CN213682103U - Anchor rod construction device for constructional engineering - Google Patents

Anchor rod construction device for constructional engineering Download PDF

Info

Publication number
CN213682103U
CN213682103U CN202021222606.7U CN202021222606U CN213682103U CN 213682103 U CN213682103 U CN 213682103U CN 202021222606 U CN202021222606 U CN 202021222606U CN 213682103 U CN213682103 U CN 213682103U
Authority
CN
China
Prior art keywords
fixedly connected
rod
bracing piece
bottom end
threaded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021222606.7U
Other languages
Chinese (zh)
Inventor
李法勇
王国志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Besheng Construction Development Co ltd
Original Assignee
China Besheng Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Besheng Construction Development Co ltd filed Critical China Besheng Construction Development Co ltd
Priority to CN202021222606.7U priority Critical patent/CN213682103U/en
Application granted granted Critical
Publication of CN213682103U publication Critical patent/CN213682103U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses an anchor rod construction equipment that building engineering used, concrete building construction equipment technical field, the bracing piece comprises a supporting bar, the inside of bracing piece bottom all is provided with the recess, one side fixedly connected with controller of bracing piece, the top fixedly connected with adjustable structure of bracing piece, adjustable structure's bottom fixedly connected with hydraulic cylinder, hydraulic cylinder's bottom fixedly connected with telescopic link, the bottom fixedly connected with clamping structure of telescopic link, the bottom of bracing piece is provided with the fine setting structure. The utility model discloses a be provided with swivel sleeve, handle, threaded spindle, base and inserted block, when meetting ground unevenness, utilize the handle, rotate the swivel sleeve, be provided with because of the inside of recess with the outside screw thread assorted internal thread of threaded spindle, when rotating the swivel sleeve, the bracing piece can rise for the bracing piece can finely tune the height, and the angle is more accurate when the stock inserts ground inside.

Description

Anchor rod construction device for constructional engineering
Technical Field
The utility model relates to a construction equipment technical field specifically is an anchor rod construction equipment that building engineering used.
Background
The anchor rod is an earth boring tool combined by a plurality of components, the anchor rod is one of important building materials for foundation pit construction, and a device is needed to assist the anchor rod in the earth boring process, but the existing anchor rod construction device has lower applicability and a plurality of problems to be improved, so that the anchor rod construction device for the building engineering is needed.
In the process of implementing the present invention, the inventor finds that at least the following problems exist in the prior art and are not solved:
(1) the traditional anchor rod construction device for the building engineering is not provided with a correction function, so that the angle of an anchor rod inserted into a foundation is inaccurate when the construction is carried out on a place with uneven ground;
(2) the traditional anchor rod construction device for the building engineering cannot clamp and fix anchor rods with different widths, so that the later construction is inconvenient;
(3) anchor rod construction equipment that traditional building engineering used is not convenient for remove the anchor rod and is under construction, leads to work efficiency lower, and wastes time and energy.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an anchor rod construction equipment that building engineering used to if provide in solving above-mentioned background art in the place of unevenness on ground, the inside unsafe problem of angle of ground is inserted to the anchor rod.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an anchor rod construction equipment that building engineering used, includes the bracing piece, the inside of bracing piece bottom all is provided with the recess, one side fixedly connected with controller of bracing piece, the top fixedly connected with adjustable structure of bracing piece, adjustable structure's bottom fixedly connected with hydraulic cylinder, hydraulic cylinder's bottom fixedly connected with telescopic link, the bottom fixedly connected with clamping structure of telescopic link, the bottom of bracing piece is provided with the fine setting structure. (ii) a
The fine setting structure includes the swivel sleeve, the equal fixedly connected with handle in one side of swivel sleeve, the inside of the inside recess of swivel sleeve all is provided with the screw thread axle, the equal fixed connection base in bottom of screw thread axle, the equal fixedly connected with inserted block in bottom of base.
Preferably, the threaded shaft is externally provided with an external thread, the groove is internally provided with an internal thread matched with the threaded shaft, and the threaded shaft and the groove are mutually meshed.
Preferably, the clamping structure comprises a connecting plate, a placing groove, a compression spring and a clamping plate, the top end of the connecting plate is fixedly connected with the bottom end of the telescopic rod, the placing groove is fixedly connected with the bottom end of the connecting plate, and the compression spring is fixedly connected with the two sides inside the connecting plate.
Preferably, one side of each compression spring is fixedly connected with a clamping plate, and the clamping plates are symmetrically distributed around the central line of the placing groove.
Preferably, adjustable structure comprises driving motor, casing, threaded rod and sliding block, one side of driving motor one side and one side fixed connection of bracing piece, driving motor's output fixedly connected with threaded rod, the outside of threaded rod is provided with the casing, be provided with the sliding block on the lateral wall of threaded rod.
Preferably, the lateral wall of threaded rod is provided with the external screw thread, the inside of sliding block is provided with the internal thread, be threaded connection between threaded rod and the sliding block.
Compared with the prior art, the beneficial effects of the utility model are that: the anchor rod construction device for the building engineering not only realizes the accuracy of inserting the uneven ground anchor rod into the foundation, realizes the clamping and fixing of the anchor rods with different widths, but also realizes the convenience of moving the anchor rods for construction;
(1) by arranging the rotary sleeve, the handle, the threaded shaft, the base and the inserting block, when the ground is uneven, the rotary sleeve is rotated by using the handle, and because the inner part of the groove is provided with the inner thread matched with the outer thread of the threaded shaft, the supporting rod can be lifted when the rotary sleeve is rotated, so that the height of the supporting rod can be finely adjusted, and the angle is more accurate when the anchor rod is inserted into the ground;
(2) the anchor rod is placed in a working area firstly during construction, the top end portion of the anchor rod is clamped by the elasticity of the spring, the arc-shaped groove is formed in the clamp plate, so that the anchor rod can be attached to the anchor rod more, the placing groove is pressed downwards through the hydraulic cylinder and the telescopic rod, the anchor rod in the placing groove can be deeply drilled into a foundation, and the spring has elasticity, so that the anchor rods with different sizes can be placed, and the applicability of the equipment is higher;
(3) through adjustable structure by driving motor, casing, threaded rod and sliding block group one-tenth, utilize driving motor drive threaded rod to rotate, because of the inside internal thread that is provided with of sliding block, the outside screw thread of threaded rod and the inside internal thread of sliding block are threaded connection, when the threaded rod is rotating, the sliding block can remove thereupon, at this moment when first engineering finishes, need not remove whole equipment, alright in order to carry out the second and bore ground engineering, improved work efficiency like this.
Drawings
Fig. 1 is a schematic front view of a cross-sectional structure of the present invention;
fig. 2 is a schematic front view of the adjustable structure of the present invention;
FIG. 3 is a front view of the clamping structure of the present invention;
fig. 4 is a front view structure diagram of the connection mode of the supporting plate and the base of the present invention.
In the figure: 1. a support bar; 2. a rotating sleeve; 3. a threaded shaft; 4. a base; 5. inserting a block; 6. a handle; 7. a groove; 8. a controller; 9. a clamping structure; 901. a connecting plate; 902. a placement groove; 903. a compression spring; 904. a splint; 10. a hydraulic cylinder; 11. a telescopic rod; 12. an adjustable structure; 1201. a drive motor; 1202. a housing; 1203. a threaded rod; 1204. and a slider.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1: referring to fig. 1-4, an anchor rod construction device for building engineering comprises a support rod 1, grooves 7 are formed in the bottom end of the support rod 1, a controller 8 is fixedly connected to one side of the support rod 1, an adjustable structure 12 is fixedly connected to the top end of the support rod 1, a hydraulic cylinder 10 is fixedly connected to the bottom end of the adjustable structure 12, an expansion link 11 is fixedly connected to the bottom end of the hydraulic cylinder 10, a clamping structure 9 is fixedly connected to the bottom end of the expansion link 11, and a fine adjustment structure is arranged at the bottom end of the support rod 1;
referring to fig. 1-4, the anchor rod construction device for the construction engineering further comprises a fine adjustment structure, the fine adjustment structure comprises a rotary sleeve 2, one side of the rotary sleeve 2 is fixedly connected with a handle 6, a threaded shaft 3 is arranged inside a groove 7 inside the rotary sleeve 2, the bottom ends of the threaded shafts 3 are fixedly connected with a base 4, and the bottom ends of the base 4 are fixedly connected with an insert block 5;
the external part of the threaded shaft 3 is provided with external threads, the internal part of the groove 7 is provided with internal threads matched with the threaded shaft 3, and the threaded shaft 3 and the groove 7 are mutually meshed;
specifically, as shown in fig. 1 and 4, when encountering ground unevenness, utilize handle 6, rotate swivel sleeve 2, because of the inside of recess 7 is provided with the internal thread that matches with the external thread of threaded shaft 3, when rotating swivel sleeve 2, bracing piece 1 can rise for bracing piece 1 can finely tune the height, and the angle is more accurate when the stock is inserted the ground inside of being convenient for.
Example 2: the clamping structure 9 consists of a connecting plate 901, a placing groove 902, a compression spring 903 and a clamping plate 904, wherein the top end of the connecting plate 901 is fixedly connected with the bottom end of the telescopic rod 11, the placing groove 902 is fixedly connected with the bottom end of the connecting plate 901, and the compression spring 903 is fixedly connected with both sides of the inside of the connecting plate 901;
one side of each compression spring 903 is fixedly connected with a clamping plate 904, and the clamping plates 904 are symmetrically distributed around the central line of the placing groove 902;
specifically, as shown in fig. 1 and 3, when the construction, put the stock at work area earlier, then utilize compression spring 903's elasticity to carry out the centre gripping to the top portion of stock, because of splint 904 is inside to be provided with the arc wall, can make and laminate more between the stock, through hydraulic cylinder 10 and telescopic link 11, to standing groove 902 pressfitting down, at this moment the inside stock of standing groove 902 can carry out the deep drilling to the ground is inside, because of the spring has the elasticity, can place the stock of different sizes, make the suitability of equipment higher.
Example 3: the adjustable structure 12 is composed of a driving motor 1201, a shell 1202, a threaded rod 1203 and a sliding block 1204, one side of the driving motor 1201 is fixedly connected with one side of the supporting rod 1, the model of the driving motor 1201 can be Y90S-2, the output end of the driving motor 1201 is fixedly connected with the threaded rod 1203, the shell 1202 is arranged outside the threaded rod 1203, and the sliding block 1204 is arranged on the outer side wall of the threaded rod 1203;
the outer side wall of the threaded rod 1203 is provided with external threads, the inner part of the sliding block 1204 is provided with internal threads, and the threaded rod 1203 is in threaded connection with the sliding block 1204;
specifically, as shown in fig. 1 and fig. 2, the driving motor 1201 is used to drive the threaded rod 1203 to rotate, and since the internal thread is arranged inside the sliding block 1204, the external thread of the threaded rod 1203 and the internal thread inside the sliding block 1204 are in threaded connection, when the threaded rod 1203 rotates, the sliding block 1204 will move along with the threaded rod 1203, and at this time, when the first project is finished, the whole equipment does not need to be moved, the second earth drilling project can be performed, and thus the working efficiency is improved.
The working principle is as follows: the utility model discloses when using, at first, place the device at work area, insert the ground with inserted block 5 in, when meetting ground unevenness, utilize handle 6, rotate swivel sleeve 2, because of the inside of recess 7 be provided with 3 outside screw thread assorted internal threads of threaded spindle, when rotating swivel sleeve 2, bracing piece 1 can rise for bracing piece 1 can finely tune the height, and the angle is more accurate when the stock inserts ground inside.
Afterwards, when the construction, put the stock at work area earlier, then utilize compression spring 903's elasticity to carry out the centre gripping to the top portion of stock, because of the inside arc wall that is provided with of splint 904, can make and laminate more between the stock, open controller 8, through hydraulic cylinder 10 and telescopic link 11, to the downward pressfitting of standing groove 902, at this moment the inside stock of standing groove 902 can carry out the deep drilling to the ground is inside, because of the spring has the elasticity, can place the stock of different sizes, make the suitability of equipment higher.
Finally, the driving motor 1201 is used for driving the threaded rod 1203 to rotate, internal threads are arranged inside the sliding block 1204, external threads of the threaded rod 1203 are in threaded connection with the internal threads inside the sliding block 1204, when the threaded rod 1203 rotates, the sliding block 1204 can move along with the threaded rod 1203, at the moment, when the first project is finished, the whole device does not need to be moved, the second ground drilling project can be carried out, and therefore working efficiency is improved.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides an anchor rod construction equipment that building engineering used, includes bracing piece (1), its characterized in that: the groove (7) is formed in the bottom end of the supporting rod (1), a controller (8) is fixedly connected to one side of the supporting rod (1), an adjustable structure (12) is fixedly connected to the top end of the supporting rod (1), a hydraulic cylinder (10) is fixedly connected to the bottom end of the adjustable structure (12), an expansion rod (11) is fixedly connected to the bottom end of the hydraulic cylinder (10), a clamping structure (9) is fixedly connected to the bottom end of the expansion rod (11), and a fine adjustment structure is arranged at the bottom end of the supporting rod (1);
the fine setting structure includes swivel sleeve (2), the equal fixedly connected with handle (6) in one side of swivel sleeve (2), the inside of swivel sleeve (2) inside recess (7) all is provided with threaded shaft (3), the equal fixed connection base in bottom (4) of threaded shaft (3), the equal fixedly connected with inserted block in bottom (5) of base (4).
2. A rock bolt working apparatus for construction work according to claim 1, wherein: the thread shaft (3) is externally provided with an external thread, the groove (7) is internally provided with an internal thread matched with the thread shaft (3), and the thread shaft (3) and the groove (7) are mutually meshed.
3. A rock bolt working apparatus for construction work according to claim 1, wherein: the clamping structure (9) comprises a connecting plate (901), a placing groove (902), a compression spring (903) and a clamping plate (904), the top end of the connecting plate (901) is fixedly connected with the bottom end of the telescopic rod (11), the placing groove (902) is fixedly connected with the bottom end of the connecting plate (901), and the compression spring (903) is fixedly connected to the two sides of the inside of the connecting plate (901).
4. A rock bolt working apparatus for construction work according to claim 3, wherein: one side of each compression spring (903) is fixedly connected with a clamping plate (904), and the clamping plates (904) are symmetrically distributed around the central line of the placement groove (902).
5. A rock bolt working apparatus for construction work according to claim 1, wherein: the adjustable structure (12) is composed of a driving motor (1201), a shell (1202), a threaded rod (1203) and a sliding block (1204), one side of the driving motor (1201) is fixedly connected with one side of the supporting rod (1), the output end of the driving motor (1201) is fixedly connected with the threaded rod (1203), the shell (1202) is arranged outside the threaded rod (1203), and the sliding block (1204) is arranged on the outer side wall of the threaded rod (1203).
6. An anchor rod constructing device for construction engineering according to claim 5, wherein: the lateral wall of threaded rod (1203) is provided with the external screw thread, the inside of sliding block (1204) is provided with the internal thread, be threaded connection between threaded rod (1203) and sliding block (1204).
CN202021222606.7U 2020-06-23 2020-06-23 Anchor rod construction device for constructional engineering Active CN213682103U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021222606.7U CN213682103U (en) 2020-06-23 2020-06-23 Anchor rod construction device for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021222606.7U CN213682103U (en) 2020-06-23 2020-06-23 Anchor rod construction device for constructional engineering

Publications (1)

Publication Number Publication Date
CN213682103U true CN213682103U (en) 2021-07-13

Family

ID=76724569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021222606.7U Active CN213682103U (en) 2020-06-23 2020-06-23 Anchor rod construction device for constructional engineering

Country Status (1)

Country Link
CN (1) CN213682103U (en)

Similar Documents

Publication Publication Date Title
CN210658384U (en) Building engineering foundation pit supporting device
CN111441719A (en) Drilling device for slope reinforcement
CN210090077U (en) Portable ground detects sampling device
CN213682103U (en) Anchor rod construction device for constructional engineering
CN113186917B (en) Perpendicularity adjustable support for pile foundation construction
CN212389262U (en) Drilling device for slope reinforcement
CN210768592U (en) Drilling equipment for building foundation reinforcement
CN215926101U (en) Building engineering detects and detects with engineering foundation pile detection fixing device
CN111809631A (en) Ultra-deep foundation pit supporting device and using method
CN214815087U (en) Adjustable drilling tool
CN215169722U (en) Bored concrete pile construction rig that facilitates use
CN214204701U (en) Interim support frame of cable for electric power engineering
CN213177519U (en) Topography mapping auxiliary assembly of municipal works construction usefulness
CN214091729U (en) Constructional engineering pile device
CN212656574U (en) Steel bar positioning structure based on construction site construction
CN210397935U (en) Cable support
CN221878078U (en) Immersed tube sinking device for water conservancy construction
CN215889909U (en) Tunnel design massif reconnaissance equipment
CN214093647U (en) Mine safety inspection is with portable's detector
CN216190580U (en) Tower machine pull rod auxiliary installation device easy to assemble
CN221546884U (en) Blasting drilling positioner
CN214614069U (en) Energy-saving fixing device for building
CN217273178U (en) Logging-while-drilling instrument support
CN210952555U (en) Blasting drilling support device for rapid angle positioning
CN211500517U (en) Drilling equipment is used in building engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant