CN213233001U - Colored bituminous paving structure that permeates water - Google Patents

Colored bituminous paving structure that permeates water Download PDF

Info

Publication number
CN213233001U
CN213233001U CN202021748818.9U CN202021748818U CN213233001U CN 213233001 U CN213233001 U CN 213233001U CN 202021748818 U CN202021748818 U CN 202021748818U CN 213233001 U CN213233001 U CN 213233001U
Authority
CN
China
Prior art keywords
block
colored
groove
surface course
shaping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021748818.9U
Other languages
Chinese (zh)
Inventor
陶志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Meiqiao Landscape Building Materials Co ltd
Original Assignee
Guangdong Meiqiao Landscape Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Meiqiao Landscape Building Materials Co ltd filed Critical Guangdong Meiqiao Landscape Building Materials Co ltd
Priority to CN202021748818.9U priority Critical patent/CN213233001U/en
Application granted granted Critical
Publication of CN213233001U publication Critical patent/CN213233001U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a permeate water and mix earth technical field, especially relate to colored bituminous paving structure that permeates water, including the basic unit to and have the surface course on colored surface, surface course surface forming has the dismantlement structure, it includes the recess to dismantle the structure, vertical shaping has the kicking block in the recess, the kicking block top level extends to the outside, the kicking block is the cement machine-shaping that hardness is big, dismantle the structure and still include spread groove and the connecting block of shaping in the surface course edge, spread groove and connecting block interval setting respectively are at the surface course edge. The utility model discloses a colored bituminous paving structure that permeates water when dismantling, can use a plurality of cast iron bars to insert a plurality of recesses simultaneously, utilizes lever principle, and the strength is prized out simultaneously, and firm kicking block can effectively protect road surface block structure not receive the damage, need not use large-scale machinery to carry out the operation moreover, has reduced construction cost.

Description

Colored bituminous paving structure that permeates water
Technical Field
The utility model relates to a permeate water and mix earth technical field, especially relate to colored bituminous paving structure that permeates water.
Background
The application of water permeability paving in daily life is more and more common along with the development of society from time to time, and regarding water permeability data, people should be confident not to be dredged, particularly in rainy season, the effect of water permeability is naturally invisible, and in the application process, the water permeability is not only anti-skidding, high in strength and good in freeze-thaw resistance, but also has strong environmental protection value;
the existing permeable pavement structure is high in maintenance cost, needs large-scale mechanical equipment to break and is low in efficiency.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a not enough heat of prior art pastes seam area.
In order to achieve the above purpose, the technical scheme of the utility model is as follows:
colored bituminous paving structure that permeates water, including the basic unit to and the surface course that has the colored surface, surface course surface molding has the dismantlement structure, it includes the recess to dismantle the structure, vertical shaping has the kicking block in the recess, kicking block top level extends to the outside, dismantle the structure still including the shaping in the spread groove and the connecting block at surface course edge, spread groove and connecting block interval respectively set up at the surface course edge.
Further: the top block is formed by processing cement with high hardness, and the groove is a square groove or a circular groove.
Further: and the inner wall of the groove is attached with a stress absorption film for protecting the internal structure.
Further: the number of the grooves is two or more.
Further: the number of the connecting grooves and the connecting blocks is two respectively, and the connecting grooves and the connecting blocks are sequentially formed on the edge of the surface layer.
Further: the connecting block is formed by processing elastic concrete
The utility model has the advantages that: the utility model discloses a colored bituminous paving structure that permeates water when dismantling, can use a plurality of cast iron bars to insert a plurality of recesses simultaneously, utilizes lever principle, and the strength is prized out simultaneously, and firm kicking block can effectively protect road surface block structure not receive the damage, need not use large-scale machinery to carry out the operation moreover, has reduced construction cost.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic cross-sectional structure diagram of the present invention.
Fig. 3 is a schematic top view of the present invention.
The reference numerals include:
1-pavement block 11-base layer 12-surface layer 13-color surface
2-disassembly structure 20-groove 21-top block 22-stress absorption film 23-connecting groove 24-connecting block.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1-3, the color permeable asphalt pavement structure comprises a pavement block 1 formed by processing a base layer 11 and a surface layer 12 with a color surface 13, wherein a detachable structure 2 is formed on the surface of the surface layer 12, the detachable structure 2 comprises a groove 20, the groove 20 can increase the water permeability to drain rainwater to the base layer 11, and the water permeability of the base layer 11 is higher than that of the surface layer 12; the groove 20 is vertically formed with a top block 21, the top of the top block 21 extends horizontally to the outside, the top block 21 is formed by processing cement with high hardness, the disassembly structure 2 further comprises a connecting groove 23 and a connecting block 24 which are formed on the edge of the surface layer 12, the connecting block 24 is formed by processing elastic concrete, the connecting groove 23 and the connecting block 24 are respectively arranged on the edge of the surface layer 12 at intervals, the angle between the connecting groove 23 and the connecting block 24 is 90 degrees, a plurality of pavement blocks 1 are spliced and formed through the connecting groove 23 and the connecting block 24, when the disassembly is carried out, iron columns or iron bars with the same size as the opening of the groove 20 are inserted into the groove 20, the pavement blocks 1 are pried by utilizing the lever principle, a plurality of iron bars can be simultaneously inserted into other grooves 20 and are pried by force, the firm top block 21 can effectively protect the structure of the pavement blocks 1 from being damaged without using large machinery for operation, the construction cost is reduced.
Further: the top block 21 is formed by processing high-hardness cement, and the groove 20 is a square groove or a circular groove and can be suitable for being inserted by matching cast iron rods in various shapes.
Further: the stress absorption film 22 for protecting the internal structure is attached to the inner wall of the groove 20, so that the internal structure of the pavement block 1 can be effectively protected from being damaged when the pavement block 1 is disassembled.
Further: the number of the grooves 20 is two or more, and the number of the grooves 20 can be set according to the splicing firmness degree of the pavement block 1.
Further: the quantity of connecting groove 23 and connecting block 24 is two respectively to the shaping is at surface course 12 edges in proper order, and a plurality of pavement pieces 1 improve the area of pavement piece 1 through connecting groove 23 and connecting block 24 concatenation shaping.
In conclusion, the present invention has the above-mentioned excellent characteristics, so that it can be used to enhance the effectiveness of the prior art and has practicability, and thus it is a product with practical value.
The above description is only for the preferred embodiment of the present invention, and for those skilled in the art, there are variations on the detailed description and the application scope according to the idea of the present invention, and the content of the description should not be construed as a limitation to the present invention.

Claims (6)

1. Colored bituminous paving structure that permeates water includes the basic unit to and have the surface course on colored surface, its characterized in that: surface course surface molding has dismantlement structure, it includes the recess to dismantle the structure, vertical shaping has the kicking block in the recess, kicking block top level extends to the outside, dismantle the structure still including the shaping in spread groove and the connecting block at surface course edge, spread groove and connecting block interval setting are at the surface course edge respectively.
2. The colored water-permeable asphalt pavement structure according to claim 1, characterized in that: the top block is formed by processing cement with high hardness, and the groove is a square groove or a circular groove.
3. The colored water-permeable asphalt pavement structure according to claim 1, characterized in that: and the inner wall of the groove is attached with a stress absorption film for protecting the internal structure.
4. The colored water-permeable asphalt pavement structure according to claim 1, characterized in that: the number of the grooves is two or more.
5. The colored water-permeable asphalt pavement structure according to claim 1, characterized in that: the number of the connecting grooves and the connecting blocks is two respectively, and the connecting grooves and the connecting blocks are sequentially formed on the edge of the surface layer.
6. The colored water-permeable asphalt pavement structure according to claim 1, characterized in that: the connecting block is formed by processing elastic concrete.
CN202021748818.9U 2020-08-20 2020-08-20 Colored bituminous paving structure that permeates water Expired - Fee Related CN213233001U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021748818.9U CN213233001U (en) 2020-08-20 2020-08-20 Colored bituminous paving structure that permeates water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021748818.9U CN213233001U (en) 2020-08-20 2020-08-20 Colored bituminous paving structure that permeates water

Publications (1)

Publication Number Publication Date
CN213233001U true CN213233001U (en) 2021-05-18

Family

ID=75900716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021748818.9U Expired - Fee Related CN213233001U (en) 2020-08-20 2020-08-20 Colored bituminous paving structure that permeates water

Country Status (1)

Country Link
CN (1) CN213233001U (en)

Similar Documents

Publication Publication Date Title
CN213233001U (en) Colored bituminous paving structure that permeates water
CN204238092U (en) Interim detachable roads plate for building
CN202787282U (en) Step type wet masonry rock berm roadbed side slope
CN106088119A (en) A kind of greening block and bank protection and the method for construction of bank protection
CN207176614U (en) New landscape breakwater
CN215188431U (en) Pavement tree root fixing tree pool for protecting sidewalk
CN205917651U (en) Assembled seashore breakwater dam
CN203360974U (en) Buckled lock type floor tiles and built-in lock type floor tiles comprising same
CN2813710Y (en) Intercepting blind drain
CN207775819U (en) U-frame frame fish slot brick prefabricated components and the fish slot brick for using above-mentioned prefabricated components
CN106212355A (en) A kind of method building pond fence
CN207776228U (en) A kind of building-block structure suitable for loam wall external corner
CN205975643U (en) Afforestation building block and bank protection that utilizes this building block construction
CN204715501U (en) The interim water draw-off of Assembled environmental type
CN207775818U (en) A kind of anchoring grid bank protection
CN216838800U (en) Environment-friendly durable marble stone
CN211396934U (en) Protector for civil engineering
CN215210277U (en) Porous pavement system
CN215366627U (en) High strength pc regeneration stone-like brick that permeates water
CN203373628U (en) Novel floor tile and pin lock type floor tile formed by same
CN214061096U (en) Concrete water permeable brick with construction waste as aggregate
CN204040060U (en) Spade retaining wall concrete block
CN211415620U (en) Rolling brush suitable for release agent injection system
CN204266352U (en) A kind of inlet for stom water mould
CN213142964U (en) Ecological bank protection of water conservancy

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210518