CN213204664U - Construction is with building fast wall brick structure of building up - Google Patents
Construction is with building fast wall brick structure of building up Download PDFInfo
- Publication number
- CN213204664U CN213204664U CN202021082655.5U CN202021082655U CN213204664U CN 213204664 U CN213204664 U CN 213204664U CN 202021082655 U CN202021082655 U CN 202021082655U CN 213204664 U CN213204664 U CN 213204664U
- Authority
- CN
- China
- Prior art keywords
- bricks
- groove
- wall brick
- building
- mortar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model discloses a construction is with building fast and building up long-pending wall brick structure, including the well body, two piece at least limit bricks have been installed respectively to the double-phase adjacent limit of the well body, the top of the well body is equipped with pastes the groove, the central point that pastes the groove puts and is equipped with the hidden groove, the bottom of the well body has been installed and has been pasted protrudingly, paste protruding central point and put and be equipped with hidden post. When the wall brick is used for lapping the corner of the enclosure, one end of the middle body, which is provided with the hidden groove, faces downwards, can be covered with mortar by the hidden groove and the sticking protrusion, the hidden groove of the other wall brick is inserted into the hidden groove correspondingly covered with mortar until the end parts of the two wall bricks are stuck, the directions of the side bricks are kept to be the same, the operation is repeated, the plate bricks on the two sides of the corner can be covered with mortar and inserted between the side bricks on the two wall bricks on the upper side and the lower side, after the mortar is solidified, the side bricks of the middle column and the plate bricks on the two sides of the corner form keying fit, the falling resistance of the enclosure is enhanced, and each layer of the wall bricks only needs to be lapped with.
Description
Technical Field
The utility model belongs to the technical field of the wall brick, concretely relates to construction is with building fast and building up wall brick structure.
Background
Wall brick, as in current building construction, the indispensable material is fired through clay and is formed, and especially the plate brick uses mostly.
Outlying enclosure, it builds the pile and forms to scribble the mortar through the plate brick more, and enclosure corner passes through four plate brick corner overlap joints more, forms a square column structure for the plate brick of scarf joint turning both sides, after the mortar solidifies, the fragment of brick that the corner emits forms key cooperation with the fragment of brick of turning both sides for the anti falling nature of wall body is stronger, and the weak point of existence has: and a plurality of flat bricks need to be coated with mortar for lap joint at a single-layer corner, which is not convenient enough.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction is with building fast and building up long-pending wall brick structure to solve the not convenient enough problem of enclosure turning overlap joint that exists among the prior art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a construction is with building fast and is piled up wall brick structure, includes well body, two piece at least limit bricks have been installed respectively to the double-phase adjacent limit of well body, the top of well body is equipped with pastes the groove, the central point who pastes the groove puts and is equipped with latent groove, the bottom of well body has been installed and has been pasted protrudingly, paste protruding central point and put and be equipped with latent post.
Preferably, the middle body is of a square column structure, and the side bricks are of square block structures.
Preferably, the thickness of the side brick is not more than 53 mm.
Preferably, the sticking groove is of a rectangular pyramid groove structure, and the sticking protrusion is of a rectangular pyramid protrusion structure.
Preferably, the submerged tank is of a square groove structure, and the submerged column is of a square column structure.
Compared with the prior art, the beneficial effects of the utility model are that: when using this kind of wall brick overlap joint enclosure turning, the one end that sets up the hidden slot on the internal body is downward, can be with its hidden post and the protruding mortar of pasting of scribbling, the hidden slot of another this kind of wall brick corresponds the hidden post of scribbling the mortar and inserts, until two blocks of wall brick tip laminating, and in the insertion process, it is the same to keep the limit brick direction, repeat with this operation, the board brick of turning both sides can scribble between the limit brick on two wall bricks of upper and lower sides of plastering mortar insertion, after the mortar solidifies, the limit brick of center pillar forms the key-in cooperation with the board brick of turning both sides, strengthen the lodging resistance of enclosure, every layer only needs this kind of wall brick of overlap joint, the not enough convenient problem of corner overlap joint that exists among the prior art has been solved.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic bottom view of the present invention;
fig. 3 is a schematic top view of the present invention;
FIG. 4 is a schematic top view of the cross section at A-A of the present invention;
fig. 5 is a partially sectional schematic view of the front view of the present invention.
In the figure: 1 middle body, 2 side bricks, 3 submerged grooves, 4 submerged columns, 301 sticking grooves and 401 sticking bulges.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, 2, 3, 4 and 5, a fast stacking wall brick structure for building construction includes a middle body 1, two adjacent sides of the middle body 1 are respectively provided with two side bricks 2, the middle body 1 and the side bricks 2 are a fired integral body, the middle body 1 is a square column structure, the side bricks 2 are square block structures, the thickness of the side bricks 2 is 53 mm, the vertical distance between the upper ends of the side bricks 2 and the upper surface of the middle body 1 is 56 mm, the lower surfaces of the middle body 1 at the lower ends of the side bricks 2 are on the same horizontal plane, the width of the side bricks 2 is the same as that of the existing plate bricks, both the width of the side bricks are 115 mm, and the length of the side bricks 2 is 120 mm.
Referring to fig. 1, 2, 3 and 5, a sticking groove 301 is arranged at the top end of a middle body 1, a hidden groove 3 is arranged at the center of the sticking groove 301, the depth of the hidden groove 3 is 3 cm, the overlooking section of the hidden groove 3 is a square with 10 cm side length, a sticking protrusion 401 is arranged at the bottom end of the middle body 1, the sticking groove 301 is of a rectangular pyramid groove structure, the sticking protrusion 401 is of a rectangular pyramid protrusion structure, a hidden column 4 is arranged at the center of the sticking protrusion 401, the height of the hidden column 4 is 2.4 cm, the overlooking section of the hidden column 4 is a square with 7 cm side length, the sticking protrusion 401, the hidden column 4 and the middle body 1 are integrally fired, the hidden groove 3 is of a square groove structure, and the hidden column 4 is of a square column structure.
When the wall brick overlap joint enclosing wall corner is used, one end of the middle body 1, which is provided with the submerged groove 3, is downward, the submerged column 4 and the sticking protrusion 401 can be coated with mortar, the submerged groove 3 of another wall brick is inserted into the corresponding submerged column 4 coated with mortar until the end parts of the two wall bricks are attached, in the insertion process, the directions of the side bricks 2 are kept the same, the operation is repeated, the plate bricks on the two sides of the corner can be coated with mortar to be inserted between the side bricks 2 on the two wall bricks on the upper side and the lower side, after the mortar is solidified, the side bricks 2 of the middle column 1 and the plate bricks on the two sides of the corner form typing matching, the falling resistance of the enclosing wall is enhanced, the corner is overlapped, each layer only needs to overlap joint one wall brick, and the overlapping is more convenient.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a building construction is with building fast and amasss wall brick structure, includes well body (1), its characterized in that: two adjacent sides of the middle body (1) are respectively provided with at least two side bricks (2), the top end of the middle body (1) is provided with a sticking groove (301), the center of the sticking groove (301) is provided with a latent groove (3), the bottom end of the middle body (1) is provided with a sticking protrusion (401), and the center of the sticking protrusion (401) is provided with a latent column (4).
2. The rapid stacking wall brick structure for building construction according to claim 1, wherein: the middle body (1) is of a square column structure, and the side bricks (2) are of a square block structure.
3. The rapid stacking wall brick structure for building construction according to claim 2, wherein: the thickness of the side brick (2) is not more than 53 mm.
4. The rapid stacking wall brick structure for building construction according to claim 1, wherein: the sticking groove (301) is of a rectangular pyramid groove structure, and the sticking protrusion (401) is of a rectangular pyramid protrusion structure.
5. The rapid stacking wall brick structure for building construction according to claim 1, wherein: the submerged tank (3) is of a square groove structure, and the submerged columns (4) are of a square column structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021082655.5U CN213204664U (en) | 2020-06-12 | 2020-06-12 | Construction is with building fast wall brick structure of building up |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021082655.5U CN213204664U (en) | 2020-06-12 | 2020-06-12 | Construction is with building fast wall brick structure of building up |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213204664U true CN213204664U (en) | 2021-05-14 |
Family
ID=75830551
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021082655.5U Expired - Fee Related CN213204664U (en) | 2020-06-12 | 2020-06-12 | Construction is with building fast wall brick structure of building up |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213204664U (en) |
-
2020
- 2020-06-12 CN CN202021082655.5U patent/CN213204664U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213204664U (en) | Construction is with building fast wall brick structure of building up | |
CN214461722U (en) | Module brick and module brick group | |
CN206737198U (en) | A kind of Combined type external wall panel with reinforced fixed structure | |
CN215519946U (en) | Wall body corner constructional column exempts from formwork construction structures | |
CN213979399U (en) | Wallboard connecting structure | |
CN218205172U (en) | Integrated high-strength integrated wall brick | |
CN211172671U (en) | Rectangular-hole light shale sintered environment-friendly porous brick | |
CN203361646U (en) | Hollow plastic corner sectional material for construction formwork system | |
CN210216884U (en) | Novel interior wall brick is recycled to gangue | |
CN204126107U (en) | A kind of novel chain energy saving airbrick | |
CN215888932U (en) | Aerated concrete block | |
CN204475971U (en) | A kind of enclosure wall back timber | |
CN216587295U (en) | Non-cracking sintered coal gangue perforated brick | |
CN206352345U (en) | A kind of seepage-proof structure of Light trabses | |
CN210507011U (en) | Novel energy-saving environment-friendly color coded brick | |
CN213653973U (en) | High-strength sound insulation building block component for light composite wallboard | |
CN217461157U (en) | Sintered porous brick with strong pressure resistance and difficult occurrence of cracks | |
CN213174288U (en) | Evaporate and press light air entrainment scale panel wall body | |
CN203569792U (en) | Autoclaved aerated concrete slab | |
CN221219349U (en) | Positioning assembly of environment-friendly brick | |
CN206873774U (en) | Self waterproof double-T plate roof structure | |
CN204510594U (en) | Composite block | |
CN212773102U (en) | Energy-saving environment-friendly novel aerated brick | |
CN207092361U (en) | A kind of environmental protection brick for building | |
CN204899011U (en) | Ceramic tile honeycomb composite sheet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210514 |
|
CF01 | Termination of patent right due to non-payment of annual fee |