CN213195404U - Building construction steel pipe aligning device - Google Patents
Building construction steel pipe aligning device Download PDFInfo
- Publication number
- CN213195404U CN213195404U CN202021387852.8U CN202021387852U CN213195404U CN 213195404 U CN213195404 U CN 213195404U CN 202021387852 U CN202021387852 U CN 202021387852U CN 213195404 U CN213195404 U CN 213195404U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- location
- pipe straightening
- thick bamboo
- building construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 50
- 239000010959 steel Substances 0.000 title claims abstract description 50
- 238000009435 building construction Methods 0.000 title claims description 13
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims abstract description 13
- 235000017491 Bambusa tulda Nutrition 0.000 claims abstract description 13
- 241001330002 Bambuseae Species 0.000 claims abstract description 13
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims abstract description 13
- 239000011425 bamboo Substances 0.000 claims abstract description 13
- 238000003780 insertion Methods 0.000 claims description 10
- 230000037431 insertion Effects 0.000 claims description 10
- 238000003466 welding Methods 0.000 claims description 6
- 230000007246 mechanism Effects 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 18
- 230000000694 effects Effects 0.000 abstract description 4
- 238000004146 energy storage Methods 0.000 abstract description 3
- 230000002349 favourable effect Effects 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 8
- 230000008569 process Effects 0.000 description 5
- 230000009471 action Effects 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B10/00—Integration of renewable energy sources in buildings
- Y02B10/10—Photovoltaic [PV]
Landscapes
- Photovoltaic Devices (AREA)
Abstract
The utility model discloses a construction steel pipe aligning device, including steel pipe straightener body, install control switch on the steel pipe straightener body, and the equal fixed mounting of both sides surface has two location to insert a section of thick bamboo around the steel pipe straightener body, the bottom fixedly connected with stationary blade of a section of thick bamboo is inserted in the location, and the side of a section of thick bamboo is inserted in the location is provided with stop gear, it has the location intubate, adjacent two to peg graft on the section of thick bamboo is inserted in the location welded connection has the connecting rod between the intubate in the location. This construction steel pipe alignment device, photovoltaic cell board changes the light energy into the inside of electric energy storage at the battery, utilizes control switch to open the light, changes the electric energy in the battery into the light energy, provides the light for the operation at night, and this energy is clean energy, and energy-concerving and environment-protective effectual, and the weather enclosure has rainproof effect simultaneously for steel pipe alignment machine body can be overcast and rainy weather and last the operation, is favorable to improving the work efficiency of steel pipe alignment machine body.
Description
Technical Field
The utility model relates to a construction technical field especially relates to a construction steel pipe aligning device.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or a "construction site", also called a construction site; in the building construction process, a special steel pipe straightener is required for straightening steel pipes, and the steel pipe straightener is maintenance machinery for building fastener type steel pipe scaffold steel pipes and is mainly used for straightening and repairing scaffold steel pipes and other pipes which are bent and deformed in building construction.
The steel pipe straightening machine used for building construction in the market at present generally can straighten steel pipes outdoors, so that the use of the steel pipe straightening machine is limited by weather and environment, and the steel pipes cannot be straightened in rainy days and at night.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a construction steel pipe aligning device has solved the steel pipe straightening machine that is used for construction on the existing market and generally can all carry out the alignment of steel pipe in the open air, and this use that just leads to steel pipe straightening machine has received the restriction of weather and environment, then can't carry out the problem of alignment to the steel pipe at overcast and rainy weather and night.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a building construction steel pipe straightening device comprises a steel pipe straightening machine body, wherein a control switch is mounted on the steel pipe straightening machine body, two positioning inserting cylinders are fixedly mounted on the outer surfaces of the front side and the rear side of the steel pipe straightening machine body, fixing pieces are fixedly connected to the bottoms of the positioning inserting cylinders, limiting mechanisms are arranged on the side surfaces of the positioning inserting cylinders, positioning inserting pipes are inserted into the positioning inserting cylinders in a splicing mode, connecting rods are welded between every two adjacent positioning inserting pipes, the tops of the four positioning inserting pipes are provided with a same rain-proof shed, a photovoltaic cell panel is fixedly mounted on the outer surface of the upper end of the rain-proof shed, two tripods are fixedly mounted at the bottom of the rain-proof shed, vertical pipes are fixedly mounted on the tripods, a same fixing plate is fixedly mounted between the four positioning inserting pipes, a lighting lamp is mounted at the bottom of the, stop gear includes handle bar and two gag lever posts, two the gag lever post is fixed respectively at the both ends of handle bar, two first through-holes have been seted up on the section of thick bamboo is inserted in the location, two second through-holes have been seted up on the location intubate, and the inside welding of second through-hole has a spacing section of thick bamboo, two screens holes have been seted up on the spacing section of thick bamboo, the welding has two screens to insert the post on the gag lever post.
Preferably, the four positioning insertion tubes are evenly divided into two groups, and the two positioning insertion tubes in the same group are fixedly connected with a tripod through screws.
Preferably, the aperture of the clamping hole is larger than the diameter of the cross section of the clamping insertion column, and the top of the clamping insertion column is of a conical structure.
Preferably, the outer side of the handle rod is sleeved with a rubber sleeve, and the outer surface of the rubber sleeve is provided with a plurality of anti-skid convex strips.
Preferably, the output end of the photovoltaic cell panel is electrically connected with the input end of the battery, the output end of the battery is electrically connected with the input end of the control switch, and the output end of the control switch is electrically connected with the input end of the illuminating lamp.
Compared with the prior art, the beneficial effects of the utility model are that: this construction steel pipe alignment device, photovoltaic cell board changes the light energy into the inside of electric energy storage at the battery, utilizes control switch to open the light, changes the electric energy in the battery into the light energy, provides the light for the operation at night, and this energy is clean energy, and energy-concerving and environment-protective effectual, and the weather enclosure has rainproof effect simultaneously for steel pipe alignment machine body can be overcast and rainy weather and last the operation, is favorable to improving the work efficiency of steel pipe alignment machine body.
Drawings
FIG. 1 is an overall structure diagram of the present invention;
fig. 2 is a side view of the rain-proof shed of the utility model;
fig. 3 is a side sectional view of the positioning insert cylinder of the present invention.
In the figure: 1 steel pipe bar straightener body, 2 control switch, 3 location are inserted a section of thick bamboo, 4 stationary blades, 5 stop gear, 6 location intubate, 7 connecting rods, 8 weather enclosure, 9 photovoltaic cell board, 10 tripods, 11 standpipe, 12 fixed plates, 13 light, 14 batteries, 15 handle bars, 16 gag lever posts, 17 first through-hole, 18 second through-hole, 19 spacing section of thick bamboo, 20 screens hole, 21 screens insert the post.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a steel pipe straightening device for building construction comprises a steel pipe straightening machine body 1, wherein a control switch 2 is installed on the steel pipe straightening machine body 1, the control switch 2 is used for controlling the on-off of an illuminating lamp 13, two positioning inserting cylinders 3 are fixedly installed on the outer surfaces of the front side and the rear side of the steel pipe straightening machine body 1, the positioning inserting cylinders 3 are used for inserting positioning inserting pipes 6, fixing pieces 4 are fixedly connected to the bottoms of the positioning inserting cylinders 3, limiting mechanisms 5 are arranged on the side surfaces of the positioning inserting cylinders 3, positioning inserting pipes 6 are inserted into the positioning inserting cylinders 3, the positioning inserting pipes 6 are used for supporting a weather-proof shed 8, connecting rods 7 are welded between every two adjacent positioning inserting pipes 6 and are used for connecting the four positioning inserting pipes 6 together so as to improve the structural strength of the four positioning inserting pipes 6, the same weather-proof shed 8 is arranged at the tops of, the rain-proof shed 8 can prevent rainwater from washing the steel pipe straightener body 1, the steel pipe straightener body 1 is operated in rainy days, the outer surface of the upper end of the rain-proof shed 8 is fixedly provided with a photovoltaic cell panel 9, the photovoltaic cell panel 9 is used for converting light energy into electric energy, the bottom of the rain-proof shed 8 is fixedly provided with two tripods 10, the tripods 10 are fixedly provided with vertical pipes 11, the vertical pipes 11 are used for enhancing the structural strength of the tripods 10, a same fixing plate 12 is fixedly arranged between four positioning insertion pipes 6, the bottom of the fixing plate 12 is provided with a lighting lamp 13, the top of the fixing plate 12 is provided with a battery 14, the battery 14 is used for storing the electric energy generated by the photovoltaic cell panel 9, the limiting mechanism 5 comprises a handle bar 15 and two limiting bars 16, the two limiting bars 16 are respectively fixed at two ends of the handle bar 15, the positioning insertion cylinder 3 is provided with two first through holes, and the inside welding of second through-hole 18 has spacing section of thick bamboo 19, has seted up two screens holes 20 on the spacing section of thick bamboo 19, and the welding has two screens to insert post 21 on the gag lever post 16, and the inside at screens hole 20 is inserted to the screens 21, makes the peg graft inside first through-hole 17 and second through-hole 18 that gag lever post 16 can be stable for the unexpected condition emergence of roll-off first through-hole 17 of gag lever post 16 and second through-hole 18 has been avoided.
The utility model discloses in, four location intubate 6 evenly divide into two sets ofly, and two location intubate 6 of the same set of all are through screw and 10 fixed connection of tripod.
The utility model discloses in, the aperture in screens hole 20 is greater than the screens and inserts the cross section diameter of post 21, and the screens inserts the top of post 21 and be conical structure, the design of conical structure for the screens inserts the inside of pegging graft screens hole 20 that post 21 can be easier.
The utility model discloses in, the rubber sleeve has been cup jointed in the outside of handle bar 15, and the surface of rubber sleeve is provided with a plurality of anti-skidding sand grips.
The utility model discloses in, photovoltaic cell board 9's output and battery 14's input electric connection, and battery 14's output and control switch 2's input electric connection, control switch 2's output and light 13's input electric connection.
To sum up, this construction steel pipe aligning device, photovoltaic cell board 9 changes light energy into electric energy storage in the inside of battery 14, utilizes control switch 2 can open light 13, changes the electric energy in the battery 14 into light energy, provides the light for the operation at night, and this energy is clean energy, and energy-concerving and environment-protective effectual, weather enclosure 8 has rainproof effect simultaneously for steel pipe aligning machine body 1 can be overcast and rainy weather and last the operation, is favorable to improving the work efficiency of steel pipe aligning machine body 1.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. A building construction steel pipe straightening device comprises a steel pipe straightening machine body (1), and is characterized in that a control switch (2) is mounted on the steel pipe straightening machine body (1), two positioning inserting cylinders (3) are fixedly mounted on the outer surfaces of the front side and the rear side of the steel pipe straightening machine body (1), the bottoms of the positioning inserting cylinders (3) are fixedly connected with fixing pieces (4), a limiting mechanism (5) is arranged on the side surface of each positioning inserting cylinder (3), positioning inserting pipes (6) are inserted into the positioning inserting cylinders (3), and a connecting rod (7) is welded between every two adjacent positioning inserting pipes (6);
the top of four location intubate (6) is provided with same weather enclosure (8), the upper end surface fixed mounting of weather enclosure (8) has photovoltaic cell board (9), and the bottom fixed mounting of weather enclosure (8) has two tripods (10), fixed mounting has standpipe (11) on tripod (10), four fixed mounting has same fixed plate (12) between location intubate (6), light (13) are installed to the bottom of fixed plate (12), and the top of fixed plate (12) is provided with battery (14), stop gear (5) include handle bar (15) and two gag lever posts (16), two gag lever posts (16) are fixed respectively at the both ends of handle bar (15), two first through-holes (17) have been seted up on location intubate (3), two second through-holes (18) have been seted up on location intubate (6), and the inside welding of second through-hole (18) has spacing section of thick bamboo (19), two screens holes (20) have been seted up on spacing section of thick bamboo (19), the welding has two screens to insert post (21) on gag lever post (16).
2. The building construction steel pipe straightening device according to the claim 1, characterized in that the four positioning insertion pipes (6) are evenly divided into two groups, and the two positioning insertion pipes (6) in the same group are fixedly connected with a tripod (10) through screws.
3. The building construction steel pipe straightening device according to claim 2, characterized in that the diameter of the clamping hole (20) is larger than the cross-sectional diameter of the clamping insertion column (21), and the top of the clamping insertion column (21) is of a conical structure.
4. The building construction steel pipe straightening device according to claim 2, wherein a rubber sleeve is sleeved on the outer side of the handle rod (15), and a plurality of anti-skid convex strips are arranged on the outer surface of the rubber sleeve.
5. The building construction steel pipe straightening device according to claim 1, characterized in that the output end of the photovoltaic cell panel (9) is electrically connected with the input end of a battery (14), the output end of the battery (14) is electrically connected with the input end of a control switch (2), and the output end of the control switch (2) is electrically connected with the input end of an illuminating lamp (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021387852.8U CN213195404U (en) | 2020-07-15 | 2020-07-15 | Building construction steel pipe aligning device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021387852.8U CN213195404U (en) | 2020-07-15 | 2020-07-15 | Building construction steel pipe aligning device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213195404U true CN213195404U (en) | 2021-05-14 |
Family
ID=75833580
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021387852.8U Expired - Fee Related CN213195404U (en) | 2020-07-15 | 2020-07-15 | Building construction steel pipe aligning device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213195404U (en) |
-
2020
- 2020-07-15 CN CN202021387852.8U patent/CN213195404U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203782942U (en) | Mounting system used for multi-dimensional-adjusting double-curved-surface titanium-plate curtain wall | |
CN213195404U (en) | Building construction steel pipe aligning device | |
KR200441732Y1 (en) | Device for fixing the solar photovoltatic power generation module | |
CN216086555U (en) | Novel photovoltaic staple bolt support cross arm connection structure | |
CN218060737U (en) | Prefabricated light steel construction house | |
CN108375014A (en) | A kind of single-pipe tower | |
CN214739106U (en) | Curtain wall steel frame node | |
CN211126455U (en) | Boats and ships distribution board protection device | |
CN213174923U (en) | Steel construction board house that stability can be good | |
CN209748466U (en) | Adjustable photovoltaic support of fixed six side's pipes | |
CN210421426U (en) | Reinforcing steel bar processing workshop | |
CN108365800B (en) | Inhaul cable pre-pressing photovoltaic bracket | |
CN217054586U (en) | Corrosion-resistant electric power steel pipe tower | |
CN106533336A (en) | Simple flat roof photovoltaic bracket system | |
CN220202985U (en) | Modularized movable board house | |
CN215859322U (en) | Fishing-light integrated greenhouse skeleton structure for pond | |
CN215369133U (en) | Construction of building engineering is with enclosing fender baffle | |
CN215107605U (en) | Firm formula reinforcing means based on building engineering uses | |
CN221652534U (en) | Wall-mounted flat-plate solar energy | |
CN221168420U (en) | Composite roof with decorative plate | |
CN213509088U (en) | Integrated assembly structure of glass curtain wall | |
CN214943056U (en) | Effluent water sump guardrail of quick installation | |
CN204794821U (en) | Fixed solar energy ground mounting system | |
CN220022675U (en) | A photovoltaic wall body installation mechanism for photovoltaic building integration | |
CN219287125U (en) | Be used for CPVC power tube mounting fixture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210514 |
|
CF01 | Termination of patent right due to non-payment of annual fee |