CN213177519U - Topography mapping auxiliary assembly of municipal works construction usefulness - Google Patents
Topography mapping auxiliary assembly of municipal works construction usefulness Download PDFInfo
- Publication number
- CN213177519U CN213177519U CN202021449796.6U CN202021449796U CN213177519U CN 213177519 U CN213177519 U CN 213177519U CN 202021449796 U CN202021449796 U CN 202021449796U CN 213177519 U CN213177519 U CN 213177519U
- Authority
- CN
- China
- Prior art keywords
- rod
- wall
- lead screw
- welded
- rotating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The utility model discloses a topography mapping auxiliary assembly that municipal works construction used, which comprises a fixed base, the bottom of fixing base is rotated through first bull stick and is connected with the commentaries on classics cover, the one end embedding of commentaries on classics cover has the bracing piece, the one end welding of keeping away from the commentaries on classics cover on the bracing piece has the dead lever, the one end embedding of keeping away from the bracing piece on the dead lever has the ball, the welding has the connecting rod on one side outer wall of ball. This topography mapping auxiliary assembly of municipal works construction usefulness, ball and bottom plate through the dead lever bottom, can guarantee that the dead lever is more comprehensive with the contact on ground, improve frictional force, guarantee the stability that auxiliary assembly placed, bore into soil through the drilling rod, can guarantee the fastness that auxiliary assembly placed, and then guarantee the precision of follow-up survey and drawing, through mobilizable commentaries on classics cover, can promote placing platform's slope department rebound, the leveling of placing platform is realized placing, and then the level that follow-up mapping equipment placed is guaranteed.
Description
Technical Field
The utility model relates to a municipal works technical field specifically is a topography mapping auxiliary assembly that municipal works construction was used.
Background
The municipal engineering refers to municipal facility construction engineering, and in China, municipal facilities refer to various buildings, structures, equipment and the like which are arranged in urban areas and town planning construction ranges and provide paid or unpaid public products and services for residents based on government responsibilities and obligations.
However, current municipal works construction needs to survey and draw required topography, and current mapping equipment carries out supplementary support through the tripod mostly to the precision of follow-up survey and drawing, current topography survey and drawing auxiliary assembly place unstability, the skew in the position appears easily and leads to the fact the problem of follow-up survey and drawing precision, in addition, because the topography has great complexity, just so causes auxiliary assembly to place the disalignment.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a topography survey and drawing auxiliary assembly that municipal works were used to it places unstablely and places the problem of unevenness to propose current topography survey and drawing auxiliary assembly for municipal works construction in solving above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a terrain surveying and mapping auxiliary device for municipal engineering construction comprises a fixed seat, wherein the bottom of the fixed seat is rotatably connected with a rotating sleeve through a first rotating rod, a supporting rod is embedded into one end of the rotating sleeve, a fixed rod is welded at one end, far away from the rotating sleeve, of the supporting rod, a ball is embedded into one end, far away from the supporting rod, of the fixed rod, a connecting rod is welded on the outer wall of one side of the ball, a bottom plate is welded at one end of the connecting rod, a friction pad is embedded on the outer wall of one side of the bottom plate, the top of the bottom plate is connected with a drill rod in a screwing mode through threads, a first hand wheel is welded at the top end of the drill rod, a second rotating rod is rotatably connected on the outer wall of one side of the fixed rod, a second hand wheel is welded at one end of the second rotating rod, a first bevel, the welding has the second bevel gear on one side outer wall of first lead screw, and closes soon through the screw thread on one side outer wall of first lead screw and be connected with the removal frame, bolt fixedly connected with place the platform is passed through at the top of fixing base, it is connected with the second lead screw to rotate on one side inner wall of place the platform, the one end welding of second lead screw has the third lead screw, it is connected with splint all to close soon through the screw thread on one side outer wall of second lead screw and third lead screw, the embedding has the foam-rubber cushion on one side outer wall of splint, the welding of one side position department near first bull stick on one side outer wall of fixing base has the ring cover, close soon through the screw thread on one side outer wall of ring cover and be connected with fastening nut.
Preferably, the number of the rotating sleeves is three, and the three rotating sleeves are symmetrically arranged at the bottom of the fixed seat.
Preferably, the rotating sleeve is connected with the moving frame in a welding mode, and the rotating sleeve is connected with the supporting rod in a sliding mode.
Preferably, the first bevel gear and the second bevel gear are in meshing connection through gear teeth.
Preferably, the thread directions of the second lead screw and the third lead screw are opposite.
Preferably, a groove is formed in the outer wall of one side of the supporting rod.
Compared with the prior art, the beneficial effects of the utility model are that: this topography mapping auxiliary assembly of municipal works construction usefulness, ball and bottom plate through the dead lever bottom, can guarantee that the dead lever is more comprehensive with the contact on ground, improve frictional force, guarantee the stability that auxiliary assembly placed, bore into soil through the drilling rod, can guarantee the fastness that auxiliary assembly placed, and then guarantee the precision of follow-up survey and drawing, through mobilizable commentaries on classics cover, can promote place platform's slope department rebound, realize placing place platform's leveling, and then guarantee the level that follow-up survey and drawing equipment placed, in addition, splint through removing in opposite directions, can press from both sides surveying equipment tightly, avoid surveying equipment to drop and cause the damage.
Drawings
Fig. 1 is a front view of the present invention;
FIG. 2 is a schematic view of the internal structure of the fixing rod of the present invention;
FIG. 3 is a schematic view of the internal structure of the platform of the present invention;
fig. 4 is a front view of the ring sleeve of the present invention.
In the figure: 1. a fixed seat; 2. a first rotating lever; 3. rotating the sleeve; 4. a support bar; 5. fixing the rod; 6. a ball bearing; 7. a connecting rod; 8. a base plate; 9. a friction pad; 10. a drill stem; 11. a first hand wheel; 12. a second rotating rod; 13. a second hand wheel; 14. a first bevel gear; 15. a first lead screw; 16. a second bevel gear; 17. A movable frame; 18. placing a platform; 19. a second lead screw; 20. a third lead screw; 21. a splint; 22. a sponge cushion; 23. sleeving a ring; 24. and (5) tightening the nut.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a topographic surveying and mapping auxiliary device for municipal engineering construction comprises a fixed seat 1, wherein the bottom of the fixed seat 1 is rotatably connected with a rotary sleeve 3 through a first rotary rod 2, one end of the rotary sleeve 3 is embedded with a support rod 4, one end of the support rod 4, which is far away from the rotary sleeve 3, is welded with a fixed rod 5, one end of the fixed rod 5, which is far away from the support rod 4, is embedded with a ball 6, one outer wall of one side of the ball 6 is welded with a connecting rod 7, one end of the connecting rod 7 is welded with a bottom plate 8, one outer wall of one side of the bottom plate 8 is embedded with a friction pad 9, the top of the bottom plate 8 is connected with a drill rod 10 through screw thread screwing, the top end of the drill rod 10 is welded with a first hand wheel 11, one outer wall of one side of the fixed rod 5 is rotatably connected with a second rotary rod 12, one end of the second rotary rod 12 is welded, the welding has second bevel gear 16 on one side outer wall of first lead screw 15, and close soon through the screw thread on one side outer wall of first lead screw 15 and be connected with removal frame 17, bolt fixedly connected with place the platform 18 is passed through at the top of fixing base 1, it is connected with second lead screw 19 to rotate on one side inner wall of place the platform 18, the welding of one end of second lead screw 19 has third lead screw 20, it is connected with splint 21 all to close soon through the screw thread on one side outer wall of second lead screw 19 and third lead screw 20, the embedding has foam-rubber cushion 22 on one side outer wall of splint 21, it has ring cover 23 to weld near one side position department of first bull stick 2 on one side outer wall of fixing base 1, it is connected with fastening nut 24 to close soon through the screw thread on one side outer.
The utility model discloses in: the number of the rotating sleeves 3 is three, and the three rotating sleeves 3 are symmetrically arranged at the bottom of the fixed seat 1; the stability of auxiliary assembly support is guaranteed.
The utility model discloses in: the rotating sleeve 3 is welded with the moving frame 17, and the rotating sleeve 3 is connected with the supporting rod 4 in a sliding way; ensuring that the rotating sleeve 3 moves on the supporting rod 4.
The utility model discloses in: the first bevel gear 14 and the second bevel gear 16 are in gear meshing connection; so that the first lead screw 15 is driven to rotate by the second rotating rod 12.
The utility model discloses in: the thread directions of the second lead screw 19 and the third lead screw 20 are opposite; the clamping plates 21 on the second lead screw 19 and the third lead screw 20 are ensured to move towards or away from each other.
The utility model discloses in: a groove is formed in the outer wall of one side of the support rod 4; the rotating sleeve 3 can move on the supporting rod 4 conveniently.
The working principle is as follows: the auxiliary equipment is placed at a position required by municipal construction surveying and mapping, the rotating sleeve 3 is rotated by the rotation of the first rotating rod 2, the friction pad 9 below the bottom plate 8 is contacted with the ground, the three rotating sleeves 3 support the fixed seat 1, when the ground is soil, the drill rod 10 is connected with the bottom plate 8 in a screwing way, the first hand wheel 11 is rotated, the drill rod 10 is drilled into the ground to realize fixation, the leveling instrument is placed on the placing platform 18, the levelness of the placing platform 18 is detected, when the slope occurs, the second hand wheel 13 on the fixed rod 5 below the slope is rotated, the second hand wheel 13 drives the first bevel gear 14 to rotate through the second rotating rod 12, the second bevel gear 16 is connected with the second bevel gear 16 in a meshing way, the second bevel gear 16 drives the first lead screw 15 to rotate, the moving frame 17 drives the rotating sleeve 3 to move, and further pushes the slope part of the placing platform 18 to move upwards, the leveling of placing platform 18 is realized placing, and then the level that follow-up mapping equipment placed is guaranteed, puts mapping equipment on placing platform 18, rotates second lead screw 19, and second lead screw 19 drives third lead screw 20 and rotates, all closes with the soon of splint 21 through second lead screw 19 and third lead screw 20 and is connected, and two splint 21 move in opposite directions press from both sides mapping equipment tightly.
In summary, the following steps: this topography survey and drawing auxiliary assembly of municipal works construction usefulness, ball 6 and bottom plate 8 through dead lever 5 bottom, can guarantee that the contact of dead lever 5 and ground is more comprehensive, improve frictional force, guarantee the stability that auxiliary assembly placed, bore into soil through drilling rod 10, can guarantee the fastness that auxiliary assembly placed, and then guarantee the precision of follow-up survey and drawing, overlap 3 through mobilizable commentaries on classics, can promote the slope rebound of place platform 18, realize placing place platform 18's leveling, and then guarantee the level that follow-up survey and drawing equipment placed, in addition, splint 21 through removing in opposite directions, can press from both sides the survey and drawing equipment tightly, avoid the survey and drawing equipment to drop and cause the damage.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a topography mapping auxiliary assembly of municipal works construction usefulness, includes fixing base (1), its characterized in that: the bottom of the fixing seat (1) is rotatably connected with a rotating sleeve (3) through a first rotating rod (2), one end of the rotating sleeve (3) is embedded with a supporting rod (4), one end of the supporting rod (4), far away from the rotating sleeve (3), is welded with a fixed rod (5), one end of the fixed rod (5), far away from the supporting rod (4), is embedded with a ball (6), one outer wall of one side of the ball (6) is welded with a connecting rod (7), one end of the connecting rod (7) is welded with a bottom plate (8), one outer wall of one side of the bottom plate (8) is embedded with a friction pad (9), the top of the bottom plate (8) is connected with a drill rod (10) through threaded screwing, the top end of the drill rod (10) is welded with a first hand wheel (11), one outer wall of one side of the fixed rod (5) is rotatably connected with a second rotating rod (12), one end of the second rotating rod, a first bevel gear (14) is welded at the other end of the second rotating rod (12), a first lead screw (15) is rotatably connected to the inner wall of one side of the fixed rod (5), a second bevel gear (16) is welded to the outer wall of one side of the first lead screw (15), a movable frame (17) is rotatably connected to the outer wall of one side of the first lead screw (15) through threads, a placing platform (18) is fixedly connected to the top of the fixed seat (1) through bolts, a second lead screw (19) is rotatably connected to the inner wall of one side of the placing platform (18), a third lead screw (20) is welded to one end of the second lead screw (19), clamping plates (21) are rotatably connected to the outer walls of one sides of the second lead screw (19) and the third lead screw (20) through threads, a sponge pad (22) is embedded into the outer wall of one side of the clamping plates (21), and a ring sleeve (23) is welded to the position, close to the first rotating rod (2), on the outer wall, and a fastening nut (24) is screwed on the outer wall of one side of the ring sleeve (23) through threads.
2. The topographic survey and drawing auxiliary device for municipal engineering construction according to claim 1, wherein: the number of the rotating sleeves (3) is three, and the three rotating sleeves (3) are symmetrically arranged at the bottom of the fixed seat (1).
3. The topographic survey and drawing auxiliary device for municipal engineering construction according to claim 1, wherein: the rotating sleeve (3) is connected with the moving frame (17) in a welding mode, and the rotating sleeve (3) is connected with the supporting rod (4) in a sliding mode.
4. The topographic survey and drawing auxiliary device for municipal engineering construction according to claim 1, wherein: the first bevel gear (14) and the second bevel gear (16) are connected through gear tooth meshing.
5. The topographic survey and drawing auxiliary device for municipal engineering construction according to claim 1, wherein: the thread directions of the second lead screw (19) and the third lead screw (20) are opposite.
6. The topographic survey and drawing auxiliary device for municipal engineering construction according to claim 1, wherein: the outer wall of one side of the support rod (4) is provided with a groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021449796.6U CN213177519U (en) | 2020-07-17 | 2020-07-17 | Topography mapping auxiliary assembly of municipal works construction usefulness |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021449796.6U CN213177519U (en) | 2020-07-17 | 2020-07-17 | Topography mapping auxiliary assembly of municipal works construction usefulness |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213177519U true CN213177519U (en) | 2021-05-11 |
Family
ID=75794541
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021449796.6U Expired - Fee Related CN213177519U (en) | 2020-07-17 | 2020-07-17 | Topography mapping auxiliary assembly of municipal works construction usefulness |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213177519U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113864577A (en) * | 2021-08-13 | 2021-12-31 | 惠盟电力科技有限公司 | Distance measuring device for electromechanical engineering construction and using method thereof |
-
2020
- 2020-07-17 CN CN202021449796.6U patent/CN213177519U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113864577A (en) * | 2021-08-13 | 2021-12-31 | 惠盟电力科技有限公司 | Distance measuring device for electromechanical engineering construction and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN213177519U (en) | Topography mapping auxiliary assembly of municipal works construction usefulness | |
CN210658384U (en) | Building engineering foundation pit supporting device | |
CN108007764A (en) | Lower embedding type concrete component intensity Indirect testing devices and methods therefor | |
CN210712982U (en) | Pile foundation settlement comprehensive monitoring device | |
CN219221752U (en) | Construction auxiliary device | |
CN210105743U (en) | Excavation device for drainage well in municipal engineering road maintenance ponding area | |
CN212745827U (en) | Engineering survey and drawing support convenient to carry | |
CN215445809U (en) | Deep basal pit side slope monitoring supporting construction | |
CN211475089U (en) | Pipeline strutting arrangement for municipal construction | |
CN210767831U (en) | Civil engineering construction support | |
CN113699964A (en) | Road engineering is with intelligent road bed road surface compactness detection device | |
CN210507385U (en) | Drill rod exploration locomotive frame | |
CN208067378U (en) | A kind of architectural engineering drilling equipment | |
CN216643308U (en) | Pipeline fixing device is used in municipal works pipe network construction | |
CN221171526U (en) | Auxiliary device for measuring electronic level | |
CN217580059U (en) | Ground settlement deformation monitoring devices | |
CN216667145U (en) | Portable land surveying and mapping frame | |
CN219159700U (en) | Hydraulic push bench | |
CN206601130U (en) | A kind of spirit level | |
CN220104544U (en) | Sampling device for civil engineering investigation | |
CN213682103U (en) | Anchor rod construction device for constructional engineering | |
CN220396717U (en) | PE pipe structure of rural drinking water engineering field concrete road | |
CN220453316U (en) | Portable mapping support | |
CN214299105U (en) | Pipeline fixing frame for civil engineering safety construction | |
CN214369064U (en) | Earth measuring instrument support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210511 |