CN209686923U - Round tube combined support device and steel construction temporary construction support device - Google Patents

Round tube combined support device and steel construction temporary construction support device Download PDF

Info

Publication number
CN209686923U
CN209686923U CN201920082123.2U CN201920082123U CN209686923U CN 209686923 U CN209686923 U CN 209686923U CN 201920082123 U CN201920082123 U CN 201920082123U CN 209686923 U CN209686923 U CN 209686923U
Authority
CN
China
Prior art keywords
round tube
support device
gooseneck
truss
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920082123.2U
Other languages
Chinese (zh)
Inventor
蔡文文
袁晓民
荣浩宇
锦冠
王旻
严伟东
李晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Steel Structure Engineering Co Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201920082123.2U priority Critical patent/CN209686923U/en
Application granted granted Critical
Publication of CN209686923U publication Critical patent/CN209686923U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of round tube combined support device and steel construction temporary construction support device, is related to truss support technical field, the round tube combined support device, moulding bed pedestal and composite roof truss support construction;Composite roof truss support construction includes truss, multistage round tube, gooseneck and steel coupling beam;Multistage round tube is in turn connected to form at least two column round tubes along the vertical direction, and the round tube for being located at bottom is connect with moulding bed pedestal;Gooseneck and steel coupling beam are arranged in parallel both with respect to horizontal plane and are connected between each column round tube, and truss is respectively placed on gooseneck, and flexibility is lower when alleviating terminal pedestal fixed operation plate used in the prior art and is not easy to the technical problems such as operation.

Description

Round tube combined support device and steel construction temporary construction support device
Technical field
The utility model relates to technical field of building construction more particularly to a kind of round tube combined support devices and steel construction Temporary construction support device.
Background technique
Structural steelwork is high, big, new, point, special, weight project emerge one after another, with Super High skyscraper, large span venue, Bridge steel structure is that the structural steelwork of representative is quickly grown.Steel building has congenital excellent in assembled architecture evaluation Gesture, while carrying out actively pushing forward steel building throughout the country, matched assembling type steel structure construction technology is increasingly It is perfect.
Construction site scene steel member mainly uses fabricated construction mounting means, uses lifting by professional construction personnel Machinery lifts steel member in place, and connection is completed in high-altitude, and assembly is completed.Steel member or the steel member combination of on-site hoisting include steel Column, girder steel, bracing members, steel truss, Elements of Space Grid Truss etc., according to different steel construction types, there are ultralong overweight girder steels, large-tonnage steel truss Frame and Large Area Steel rack.Need to take that segmental hoisting, to be assembled into unit whole in steel member fabricated construction according to the actual situation Body lifting and construction technologies, the temporary support measure such as promotion and sliding are the key skills in above-mentioned Construction Technology of Steel Configuration Art.
In traditional steel construction temporary support measure at the construction field (site) in place of Shortcomings: strutting means sets up time length, consumption With personnel it is more, degree bottom can be had enough to meet the need, secondary use low efficiency, bearing capacity is not high, sets up process safety ensure it is insufficient.Interim branch The speed and exploitativeness that support measure is set up also determine the success or failure of entire engineering while determining the duration of a project.With building Build safety construction level rise year by year, lack of labor of constructing, how effectively to be promoted temporary support measure feasibility, improve Strutting means sets up efficiency and can have enough to meet the need generalization, is main research and improvement of the Construction of Steel Structure enterprise in fabricated construction Direction.
The scheme of prior art steel construction temporary support measure:
One, as shown in Figure 1, Bailey bracket combined support: using materials such as beret slice, H profile steels, being taken by 1 standard of Bailey bracket If mode carries out, assembling is set up and H profile steel intermediate structure layer converts multilayer truss support.After the completion of use, by Bailey bracket 1 gradually removes.Its major defect are as follows: supporting erection assembling is more many and diverse;When across intermediate truss, need to set up conversion fashioned iron, The verticality and stability requirement that conversion fashioned iron is set up are difficult to meet;The beret slice joint number of tissue is needed for different height truss It needs finely to arrange;Bearing capacity is limited.
Two, as shown in Fig. 2, steel pipe support: using certain wall thickness fished pipe, meet steel truss bearing capacity being computed Under the premise of successively set up, by with installed welding for steel structure connect realize higher level structural bearing.Its major defect are as follows: single The verticality that root steel pipe 2 supports requires height, and stability is difficult to meet;Two layers of truss fully rely on bottom truss load and erect steel pipe branch Support, is affected to structure itself, needs truss to lift and weld and completes;Bearing capacity is limited.
In consideration of it, can be solved there is an urgent need to a kind of round tube combined support device and steel construction temporary construction support device The certainly above problem.
The information disclosed in the background technology section is intended only to deepen the reason to the general background technology of the utility model Solution, and it is known to those skilled in the art existing to be not construed as recognizing or imply that the information is constituted in any form Technology.
Utility model content
The first of the utility model is designed to provide a kind of round tube combined support device, is carried in the prior art with alleviating Ability is low, strutting means sets up low efficiency and can have enough to meet the need the technical problem of generalization difference.
To achieve the goals above, the utility model uses following technical scheme:
A kind of round tube combined support device provided by the utility model, including moulding bed pedestal and composite roof truss support construction;
The composite roof truss support construction includes truss, multistage round tube, gooseneck and steel coupling beam;
Round tube described in multistage is in turn connected to form at least two column round tubes along the vertical direction, and the round tube for being located at bottom is equal It is connect with the moulding bed pedestal;
The gooseneck and steel coupling beam are arranged in parallel both with respect to horizontal plane and are connected between each column round tube, described Truss is respectively placed on the gooseneck.
In the above-mentioned technical solutions, further, pass through welding phase between the round tube and gooseneck, steel coupling beam respectively Even.
In any of the above-described technical solution, further, the gooseneck bottom is fixedly connected on institute by triangle gusset It states on round tube.
In any of the above-described technical solution, further, the truss adjusts section by square tube and is installed on the gooseneck On.
In any of the above-described technical solution, further, between the round tube and round tube and round tube and moulding bed pedestal it Between pass through round tube adjust section connection.
In any of the above-described technical solution, further, the round tube adjusts section and includes tube body and be located at the tube body The first flange disk at both ends is fixedly connected between the first flange disk and the tube body by triangle gusset.
In any of the above-described technical solution, further, the tube ends are provided with second flange disk, the round tube with The round tube is adjusted to be connected by first flange disk with the docking of second flange disk between section.
In any of the above-described technical solution, further, the moulding bed base upper surface is equipped with junction steel plate, the circle It is weldingly connected between pipe and the moulding bed base upper surface by first flange disk and junction steel plate.
In any of the above-described technical solution, further, the moulding bed base bottom is fixed on concrete by built-in fitting In.
The second of the utility model is designed to provide a kind of steel construction temporary construction support device, to alleviate the prior art In bearing capacity is low, strutting means sets up low efficiency and can have enough to meet the need the technical problems such as generalization difference.
The utility model also provides a kind of steel construction temporary construction support device, fills including above-mentioned round tube combined support It sets.
The utility model has the following beneficial effects:
A kind of round tube combined support device provided by the utility model, including moulding bed pedestal and composite roof truss support construction; The composite roof truss support construction includes truss, multistage round tube, gooseneck and steel coupling beam;Round tube described in multistage along the vertical direction according to Secondary connection forms at least two column round tubes, and the round tube for being located at bottom is connect with the moulding bed pedestal;The gooseneck and Steel coupling beam is arranged in parallel both with respect to horizontal plane and is connected between each column round tube, and it is horizontal that the truss is respectively placed in the steel Liang Shang.
It simplifies each modular construction compared to traditional Bailey bracket support and the support of lattice moulding bed, the utility model and sets Meter, using round tube instead of beret slice and a large amount of rod pieces of lattice, saves a large amount of material purchases expense and cost of manufacture; The combination of multistage round tube easily realizes the installation support of the truss of different height, reduces the complexity of support device, improves branch The installation effectiveness of support arrangement, at least two column round tubes ensure that structural stability, increase integrally-built bearing capacity;Round tube combination Support device occupies little space, and is conducive to the cross-operation of multi-process and the crossed construction of other professions;The utility model adapts to Property wide, the especially construction of assembled arthitecutral structure, in addition to be suitable for steel truss, part ultralong overweight girder steel, cantilevered structure are Installation as prefabricated concrete structure prefabricated components can be used, and it is stronger can to have enough to meet the need generalization.
A kind of steel construction temporary construction support device provided by the utility model is filled including above-mentioned round tube combined support It sets.
It should be noted that the structure of round tube combined support device and the beneficial effect of generation have elaborated, so Details are not described herein.
Detailed description of the invention
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art Under the premise of labour, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of Bailey bracket combined support in the prior art;
Fig. 2 is the structural schematic diagram of round tube support in the prior art;
Fig. 3 is the structural schematic diagram for the round tube combined support device that embodiment provides;
Fig. 4 is the structural schematic diagram for the moulding bed pedestal that embodiment provides;
Fig. 5 is the structural schematic diagram that the moulding bed pedestal that embodiment provides is connect with round tube;
Fig. 6 is the structural schematic diagram that the gooseneck that embodiment provides is connect with round tube;
Fig. 7 is the structural schematic diagram for the round tube that embodiment provides;
Fig. 8 is the structural schematic diagram of the installation process of built-in fitting and moulding bed pedestal that embodiment provides;
Fig. 9 is the structural schematic diagram of the assembled process for the composite roof truss support construction that embodiment provides;
Figure 10 is the structural schematic diagram of the installation process for the round tube combined support device that embodiment provides.
Icon: 1- Bailey bracket;The single steel pipe of 2-;10- round tube;11- second flange disk;20- moulding bed pedestal;21- built-in fitting; 22- junction steel plate;23- stiffened panel;24- steel plate;30- round tube adjusts section;31- first flange disk;32- tube body;40- gooseneck; 50- steel coupling beam;60- square tube adjusts section;70- triangle gusset;80- truss;90- cable wind rope.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention, originally Field those of ordinary skill every other embodiment obtained without making creative work belongs to practical Novel protected range.
In the description of the present invention, it should be noted that term " first ", " second " are used for description purposes only, and It cannot be understood as indicating or implying relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition The concrete meaning of language in the present invention.
Embodiment one
As shown in Fig. 1-Fig. 7, a kind of round tube combined support device provided in this embodiment, including moulding bed pedestal 20 and combination 80 support construction of truss;80 support construction of composite roof truss includes truss 80, multistage round tube 10, gooseneck 40 and steel coupling beam 50;It is more Duan Yuanguan 10 is in turn connected to form at least two column round tubes 10 along the vertical direction, and be located at the round tube 10 of bottom with moulding bed pedestal 20 Connection;Gooseneck 40 and steel coupling beam 50 are arranged in parallel both with respect to horizontal plane and are connected between each column round tube 10, and truss 80 divides It is not placed on gooseneck 40.
Compared to traditional Bailey bracket support and the support of lattice moulding bed, this embodiment simplifies the design of each modular construction, Using round tube 10 instead of beret slice and a large amount of rod pieces of lattice, a large amount of material purchases expense and cost of manufacture are saved; Multistage round tube 10 combines the installation support for easily realizing the truss 80 of different height, reduces the complexity of support device, mentions The installation effectiveness of high support device, at least two column round tubes 10 ensure that structural stability, increase integrally-built bearing capacity;Circle Pipe combined support device occupies little space, and is conducive to the cross-operation of multi-process and the crossed construction of other professions;The present embodiment The construction of wide adaptability, especially assembled arthitecutral structure, in addition to being suitable for steel truss 80, part ultralong overweight girder steel, overhanging The installation of structure or even prefabricated concrete structure prefabricated components can be used, and it is stronger can to have enough to meet the need generalization.
In the optinal plan of the present embodiment, it is connected by welding respectively between round tube 10 and gooseneck 40, steel coupling beam 50.
In the optinal plan of the present embodiment, 40 bottom of gooseneck is fixedly connected on round tube 10 by triangle gusset 70.
In the optinal plan of the present embodiment, truss 80 adjusts section 60 by square tube and is installed on gooseneck 40.
In the optinal plan of the present embodiment, pass through between round tube 10 and round tube 10 and between round tube 10 and moulding bed pedestal 20 Round tube adjusts section 30 and connects.Further, it includes tube body 32 and the first flange positioned at 32 both ends of tube body that round tube, which adjusts section 30, Disk 31 is fixedly connected between first flange disk 31 and tube body 32 by triangle gusset 70.On the one hand, 10 both ends of round tube are provided with Two ring flanges 11, round tube 10 is adjusted with round tube to be connected between section 30 by first flange disk 31 and the docking of second flange disk 11.Separately On the one hand, 20 upper surface of moulding bed pedestal is equipped with junction steel plate 22, passes through first between 20 upper surface of round tube 10 and moulding bed pedestal Ring flange 31 and junction steel plate 22 are weldingly connected.
In the optinal plan of the present embodiment, 20 bottom of moulding bed pedestal is fixed in concrete by built-in fitting 21, and moulding bed 20 bottom of pedestal is provided with stiffened panel 23.
Some other schemes of the present embodiment, the connection of gooseneck 40 and steel coupling beam 50 and round tube 10 can be in strutting means Scheme is bolted to replace being welded to connect, it is higher that round tube combined support device peace tears more saving material, turnover rate open.Moulding bed bottom Seat 20 can be used subgrade case or the sufficiently large fashioned iron of other areas set up made of the pedestal that can carry.
The round tube combined support device of the present embodiment is mainly made of several parts: moulding bed pedestal 20,200mm round tube adjust section 30, Φ 609*16 round tube 10,700*300*13*24 gooseneck 40,200*200*8*12 steel coupling beam 50,600*600*13 square tube tune Segment 60.Wherein, it is the round tube with ring flange Yu triangle gusset 70 that Φ 609*16 round tube 10 and 200mm round tube, which adjust section 30, 10, moulding bed pedestal 20 is by 350*350*12*19 processing and fabricating.Principle: Φ 609*16 round tube 10,700*300*13*24 gooseneck 40,200*200*8*12 steel coupling beam 50 is combined into 80 support construction of composite roof truss by being welded to connect, and mainly holds as truss 80 Power component.The position of 700*300*13*24 gooseneck 40 adjusts 60 sub-truss of section by 600*600*13 square tube in the structure 80 dead loads, Φ 609*16 round tube 10 adjust section 30 and 20 power transmission of moulding bed pedestal to ground by 200mm round tube.Φ609*16 Round tube 10 by ring flange connection continues that other round tubes 10 are installed, on the basis of not influencing first layer 80 mounting structure of truss according to This analogizes composition 80 mounting structure of second layer truss, for carrying second layer truss 80.Φ 609*16 round tube 10 includes a variety of length Metric lattice can arrange in pairs or groups and select 80 structure of truss for being applicable in different height, and adjust section 60 by 600*600*13 square tube and carry out High fine-tuning.200mm round tube adjusts the company of second flange disk 11 that 30 one end of section is first flange disk 31 and Φ 609*16 round tube 10 It connects, the junction steel plate 22 of the other end and moulding bed pedestal 20 welds, and the verticality of adjustable Φ 609*16 round tube 10 and is convenient for The bolt penetration hole of first flange disk 31 and second flange disk 11.
The present embodiment passes through in 40 power transmission of gooseneck at least two column round tubes 10, and carries out stress, round tube by round tube 10 10 be multistage, can increase height segment and realize that strutting means continues to carry across floor structure;Moulding bed pedestal 20 and round tube 10 Connection, section 30 can be adjusted using fashioned iron stiffened panel 23 or junction steel plate 22 and round tube;The connection of gooseneck 40 and steel pipe, Fashioned iron stiffened panel 23 or triangle gusset 70 can be used: round tube 10 is detachable and by first flange disk 31 and second flange disk 11 and bolt realize it is detachable.
Embodiment two
As Figure 8-Figure 10, a kind of steel construction temporary construction support device provided in this embodiment, comprising the following steps: Built-in fitting 21 is installed: moulding bed pedestal 20 and assembling reinforcement carry out welding positioning and form built-in fitting 21, and concrete vibrating is laggard 21 position repetition measurement of row built-in fitting;Moulding bed pedestal 20 is installed: 20 position of moulding bed pedestal is determined, by concrete raised face chipping, pre- Junction steel plate 22 is added on embedded part 21 and is leveled, and junction steel plate 22 and 21 weld all around of built-in fitting are formed into moulding bed pedestal 20;Combine purlin Frame 80 support construction is assembled, will adjust the docking of section 30 by round tube between round tube 10 and be connected, on round tube 10 installation gooseneck 40, Steel coupling beam 50, lifting ear plate, steel ladder and operating platform form 80 support construction of composite roof truss;Round tube combined support device peace Dress lifts 80 support construction of composite roof truss that assembly is completed on the junction steel plate 22 on moulding bed pedestal 20 and welding.
The present embodiment simplifies support installation, dismounting and secondary use process, improves the efficiency of installation and dismounting, facilitates peace It tears open and shifts, saved a large amount of duration;Adjusting section 30 by round tube realizes strutting means to the support knot of bottom truss 80 The installation of structure without influence under the premise of continuously support across floor, reduce the installation of support jig multiple bearing difficulty and when Between, while the continuous productive process of the combination installation of multilayer truss 80 is realized, also farthest guarantee 80 Construction of Supporting of main body truss Safety, generalization height can be had enough to meet the need.
Specifically, built-in fitting 21 is installed: the built-in fitting 21 of moulding bed pedestal 20 is installed, and is inserted into before civil engineering casting concrete, Built-in fitting 21 carries out welding positioning with assembling reinforcement after completing surveying setting-out before installing, and carries out built-in fitting after concrete vibrating 21 position repetition measurements;Moulding bed pedestal 20 is installed: before moulding bed pedestal 20 is installed, needing first to have provided according to according in moulding bed floor plan Coordinate points and point with the relationship of axis determine 20 position of moulding bed pedestal, concrete plate surface pours not usually, and concrete is prominent Face chipping is added steel plate 24 and is leveled on embedded part, adds steel plate 24 less than 21 panel of built-in fitting and is greater than section steel flange, with 21 panel weld all around of built-in fitting.The installation of 80 support construction of composite roof truss: before the support installation of round tube 10, carrying out assembly on ground first, The assembly of first pitch circle pipe 10 includes the installation that round tube adjusts section 30, and round tube adjusts section 30 and is transported to scene, round tube tune by factory process Segment 30 has first flange disk 31, and scene is connected by M24*90 bolt and the first flange disk 31 of 10 segment of round tube, Head section support gooseneck 40, steel coupling beam 50, lifting ear plate, steel ladder and operating platform are mounted on round tube 10 on ground simultaneously On, form door cabinet frame form;The junction steel plate 22 in composite door cabinet frame integral hoisting to moulding bed pedestal 20 completed to assembly is simultaneously Welding.Finally with respect to the fixation of truss 80, actual measurement is carried out to 40 absolute altitude of gooseneck, compares, obtains with 80 lower edge absolute altitude of truss Square tube adjusts 60 length of section out, and on ground, interception square tube is lifted after adjusting 60 length of section to 40 upper surface square tube sealing plate of gooseneck, It is welded and fixed, is installed post-tensioning and sets enhancing 10 Out-of-plane Stability of round tube of cable wind rope 90.
It should be noted that round tube combined support device structure and generation beneficial effect in example 1 in detail Thin to illustrate, so the present embodiment is related to the specific effect of round tube combined support device, details are not described herein.
Finally, it should be noted that the above various embodiments is only to illustrate the technical solution of the utility model, rather than it is limited System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should Understand: it is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of Technical characteristic is equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution, and this is practical new The range of each embodiment technical solution of type.

Claims (10)

1. a kind of round tube combined support device, which is characterized in that including moulding bed pedestal and composite roof truss support construction;
The composite roof truss support construction includes truss, multistage round tube, gooseneck and steel coupling beam;
Round tube described in multistage is in turn connected to form at least two column round tubes along the vertical direction, and is located at the round tube of bottom and institute State the connection of moulding bed pedestal;
The gooseneck and steel coupling beam are arranged in parallel both with respect to horizontal plane and are connected between each column round tube, the truss It is respectively placed on the gooseneck.
2. round tube combined support device according to claim 1, which is characterized in that the round tube and gooseneck, steel coupling beam Between be connected by welding respectively.
3. round tube combined support device according to claim 1 or 2, which is characterized in that the gooseneck bottom passes through three Angle gusset is fixedly connected on the round tube.
4. round tube combined support device according to claim 1, which is characterized in that the truss adjusts Duan An by square tube Loaded on the gooseneck.
5. round tube combined support device according to claim 1, which is characterized in that between the round tube and round tube and round Section connection is adjusted by round tube between pipe and moulding bed pedestal.
6. round tube combined support device according to claim 5, which is characterized in that the round tube adjust section include tube body with And the first flange disk positioned at the tube body both ends, connect between the first flange disk and the tube body by the way that triangle gusset is fixed It connects.
7. round tube combined support device according to claim 6, which is characterized in that the tube ends are provided with the second method Blue disk, the round tube is adjusted with the round tube to be connected between section by first flange disk and the docking of second flange disk.
8. round tube combined support device according to claim 6, which is characterized in that the moulding bed base upper surface is equipped with Junction steel plate is weldingly connected between the round tube and the moulding bed base upper surface by first flange disk and junction steel plate.
9. round tube combined support device according to claim 1 or 8, which is characterized in that the moulding bed base bottom passes through Built-in fitting is fixed in concrete.
10. a kind of steel construction temporary construction support device, which is characterized in that including the described in any item round tubes of claim 1-9 Combined support device.
CN201920082123.2U 2019-01-17 2019-01-17 Round tube combined support device and steel construction temporary construction support device Active CN209686923U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920082123.2U CN209686923U (en) 2019-01-17 2019-01-17 Round tube combined support device and steel construction temporary construction support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920082123.2U CN209686923U (en) 2019-01-17 2019-01-17 Round tube combined support device and steel construction temporary construction support device

Publications (1)

Publication Number Publication Date
CN209686923U true CN209686923U (en) 2019-11-26

Family

ID=68599203

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920082123.2U Active CN209686923U (en) 2019-01-17 2019-01-17 Round tube combined support device and steel construction temporary construction support device

Country Status (1)

Country Link
CN (1) CN209686923U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723236A (en) * 2019-01-17 2019-05-07 中建钢构有限公司 Round tube combined support device and round tube combined support device building method
CN113882712A (en) * 2021-10-26 2022-01-04 中国建筑第二工程局有限公司 Temporary support reinforcing method for large-scale suspension type steel structure construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723236A (en) * 2019-01-17 2019-05-07 中建钢构有限公司 Round tube combined support device and round tube combined support device building method
CN113882712A (en) * 2021-10-26 2022-01-04 中国建筑第二工程局有限公司 Temporary support reinforcing method for large-scale suspension type steel structure construction
CN113882712B (en) * 2021-10-26 2023-02-03 中国建筑第二工程局有限公司 Temporary support reinforcing method for large-scale suspension type steel structure construction

Similar Documents

Publication Publication Date Title
CN201128956Y (en) Assembled integral flat-plate or curve type vierendeel steel lattice structure
CN102912972B (en) Multifunctional lifting steel platform switching jig and construction method
CN207944590U (en) A kind of assembled steel frame-prefabricated steel reinforced concrete shear wall structure system
CN101451378A (en) 'Drip shaped' radial monolayer steel pipe reticulated shell block and installation method
CN209686923U (en) Round tube combined support device and steel construction temporary construction support device
CN109868726A (en) A kind of prefabricated assembled cylindricality bridge pier and its construction method
CN114837483B (en) High-low span portal steel frame building structure and construction process thereof
CN105568854A (en) Construction method of overwater curved fish-bellied cast-in-place reinforced concrete box girder
CN104674665A (en) Installation method for corridor bridge of large space steel structure
CN207714108U (en) A kind of support system of the more arcading arched aqueducts of large span or bridge
CN116770980A (en) Ultra-long variable-height V-shaped large-span steel structure corridor and construction method thereof
CN210420862U (en) Stay cable tower end anchoring device
CN108204039A (en) A kind of assembled architecture truss structure
CN209555972U (en) A kind of side's arch piping lane erection support and piping lane system
CN207905104U (en) A kind of assembled architecture truss structure
CN110939067A (en) Method for determining position of bridge closure section of collaboration system
CN202913677U (en) Multifunctional conversion scaffold capable of lifting steel platform
CN109610707A (en) A kind of design and rapid constructing method of prefabricated girder steel and floor fit flush
CN109505225A (en) A kind of safe and stable type suspension bridge and its construction technology
CN109723236A (en) Round tube combined support device and round tube combined support device building method
CN211257308U (en) Assembled steel structure beam column connected node
CN210657956U (en) Pier is assembled to prefabricated tubular column of truss-like
CN204212261U (en) Post and curved beam horizontal flexibility connection space structural system
CN208685457U (en) Cast-in-place box beam bracket device
CN208803631U (en) Light steel grating concrete superposed column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Science And Industry Co.,Ltd.

Address before: 518000 Guangdong city of Shenzhen province Nanshan District Guangdong streets Center Road No. 3331 steel built in 27 storey building room 2701

Patentee before: China Construction Steel Structure Corp.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220921

Address after: Room 1908, Chengtou Xin Times Building, No. 2009, Pingshan Avenue, Liulian Community, Pingshan Street, Pingshan District, Shenzhen 518000

Patentee after: China Construction Steel Engineering Co.,Ltd.

Address before: 3801, 38 / F, China Construction Science and engineering building, No. 3331, Weilan Coast Community Central Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee before: China Construction Science And Industry Co.,Ltd.