Documents

Publication Publication Date Title
CN206820364U (en) Special tools for power distribution lines
CN205489296U (en) Swift pay off rack of secondary cable
CN204243624U (en) Turning wire dispenser
CN201882847U (en) Hoisting tool of pole-mounted transformer
CN203942204U (en) The live line working of a kind of 35kV supply line is carried line apparatus with insulation
CN209948537U (en) Auxiliary device for laying ship shore power cable
CN204947468U (en) For the operating desk of pole guy end portion treatment
CN204793847U (en) Frame is strideed across to portable unwrapping wire
CN202602171U (en) A tool for power-on replacing multi-loop double split conductor insulator of 220kV line
CN105811301B (en) The insulation of the 35kV supply lines livewire work of low cost carries line apparatus
CN102832579A (en) Traction fixture for fixing optical cable with insulation outer skin and electric cable
CN202550413U (en) Parallel bunched cable tightener
CN205733328U (en) A kind of wire or cable are from being dynamically connected equipment
CN104500512B (en) A fixing structure for fixing the bundle line normalizer to the pole
CN209455823U (en) A kind of combined type pay off rack for electric wire
CN207896627U (en) A kind of cable channel cover plate
CN212094122U (en) Secondary cable organizer for substation station
CN110690589A (en) A grounding pile that can be pulled out quickly
CN103398221B (en) Parallel bundled cable normalizer
CN206023034U (en) A kind of collection bunch side of returning device
CN209844404U (en) An automatic crimping machine for high-altitude crimping of strain-resistant clamps
CN217656330U (en) Electric cable laying device
CN108512129B (en) Cable wiring device
CN205709174U (en) A kind of hand-rail type wiring coiling device
CN111628449A (en) Auxiliary device for delivering and erecting wire guide rod

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171229

Termination date: 20180605