- CN213174691U CN213174691U CN202020951316.XU CN202020951316U CN213174691U CN 213174691 U CN213174691 U CN 213174691U CN 202020951316 U CN202020951316 U CN 202020951316U CN 213174691 U CN213174691 U CN 213174691U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- support frame
- support
- frame
- fixing rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a scaffold frame for building site, including the scaffold frame body, the scaffold frame body includes brace table and two first support frames, the fixed two second support frames that are provided with on the first support frame, the second support frame comprises first dead lever and second dead lever, and first dead lever and second dead lever sliding connection, the fixed third support frame that is provided with on the second support frame, first support frame bottom mounting is provided with the supporting legs, the supporting legs top is located first support frame and fixes being provided with the universal wheel, and the fixed cat ladder of dismantling that is provided with in brace table side. This kind of scaffold for building site fixes cat ladder bottom and ground, and the cat ladder top is fixed with a supporting bench, opens second support frame and third support frame, with the fixed back of scaffold body, to the support table surface operation on the staff's accessible cat ladder, can put down the universal wheel when needs change place, promotes the scaffold body and can easily change a place with it.
Description
Technical Field
The utility model relates to a building engineering technical field specifically is a scaffold frame for building site.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. The scaffold is divided into an outer scaffold and an inner scaffold according to the erected positions; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; divide into pole setting formula scaffold, bridge type scaffold, gate-type scaffold, suspension type scaffold, hanging scaffold, choose formula scaffold, climb formula scaffold according to the structural style, present scaffold all can use in a lot of trades, especially the building trade, but current scaffold still has a lot of problems in the use, and including scaffold is not stable enough in the use, the easy accident that takes place. Therefore, the scaffold for the construction site is improved.
Disclosure of Invention
In order to solve the technical problem, the utility model provides a following technical scheme:
the utility model relates to a scaffold frame for building site, include:
the scaffold comprises a scaffold body, a scaffold body and a scaffold body, wherein the scaffold body comprises a support table and two first support frames, and the top ends of the first support frames are fixedly connected with the bottom end of the support table;
the second support frame comprises a first fixed rod and a second fixed rod, and the second support frame is movably connected with the first support frame through a first fixing piece;
and the top end of the third support frame is fixedly provided with a second fixing piece, and the third support frame is movably connected with the first fixing rod through the second fixing piece.
The top ends of the supporting legs are fixedly connected with the bottom end of the first supporting frame;
the universal wheel is movably connected with a fixing plate fixedly arranged on the side face of the bottom end of the first support frame;
the ladder stand comprises a ladder board and a handrail.
As an optimized technical scheme of the utility model, the fixed skid resistant course that bonds in brace table top.
As a preferred technical solution of the present invention, the diameter of the first fixing rod is smaller than the diameter of the second fixing rod, and a sliding groove is fixedly arranged inside the second fixing rod;
the surface of the first fixing rod is fixedly provided with a sliding block, and the first fixing rod is connected with the second fixing rod in a sliding mode through the sliding block.
As an optimized technical scheme of the utility model, fixed plate fixed surface is provided with control switch.
As a preferred technical scheme of the utility model, the quantity of the fixed second support frame that sets up is two on the first support frame, and the second support frame symmetry sets up on first support frame surface.
As an optimized technical scheme of the utility model, the bottom mounting of handrail is provided with the slipmat.
As a preferred technical scheme of the utility model, the top end of the handrail is fixedly provided with a clamping block;
the side of brace table is fixed and is provided with the joint interface, joint piece and joint interface phase-match.
As a preferred technical scheme of the utility model, fixed plate, first mounting and the inside all fixed positioning spring that is provided with of second mounting.
The utility model has the advantages that: the utility model provides a scaffold frame for building site, including the scaffold frame body, the scaffold frame body comprises a supporting bench and two first support frames, the fixed two second support frames that are provided with on the first support frame, the second support frame comprises first dead lever and second dead lever, the fixed third support frame that is provided with on the second support frame, and first support frame bottom mounting is provided with the supporting legs, the fixed detachable cat ladder that is provided with in supporting bench one side, cat ladder and two supporting legs constitute triangle-shaped, combine second support frame and third support frame to increase the stability of scaffold frame body together, and the skid resistant course that a supporting bench fixed surface set up effectively prevents that the staff from slipping when the construction, and the cat ladder helps staff to go up supporting bench from top to bottom.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a plan view of a scaffold for construction sites according to the present invention;
FIG. 2 is an enlarged view of a portion of the scaffold for construction site according to the present invention;
FIG. 3 is an enlarged view of a portion of the scaffold for construction site according to the present invention;
fig. 4 is a partial enlarged view of the scaffold for construction site of the present invention.
In the figure 1, a scaffold body; 101. a support table; 1011. an anti-slip layer; 1012. a card interface; 102. a first support frame; 1021. a fixing plate; 1022. a control switch; 103. a second support frame; 1031. a first fixing lever; 1032. a second fixing bar; 1033. a first fixing member; 104. a third support frame; 1041. a second fixing member; 105. supporting legs; 106. a universal wheel; 107. climbing a ladder; 1071. a step plate; 1072. a grab bar; 1073. a clamping block; 1074. a non-slip mat.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
Example (b): as shown in fig. 1-4, the utility model relates to a scaffold frame for building site, include:
the scaffold comprises a scaffold body 1, wherein the scaffold body 1 comprises a support table 101 and two first support frames 102, and the top ends of the first support frames 102 are fixedly connected with the bottom end of the support table 101;
the second support frame 103, the second support frame 103 includes a first fixing bar 1031 and a second fixing bar 1032, and the second support frame 103 is movably connected with the first support frame 102 through a first fixing member 1033;
a second fixing member 1041 is fixedly disposed at the top end of the third supporting frame 104, and the third supporting frame 104 is movably connected to the first fixing bar 1031 through the second fixing member 1041.
The top ends of the supporting legs 105 are fixedly connected with the bottom end of the first supporting frame 102;
the universal wheel 106 is movably connected with a fixing plate 1021 fixedly arranged on the side surface of the bottom end of the first support frame 102;
Wherein, the fixed skid resistant course 1011 that bonds in brace table 101 top effectively prevents that the staff from taking place the landing when working on brace table 101.
The diameter of the first fixing rod 1031 is smaller than that of the second fixing rod 1032, and a chute is fixedly arranged inside the second fixing rod 1032;
the first fixing rod 1031 is provided with a sliding block on the surface, and the first fixing rod 1031 is slidably connected with the second fixing rod 1032 through the sliding block, so that the second support frame 103 can be conveniently retracted at any time when the scaffold body 1 is not used.
Wherein, the surface of the fixed plate 1021 is fixedly provided with a control switch 1022 which can control the opening and the retraction of the universal wheel 106.
The number of the second support frames 103 fixedly arranged on the first support frame 102 is two, and the second support frames 103 are symmetrically arranged on the surface of the first support frame 102, so that the stability of the scaffold body 1 is improved.
Wherein, the bottom mounting of handrail 1072 is provided with slipmat 1074, increases cat ladder 107's stability.
Wherein, the top end of the handrail 1072 is fixedly provided with a clamping block 1073;
the side of brace table 101 is fixed and is provided with joint interface 1012, and joint piece 1073 and joint interface 1012 phase-match can dismantle cat ladder 107 at any time.
The fixing plate 1021, the first fixing element 1033, and the second fixing element 1041 are all provided with a positioning spring, which can fix the universal wheel 106, the second support frame 103, and the third support frame 104 at a certain angle.
The working principle is as follows: the scaffold body 1 is placed at a fixed position, the second support frame 103 is opened, the second support frame 103 is fixed at a specific angle by the positioning spring in the first fixing unit 1033 of the second support frame 103, the first fixing bar 1031 is fixed after being drawn out from the second fixing bar 1032, meanwhile, the third supporting frame 104 is opened, the positioning spring in the second fixing member 1041 fixes the third supporting frame 104 at a specific position, the ladder 107 is supported, the bottom end of the ladder 107 is fixed with the ground, the top end of the ladder 107 is fixed with the supporting platform 101, then a worker can enter the supporting platform 101 through the ladder 107 to perform construction operation, when the scaffold body 1 needs to be moved to another position after the construction is completed, after the universal wheel 106 is opened and the positioning spring in the fixing plate 1021 fixes the universal wheel 106 at a specific position, the scaffold body 1 is pushed to move to another position easily, and construction is carried out by using the scaffold body 1 continuously.
Finally, it should be noted that: in the description of the present invention, it should be noted that the terms "vertical", "upper", "lower", "horizontal", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (9)
1. The utility model provides a scaffold frame for building site which characterized in that: comprises the steps of (a) preparing a mixture of a plurality of raw materials,
the scaffold comprises a scaffold body (1), wherein the scaffold body (1) comprises a support table (101) and two first support frames (102), and the top ends of the first support frames (102) are fixedly connected with the bottom end of the support table (101);
the second support frame (103), the second support frame (103) comprises a first fixing rod (1031) and a second fixing rod (1032), and the second support frame (103) is movably connected with the first support frame (102) through a first fixing piece (1033);
the supporting device comprises a third supporting frame (104), wherein a second fixing piece (1041) is fixedly arranged at the top end of the third supporting frame (104), and the third supporting frame (104) is movably connected with a first fixing rod (1031) through the second fixing piece (1041).
2. A scaffold for construction sites according to claim 1, wherein:
also comprises the following steps of (1) preparing,
the top ends of the supporting legs (105) are fixedly connected with the bottom end of the first supporting frame (102);
the universal wheel (106) is movably connected with a fixing plate (1021) fixedly arranged on the side surface of the bottom end of the first support frame (102);
the ladder stand (107), the ladder stand (107) includes a ladder plate (1071) and a handrail (1072).
3. A scaffold for construction sites according to claim 1, wherein: an anti-slip layer (1011) is fixedly bonded on the top end of the support table (101).
4. A scaffold for construction sites according to claim 1, wherein:
the diameter of the first fixing rod (1031) is smaller than that of the second fixing rod (1032), and a sliding groove is fixedly formed in the second fixing rod (1032);
the surface of the first fixing rod (1031) is fixedly provided with a sliding block, and the first fixing rod (1031) is connected with the second fixing rod (1032) in a sliding mode through the sliding block.
5. A scaffold for construction sites according to claim 2, wherein:
the surface of the fixed plate (1021) is fixedly provided with a control switch (1022).
6. A scaffold for construction sites according to claim 1, wherein:
the number of the second support frames (103) fixedly arranged on the first support frame (102) is two, and the second support frames (103) are symmetrically arranged on the surface of the first support frame (102).
7. A scaffold for construction sites according to claim 2, wherein: the bottom end of the handrail (1072) is fixedly provided with an anti-slip pad (1074).
8. A scaffold for construction sites according to claim 2, wherein: a clamping block (1073) is fixedly arranged at the top end of the handrail (1072);
the side of brace table (101) is fixed and is provided with joint interface (1012), joint piece (1073) and joint interface (1012) phase-match.
9. A scaffold for construction sites according to claim 2, wherein:
and positioning springs are fixedly arranged in the fixing plate (1021), the first fixing piece (1033) and the second fixing piece (1041).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020951316.XU CN213174691U (en) | 2020-05-29 | 2020-05-29 | Scaffold for building site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020951316.XU CN213174691U (en) | 2020-05-29 | 2020-05-29 | Scaffold for building site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213174691U true CN213174691U (en) | 2021-05-11 |
Family
ID=75786820
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020951316.XU Active CN213174691U (en) | 2020-05-29 | 2020-05-29 | Scaffold for building site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213174691U (en) |
-
2020
- 2020-05-29 CN CN202020951316.XU patent/CN213174691U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109707144A (en) | A kind of telescopic foot hand cradle being applicable in narrow space operation | |
CN213174691U (en) | Scaffold for building site | |
CN207511796U (en) | A kind of adjustable height for construction moves ladder | |
CN211775579U (en) | Building scaffold | |
CN208456081U (en) | A kind of height-adjustable building construction scaffold | |
CN208168197U (en) | A kind of anti-skidding assembled stair | |
CN207960496U (en) | Be easily installed drilling tool from hoisting type horizontal boring machine | |
CN215443325U (en) | Protection canopy for building engineering | |
CN215407325U (en) | Climbing frame building connecting assembly | |
CN214302762U (en) | Convenient locking structure for lifting scaffold | |
CN214659903U (en) | A cat ladder for safety engineering | |
CN210127618U (en) | Adjustable movable steel pipe scaffold | |
CN111155754B (en) | Automatic elevator shaft jacking platform and using method thereof | |
CN212478603U (en) | High-stability protection device for high-rise building construction | |
CN209817380U (en) | Mobile supporting platform for building construction | |
CN209040527U (en) | A kind of scaffold cradle structure | |
CN110965750A (en) | Liftable full hall scaffold | |
CN217580664U (en) | Construction device with post-pouring section for prefabricated shear wall | |
CN216474581U (en) | Bridge guardrail construction work platform | |
CN217173066U (en) | Tower crane base for construction that shock attenuation is effectual | |
CN210195189U (en) | Auxiliary device for slope construction operation | |
CN213569348U (en) | Equipment lifting device | |
CN209853675U (en) | Elevating gear is used in electromechanical installation | |
CN213539646U (en) | Scaffold for construction site for constructional engineering | |
CN214192460U (en) | Over-and-under type maintenance platform of equipment maintenance debugging |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |