CN213114667U - Temporary slope protection device for traffic engineering construction management - Google Patents

Temporary slope protection device for traffic engineering construction management Download PDF

Info

Publication number
CN213114667U
CN213114667U CN202020789416.7U CN202020789416U CN213114667U CN 213114667 U CN213114667 U CN 213114667U CN 202020789416 U CN202020789416 U CN 202020789416U CN 213114667 U CN213114667 U CN 213114667U
Authority
CN
China
Prior art keywords
fixed
fixing
slope
protection device
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020789416.7U
Other languages
Chinese (zh)
Inventor
程静
田亮
刘阳
刘艳丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Agricultural University
Original Assignee
Yunnan Agricultural University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Agricultural University filed Critical Yunnan Agricultural University
Priority to CN202020789416.7U priority Critical patent/CN213114667U/en
Application granted granted Critical
Publication of CN213114667U publication Critical patent/CN213114667U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a traffic engineering construction management is with interim bank protection device, fixed connection's protection network between the dead lever of multisection separation including left and right sides symmetry and the both sides dead lever, the lower surface of every dead lever is fixed with the fixed needle of slope respectively, evenly is provided with a plurality of curved fixed picture pegs on the protection network, and the one end of fixed picture peg is arranged in inserting the soil slope, and the dead lever at both sides top is fixed with the fixed plate of a lower surface area fixed hook respectively through fixed chain. The utility model discloses at first fixed plate and the fixed hook through the top are fixed, and the both sides of protection network also have fixed knot and construct, and a plurality of fixed picture pegs of fixed on the protection network, the one end of fixed picture peg are inserted in the soil slope, not only can form a plurality of fixed points, further form comprehensive fixed to the protection network, provide an amount of water for vegetation growth better, also do benefit to and provide fixed position for the seed, are convenient for carry out the even planting vegetation of large tracts of land on the soil slope.

Description

Temporary slope protection device for traffic engineering construction management
Technical Field
The utility model relates to a bank protection device, a traffic engineering construction management is with interim bank protection device specifically says so.
Background
With the development of social economy and the increase of highway construction engineering in China, because the side slope excavated in the highway construction damages the original vegetation cover layer, severe landslide and water and soil loss are caused, the degradation of an ecological system is caused, and the national property safety and the life safety of people are seriously harmed, so that the strengthening of the slope protection stability is very important, the strengthening of the slope protection stability not only can provide a basis for engineering construction, but also has an important effect on slope protection strengthening and accurate prediction of landslide.
The side slope disaster not only seriously harms national property and life safety of people, but also has great influence on ecological balance and ecological environment, and the current departments of traffic, water conservancy, mine, municipal administration and the like all relate to the side slope problem, so that the side slope stability research has important significance. The slope stability research is mainly established on soil mechanics and soil mechanics, so the development and achievement of the two disciplines have a decisive effect on the degree of the slope research. The factors influencing the stability of the side slope mainly include external factors and internal factors, wherein the external factors mainly include earthquakes, engineering load conditions, water action, rock mass weathering degree and human factors, the internal factors mainly include the landform characteristics of the side slope, geological structure, rock-soil body structure, the properties of the rock-soil body and the like, wherein the rock-soil body has a control effect on the stability of the side slope and slope toe and slope height, and in areas with complicated geological structure, strong folds and active new structure movement, the side slope has the worst stability, and the phenomena of mountain landslide easily occur in areas with broken fault zones or abundant underground water and severe weathering.
At present in traffic engineering work progress, some highway section sloping fields need protect temporarily to in the safety of guaranteeing the construction, however current soil slope protection structure inconvenient planting vegetation when in-service use generally only has reticular guard action, is unfavorable for demolising the firmness that improves the soil slope behind the interim bank protection device.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model aims at providing a traffic engineering construction management is with interim bank protection device.
In order to achieve the above purpose, the technical scheme of the utility model is that: the utility model provides a traffic engineering construction management is with interim bank protection device, fixed connection's protection network between the dead lever of multisection separation including left and right sides symmetry and the both sides dead lever, the lower surface of every dead lever is fixed with the fixed needle of slope respectively, evenly is provided with a plurality of curved fixed picture pegs on the protection network, and the one end of fixed picture peg is arranged in inserting the soil slope, and the dead lever at both sides top is fixed with the fixed plate of a lower surface area fixed hook respectively through fixed chain.
Furthermore, the tip of the fixing needle and the tip of the fixing hook are respectively provided with barbs.
Furthermore, the fixing plug board further comprises a U-shaped reverse buckle sleeved at the upper end of the fixing plug board, one end of the U-shaped reverse buckle is fixedly connected with a pull rod with a pull ring, and the main body of the U-shaped reverse buckle is perpendicular to the pull rod.
Through the arrangement, the utility model is firstly fixed by the fixing plate and the fixing hook at the top, a certain pulling fixing effect is formed at the top of the protective net, in addition, both sides of the protective net are also provided with fixing structures, namely a plurality of fixing rods and the fixing needle of each fixing rod, the plurality of fixing rods form a structure which can be bent, so that each fixing rod can be better attached and fixed with a soil slope, a plurality of fixing inserting plates are fixed on the protective net, one end of each fixing inserting plate is inserted into the soil slope, not only a plurality of fixing points can be formed, further the protective net can be comprehensively fixed, but also the fixing inserting plates are of tile-shaped structures, namely the concave surfaces face downwards, the part of each fixing inserting plate inserted into the ground is formed into a structure similar to a water groove structure tightly attached to the ground, so as to accommodate the seeds of plants, store a certain amount of water when raining, better, because the arc structure groove structure who forms, it is inevitable more than the moisture that directly plants the seed on the soil slope and obtain, also do benefit to in addition for the seed provides fixed position, be convenient for carry out the even planting vegetation of large tracts of land on the soil slope, be convenient for demolish the back at interim slope protection device, further carry out the plant reinforcement to the soil slope through the vegetation of planting.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic cross-sectional structure view of the fixing board of the present invention.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The present embodiment is described in detail below with reference to the accompanying drawings:
this embodiment provides a temporary slope protection device for traffic engineering construction management, please refer to fig. 1 and fig. 2 in the drawings of the specification together.
As shown in fig. 1 and 2, the temporary slope protection device for traffic engineering construction management comprises a plurality of symmetrical left and right sides, a plurality of separated fixing rods 1 and a protection net 2 fixedly connected between the fixing rods 1, the protection net 2 can be woven by steel wire ropes or nylon ropes, the lower surface of each fixing rod 1 is respectively fixed with an inclined fixing needle 3, the protection net 2 is evenly provided with a plurality of arc-shaped fixing insertion plates 4, one end of each fixing insertion plate 4 is used for being inserted into a soil slope, and the fixing rods 1 at the top of the two sides are respectively fixed with a fixing plate 7 with a fixing hook 6 on the lower surface through fixing chains 5.
The utility model is installed on a soil slope, firstly, the fixing is carried out through the fixing plate 7 and the fixing hook 6 at the top, a certain pulling fixing function is formed at the top of the protective net 2, in addition, both sides of the protective net 2 are also provided with a fixing structure, namely a plurality of fixing rods 1 and the fixing needles 3 of each fixing rod 1, a plurality of fixing rods 1 form a structure which can be bent, so that each fixing rod 1 can be better attached and fixed with the soil slope, a plurality of fixing inserting plates 4 are fixed on the protective net 2, one end of each fixing inserting plate 4 is inserted into the soil slope, a plurality of fixing points can be formed, further, the protective net is comprehensively fixed, the fixing inserting plates 4 are tile-shaped structures, namely, the concave surfaces face downwards, the parts of each fixing inserting plate 4, which are inserted into the ground, are similar to a water groove structure which is tightly attached to the ground, so as to contain, better for plant growth provides a quantitative water, because the arc structure groove structure who forms, it is certainly more than the moisture that directly plants the seed on the slight slope and obtain, and also do benefit to and provide fixed position for the seed, be convenient for carry out the even planting vegetation of large tracts of land on the slight slope, remove protection network 2, directly extract 4 picture pegs of every fixed picture peg can, and can not hinder the vegetation of growing, because, interim slope protection device vegetation generally plants and grows and can not very much, so make the vegetation pass fixed picture peg 4 easily, be convenient for take off the protection network.
In order to further improve the fastness that stationary needle 3, stationary hook 6 inserted the soil slope, the point portion of stationary needle 3, stationary hook 6 is provided with barb 8 respectively.
In order to plant the seeds of the plants in the soil slope, the plant planting device further comprises a U-shaped reverse buckle 9 which is used for being sleeved at the upper end of the fixed inserting plate 4, one end of the U-shaped reverse buckle 9 is fixedly connected with a pull rod 10 with a pull ring 11, the main body of the U-shaped reverse buckle 9 is perpendicular to the pull rod 10, when the plant planting device is used, one end of the fixed inserting plate 4 is used for being inserted into the soil slope, the seeds are placed on the fixed inserting plate 4, at the moment, the U-shaped reverse buckle 9 is clamped at the upper end of the fixed inserting plate 4, then the pull ring 11 is pulled downwards, the pull rod 10 is driven to pull the U-shaped reverse buckle 9, the fixed inserting plate 4 is pulled downwards equivalently, as shown in a figure 2, the part, which is in contact with the soil, of the fixed inserting plate 4 is pulled downwards to form a gap, the fixed inserting plate 4 cannot be pulled out.
Of course, the above embodiments are only used for illustrating the technical solution of the present invention, and not for limiting the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention.

Claims (3)

1. The utility model provides a traffic engineering construction management is with interim bank protection device which characterized in that: the soil slope fixing device comprises a plurality of symmetrical multi-section separated fixing rods (1) on the left side and the right side and a protection net (2) fixedly connected between the fixing rods (1) on the two sides, wherein the lower surface of each fixing rod (1) is respectively fixed with an inclined fixing needle (3), a plurality of arc-shaped fixing insertion plates (4) are uniformly arranged on the protection net (2), one end of each fixing insertion plate (4) is used for being inserted into a soil slope, and the fixing rods (1) on the top of the two sides are respectively fixed with a fixing plate (7) with fixing hooks (6) on the lower surface through fixing chains (5).
2. The temporary slope protection device for traffic engineering construction management according to claim 1, characterized in that: the tip parts of the fixing needle (3) and the fixing hook (6) are respectively provided with barbs (8).
3. The temporary slope protection device for traffic engineering construction management according to claim 1, characterized in that: the plug board is characterized by further comprising a U-shaped reverse buckle (9) sleeved at the upper end of the fixed plug board (4), one end of the U-shaped reverse buckle (9) is fixedly connected with a pull rod (10) with a pull ring (11), and the main body of the U-shaped reverse buckle (9) is perpendicular to the pull rod (10).
CN202020789416.7U 2020-05-13 2020-05-13 Temporary slope protection device for traffic engineering construction management Expired - Fee Related CN213114667U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020789416.7U CN213114667U (en) 2020-05-13 2020-05-13 Temporary slope protection device for traffic engineering construction management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020789416.7U CN213114667U (en) 2020-05-13 2020-05-13 Temporary slope protection device for traffic engineering construction management

Publications (1)

Publication Number Publication Date
CN213114667U true CN213114667U (en) 2021-05-04

Family

ID=75668719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020789416.7U Expired - Fee Related CN213114667U (en) 2020-05-13 2020-05-13 Temporary slope protection device for traffic engineering construction management

Country Status (1)

Country Link
CN (1) CN213114667U (en)

Similar Documents

Publication Publication Date Title
CN202672096U (en) Vegetated interlocking protective slope building block and vegetated interlocking protective slope
CN201704636U (en) Novel active protecting net
CN101502223A (en) Slope soil-establishing greening apparatus and method
CN106400819A (en) Soil slope collapsing treatment system and construction method thereof
CN213114667U (en) Temporary slope protection device for traffic engineering construction management
CN103650694B (en) A kind of erosion gully reclamation method
CN210946838U (en) Can afforest terraced fields slope reinforced structure
CN206189423U (en) Ecological protection anchor system of rock slope
CN205591233U (en) High -steep soil nail grass planting slope protection structure system
CN218346206U (en) Deep cutting slope protection device
CN208183655U (en) A kind of Channel slope guard system
CN211228546U (en) Slope protection greening structure
CN212801574U (en) High steep rock slope afforestation protective structure
CN205894022U (en) Water conservancy slope protection net
CN211571752U (en) Landscape garden design ecological slope protection
CN208266862U (en) A kind of sleeve, anchor pole and slope protection system
CN113338312A (en) Ecological bank protection structure of coconut palm soil bag
CN203113354U (en) Slope protection structure
CN207904941U (en) A kind of environmental-friendly flexible shotcrete slope protection net structure
CN217174845U (en) Hilly mountain area is with ecological grass planting type bank protection gabion
KR100970161B1 (en) Wired bag for steel tower construction of power cable railroad
CN206204960U (en) A kind of expansive soil slope RC circular pipe safeguard structure
CN219951995U (en) Abrupt slope supporting construction
CN218911459U (en) Lattice beam type slope V-shaped groove
CN217438971U (en) Geotechnical engineering side slope reinforcing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210504