CN213143550U - Factory building large-span furred ceiling - Google Patents

Factory building large-span furred ceiling Download PDF

Info

Publication number
CN213143550U
CN213143550U CN202021685450.6U CN202021685450U CN213143550U CN 213143550 U CN213143550 U CN 213143550U CN 202021685450 U CN202021685450 U CN 202021685450U CN 213143550 U CN213143550 U CN 213143550U
Authority
CN
China
Prior art keywords
skylight
factory building
wall body
roof
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021685450.6U
Other languages
Chinese (zh)
Inventor
苗凯歌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Liliang Building Decoration Engineering Co ltd
Original Assignee
Suzhou Liliang Building Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Liliang Building Decoration Engineering Co ltd filed Critical Suzhou Liliang Building Decoration Engineering Co ltd
Priority to CN202021685450.6U priority Critical patent/CN213143550U/en
Application granted granted Critical
Publication of CN213143550U publication Critical patent/CN213143550U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a factory building large-span suspended ceiling, which comprises an installation wall body, a supporting structure, a roof and an electric skylight structure; a support structure: the installation wall is arranged inside the installation wall; and (4) roof construction: the bottom surface of the roof is fixedly connected with the top of the mounting wall; electric skylight structure: the electric skylight structures are uniformly distributed on the top of the roof and are fixedly connected with the upper end of the outer side surface of the mounting wall; wherein: still include the control switch group, the lower extreme in bearing structure is set up to the control switch group, and external power source is connected to the input electricity of control switch group, and this factory building large-span furred ceiling can realize bearing structure's firm and enhancement, and the tripod can pass through triangle limit direction spandrel girder to the power that two crossbeams in upper end bore, and then can increase factory building furred ceiling span under the firm condition of structure, can be to carrying out gas exchange inside and outside the present factory building, harmful gas in the discharge production process, the protection operation personnel's is healthy.

Description

Factory building large-span furred ceiling
Technical Field
The utility model relates to a factory building construction technical field specifically is a factory building large-span furred ceiling.
Background
The industrial development is rapid at the present stage of China, various industries are raised, factory building is indispensable in the industrial development, the construction of a new factory building firstly obtains the use right of the proposed land, the layout of a newly-built building is planned, and a new project report is applied to a competent department to clarify the explanations of the use purpose, the layout planning, the construction scale, the investment amount and the like of the newly-built building. Get into engineering construction preparation stage promptly after the end is criticized, the factory building furred ceiling is the heavy load of factory building construction, traditional factory building furred ceiling has a great deal of drawback, can not realize bearing structure's firm and enhancement, can not increase factory building furred ceiling span under the firm condition of structure, extravagant material, construction area is big, because the insolate is serious to the damage of factory building furred ceiling, the life of factory building furred ceiling is short, can not realize carrying out quick gas exchange inside and outside the factory building, consequently, in order to solve this type of problem, we provide a factory building large-span furred ceiling.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome current defect, provide a factory building large-span furred ceiling, can realize increaseing the factory building furred ceiling span under the firm condition of structure, can effectively solve the problem among the background art.
In order to achieve the above object, the utility model provides a following technical scheme: a factory building large-span suspended ceiling comprises an installation wall body, a supporting structure, a roof and an electric skylight structure;
installing a wall body: is a steel-concrete wall;
a support structure: the installation wall is arranged inside the installation wall;
and (4) roof construction: the bottom surface of the roof is fixedly connected with the top of the mounting wall;
electric skylight structure: the electric skylight structures are uniformly distributed on the top of the roof and are fixedly connected with the upper end of the outer side surface of the mounting wall;
wherein: still include control switch group, control switch group sets up the lower extreme in bearing structure, external power source is connected to control switch group's input electricity, can realize bearing structure's firm and enhancement, the tripod can pass through triangle limit direction spandrel girder to the power that two crossbeams in upper end bore, and then can increase the factory building furred ceiling span under the firm condition of structure, save material, reduce the area of construction, can stabilize the factory building room temperature, reduce the damage of insolateing to the factory building furred ceiling, increase the life of factory building furred ceiling, can realize inside and outside the factory building and carry out quick gas exchange, harmful gas in the discharge production process, the protection operation personnel's is healthy.
Further, bearing structure includes crossbeam, support column, tripod and spandrel girder, the inside of installation wall body is equipped with the crossbeam along the central line symmetry of roof, the bottom surface of crossbeam all with the upper surface fixed connection of evenly distributed's tripod, the lower surface of tripod all with the upper surface fixed connection of spandrel girder, the left and right sides end of spandrel girder respectively with the inner wall upper end fixed connection of installation wall body, the lower fixed surface of spandrel girder is connected with evenly distributed's support column, the support column corresponds the installation with the tripod, the support column lower extreme of center department is equipped with control switch group, can realize bearing structure's firm and enhancement.
Further, the roof includes end stay layer, heat insulation layer and sun-proof layer, the end stay layer sets up in the upper surface of installation wall body, and the lower surface on end stay layer is connected with the last fixed surface of crossbeam, and the last fixed surface on end stay layer is connected with the heat insulation layer, and the upper surface on heat insulation layer and the lower fixed surface on sun-proof layer are connected, and end stay layer, heat insulation layer and sun-proof layer coincide and lay, can stabilize the factory building room temperature, reduce the damage of insolate to the factory building furred ceiling, increase the life of factory building furred ceiling.
Further, the upper surface on sun-proof layer is equipped with evenly distributed's mounting groove, and the one end that the mounting groove is close to sun-proof layer horizontal center line all is equipped with the skylight opening, and the one end that the mounting groove is close to side around the installation wall body all is equipped with lets a mouthful, lets a mouthful and skylight opening all run through the lower surface on heat insulation layer and bottom sprag layer, provides an installation place for the top structure.
Further, the electric skylight structure includes mount pad, electric putter, skylight and window frame, the mount pad evenly sets up in the front and back lateral surface upper end of installation wall body, the equal fixedly connected with electric putter of the upper surface of mount pad, the equal fixedly connected with window frame in inside of mounting groove, the inside of window frame is close to sun-proof layer horizontal central line one side and all has the skylight through hinge joint, the window frame, skylight and skylight window coincide installation, electric putter's flexible end pass respectively corresponding abdicating the mouth and with the lower fixed surface in skylight be connected, the equal electric connection control switch of electric putter's input organizes output, can realize carrying out quick gas exchange inside and outside the factory building.
Compared with the prior art, the beneficial effects of the utility model are that: this factory building large-span furred ceiling has following benefit:
1. constructor evenly is fixed in the mounted position with the lower extreme of support column earlier, hang the spandrel girder to the upper end of support column through the crane, correctly put, welding spandrel girder and support column make the structure firm, make spandrel girder and installation wall body fixed connection through the bolt, reinforced structure, crossbeam and tripod welding, hang welded structure to the upper surface of spandrel girder through the crane after the welding is accomplished, correctly put, welding tripod and spandrel girder make the structure firm, make the crossbeam all with installation wall body fixed connection through the bolt, reinforced structure, the bearing structure construction is accomplished, can realize bearing structure's firm and enhancement, the tripod can pass through triangle limit direction spandrel girder to the power that two crossbeams in upper end bore, and then can increase the mill house ceiling span under the firm condition of structure, and save materials, and reduce the construction area.
2. Lay the roof with bearing structure as the basis, earlier with the last fixed surface of bottom supporting layer and crossbeam and installation wall body be connected, then lay heat insulating layer and sun-proof layer with the bottom supporting layer as the basis, sun-proof layer is laid and is accomplished, and the roof is by the three-layer design, can stabilize the factory building room temperature, reduces the damage of insolate to factory building furred ceiling, increases the life of factory building furred ceiling.
3. Cut out a position mouth, mounting groove and skylight opening at the upper surface of roof through measuring the setting-out, install the window frame in the mounting groove to articulated skylight in the window frame, at the upper end welding mount pad of dress wall body, at dress seat upper end installation electric putter, through bolt to electric putter's flexible end and skylight fixed connection, can realize carrying out quick gas exchange inside and outside the factory building, harmful gas in the discharge production process, the protection operation personnel's is healthy.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic side sectional view of the present invention.
In the figure: the solar energy heat-insulation house comprises a mounting wall body 1, a supporting structure 2, a cross beam 21, a supporting column 22, a tripod 23, a bearing beam 24, a roof 3, a bottom supporting layer 31, a heat-insulation layer 32, a sun-proof layer 33, an electric skylight 4, a mounting seat 41, an electric push rod 42, a skylight 43, a window frame 44, a control switch group 5, a position giving opening 6, a mounting groove 7 and a skylight 8.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution: a large-span suspended ceiling of a factory building comprises an installation wall body 1, a supporting structure 2, a roof 3 and an electric skylight structure 4;
installing a wall body 1: the installation wall body 1 provides an installation place for the upper structure for the steel-concrete wall body;
the support structure 2: the supporting structure 2 supports the upper structure to ensure the stability of the suspended ceiling and is arranged inside the installation wall body 1, the supporting structure 2 comprises a cross beam 21, supporting columns 22, a triangular frame 23 and a bearing beam 24, the cross beam 21 is symmetrically arranged inside the installation wall body 1 along the central line, the bottom surfaces of the cross beam 21 are fixedly connected with the upper surfaces of the uniformly distributed triangular frames 23, the lower surfaces of the triangular frames 23 are fixedly connected with the upper surface of the bearing beam 24, the left and right side end heads of the bearing beam 24 are respectively fixedly connected with the upper end of the inner wall of the installation wall body 1, the lower surfaces of the bearing beam 24 are fixedly connected with the uniformly distributed supporting columns 22, the supporting columns 22 are correspondingly arranged with the triangular frames 23, the lower end of the supporting column 22 at the center is provided with a control switch group 5, a constructor firstly uniformly fixes the lower end of the supporting column 22 at the, welding spandrel girder 24 and support column 22 make the structure firm, make spandrel girder 24 and 1 fixed connection of installation wall body through the bolt, reinforced structure, crossbeam 21 and tripod 23 welding, hang welded structure to the upper surface of spandrel girder 24 through the crane after the welding is accomplished, correctly put, welding tripod 23 and spandrel girder 24 make the structure firm, make crossbeam 21 all with 1 fixed connection of installation wall body through the bolt, reinforced structure, the construction of bearing structure 2 is accomplished, can realize bearing structure 2's firm and enhancement, tripod 23 can pass through triangle limit direction spandrel girder 24 to the power that two crossbeams 21 in upper end bore, and then can increase the factory building furred ceiling span under the firm condition of structure.
And (3) roof 3: the building roof is arranged on the top of a supporting structure 2, the bottom surface of the building roof 3 is fixedly connected with the top of an installation wall 1, the building roof 3 comprises a bottom bracing layer 31, a heat insulation layer 32 and a sun-proof layer 33, the bottom bracing layer 31 is arranged on the upper surface of the installation wall 1, the lower surface of the bottom bracing layer 31 is fixedly connected with the upper surface of a cross beam 21, the upper surface of the bottom bracing layer 31 is fixedly connected with the heat insulation layer 32, the upper surface of the heat insulation layer 32 is fixedly connected with the lower surface of the sun-proof layer 33, the bottom bracing layer 31, the heat insulation layer 32 and the sun-proof layer 33 are laid in a matching way, the building roof 3 is laid by taking the supporting structure 2 as a base, the bottom bracing layer 31 is fixedly connected with the upper surface of the cross beam 21 and the installation wall 1, then the heat insulation layer 32 and the sun-proof layer 33 are laid by taking the bottom bracing layer 31 as a base, the building roof is designed by three layers, the room temperature of, the upper surface on sun-proof layer 33 is equipped with evenly distributed's mounting groove 7, mounting groove 7 provides an installation place for the top structure, the one end that mounting groove 7 is close to the horizontal central line on sun-proof layer 33 all is equipped with skylight opening 8, skylight opening 8 can realize the inside and outside gas exchange of factory building, the one end that mounting groove 7 is close to side around installation wall 1 all is equipped with lets a mouthful 6, let a mouthful 6 for other structures provide one and step down the place, step down mouthful 6 and skylight opening 8 and all run through the lower surface on heat insulation layer 32 and bottom sprag layer 31.
Electric skylight structure 4: the electric skylight structure 4 is uniformly distributed on the top of the roof 3, the electric skylight structure 4 is fixedly connected with the upper end of the outer side surface of the installation wall 1, the electric skylight structure 4 comprises an installation seat 41, an electric push rod 42, a skylight 43 and a window frame 44, the installation seat 41 is uniformly arranged on the upper ends of the front outer side surface and the rear outer side surface of the installation wall 1, the electric push rod 42 is fixedly connected with the upper surface of the installation seat 41, the window frame 44 is fixedly connected with the inside of the installation groove 7, the skylight 43 is hinged to one side, close to the transverse central line of the sun-proof layer 33, of the inside of the window frame 44 through hinges, the window frame 44, the skylight 43 and the skylight window 8 are installed in a matching manner, the telescopic end of the electric push rod 42 respectively penetrates through the corresponding abdicating opening 6 and is fixedly connected with the lower surface of the skylight 43, the position opening 6, the installation groove 7, at the upper end welded fitting seat 41 of dress wall body 1, at dress seat 41 upper end installation electric putter 42, through bolt to electric putter 42's flexible end and skylight 43 fixed connection, can realize carrying out quick gas exchange inside and outside the factory building, the equal electric connection control switch group 5's of input of electric putter 42 output.
Wherein: the electric push rod supporting structure further comprises a control switch group 5, the control switch group 5 controls the electric push rod 42 to normally work, the control switch group 5 is arranged at the lower end of the supporting structure 2, and the input end of the control switch group 5 is electrically connected with an external power supply.
When in use: the method comprises the steps that constructors firstly uniformly fix the lower end of a supporting column 22 at an installation position, hang a bearing beam 24 to the upper end of the supporting column 22 through a crane, correctly place the bearing beam 24 and the supporting column 22 to enable the structure to be stable, fixedly connect the bearing beam 24 with an installation wall body 1 through bolts, reinforce the structure, weld a cross beam 21 and a triangular frame 23 through the crane, hang the welded structure to the upper surface of the bearing beam 24 through the crane after welding is completed, correctly place the bearing beam 24 and the supporting beam 24 to enable the structure to be stable, fixedly connect the cross beam 21 with the installation wall body 1 through the bolts, reinforce the structure, finish construction of a supporting structure 2, lay a roof 3 by taking the supporting structure 2 as a foundation, fixedly connect a bottom supporting layer 31 with the upper surface of the cross beam 21 and the installation wall body 1 firstly, lay a heat insulation layer 32 and a sun protection layer 33 by taking the bottom supporting layer 31 as the foundation, finish laying the sun protection layer 33, cut a position opening 6, the installation structure comprises an installation groove 7 and a skylight opening 8, wherein a window frame 44 is installed in the installation groove 7, a skylight 43 is hinged in the window frame 44, an installation seat 41 is welded at the upper end of an installation wall body 1, an electric push rod 42 is installed at the upper end of the installation seat 41, the telescopic end of the electric push rod 42 is fixedly connected with the skylight 43 through bolts, and the whole construction of a suspended ceiling of a factory building is completed.
It should be noted that the electric push rod 42 disclosed in the present embodiment can be an electric push rod of model JN185T available from shandong buffalo transmission technology co.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a factory building large-span furred ceiling which characterized in that: comprises an installation wall body (1), a supporting structure (2), a roof (3) and an electric skylight structure (4);
installing the wall body (1): is a steel-concrete wall;
support structure (2): is arranged inside the installation wall body (1);
roof (3): the bottom surface of the roof (3) is fixedly connected with the top of the mounting wall body (1);
electric sunroof structure (4): the electric skylight structure is uniformly distributed on the top of the roof (3), and the electric skylight structure (4) is fixedly connected with the upper end of the outer side surface of the installation wall body (1);
wherein: the device is characterized by further comprising a control switch group (5), wherein the control switch group (5) is arranged at the lower end of the supporting structure (2), and the input end of the control switch group (5) is electrically connected with an external power supply.
2. The factory building large-span suspended ceiling of claim 1, wherein: bearing structure (2) are including crossbeam (21), support column (22), tripod (23) and spandrel girder (24), the inside of installation wall body (1) is equipped with crossbeam (21) along the central line symmetry of roof (3), the bottom surface of crossbeam (21) all is connected with the upper surface fixed connection of evenly distributed's tripod (23), the lower surface of tripod (23) all is connected with the upper surface fixed connection of spandrel girder (24), the left and right sides end of spandrel girder (24) respectively with the inner wall upper end fixed connection of installation wall body (1), the lower fixed surface of spandrel girder (24) is connected with evenly distributed's support column (22), support column (22) correspond the installation with tripod (23), support column (22) lower extreme of center department is equipped with control switch group (5).
3. The factory building large-span suspended ceiling of claim 2, wherein: roof (3) are including end supporting layer (31), heat insulation layer (32) and sun-proof layer (33), end supporting layer (31) set up in the upper surface of installation wall body (1), and the lower surface of end supporting layer (31) is connected with the upper surface fixed connection of crossbeam (21), and the upper surface fixed connection of end supporting layer (31) has heat insulation layer (32), and the upper surface of heat insulation layer (32) is connected with the lower fixed surface of sun-proof layer (33), and end supporting layer (31), heat insulation layer (32) and sun-proof layer (33) coincide and lay.
4. The factory building large-span suspended ceiling of claim 3, wherein: the upper surface on sun-proof layer (33) is equipped with evenly distributed's mounting groove (7), and mounting groove (7) are close to sun-proof layer (33) horizontal center line's one end and all are equipped with skylight opening (8), and mounting groove (7) are close to the one end of installing wall body (1) front and back side and all are equipped with and let a mouthful (6), let a mouthful (6) and skylight opening (8) all run through the lower surface on heat-insulating layer (32) and end brace layer (31).
5. The factory building large-span suspended ceiling of claim 4, wherein: electric skylight structure (4) are including mount pad (41), electric putter (42), skylight (43) and window frame (44), mount pad (41) evenly set up in the front and back lateral surface upper end of installation wall body (1), the equal fixedly connected with electric putter (42) of upper surface of mount pad (41), the equal fixedly connected with window frame (44) in inside of mounting groove (7), the inside of window frame (44) is close to horizontal central line one side of sun-proof layer (33) and all has skylight (43) through hinge joint, window frame (44), skylight (43) and skylight window (8) coincide and install, the flexible end of electric putter (42) passes corresponding abdicating mouthful (6) respectively and with the lower fixed surface of skylight (43) and be connected, the equal electricity connection control switch group's of input (5) of electric putter (42) output.
CN202021685450.6U 2020-08-13 2020-08-13 Factory building large-span furred ceiling Active CN213143550U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021685450.6U CN213143550U (en) 2020-08-13 2020-08-13 Factory building large-span furred ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021685450.6U CN213143550U (en) 2020-08-13 2020-08-13 Factory building large-span furred ceiling

Publications (1)

Publication Number Publication Date
CN213143550U true CN213143550U (en) 2021-05-07

Family

ID=75737456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021685450.6U Active CN213143550U (en) 2020-08-13 2020-08-13 Factory building large-span furred ceiling

Country Status (1)

Country Link
CN (1) CN213143550U (en)

Similar Documents

Publication Publication Date Title
US10808396B2 (en) Building based on large-space structure and freestanding external envelope as well as construction method
CN103711262B (en) A kind of curved surface aluminum-magnesium-manganese alloy roof plate system construction method
CN112196159B (en) Glass curtain wall construction structure and construction method thereof
CN105089178A (en) Fabricated building of pre-assembling structure of prefabricated section steel concrete shear wall
CN213143550U (en) Factory building large-span furred ceiling
CN109267695B (en) Light assembled prefabricated wallboard with connecting structure and installation method thereof
CN209686923U (en) Round tube combined support device and steel construction temporary construction support device
CN109505225B (en) Safe and stable suspension bridge and construction process thereof
CN212773578U (en) Independent support system of assembled building quick detach
CN110670803A (en) Half-box half-truss structure
CN211257308U (en) Assembled steel structure beam column connected node
CN212200935U (en) Assembled steel structure concrete side fascia, assembled steel structure girder steel and couple formula lightweight concrete side fascia node
CN210529752U (en) Contain coincide component multi-structure combination assembled piping lane
CN106906902B (en) Safe and stable steel structure building and construction process thereof
CN115012578B (en) Steel structure hollow truss grid unitized structure and construction method
CN112443052A (en) Indoor wall frame connection structure of assembly type building
CN202899295U (en) B type beam column fixing component used for door-window lintel
CN111042311A (en) Steel construction factory building
CN203613820U (en) Cold machining reinforcing device for angle braces
CN207314905U (en) Roofing steel purlin bar ruggedized construction for portal frame house
CN220203135U (en) Metal ridge structure of wooden ancient building
CN205421641U (en) Individual layer net shell I -shaped constructed of aluminium curtain system
CN214785231U (en) Light-duty roofing furred ceiling conversion layer connection structure of steel construction
CN213868295U (en) Assembled steel structure house
CN219298558U (en) Node waterproof construction based on roofing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A large-span suspended ceiling for factory buildings

Effective date of registration: 20231115