CN213204970U - Concrete construction template hangs mould locator - Google Patents

Concrete construction template hangs mould locator Download PDF

Info

Publication number
CN213204970U
CN213204970U CN202021586809.4U CN202021586809U CN213204970U CN 213204970 U CN213204970 U CN 213204970U CN 202021586809 U CN202021586809 U CN 202021586809U CN 213204970 U CN213204970 U CN 213204970U
Authority
CN
China
Prior art keywords
template
concrete construction
positioning
rod
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021586809.4U
Other languages
Chinese (zh)
Inventor
孙树新
孙斌杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021586809.4U priority Critical patent/CN213204970U/en
Application granted granted Critical
Publication of CN213204970U publication Critical patent/CN213204970U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to the technical field of building, and discloses a concrete construction template suspended formwork positioner, which comprises a suspended formwork positioning frame, wherein the left side and the right side of the bottom end of the suspended formwork positioning frame are provided with supporting legs, the left side and the right side of the outer end of the suspended formwork positioning frame are provided with templates, and the top ends of the left side template and the right side template are provided with positioning reinforcing frames; the utility model discloses, can simplify the operation flow, be convenient for install and dismantle, and can ensure that the integration of bathroom stagnant water bank and beam wall is pour to guarantee to pour the effect, ensure to pour the quality.

Description

Concrete construction template hangs mould locator
Technical Field
The utility model relates to a building technical field especially relates to a concrete construction template hangs mould locator.
Background
During construction, a concrete template is usually required to be used for fixing the reinforcement cage in the process of pouring the beam body suspension mold, so that the filling operation of concrete is facilitated, the formed concrete is ensured, and the overflow of concrete grout is avoided; when the existing concrete template is used for template hanging construction, the operation of hanging and supporting template positioning and reinforcement is difficult, template running and displacement are easy to occur during pouring, and concrete needs to be repaired when displacement occurs, so that labor and time are wasted, the engineering quality is difficult to ensure, and the construction progress is seriously influenced; especially in the construction to bathroom caisson and kitchen stagnant water bank, only can play waterproof stagnant water effect through once integrated pouring, traditional mould construction method that hangs is complicated to be operated and is difficult for the location reinforcement, generally all needs secondary pouring, and secondary pouring not only needs formwork rethread but also pours the effect and is difficult to guarantee.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a concrete construction template hangs mould locator can simplify and hangs mould operation flow, is convenient for to hanging mould installation location and reinforcement, and can ensure the integration of bathroom stagnant water bank and pour to guarantee to pour the effect, ensure to pour the quality.
The utility model adopts the following technical scheme:
the utility model provides a concrete construction template hangs mould locator, includes and hangs the mould locating rack, hangs the bottom left and right sides of mould locating rack and all is provided with the supporting legs, hangs the outer end left and right sides of mould locating rack and all is provided with the template, and the top of left and right sides template is provided with the location reinforcement frame.
The mould hoisting positioning frame comprises transverse supporting rods and vertical supporting rods arranged at the left end and the right end of the transverse supporting rods, a template bracket is arranged on each vertical supporting rod, and the template brackets are located above the supporting legs.
The positioning reinforcing frame comprises a positioning cross rod, and fixing rods are arranged at the left end and the right end of the bottom surface of the positioning cross rod.
The supporting legs comprise a first supporting leg arranged along the left-right direction and a second supporting leg arranged along the front-back direction, wherein the first supporting leg is vertical to the second supporting leg.
And a support rod is obliquely arranged between the fixed rod and the positioning cross rod.
The fixing rod on one side of the positioning reinforcing frame is transversely provided with a thread adjusting cylinder, a threaded rod is arranged in the thread adjusting cylinder, one side, close to the template, of the threaded rod is provided with a fastening plate, and one side, far away from the template, of the threaded rod is provided with an operating handle.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses can realize concrete form's quick installation and location, operation labour saving and time saving ensures construction progress and construction quality, and the setting of hanging the mould locating rack can support the template, and the location reinforcement frame can carry out fastening position to the template that sets up in hanging mould locating rack outer end, and the locking mixes earth and pours back shaping size unchangeable, hangs the setting of mould locating rack bottom supporting legs, is convenient for right the utility model discloses it places to advance line location, and is easy and simple to handle to can guarantee to pour the effect, avoid running the emergence of mould displacement phenomenon.
Furthermore, the template bracket is used for supporting the template, so that the template is convenient to mount and demold in the later period; the optimization of supporting legs sets up, can further strengthen the utility model discloses the stability of placing is fixed a position, promotes its practicality.
Furthermore, the support performance of the positioning reinforcing frame can be improved due to the inclined arrangement of the support rods; the distance between the template of the left and right sides can be adjusted by the arrangement of the thread adjusting cylinder and the threaded rod so as to adapt to the beam bodies with different widths, the application range of the beam bodies is enlarged, and the practicability is improved.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the mold-hanging positioning frame of the present invention.
Detailed Description
The invention is described in detail below with reference to the following figures and examples:
as shown in figures 1 to 2, the concrete construction template hanging mould positioner of the utility model comprises a hanging mould positioning frame 1, the hanging mould positioning frame 1 is used for positioning support when the utility model is installed and supporting templates 3 arranged at the left and right sides of the outer end of the hanging mould positioning frame, supporting legs 2 are arranged at the left and right sides of the bottom end of the hanging mould positioning frame 1, the supporting legs 2 can be arranged into a rod shape or a plate shape according to actual conditions to meet different application scenes, the supporting legs 2 can be arranged into the rod shape when the supporting legs 2 need to be placed in a beam groove for positioning, the hanging mould can be positioned quickly and accurately, when the supporting legs 2 need to be placed on a plane plate for positioning, the supporting legs 2 can be arranged into the plate shape and provided with mounting fixing holes on the plate surface, the hanging mould positioning frame can be positioned accurately through bolts or steel nails, the operation is simple, fast, time and labor saving, the construction progress can be improved; hang the outer end left and right sides of mould locating rack 1 and all be provided with template 3, and 3 tops of template are provided with location reinforcement frame 4, and location reinforcement frame 4 is used for carrying out the location reinforcement operation to setting up in the template 3 of hanging the 1 outer end left and right sides of mould locating rack, ensures the utility model discloses a structure fastening avoids appearing the running die phenomenon at the concrete filling in-process, promotes the effect of pouring of concrete.
The hanging die positioning frame 1 comprises transverse supporting rods 1-1 and vertical supporting rods 1-2 arranged at the left end and the right end of the transverse supporting rods 1-1, a template bracket 1-3 is arranged on each vertical supporting rod 1-2, and the template brackets 1-3 are arranged, so that on one hand, a supporting effect on a template 3 can be achieved, on the other hand, after concrete pouring is completed, the template 3 can be conveniently detached, the operation is simple, convenient and quick, the structures of the template 3 and the positioning reinforcing frame 4 can not be damaged, repeated cyclic utilization is facilitated, and the production cost is saved; wherein the formwork bracket 1-3 is located above the supporting feet 2. The construction of the caisson and the water-stop ridge of the toilet is designed, the construction is designed to ensure that the horizontal plane of the toilet is lower than the horizontal plane of an adjacent room, and the integral forming and pouring of the water-stop ridge are ensured, at the moment, the lengths of the vertical supporting rods 1-2 at the left end and the right end are required to be different, the heights of the formwork brackets 1-3 and the supporting legs 2 arranged on the vertical supporting rods 1-2 at the left end and the right end are required to be different, wherein the height difference between the left end formwork bracket 1-3 and the right end formwork bracket 1-3 is the sinking distance of the caisson of the toilet, namely the height difference between the left end supporting leg 2 and the right end supporting leg 2; the height of left and right sides template 3 at this moment also needs to match the setting according to the co-altitude of the setting of left and right sides template bracket 1-3 to ensure that the integration of bathroom stagnant water bank and beam wall is pour, ensure to pour the effect, promote the utility model discloses a practicality. When the positioning device is used for positioning operation of pouring of a common beam, the height of the vertical supporting rods 1-2 at the left end and the right end, the height of the template brackets 1-3 arranged on the vertical supporting rods 1-2 at the left end and the right end and the height of the supporting feet 2 do not need to be set differently, and only equal-height setting is needed, so that the positioning device is wide in application range and high in practicability.
The positioning reinforcing frame 4 comprises a positioning cross rod 4-1, fixing rods 4-2 are arranged at the left end and the right end of the bottom surface of the positioning cross rod 4-1 respectively, the positioning cross rod 4-1 and the fixing rods 4-2 can be connected in a welding mode, and the fixing rods 4-2 are used for clamping the templates 3 at the left side and the right side. The supporting rods 4-3 are obliquely arranged between the fixing rods 4-2 and the positioning cross rods 4-1, and the supporting performance of the positioning reinforcing frame 4 can be further improved due to the arrangement of the supporting rods 4-3.
The supporting legs 2 include the first supporting legs 2-1 that sets up along the left and right directions and the second supporting legs 2-2 that sets up along the fore-and-aft direction, and wherein first supporting legs 2-1 is perpendicular with second supporting legs 2-2, and the optimization setting of supporting legs 2 can further promote the utility model discloses the stability of placing promotes the utility model discloses a practicality can.
A screw thread adjusting cylinder 5 is transversely arranged on a fixed rod 4-2 at one side of the positioning reinforcing frame 4, a threaded rod 6 is arranged in the screw thread adjusting cylinder 5, a fastening plate 7 is arranged at one side of the threaded rod 6 close to the template 3, the fastening plate 7 can increase the contact area with the template 3, the fastening operation of the template 3 can be conveniently achieved by adjusting the threaded rod 6, an operating handle 8 is arranged at one side of the threaded rod 6 far away from the template 3, the manual adjustment is convenient, the operation is simple and convenient, and the practicability of the utility model is improved; the setting of a screw thread adjusting cylinder 5 and threaded rod 6 is convenient for fasten the regulation to setting up at the template 3 of hanging 1 outer end left and right sides of mould locating rack on the one hand, and on the other hand can be applicable to the operation of pouring of different width roof beams bodies, enlarges the utility model discloses an application scope promotes the utility model discloses a practicality.
The utility model discloses an operating procedure does: firstly, placing a mould hanging positioning frame 1 above a manufactured reinforcement cage, positioning by placing supporting legs 2 on a beam wall template, then respectively placing templates 3 on template brackets 1-3 at the left side and the right side, and finally positioning and clamping by a positioning reinforcing frame 4; this moment, just accomplished location installation operation, treat that concrete placement accomplishes, reach the drawing of patterns standard after, carry out the drawing of patterns operation, only need take off location reinforcement frame 4, alright take out both sides template 3, easy and simple to handle, labour saving and time saving, mould hoisting locating rack 1 is pour in the concrete this moment, has further promoted concrete placement's intensity and quality.

Claims (6)

1. The utility model provides a concrete construction template hangs mould locator which characterized in that: including hanging the mould locating rack, the bottom left and right sides of hanging the mould locating rack all is provided with the supporting legs, and the outer end left and right sides of hanging the mould locating rack all is provided with the template, and the top of left and right sides template is provided with the location reinforcement frame.
2. The concrete construction formwork lifting positioner according to claim 1, characterized in that: the mould hoisting positioning frame comprises transverse supporting rods and vertical supporting rods arranged at the left end and the right end of the transverse supporting rods, a template bracket is arranged on each vertical supporting rod, and the template brackets are located above the supporting legs.
3. The concrete construction formwork lifting positioner according to claim 1, characterized in that: the positioning reinforcing frame comprises a positioning cross rod, and fixing rods are arranged at the left end and the right end of the bottom surface of the positioning cross rod.
4. The concrete construction formwork lifting positioner according to claim 1, characterized in that: the supporting legs comprise a first supporting leg arranged along the left-right direction and a second supporting leg arranged along the front-back direction, wherein the first supporting leg is vertical to the second supporting leg.
5. The concrete construction formwork hanger positioner of claim 3, characterized in that: and a support rod is obliquely arranged between the fixed rod and the positioning cross rod.
6. The concrete construction formwork hanger positioner of claim 3, characterized in that: the fixing rod on one side of the positioning reinforcing frame is transversely provided with a thread adjusting cylinder, a threaded rod is arranged in the thread adjusting cylinder, one side, close to the template, of the threaded rod is provided with a fastening plate, and one side, far away from the template, of the threaded rod is provided with an operating handle.
CN202021586809.4U 2020-08-05 2020-08-05 Concrete construction template hangs mould locator Expired - Fee Related CN213204970U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021586809.4U CN213204970U (en) 2020-08-05 2020-08-05 Concrete construction template hangs mould locator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021586809.4U CN213204970U (en) 2020-08-05 2020-08-05 Concrete construction template hangs mould locator

Publications (1)

Publication Number Publication Date
CN213204970U true CN213204970U (en) 2021-05-14

Family

ID=75836845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021586809.4U Expired - Fee Related CN213204970U (en) 2020-08-05 2020-08-05 Concrete construction template hangs mould locator

Country Status (1)

Country Link
CN (1) CN213204970U (en)

Similar Documents

Publication Publication Date Title
CN208009467U (en) A kind of foundation bolt installation control device
CN109057339B (en) One-time pouring construction method for anti-ridge of toilet
CN111021712B (en) Damper cantilever wall template reinforcing mechanism and using method thereof
CN106760495A (en) A kind of floor construction method
CN217420505U (en) Flanging one-step pouring forming formwork supporting device
CN105421781A (en) Synchronous pouring construction method and formwork system for concrete ridge platform and structural floor slab
CN214575658U (en) Post-cast strip template with cast-in-place concrete structure
CN213204970U (en) Concrete construction template hangs mould locator
CN110670873B (en) Support system of steel formwork of ultrahigh large-section concrete column and construction method
CN211396591U (en) Concrete shear wall root reinforcing apparatus
CN210414929U (en) Assembled stair mould
CN109025262B (en) Construction method for one-time pouring forming of concrete flanging
CN218233146U (en) Supporting device for pouring drainage side ditch
CN116816073A (en) Aluminum alloy template inner wall root plugging device and construction process thereof
CN217299822U (en) Cast-in-place boundary beam formwork structure of encorbelmenting
CN215926719U (en) Reinforcing structure of aluminum alloy template reverse ridge hanging die
CN212957325U (en) Device for improving installation precision of anchoring ribs at fixed end of prefabricated staircase
CN114837404A (en) Sunken type falling plate pouring mold and pouring method
CN211974316U (en) Bathroom of adjustable size hangs mould
CN211058144U (en) Integral prefabricating and forming structure for embedded part and core cylinder reinforcing mesh of tower crane
CN210658045U (en) Height-adjustable support reserved anchor bolt hole positioning device
CN111502260A (en) Kitchen and bathroom waterproof guide wall and plate integral pouring and shaping mold construction method
CN221001951U (en) One-step casting molding lifting die device for sill table lifting die and caisson sill table
CN215107328U (en) Hang fixed adjusting device of mould
CN215671015U (en) Hang mould reinforced structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210514