CN208456081U - A kind of height-adjustable building construction scaffold - Google Patents
A kind of height-adjustable building construction scaffold Download PDFInfo
- Publication number
- CN208456081U CN208456081U CN201821020418.9U CN201821020418U CN208456081U CN 208456081 U CN208456081 U CN 208456081U CN 201821020418 U CN201821020418 U CN 201821020418U CN 208456081 U CN208456081 U CN 208456081U
- Authority
- CN
- China
- Prior art keywords
- base plate
- fixedly connected
- height
- process box
- building construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a kind of height-adjustable building construction scaffolds, including base assembly, lifting assembly and falsework group valence, the base assembly includes base plate, flexible feet and wheel, the base plate and flexible feet are slidably connected, the upper and lower ends of the base plate are run through in the upper end of the flexible feet, the wheel is fixedly connected with the base plate, and it is located at the bottom of the base plate, the lifting assembly includes fixing seat, telescopic mast, telescope motor, and the fixing seat is fixedly connected with the base plate;Pass through setting telescopic mast and telescope motor, process box is fixed with telescopic mast upper end, facilitate the height for adjusting process box, height can be freely adjusted, by being provided with wheel and flexible feet, is moved easily carrying scaffold, being fixed by flexible feet when scaffold work simultaneously, the utility model facilitates building construction to work, substantially increases building construction efficiency using simply.
Description
Technical field
The utility model belongs to building construction technical field, and in particular to a kind of height-adjustable building construction foot hand
Frame.
Background technique
Scaffold is to guarantee each work progress is gone on smoothly and is set up workbench.It is divided by the position set up outer
Scaffold, internal scaffolding;Timber scaffolding, bamboo scaffolding, steel pipe scaffold can be divided by material difference;It is divided by structural form vertical
Rod-type scaffold, door-type scaffold, swinging scaffold, suspended scaffold, chooses formula scaffold, climbs formula foot hand bridge scaffold
Frame.
Original scaffold is mostly that a large amount of steel pipe support column assembles, and assembling is many and diverse, cannot freely adjust height,
And be inconvenient to move carrying, it is unfavorable for building construction work.
Utility model content
The purpose of this utility model is to provide a kind of height-adjustable building construction scaffolds, to solve above-mentioned back
It is proposed that original scaffold is mostly that a large amount of steel pipe support column assembles in scape technology, assembling is many and diverse, cannot freely adjust
Highly, the problem of and being inconvenient to move carrying, being unfavorable for building construction work.
To achieve the above object, the utility model provides the following technical solutions: a kind of height-adjustable building construction use
Scaffold, including base assembly, lifting assembly and falsework group valence, the base assembly include base plate, flexible feet and vehicle
Wheel, the base plate and flexible feet are slidably connected, and the upper and lower ends of the base plate, institute are run through in the upper end of the flexible feet
It states wheel to be fixedly connected with the base plate, and is located at the bottom of the base plate, the lifting assembly includes fixing seat, stretches
Column, telescope motor, the fixing seat are fixedly connected with the base plate, and the fixing seat quantity is four, and are respectively described
Base plate upper surface surrounding, the telescopic mast are fixedly connected with the fixing seat, and the quantity of the telescopic mast is four, and respectively
On the upper surface of four fixing seats, the telescope motor is fixedly connected with the fixing seat, the telescope motor
Quantity is four, and is located at the side of the telescopic mast, and the falsework group valence includes process box, clips and ladder,
Four branch gripping arms of the process box are fixedly connected with four telescopic mast upper ends by the clips respectively, the work
Frame is located at the inside of four telescopic masts, and the ladder is fixedly connected with the process box, and is located at table before the process box
The lower section in face, the telescope motor and external power supply are electrically connected.
Preferably, the wheel count is four, and is located at the bottom surrounding of the base plate.
Preferably, the flexible feet quantity is four, and the flexible feet is located at the base plate close to described
The outside of telescopic mast, the upper end of the flexible feet is provided with adjusting bull stick, and is fixed by adjusting bull stick with the base plate
Connection.
Preferably, the clips quantity is eight, and is fixed on four support arms of the process box with two one group
Upper and lower ends.
Preferably, the falsework group valence further includes guardrail, and the guardrail is fixedly connected with the process box, and is located at institute
State process box top surrounding.
Compared with prior art, the utility model has the beneficial effects that a kind of height-adjustable room of the utility model
Room construction scaffold, is fixed with telescopic mast upper end by setting telescopic mast and telescope motor, process box, facilitates adjusting process box
Height, can freely adjust height, by being provided with wheel and flexible feet, be moved easily carrying scaffold, while foot hand
Being fixed when frame works by flexible feet, the utility model facilitates building construction to work, substantially increases house using simply
Construction efficiency.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the base plate overlooking structure diagram of the utility model.
In figure: 10- base assembly, 11- base plate, 12- stretch feet, 13- wheel, 20- lifting assembly, 21- fixing seat,
22- telescopic mast, 23- telescope motor, 30- falsework group valence, 31- process box, 32- clips, 33- guardrail, 34- ladder.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
In the description of the present invention, it should be understood that term " length ", " width ", "upper", "lower", " preceding ",
The orientation or positional relationship of the instructions such as " rear ", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" is based on attached
Orientation or positional relationship shown in figure, is merely for convenience of describing the present invention and simplifying the description, rather than indication or suggestion
Signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to this
The limitation of utility model.In addition, the meaning of " plurality " is two or more in the description of the present invention, unless separately
There is clearly specific restriction.
Fig. 1 and Fig. 2 are please referred to, the utility model provides a kind of technical solution: a kind of height-adjustable building construction use
Scaffold, including base assembly 10, lifting assembly 20 and falsework group valence 30, base assembly 10 include base plate 11, expansion pad
Foot 12 and wheel 13, base plate 11 and flexible feet 12 are slidably connected, and the upper end for feet 12 of stretching is above and below base plate 11
Both ends, wheel 13 are fixedly connected with base plate 11, and are located at the bottom of base plate 11, and lifting assembly 20 includes fixing seat 21, stretches
Contracting column 22, telescope motor 23, fixing seat 21 are fixedly connected with base plate 11, and 21 quantity of fixing seat is four, and respectively pedestal
11 upper surface surrounding of plate, telescopic mast 22 are fixedly connected with fixing seat 21, and the quantity of telescopic mast 22 is four, and is located at four
On the upper surface of fixing seat 21, telescope motor 23 is fixedly connected with fixing seat 21, and the quantity of telescope motor 23 is four, and respectively
Positioned at the side of telescopic mast 22, falsework group valence 30 includes process box 31, clips 32 and ladder 34, four branch of process box 31
Gripping arm is fixedly connected with four 22 upper ends of telescopic mast by clips 32 respectively, and process box 31 is located at the interior of four telescopic masts 22
Side, ladder 34 are fixedly connected with process box 31, and are located at the lower section of 31 front surface of process box, telescope motor 23 and external power supply electricity
Property connection.
Further, 13 quantity of wheel is four, and is located at the bottom surrounding of base plate 11.
In the present embodiment, four wheels 13 are separately mounted to the bottom surrounding of base plate 11, facilitate scaffold mobile
And carrying.
Further, 12 quantity of feet of stretching is four, and flexible feet 12 is located at base plate 11 close to telescopic mast 22
Outside, the upper end of flexible feet 12 is provided with adjusting bull stick, and is fixedly connected by adjusting bull stick with base plate 11.
In the present embodiment, when scaffold works, make flexible feet 12 to 11 bottom of base plate by adjusting bull stick
Elongation keeps scaffold more stable by the fixed scaffold of four flexible feets 12.
Further, 32 quantity of clips is eight, and is fixed on the upper of 31 4 support arms of process box with two one group
Lower both ends.
In the present embodiment, clips 32 fix process box 31 and the upper end of telescopic mast 32, conveniently pass through telescopic mast
32 extend to adjust the height of process box 31, keep process box 31 more stable and secured, improve staff and use scaffold
Safety.
Further, falsework group valence 30 further includes guardrail 33, and guardrail 33 is fixedly connected with process box 31, and is located at work
31 top surrounding of frame.
In the present embodiment, guardrail 33 is fixedly connected by welding with process box 31, and protection staff builds in house
If when safety.
The working principle and process for using of the utility model: after the utility model installs, pass through the bottom of base plate 11
Portion's wheel 13 is moved to job site, connects external power supply, extends fixed support base plate 11 by flexible feet 12, makes foot hand
Frame is more stable, connects external power supply, and staff can be entered in process box 31 by ladder 34, be controlled by telescope motor 23
Telescopic mast 22 processed is flexible, freely adjusts the height of scaffold, building construction is facilitated to work, complete a kind of height-adjustable room
The process for using of the scaffold of room construction.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of height-adjustable building construction scaffold, it is characterised in that: including base assembly (10), lifting assembly
(20) and falsework group valence (30), the base assembly (10) include base plate (11), flexible feet (12) and wheel (13), institute
It states base plate (11) and flexible feet (12) is slidably connected, the upper end of the flexible feet (12) is through the base plate (11)
Upper and lower ends, the wheel (13) are fixedly connected with the base plate (11), and are located at the bottom of the base plate (11), described
Lifting assembly (20) includes fixing seat (21), telescopic mast (22), telescope motor (23), the fixing seat (21) and the base plate
(11) it is fixedly connected, fixing seat (21) quantity is four, and respectively described base plate (11) the upper surface surrounding, described to stretch
Contracting column (22) is fixedly connected with the fixing seat (21), and the quantity of the telescopic mast (22) is four, and is located at four institutes
On the upper surface for stating fixing seat (21), the telescope motor (23) is fixedly connected with the fixing seat (21), the telescope motor
(23) quantity is four, and is located at the side of the telescopic mast (22), and the falsework group valence (30) includes process box
(31), clips (32) and ladder (34), four branch gripping arms of the process box (31) respectively with four telescopic masts (22)
Upper end is fixedly connected by the clips (32), and the process box (31) is located at the inside of four telescopic masts (22), institute
It states ladder (34) to be fixedly connected with the process box (31), and is located at the lower section of the process box (31) front surface, it is described flexible
Motor (23) and external power supply are electrically connected.
2. a kind of height-adjustable building construction scaffold according to claim 1, it is characterised in that: the wheel
(13) quantity is four, and is located at the bottom surrounding of the base plate (11).
3. a kind of height-adjustable building construction scaffold according to claim 1, it is characterised in that: described flexible
Feet (12) quantity is four, and the flexible feet (12) is located at the base plate (11) close to the telescopic mast (22)
Outside, the upper end of the flexible feet (12) are provided with adjusting bull stick, and fixed by adjusting bull stick and the base plate (11)
Connection.
4. a kind of height-adjustable building construction scaffold according to claim 1, it is characterised in that: the fixation
Binding round (32) quantity is eight, and the upper and lower ends of (31) four support arms of process box are fixed on two one group.
5. a kind of height-adjustable building construction scaffold according to claim 1, it is characterised in that: the work
Frame group valence (30) further includes guardrail (33), and the guardrail (33) is fixedly connected with the process box (31), and is located at the work
Frame (31) top surrounding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821020418.9U CN208456081U (en) | 2018-06-29 | 2018-06-29 | A kind of height-adjustable building construction scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821020418.9U CN208456081U (en) | 2018-06-29 | 2018-06-29 | A kind of height-adjustable building construction scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208456081U true CN208456081U (en) | 2019-02-01 |
Family
ID=65170254
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821020418.9U Expired - Fee Related CN208456081U (en) | 2018-06-29 | 2018-06-29 | A kind of height-adjustable building construction scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208456081U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110821125A (en) * | 2019-11-18 | 2020-02-21 | 江苏优美特工程技术有限公司 | Double-layer scaffold for tunnel construction |
CN112854759A (en) * | 2021-01-15 | 2021-05-28 | 福建省春天生态科技股份有限公司 | Construction method of anticorrosive wooden house for rural sojourn |
-
2018
- 2018-06-29 CN CN201821020418.9U patent/CN208456081U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110821125A (en) * | 2019-11-18 | 2020-02-21 | 江苏优美特工程技术有限公司 | Double-layer scaffold for tunnel construction |
CN112854759A (en) * | 2021-01-15 | 2021-05-28 | 福建省春天生态科技股份有限公司 | Construction method of anticorrosive wooden house for rural sojourn |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208456081U (en) | A kind of height-adjustable building construction scaffold | |
CN213572947U (en) | Constructional column outer wall side instrument formula operation platform | |
CN211143939U (en) | Tower mast structure lift operation platform | |
CN205822747U (en) | Architectural engineering scaffold | |
CN205742942U (en) | A kind of gardens special-purpose multifunctional construction platform | |
CN204983582U (en) | Multi -functional fitment platform | |
CN210918213U (en) | Building outer wall template robot | |
CN211548713U (en) | A suspension type scaffold frame for square chimney | |
CN207511796U (en) | A kind of adjustable height for construction moves ladder | |
CN207847033U (en) | A kind of scaffold for building convenient for adjusting | |
CN209277797U (en) | A kind of electric power first-aid ladder based on power engineering | |
CN215978330U (en) | Construction platform convenient to use | |
CN212249095U (en) | Lifting platform for ceiling construction repair | |
CN211172986U (en) | External protection type lifting device for decoration of museum | |
CN208633477U (en) | A kind of construction site scaffold | |
CN207526079U (en) | A kind of scaffold that can adjust height | |
CN207017618U (en) | Lift adjustable climbing operation platform | |
CN209443737U (en) | A kind of outer eaves scaffold for building | |
CN110965750A (en) | Liftable full hall scaffold | |
CN207314786U (en) | One kind is moved easily Liftable scaffolding | |
CN218933768U (en) | Prefabricated stair mounting rack | |
CN216042510U (en) | Interior decoration is with multi-level high decoration and fitment operation platform | |
CN219653539U (en) | Support frame is used in construction of multi-functional bridge of convenient regulation | |
CN216553728U (en) | Portable removes work platform | |
CN215291208U (en) | Telescopic mortar spraying device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190201 Termination date: 20210629 |
|
CF01 | Termination of patent right due to non-payment of annual fee |