CN213202134U - High-efficiency bridge crane - Google Patents
High-efficiency bridge crane Download PDFInfo
- Publication number
- CN213202134U CN213202134U CN202022024367.0U CN202022024367U CN213202134U CN 213202134 U CN213202134 U CN 213202134U CN 202022024367 U CN202022024367 U CN 202022024367U CN 213202134 U CN213202134 U CN 213202134U
- Authority
- CN
- China
- Prior art keywords
- crane
- hoist
- bridge crane
- remote control
- control electric
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000007246 mechanism Effects 0.000 claims description 5
- 238000004804 winding Methods 0.000 claims description 5
- 238000010276 construction Methods 0.000 abstract description 2
- 238000012423 maintenance Methods 0.000 abstract description 2
- 239000000463 material Substances 0.000 description 3
- 239000002184 metal Substances 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
The utility model discloses a high efficiency bridge crane, its characterized in that: the main part includes the bridge crane body, the bridge crane base, hoist equipment vaulting pole, the fixed horizontal pole of hoist, hoist remote control electric block, bridge crane body bottom is provided with the bridge crane base, bridge crane base top is provided with hoist equipment vaulting pole, hoist equipment vaulting pole top is provided with the fixed horizontal pole of hoist, hoist fixed horizontal pole middle part bottom is provided with hoist remote control electric block, this device simple structure, the operation is convenient, and can change the work place according to the in-service use condition, the difficult problem of the transportation can't be lifted by crane easily to the several kilograms of heavy objects of having solved the tradition, even also can accomplish mechanical equipment easily in the open air and lift by crane work such as maintenance, and the work efficiency is increased, the amount of labour is reduced, construction cost has been reduced.
Description
Technical Field
The utility model relates to a lifting device technical field specifically is a high efficiency bridge crane.
Background
The bridge crane is a hoisting device which is transversely erected above workshops, warehouses and material yards for hoisting materials, because the two ends of the bridge crane are positioned on high cement columns or metal supports and shaped like a bridge, the bridge frame of the bridge crane longitudinally runs along rails laid on the high frames at the two sides, the space below the bridge frame can be fully utilized for hoisting the materials without being blocked by ground equipment, the bridge crane is a hoisting machine with the widest application range and the largest quantity, the traditional bridge crane has a fixed application area, has higher requirements on the predicted surrounding environment of the ground and is suitable for hoisting heavy objects with larger volume, but in reality, the heavy objects such as landscape stones or metal blocks with larger volume are often hoisted at the places which the bridge crane cannot reach, the hoisting requirements are difficult to be met by using small equipment, and the use cost is expensive, so the crane, aiming at the existing hoisting equipment in the market at present, the high-efficiency bridge type hoisting equipment which is convenient to disassemble, rotate and move is in short supply in the market.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a simple structure, operation are used conveniently, can change the work place according to the in-service use condition, increase work efficiency, reduce the amount of labour, reduce construction cost's high efficiency bridge crane.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a high efficiency bridge crane main part includes bridge crane body, bridge crane base, hoist equipment vaulting pole, the fixed horizontal pole of hoist, hoist remote control electric block, and bridge crane body bottom is provided with the bridge crane base, and bridge crane base top is provided with hoist equipment vaulting pole, and hoist equipment vaulting pole top is provided with the fixed horizontal pole of hoist, and the fixed horizontal pole middle part bottom of hoist is provided with hoist remote control electric block.
As preferred, bridge crane base bottom is provided with the base bottom plate, and base bottom plate middle part is provided with the fixed hole of gyro wheel, and the fixed hole top of gyro wheel is provided with the hydraulic drive gyro wheel, and hydraulic drive gyro wheel top side is provided with hydraulic pressure manually operation handle, and bridge crane base top is provided with equipment vaulting pole fixed port.
Preferably, the crane assembling support rod is arranged to be of a regular trapezoid structure, a support rod fixing pin is arranged at the bottom end of the crane assembling support rod and connected with a fixed port of the assembling support rod, a carrying auxiliary handrail is arranged on the side face of the crane assembling support rod, a cross rod fixing groove is formed in the top end of the crane assembling support rod, and the cross rod fixing groove is connected with a fixed cross rod of the crane.
Preferably, a driving battery is arranged on the inner side of one end of the fixed cross rod of the crane, a power supply wiring is arranged on the side face of the driving battery and connected with the side face of the remote control electric hoist of the crane, a cross rod guide rail groove is arranged at the bottom end of the fixed cross rod of the crane and connected with the top end of the remote control electric hoist of the crane.
Preferably, the top end of the crane remote control electric hoist is provided with a hoist moving roller, the bottom end of the hoist moving roller is provided with a driving motor, the side surface of the driving motor is provided with a motor control signal receiving device, and the output end of the driving motor is provided with a hoisting winding mechanism.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the utility model discloses the bridge crane base that sets up can make things convenient for the short distance to remove, supports upper portion weight, can be applicable to the vehicle outdoor and lift by crane the maintenance and lift by crane the heavy object and shift to other platforms and transport.
(2) The hoist equipment vaulting pole can improve the spacing height of lifting by crane, conveniently dismantles the transport equipment, lifts by crane the heavy object when there is not large-scale equipment of lifting by crane in the open air, and auxiliary assembly assembles, when guaranteeing overall structure intensity, conveniently dismantles the transportation, improves the actual work efficiency of equipment of lifting by crane.
(3) The crane fixing cross rod can facilitate the crane to remotely control the electric hoist to move transversely, and provides electric support for integral hoisting.
(4) The remote control electric hoist of the crane can improve remote control to lift and transport heavy objects, avoids traditional outdoor manual carrying of heavy objects, and improves the carrying work efficiency of the heavy objects.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the structure of the bridge crane base of the present invention;
FIG. 3 is a schematic view of the structure of the supporting rod of the crane assembly of the present invention;
FIG. 4 is a schematic structural view of the fixed cross bar of the crane of the present invention;
fig. 5 is the schematic diagram of the structure of the remote control electric hoist of the crane.
In the figure: 1. a bridge crane body; 2. a bridge crane base; 3. assembling a support rod by using a crane; 4. a crane fixing cross bar; 5. a crane remote control electric hoist; 6. a base bottom plate; 7. fixing holes by rollers; 8. hydraulically driving the rollers; 9. a hydraulic manual operating handle; 10. assembling a strut fixing port; 11. a strut fixing pin; 12. carrying the auxiliary handrail; 13. fixing the groove on the cross rod; 14. a drive battery; 15. a power connection; 16. a rail guide groove; 17. a hoist moving roller; 18. a drive motor; 19. a motor control signal receiving device; 20. and (5) hoisting and winding mechanisms.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1, the main part includes bridge crane body 1, bridge crane base 2, hoist equipment vaulting pole 3, the fixed horizontal pole 4 of hoist, hoist remote control electric block 5, and 1 bottom of bridge crane body is provided with bridge crane base 2, and 2 tops of bridge crane base are provided with hoist equipment vaulting pole 3, and 3 tops of hoist equipment vaulting pole are provided with the fixed horizontal pole 4 of hoist, and 4 middle part bottoms of the fixed horizontal pole of hoist are provided with hoist remote control electric block 5.
As shown in fig. 2, a base bottom plate 6 is arranged at the bottom end of a base 2 of the bridge crane, roller fixing holes 7 are formed in the middle of the base bottom plate 6, hydraulic driving rollers 8 are arranged at the top ends of the roller fixing holes 7, hydraulic manual operating handles 9 are arranged on the side surfaces of the top ends of the hydraulic driving rollers 8, and assembling stay bar fixing ports 10 are arranged at the top end of the base 2 of the bridge crane.
As shown in fig. 3, the crane assembling support rod 3 is set to be of a regular trapezoid structure, a support rod fixing pin 11 is arranged at the bottom end of the crane assembling support rod 3, the support rod fixing pin 11 is connected with an assembling support rod fixing port 10, a carrying auxiliary handrail 12 is arranged on the side surface of the crane assembling support rod 3, a cross rod fixing groove 13 is arranged at the top end of the crane assembling support rod 3, and the cross rod fixing groove 13 is connected with a crane fixing cross rod 4.
As shown in fig. 4, a driving battery 14 is arranged on the inner side of one end of the crane fixing cross bar 4, a power supply wiring 15 is arranged on the side surface of the driving battery 14, the power supply wiring 15 is connected with the side surface of the crane remote control electric hoist 5, a cross bar guide rail groove 16 is arranged at the bottom end of the crane fixing cross bar 4, and the cross bar guide rail groove 16 is connected with the top end of the crane remote control electric hoist 5.
As shown in fig. 5, a hoist moving roller 17 is arranged at the top end of the crane remote control electric hoist 5, a driving motor 18 is arranged at the bottom end of the hoist moving roller 17, a motor control signal receiving device 19 is arranged on the side surface of the driving motor 18, and a hoisting winding mechanism 20 is arranged at the output end of the driving motor 18.
Application method
Firstly, when a heavy object needs to be lifted outdoors, a bridge crane base 2 is placed on a plane, and then a crane assembling support rod 3 and a crane fixing cross rod 4 are assembled and spliced; secondly, after splicing, connecting a power supply of the crane remote control electric hoist 5, and debugging whether the equipment runs normally; thirdly, the heavy objects are tied up and fixed and are remotely controlled through the hoisting winding mechanism 20 and the motor control signal receiving device 19, when the hoisting of the heavy objects is finished, the heavy objects are sequentially removed, the bridge crane body 1 is transferred and placed at a preset position, and then the bridge crane body 1 is used once.
The above-mentioned embodiment is only the preferred embodiment of the present invention, and is not to the limitation of the technical solution of the present invention, as long as the technical solution can be realized on the basis of the above-mentioned embodiment without creative work, all should be regarded as falling into the protection scope of the right of the present invention.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. A high efficiency bridge crane, characterized by: the main part includes bridge crane body (1), bridge crane base (2), hoist equipment vaulting pole (3), the fixed horizontal pole of hoist (4), hoist remote control electric block (5), bridge crane body (1) bottom is provided with bridge crane base (2), bridge crane base (2) top is provided with hoist equipment vaulting pole (3), hoist equipment vaulting pole (3) top is provided with the fixed horizontal pole of hoist (4), hoist fixed horizontal pole (4) middle part bottom is provided with hoist remote control electric block (5).
2. A high efficiency bridge crane as claimed in claim 1, wherein: bridge crane base (2) bottom is provided with base bottom plate (6), base bottom plate (6) middle part is provided with gyro wheel fixed orifices (7), gyro wheel fixed orifices (7) top is provided with hydraulic drive gyro wheel (8), hydraulic drive gyro wheel (8) top side is provided with hydraulic pressure manual operation handle (9), bridge crane base (2) top is provided with equipment vaulting pole fixed port (10).
3. A high efficiency bridge crane as claimed in claim 1, wherein: the novel crane assembling support rod is characterized in that the crane assembling support rod (3) is arranged to be of a regular trapezoid structure, a support rod fixing pin (11) is arranged at the bottom end of the crane assembling support rod (3), an assembling support rod fixing port (10) is connected to the support rod fixing pin (11), a carrying auxiliary handrail (12) is arranged on the side face of the crane assembling support rod (3), a transverse rod fixing groove (13) is formed in the top end of the crane assembling support rod (3), and the transverse rod fixing groove (13) is connected with a crane fixing transverse rod (4).
4. A high efficiency bridge crane as claimed in claim 1, wherein: the crane remote control electric hoist is characterized in that a driving battery (14) is arranged on the inner side of one end of the fixed cross rod (4) of the crane, a power supply wiring (15) is arranged on the side face of the driving battery (14), the power supply wiring (15) is connected with the side face of the crane remote control electric hoist (5), a cross rod guide rail groove (16) is arranged at the bottom end of the fixed cross rod (4) of the crane, and the cross rod guide rail groove (16) is connected with the top end of the crane remote control electric hoist (.
5. A high efficiency bridge crane as claimed in claim 1, wherein: the crane remote control electric hoist is characterized in that a hoist moving roller (17) is arranged at the top end of the crane remote control electric hoist (5), a driving motor (18) is arranged at the bottom end of the hoist moving roller (17), a motor control signal receiving device (19) is arranged on the side surface of the driving motor (18), and a hoisting winding mechanism (20) is arranged at the output end of the driving motor (18).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022024367.0U CN213202134U (en) | 2020-09-16 | 2020-09-16 | High-efficiency bridge crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022024367.0U CN213202134U (en) | 2020-09-16 | 2020-09-16 | High-efficiency bridge crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213202134U true CN213202134U (en) | 2021-05-14 |
Family
ID=75820728
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022024367.0U Expired - Fee Related CN213202134U (en) | 2020-09-16 | 2020-09-16 | High-efficiency bridge crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213202134U (en) |
-
2020
- 2020-09-16 CN CN202022024367.0U patent/CN213202134U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201746779U (en) | Prestressed tension jack moving frame | |
CN201250058Y (en) | Improved lifting trolley | |
CN213202134U (en) | High-efficiency bridge crane | |
CN108726358B (en) | Batch hoisting device and method for main reinforcement of high-rise concrete structure | |
CN216807824U (en) | Pipeline mobile device for hydraulic engineering | |
CN110723642A (en) | Device and method for horizontally lifting equipment in closed workshop in place | |
CN206886632U (en) | A kind of cable channel cover plate handling device | |
CN216889750U (en) | Detachable movable portal frame for improving hoisting operation safety | |
CN206654689U (en) | A kind of electronic stacker | |
CN212740480U (en) | Crane for carrying steel coils | |
CN206051351U (en) | Hang a kind of purlin for assembling and disassembling construction for bridge-collision-avoidance wall form | |
CN213865193U (en) | Lifting device for small and medium-sized equipment | |
CN206844614U (en) | A kind of external wall construction construction platform | |
CN111924725A (en) | Building templates hoist device for house construction | |
CN103359625A (en) | Automatic construction equipment for building hoisting and platform elevating of new rural construction | |
CN221165664U (en) | Detachable multifunctional movable hoisting trolley | |
CN220055207U (en) | Axial-flow hydroelectric set stopper dismouting transfer device | |
CN215666644U (en) | A operation ladder for installing factory building outer wall material | |
CN220265115U (en) | Detachable movable material lifting machine device | |
CN211078293U (en) | High-altitude hoisting prefabricated part symmetrical equipment | |
CN215924312U (en) | Material lifting device of tunnel equipment installation trolley | |
CN221343578U (en) | Civil engineering material hoisting device | |
CN215886101U (en) | Novel portal crane | |
CN213569108U (en) | Precast beam template hoist and mount system | |
CN216809835U (en) | Vertical type rapid assembling device for offshore wind power jacket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210514 |