CN207017618U - Lift adjustable climbing operation platform - Google Patents

Lift adjustable climbing operation platform Download PDF

Info

Publication number
CN207017618U
CN207017618U CN201720786861.6U CN201720786861U CN207017618U CN 207017618 U CN207017618 U CN 207017618U CN 201720786861 U CN201720786861 U CN 201720786861U CN 207017618 U CN207017618 U CN 207017618U
Authority
CN
China
Prior art keywords
rectangle frame
fixed
support
frame
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720786861.6U
Other languages
Chinese (zh)
Inventor
许亚飞
项立新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Shengyun Heavy Industry Machinery Co Ltd
Original Assignee
Anhui Shengyun Heavy Industry Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Shengyun Heavy Industry Machinery Co Ltd filed Critical Anhui Shengyun Heavy Industry Machinery Co Ltd
Priority to CN201720786861.6U priority Critical patent/CN207017618U/en
Application granted granted Critical
Publication of CN207017618U publication Critical patent/CN207017618U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a kind of six support feets and foot-mounted support frame, halfpace for lifting adjustable climbing operation platform, including rectangular distribution;Several first fixing holes are vertically distributed with the surface of the support feet, elevating lever is plugged with support feet, elevating lever is provided with the second fixing hole to match with the first fixing hole, is provided with alignment pin in the first fixing hole and the second fixing hole, elevating lever lower end is equipped with universal wheel;The second rectangle frame is fixed among support column, the second rectangle frame is located at the top of the first rectangle frame, and support column upper end is fixed with operating desk;Two braces be arrangeding in parallel are fixed with 3rd rectangle frame, the climb plank being uniformly arranged is fixed between brace.The utility model fixes fence by being welded around climb plank around guard rail rod and operating desk, solves safety problem when ascending a height operation, also by installing elevating lever in support feet, solve the problems, such as to ascend a height operation when be difficult to adjust height.

Description

Lift adjustable climbing operation platform
Technical field
A kind of ascending platform is the utility model is related to, is specifically a kind of adjustable climbing operation platform of lifting.
Background technology
Ascend a height operation, this kind of operation is easier to cause danger, therefore, when working out Design of Construction Organization, it is contemplated that and really Various required for fixed construction ascend a height and climbed facility.In general, various action of ascending a height should try one's best using ready-made condition, such as borrow Help ascend a height ladder access or the manned vertical transport equipment, such as power supply for construction ladder in building structure and scaffold.So whole In the individual construction period, all kinds of personnel up and down, it is necessary to walked on defined passage, not in non-between balcony etc. RC is ascended a height or crossed over, and can not be climbed using the construction equipment such as crane arm support or scaffold rod member.
At present, in welding shop, as equipment volume is increasing, the welding such as head frame, truss for superelevation overlength, mill When light, assembling, operation of ascending a height is carried out using easy square stool, because square stool area is smaller, welds one end distance, staff is just Climb up and climb down mobile square stool, electric welding machine and bonding wire, operating efficiency is low, also, operator station, on square stool, no safety is arranged Apply, the potential safety hazard coefficient of operation is big.
Utility model content
In order to solve above-mentioned technical problem, the purpose of this utility model is to provide a kind of adjustable operation of ascending a height of lifting Platform, fence is fixed around guard rail rod and operating desk by being welded around climb plank, solves safety when ascending a height operation Problem, also by installing elevating lever in support feet, solve the problems, such as to ascend a height operation when be difficult to adjust height.
The purpose of this utility model can be achieved through the following technical solutions:
Lift adjustable climbing operation platform, including six support feets of rectangular distribution and foot-mounted Support frame, halfpace;
Several first fixing holes are vertically distributed with the surface of the support feet, liter is plugged with support feet Bar drops, and elevating lever is provided with the second fixing hole to match with the first fixing hole, is provided with the first fixing hole and the second fixing hole Alignment pin, elevating lever lower end are equipped with universal wheel;
Support frame as described above includes the first rectangle frame and four support columns being fixed at the first rectangle frame upper side corners, branch The second rectangle frame is fixed among dagger, the second rectangle frame is located at the top of the first rectangle frame, and support column upper end is fixed with operation Platform;
The halfpace includes the 3rd rectangle frame, is fixed with two braces be arrangeding in parallel on the 3rd rectangle frame, between brace It is fixed with the climb plank being uniformly arranged.
Further, the support feet is rectangular tube, and support feet is fixedly linked by alignment pin and elevating lever.
Further, first rectangle frame is fixed on the support feet upper end of inner side, and the 3rd rectangle frame is fixed on outside Support feet upper end, it is horizontal welding between the 3rd rectangle frame and the first rectangle frame.
Further, it is fixed with a pedal between the support feet in the outside.
Further, the operating desk is Rectangular Plate Structure, and fence is vertically and fixedly provided with operating desk, is fixed in fence lower end There is baffle plate.
Further, the jib head is fixed on the support columns, and what brace, support column and the 3rd rectangle frame surrounded cuts Face is isosceles right triangle structure.
Further, the vertical drop between the adjacent climb plank is 20cm, between climb plank and the 3rd rectangle frame It is arranged in parallel.
Further, two retaining frames be arrangeding in parallel are vertically and fixedly provided with the upper end external corners of the 3rd rectangle frame, The height of retaining frame is less than the height of fence, and three guard rail rods be arrangeding in parallel are fixed between retaining frame and fence.
The beneficial effects of the utility model:The utility model is reasonable in design, firm supporting, is made using clout, Cost is cheap, and when ascending a height operation, working space is greatly improved, and improves efficiency, is adjusted according to workpiece height Platform is flattened, facilitates human users, raises labour efficiency, fence and guard rail rod are fixed with around operating desk and climb plank, significantly Improve safety coefficient.
Brief description of the drawings
The utility model is further described below in conjunction with the accompanying drawings.
Fig. 1 is that the utility model lifts adjustable climbing operation platform structural representation.
Fig. 2 is the structural representation of Fig. 1 backsights.
Fig. 3 is the schematic diagram of Fig. 1 side views.
Fig. 4 is the structural representation of support feet in Fig. 1.
Fig. 5 is the structural representation of support frame in Fig. 1.
Fig. 6 is the structural representation of halfpace in Fig. 1.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The all other embodiment obtained, belong to the scope of the utility model protection.
As Figure 1-3, adjustable climbing operation platform, including six support feets 1 of rectangular distribution and peace are lifted Support frame 2, halfpace 3 in support feet 1.
As shown in figure 4, wherein, support feet 1 is rectangular tube, is vertically distributed with the surface of support feet 1 some Individual first fixing hole 101, elevating lever 102 is plugged with support feet 1, elevating lever 102 is provided with to match with the first fixing hole 101 The second fixing hole 103, be provided with alignment pin 104 in the first fixing hole 101 and the second fixing hole 103, will branch by alignment pin 104 Spike 1 and elevating lever 102 are fixed together, and the lower end of elevating lever 102 is equipped with universal wheel 105, for different operation heights, lifting It is adjustable, by using universal wheel 105 onto, this platform is shifted to the position of needs effect, it is convenient and practical.
As shown in figure 5, wherein, support frame 2 includes the first rectangle frame 201 and is fixed on the upper end of the first rectangle frame 201 turning Four support columns 202 at angle, the first rectangle frame 201 are fixed on the upper end of support feet 1 of inner side, are fixed among support column 202 Second rectangle frame 203, the second rectangle frame 203 are located at the top of the first rectangle frame 201, and the upper end of support column 202 is fixed with operating desk 204, operating desk 204 is Rectangular Plate Structure, and fence 205 is vertically and fixedly provided with operating desk 204, and fence 205 is fixed with gear in lower end Plate 206, quite convenient for operation of ascending a height, the operating space of operating personnel is added, and ensure that the security of operation.
As shown in fig. 6, wherein, halfpace 3 includes the 3rd rectangle frame 301, the 3rd rectangle frame 301 and the water of the first rectangle frame 201 Downhand welding is connected together, and the 3rd rectangle frame 301 is fixed on the upper end of support feet 1 in outside, and pedal is fixed between the support feet 1 in outside 306, two braces be arrangeding in parallel 302 are fixed with the 3rd rectangle frame 301, the upper end of brace 302 is fixed on support column 202, The section that brace 302, the rectangle frame 301 of support column 202 and the 3rd surround is isosceles right triangle structure, between brace 302 It is fixed with the climb plank 303 being uniformly arranged, the vertical drop between adjacent climb plank 303 is 20cm, climb plank 303 and the 3rd It is be arranged in parallel between rectangle frame 301, two shields be arrangeding in parallel is vertically and fixedly provided with the upper end external corners of the 3rd rectangle frame 301 Frame 304, the height of retaining frame 304 be less than the height of fence 205, and three are fixed between retaining frame 304 and fence 205 and is be arranged in parallel Guard rail rod 305.Staff is ascended a height by pedal 306 and climb plank 303, and guard rail rod 305 is effectively protected work people The safety of ascending a height of member, the height of climb plank 303 is reasonable in design, and upper lower platform is very convenient.
Above content is only to the utility model structure example and explanation, the technology people of affiliated the art Member is made various modifications or supplement to described specific embodiment or substituted using similar mode, without departing from reality With new structure or surmount scope defined in the claims, the scope of protection of the utility model all should be belonged to.

Claims (8)

1. the adjustable climbing operation platform of lifting, it is characterised in that six support feets (1) and installation including rectangular distribution Support frame (2), halfpace (3) in support feet (1);
Several first fixing holes (101) are vertically distributed with the surface of the support feet (1), support feet (1) is interior Elevating lever (102) is plugged with, elevating lever (102) is provided with the second fixing hole (103) to match with the first fixing hole (101), Alignment pin (104) is provided with first fixing hole (101) and the second fixing hole (103), elevating lever (102) lower end is equipped with universal wheel (105);
Support frame as described above (2) includes the first rectangle frame (201) and four be fixed at the first rectangle frame (201) upper side corners Support column (202), support column (202) is middle to be fixed with the second rectangle frame (203), and the second rectangle frame (203) is located at the first rectangle The top of frame (201), support column (202) upper end are fixed with operating desk (204);
The halfpace (3) includes the 3rd rectangle frame (301), and two braces be arrangeding in parallel are fixed with the 3rd rectangle frame (301) (302) climb plank (303) being uniformly arranged, is fixed between brace (302).
2. the adjustable climbing operation platform of lifting according to claim 1, it is characterised in that the support feet (1) is square Shape pipe, support feet (1) are fixedly linked by alignment pin (104) and elevating lever (102).
3. the adjustable climbing operation platform of lifting according to claim 1, it is characterised in that first rectangle frame (201) be fixed on inner side support feet (1) upper end, the 3rd rectangle frame (301) be fixed on outside support feet (1) upper end, the 3rd It is horizontal welding between rectangle frame (301) and the first rectangle frame (201).
4. the adjustable climbing operation platform of lifting according to claim 1, it is characterised in that the support feet in the outside (1) pedal (306) is fixed between.
5. the adjustable climbing operation platform of lifting according to claim 1, it is characterised in that the operating desk (204) is Rectangular Plate Structure, fence (205) is vertically and fixedly provided with operating desk (204), baffle plate (206) is fixed with fence (205) lower end.
6. the adjustable climbing operation platform of lifting according to claim 1, it is characterised in that brace (302) upper end It is fixed on support column (202), the section that brace (302), support column (202) and the 3rd rectangle frame (301) surround is isosceles Triangular structure of right angle.
7. the adjustable climbing operation platform of lifting according to claim 1, it is characterised in that the adjacent climb plank (303) vertical drop between is 20cm, is be arranged in parallel between climb plank (303) and the 3rd rectangle frame (301).
8. the adjustable climbing operation platform of lifting according to claim 1, it is characterised in that the 3rd rectangle frame (301) two retaining frames be arrangeding in parallel (304) are vertically and fixedly provided with upper end external corners, the height of retaining frame (304), which is less than, encloses The height on column (205), three guard rail rods be arrangeding in parallel (305) are fixed between retaining frame (304) and fence (205).
CN201720786861.6U 2017-07-03 2017-07-03 Lift adjustable climbing operation platform Expired - Fee Related CN207017618U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720786861.6U CN207017618U (en) 2017-07-03 2017-07-03 Lift adjustable climbing operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720786861.6U CN207017618U (en) 2017-07-03 2017-07-03 Lift adjustable climbing operation platform

Publications (1)

Publication Number Publication Date
CN207017618U true CN207017618U (en) 2018-02-16

Family

ID=61482827

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720786861.6U Expired - Fee Related CN207017618U (en) 2017-07-03 2017-07-03 Lift adjustable climbing operation platform

Country Status (1)

Country Link
CN (1) CN207017618U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485908A (en) * 2019-09-06 2019-11-22 上海外高桥造船有限公司 Case ship hatch coaming Special ladder

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485908A (en) * 2019-09-06 2019-11-22 上海外高桥造船有限公司 Case ship hatch coaming Special ladder

Similar Documents

Publication Publication Date Title
CN206828042U (en) A kind of inspection platform of power station main building rack illuminator
CN207017618U (en) Lift adjustable climbing operation platform
CN208456081U (en) A kind of height-adjustable building construction scaffold
CN207511796U (en) A kind of adjustable height for construction moves ladder
CN114086594B (en) Support welding tool for offshore wind power jacket
CN107059641B (en) Goods shelf type pier body outer scaffold
CN212453549U (en) Liftable scaffold for building decoration
CN211057829U (en) Fixed maintenance platform of formula relief well is encorbelmented to counter weight antitorque type
CN207348784U (en) A kind of technique car is ascended a height bulwark ladder
CN207377209U (en) A kind of indirect cool tower lifts broadening platform stent
CN208502208U (en) Elevator special operating platform
CN215331322U (en) Civil construction is indoor with scaffold
CN215484490U (en) Telescopic scaffold
CN215356935U (en) Movable welding operation platform for steel cantilever longitudinal beam and sidewalk beam
CN214423953U (en) Steel-aluminum combined attached lifting protection platform
CN209603458U (en) Scaffold is used in a kind of construction
CN215291333U (en) Safe and economical combined hanging basket
CN215564264U (en) Can have enough to meet need formula fretwork arc cantilever beam lateral surface construction operation device
CN220365277U (en) Device for assisting in translation of hanging basket
CN214192349U (en) Tower crane staircase
CN216766685U (en) Overhanging type mobile operation platform and system
CN217812630U (en) Mounting tool for widening platform of air cooling tower
CN220247533U (en) Protective structure of scaffold
CN216380479U (en) Assembled cat ladder
CN218375054U (en) Outer wall scaffold reinforced structure for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180216

Termination date: 20180703